450:—These are the main structural components of the bridge trusses. They are welded items comprising top and bottom chords interconnected by vertical and diagonal bracing. At the end of each panel, chords terminate in male lugs or eyes and at the other end in female lugs or eyes. This allows panels to be pinned together to form the bridge span. There are two different panels; a Super Panel and a High Shear Super Panel. The High Shear Super Panel is used at each end of the bridge span depending upon the loading criteria. 22: 486:—The slope or profile of the ramps can be adjusted to allow for the passage of a range of civilian and military traffic. The length of a standard ramp at each end of the bridge is 13.5m. The ramps are bolted to the grillages and use standard deck units supported on special transoms. These transoms can be positioned at a variety of heights depending upon the set adopted with a special ramp post. The interface between the ramp and ground is a special toe ramp unit (1.5m) 480:—On greenfield sites and when being used as an over bridge, ground beams are available that form an assembly which transmits all dead and live forces from the bridge into the ground. For a 40m (MLC80T/110W) bridge the ground bearing pressure is 200 kN/m2. The grillages are located on the top of the ground beams and accommodate the bridge bearings as well as the head of the ramp transom. 412: 81: 124: 172: 428: 164: 420: 154:
Beyond the need for the re-opening of communications, Logistic Support Bridge-based equipment (Compact 200) can be used as a rescue bridge for relief in natural disaster situations or as a civilian bridge for semi-permanent bridging to open up communications in some of the most remote regions of the
511:
pontoon units, Landing Piers consisting of 16 pontoon units, and Intermediate Piers which consist of 8 pontoons each. Hand winches are mounted on steel trays which are bolted to the pontoons. The anchors are connected to the hand winches and pontoons via steel chain and polypropylene ropes. Special
134:
The Logistic Support Bridge is a non-assault bridge for the movement of supplies and the re-opening of communications. It is a low-cost system that can be used widely throughout the support area, as well as for a range of defined applications. All types of vehicles including civilian vehicles with
114:
and general support bridges and to provide a long span floating bridge capability. The bridge is a variant of the Mabey Compact 200 bridge, with alterations made to suit the military user as well as a ramp system to provide ground clearance to civilian and military vehicles.
468:—Unlike wooden Bailey decks, the steel LSB decks are 1.05m x 3.05m and are manufactured using robotic welding technology. The decks are manufactured to have a long fatigue life and with durbar/checkered plate finish. The decks withstand both wheeled and tracked vehicles. 436: 515:
If the bridge is relatively short in terms of the number of spans, it may be possible to launch the complete bridge from one bank. On a long span bridge, launching intermediate spans and floating them into position on intermediate piers is more practical.
462:—These are fabricated from universal beams and form the cross girders of the bridge, spanning between the panels and carrying the bridge deck. The transom is designed for the appropriate loading criteria and for LSB is designed to accommodate MLC80T/110W. 495:
The bridge can be constructed by the cantilever launch method without the need for any temporary intermediate support. This is achieved by erecting a temporary launching nose at the front of the bridge and pushing the bridge over the gap on rollers.
150:
material in use throughout the world, LSB is manufactured with chosen modern steel grades, with a strong steel deck system. With strong deep transoms, there are only two per bay instead of the four previously needed on Bailey bridges.
202:) to supply bridging to satisfy their specific requirements for a logistic or line of communication bridging. The LSB went into service with the British Army on 21 December 2001. The system is proved and approved by a number of 456:—These are constructed in the same way as the chords of the bridge panels and are bolted to the panels to increase the bending capacity of the bridge. For the LSB a heavy chord reinforcement is used. 499:
After pushing the bridge over the gap, the launching nose is dismantled and the bridge is jacked down onto its bearings. The launching nose is largely constructed from standard bridge components.
443:
The LSB combines standard off the shelf equipment with a range of purpose designed special equipment to meet the expectations of modern military loads and traffic expectations.
360:
on Task Force 3-09 constructed a Mabey Logistic Support Bridge over a pre-existing bridge after a vehicle borne suicide bomb detonated on the bridge close to
366:
The Swedish Transport Administration also uses the bridge where it is used during road renovation and construction or as a stop gap after road damage.
209:
Armies from a number of countries around the world own equipment or have trained and deployed on the system, notably during the crisis in the
353: 662: 345: 167:
98m bridge built by the Romanian Engineer Battalion. The bridge was completed on 6 July 1996. Construction time 6 days Loading MLC60.
65: 43: 474:—A variety of bracing members are used to connect panels to form the bridge trusses and to brace adjacent transoms to the bridge. 111: 615: 110:
units to upgrade routes for heavier traffic, replace civilian bridges damaged by enemy action or floods etc., replace
507:
There are a number of floating versions of the Mabey LSB in use across Iraq: Floating Piers which consist of steel
357: 657: 530: 191:
and manufactured large bridge girders; in May 2019, the Group sold Mabey Bridge to the US-based Acrow Bridge).
36: 30: 589: 47: 512:
span junction decks allow for the rotation of the floating spans as the spans deflect under live load.
540: 175:
Bridge built by US and Hungarian Engineers. Completed 22 March 1996. Construction time 4 days, MLC60.
107: 508: 384:
Multi-span equipment enables the bridge to be built to any length on fixed or floating supports
361: 136: 395: 199: 334: 100: 435: 651: 525: 338: 143: 344:
The bridge has been built in many locations across Iraq and Afghanistan by the U.S.
564: 195: 147: 103: 411: 535: 318: 290: 180: 123: 642: 399: 330: 298: 214: 80: 419: 427: 171: 163: 322: 306: 302: 282: 234: 230: 188: 349: 294: 274: 270: 262: 254: 250: 246: 222: 218: 210: 187:, Gloucestershire (Mabey Group's original factory, now closed, was in 326: 314: 266: 258: 238: 226: 184: 415:
Intermediate span being floated into position on intermediate piers
434: 426: 418: 410: 387:
Built on a greenfield site using grillages, ground beams and ramps
310: 286: 278: 242: 170: 162: 122: 79: 203: 128: 85: 637: 391: 15: 375:
The bridge takes military load class 80 Tracked, 110 Wheeled
632: 142:
The Mabey Logistic Support Bridge originated from the
390:
The bridge is normally built using an atc244 22 
356:. During the Canadian OPERATION ATHENA, members of 431:Landing Spans launched from the home and far banks 558: 556: 616:"Varselgult och grönt samarbete i Örsundsbro" 8: 643:Animated build of a Mabey Compact 200 Bridge 84:A Mabey Logistic Support Bridge, Tikrit, 66:Learn how and when to remove this message 29:This article includes a list of general 552: 127:US Army Mabey Logistic Support Bridge 354:United States Army Corps of Engineers 7: 346:Naval Mobile Construction Battalions 402:using a bucket with a lifting eye. 35:it lacks sufficient corresponding 14: 423:Anchor systems with hand winches 20: 183:at its Mabey Bridge factory in 194:The name LSB was given by the 179:The bridge is manufactured by 1: 378:The bridge can span up to 61m 93:Mabey Logistic Support Bridge 381:LSB has a lane width of 4.2m 663:Military bridging equipment 95:(in the United States, the 679: 478:Grillages and Ground Beams 590:"Acrow buys Mabey Bridge" 565:"Logistic Support Bridge" 531:Callender-Hamilton bridge 213:. These armies include 146:concept. Compared with 50:more precise citations. 594:The Construction Index 440: 439:Completed float bridge 432: 424: 416: 176: 168: 131: 106:, designed for use by 88: 638:www.mabeybridge.co.uk 563:Mabey & Johnson. 438: 430: 422: 414: 174: 166: 126: 83: 541:Medium Girder Bridge 108:military engineering 97:Mabey-Johnson Bridge 454:Chord reinforcement 400:hydraulic excavator 569:M&J UK website 441: 433: 425: 417: 407:System description 177: 169: 139:are accommodated. 132: 89: 503:Floating variants 362:Kandahar Airfield 137:ground clearances 76: 75: 68: 670: 658:Portable bridges 620: 619: 612: 606: 605: 603: 601: 586: 580: 579: 577: 575: 560: 99:) is a portable 71: 64: 60: 57: 51: 46:this article by 37:inline citations 24: 23: 16: 678: 677: 673: 672: 671: 669: 668: 667: 648: 647: 629: 624: 623: 614: 613: 609: 599: 597: 588: 587: 583: 573: 571: 562: 561: 554: 549: 522: 505: 493: 409: 372: 200:Royal Engineers 161: 121: 72: 61: 55: 52: 42:Please help to 41: 25: 21: 12: 11: 5: 676: 674: 666: 665: 660: 650: 649: 646: 645: 640: 635: 628: 627:External links 625: 622: 621: 607: 581: 551: 550: 548: 545: 544: 543: 538: 533: 528: 521: 518: 504: 501: 492: 489: 488: 487: 481: 475: 469: 463: 457: 451: 408: 405: 404: 403: 388: 385: 382: 379: 376: 371: 368: 335:United Kingdom 160: 157: 120: 117: 101:pre-fabricated 74: 73: 28: 26: 19: 13: 10: 9: 6: 4: 3: 2: 675: 664: 661: 659: 656: 655: 653: 644: 641: 639: 636: 634: 633:www.mabey.com 631: 630: 626: 617: 611: 608: 596:. 13 May 2019 595: 591: 585: 582: 570: 566: 559: 557: 553: 546: 542: 539: 537: 534: 532: 529: 527: 526:Bailey bridge 524: 523: 519: 517: 513: 510: 502: 500: 497: 490: 485: 482: 479: 476: 473: 470: 467: 464: 461: 458: 455: 452: 449: 446: 445: 444: 437: 429: 421: 413: 406: 401: 397: 393: 389: 386: 383: 380: 377: 374: 373: 369: 367: 364: 363: 359: 355: 351: 347: 342: 340: 339:United States 336: 332: 328: 324: 320: 316: 312: 308: 304: 300: 296: 292: 288: 284: 280: 276: 272: 268: 264: 260: 256: 252: 248: 244: 240: 236: 232: 228: 224: 220: 216: 212: 207: 205: 201: 197: 192: 190: 186: 182: 173: 165: 158: 156: 152: 149: 145: 144:Bailey bridge 140: 138: 130: 125: 118: 116: 113: 109: 105: 102: 98: 94: 87: 82: 78: 70: 67: 59: 49: 45: 39: 38: 32: 27: 18: 17: 610: 598:. Retrieved 593: 584: 572:. Retrieved 568: 514: 506: 498: 494: 491:Construction 483: 477: 471: 465: 459: 453: 447: 442: 365: 343: 208: 196:British Army 193: 178: 153: 148:World War II 141: 133: 104:truss bridge 96: 92: 90: 77: 62: 53: 34: 574:10 December 536:Mabey Group 319:Switzerland 291:Netherlands 181:Mabey Group 119:Description 48:introducing 652:Categories 547:References 509:Flexifloat 352:) and the 56:April 2009 31:references 394:capacity 331:Venezuela 299:Sri Lanka 215:Argentina 520:See also 460:Transoms 370:Features 323:Tanzania 307:Slovenia 303:Slovakia 283:Malaysia 235:Cambodia 231:Bulgaria 206:forces. 189:Chepstow 472:Bracing 350:Seabees 295:Romania 275:Ireland 271:Hungary 263:Germany 255:Finland 251:Ecuador 247:Denmark 223:Belgium 219:Austria 211:Balkans 155:world. 112:assault 44:improve 600:13 May 448:Panels 327:Turkey 315:Sweden 267:Greece 259:France 239:Canada 227:Brazil 185:Lydney 33:, but 484:Ramps 466:Decks 398:or a 396:crane 358:1 CER 311:Spain 287:Nepal 279:Italy 243:Chile 159:Users 602:2019 576:2009 204:NATO 135:low 129:Iraq 91:The 86:Iraq 392:ton 654:: 592:. 567:. 555:^ 341:. 337:, 333:, 329:, 325:, 321:, 317:, 313:, 309:, 305:, 301:, 297:, 293:, 289:, 285:, 281:, 277:, 273:, 269:, 265:, 261:, 257:, 253:, 249:, 245:, 241:, 237:, 233:, 229:, 225:, 221:, 217:, 618:. 604:. 578:. 348:( 198:( 69:) 63:( 58:) 54:( 40:.

Index

references
inline citations
improve
introducing
Learn how and when to remove this message

Iraq
pre-fabricated
truss bridge
military engineering
assault

Iraq
ground clearances
Bailey bridge
World War II


Mabey Group
Lydney
Chepstow
British Army
Royal Engineers
NATO
Balkans
Argentina
Austria
Belgium
Brazil
Bulgaria

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑