56: 260:. The cutterhead required 12,000 kW of power whilst the overall vehicle requires 18 MW total installed capacity to function. The machine started work on the Sparvo tunnel in 2011, with drilling of the 2430-metre north tube completed in 2012. The drilling of the 2600-metre south tube was finished in 2013, bringing the 5-kilometre tunneling project to an end. 387: 373: 324: 232:. It is the largest hard rock tunnel boring machine in the world and has been used for drilling the Sparvo Tunnel, a part of the larger 429: 341: 274: 424: 306: 279: 269: 225: 169: 359: 72: 233: 126: 43: 252:, an excavation diameter of 15.62 metres, a length of 130 metres, a total weight of 4500 418: 229: 253: 249: 237: 61: 409: 248:
The Martina cost 60 million USD, has a shield diameter of 15.55
257: 404: 360:"TBM Martina ended Sparvo tunnel - tunnelbuilder.com News" 152:
The largest hard rock tunnel boring machine ever built
256:and an annual operating consumption of 62 million 374:"Significant breakthrough at Sparvo - TunnelTalk" 301: 299: 297: 295: 179:4,500 tonnes (4,400 long tons; 5,000 short tons) 342:"5 Biggest Tunnel Boring Machines in the World" 8: 325:"A Herrenknecht giant reaches its target" 291: 336: 334: 18: 109: 7: 195:15.62-metre-diameter (51.2 ft) 14: 144:Disassembled after July 29, 2013 54: 20:Martina (tunnel boring machine) 1: 244:Specifications and operations 218:Martina tunnel boring machine 275:List of long tunnels by type 388:"Toto Costruzioni Generali" 446: 220:(officially named as the 156: 104: 24: 280:List of mining companies 187:130 metres (430 ft) 270:List of longest tunnels 157:General characteristics 430:Tunnel boring machines 76:60 million (2011) 410:tunnelbuilder website 226:tunnel boring machine 170:Tunnel boring machine 16:Tunnel boring machine 206:18 MW (24,138.4 hp) 21: 405:tunneltalk website 234:Variante di Valico 224:.) is a hard rock 19: 307:"Galleria Sparvo" 214: 213: 437: 392: 391: 384: 378: 377: 370: 364: 363: 356: 350: 349: 338: 329: 328: 321: 315: 314: 303: 75: 60: 58: 57: 22: 445: 444: 440: 439: 438: 436: 435: 434: 425:Heavy equipment 415: 414: 401: 396: 395: 386: 385: 381: 372: 371: 367: 358: 357: 353: 340: 339: 332: 323: 322: 318: 311:Herrenknecht AG 305: 304: 293: 288: 266: 246: 230:Herrenknecht AG 200:Installed power 127:Herrenknecht AG 71: 55: 53: 44:Herrenknecht AG 17: 12: 11: 5: 443: 441: 433: 432: 427: 417: 416: 413: 412: 407: 400: 399:External links 397: 394: 393: 379: 365: 351: 330: 327:. 17 May 2016. 316: 290: 289: 287: 284: 283: 282: 277: 272: 265: 262: 245: 242: 212: 211: 208: 207: 201: 197: 196: 193: 189: 188: 185: 181: 180: 177: 173: 172: 163: 162:Class and type 159: 158: 154: 153: 150: 146: 145: 142: 138: 137: 134: 130: 129: 124: 120: 119: 116: 112: 111: 107: 106: 102: 101: 98: 94: 93: 90: 86: 85: 82: 78: 77: 69: 65: 64: 51: 47: 46: 41: 37: 36: 31: 27: 26: 25:Class overview 15: 13: 10: 9: 6: 4: 3: 2: 442: 431: 428: 426: 423: 422: 420: 411: 408: 406: 403: 402: 398: 389: 383: 380: 375: 369: 366: 361: 355: 352: 347: 343: 337: 335: 331: 326: 320: 317: 312: 308: 302: 300: 298: 296: 292: 285: 281: 278: 276: 273: 271: 268: 267: 263: 261: 259: 255: 251: 243: 241: 239: 235: 231: 227: 223: 219: 210: 209: 205: 202: 199: 198: 194: 191: 190: 186: 183: 182: 178: 175: 174: 171: 167: 164: 161: 160: 155: 151: 148: 147: 143: 140: 139: 135: 132: 131: 128: 125: 122: 121: 117: 114: 113: 108: 103: 99: 96: 95: 91: 88: 87: 83: 80: 79: 74: 70: 67: 66: 63: 52: 49: 48: 45: 42: 39: 38: 35: 32: 29: 28: 23: 382: 368: 354: 345: 319: 310: 247: 221: 217: 215: 203: 165: 133:Commissioned 33: 236:project in 136:August 2011 419:Categories 286:References 81:In service 228:built by 89:Completed 84:2011-2013 50:Operators 264:See also 40:Builders 176:Tonnage 123:Builder 118:Martina 105:History 97:Retired 34:Martina 254:tonnes 250:metres 204:Total: 184:Length 168:-type 59:  238:Italy 222:S-574 166:S-574 149:Notes 110:Italy 62:Italy 346:ASME 216:The 192:Beam 141:Fate 115:Name 73:US$ 68:Cost 30:Name 258:kWh 421:: 344:. 333:^ 309:. 294:^ 240:. 390:. 376:. 362:. 348:. 313:. 100:1 92:1

Index

Herrenknecht AG
Italy
US$
Herrenknecht AG
Tunnel boring machine
tunnel boring machine
Herrenknecht AG
Variante di Valico
Italy
metres
tonnes
kWh
List of longest tunnels
List of long tunnels by type
List of mining companies




"Galleria Sparvo"
"A Herrenknecht giant reaches its target"


"5 Biggest Tunnel Boring Machines in the World"
"TBM Martina ended Sparvo tunnel - tunnelbuilder.com News"
"Significant breakthrough at Sparvo - TunnelTalk"
"Toto Costruzioni Generali"
tunneltalk website
tunnelbuilder website
Categories

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.