Knowledge

Moses Wheeler Bridge

Source 📝

253:. Stratford residents and officials demanded the new bridge be built to the north of the existing span, closer to the Metro-North bridge and the power lines. A compromise was reached where the new bridge will use approximately the same alignment as the original one. To make this possible, the new bridge was built substantially wider than the old one, which will also allow a future expansion with restriping of the travel lanes. The project was completed in three stages: the first two stages consisted of constructing the outer parts of the new bridge that carry the two outer lanes and the outer shoulder, while three lanes of traffic were maintained on the existing bridge. During the final stage of construction, three lanes of traffic were shifted to the new outer spans, to allow crews to demolish the original span and complete the center portion of the new bridge. 288:
could rebuilt and expanded. On January 17, 2013, southbound traffic was shifted onto the completed northern third of the new bridge and approaches. Northbound traffic was shifted onto the former southbound lanes of the old bridge on January 26, 2013. The Walsh/PCL construction team began demolishing the northbound portion of the old bridge and approaches in February 2013. Demolition of the old northbound span was completed in May 2013, and crews began erecting structural steel for the new northbound lanes in June 2013. In December 2013, northbound traffic was shifted from the old bridge to the new northbound lanes, at which point the remainder of the original 1958 structure was taken out of service and removed. During the summer of 2014, three large
204:. The current bridge is a 14-span continuous girder and floorbeam structure that carries three (expandable to four) lanes of traffic in each direction, with full inside and outside shoulders. The current bridge, completed in 2016, replaces a pre-existing structure that was completed as part of the original Connecticut Turnpike in 1958. The original bridge was a 34-span plate girder structure with a concrete deck with three 12-foot travel lanes in each direction and no shoulders. The central span of the original bridge over the river's navigation channel included a 314: 326: 257:
new 14-span structure: one option using segmented concrete hollow box girders, and the other using continuous steel plate girders. The bridge is designed for seismic loading to withstand a major earthquake. Additionally, it includes a fender system to protect the bridge piers from ship collisions. Aesthetic features are also included, among which is encasing the bridge piers with decorative granite and aesthetic lighting. The
338: 212: 74: 463: 448: 292:
were assembled in the median of I-95 to facilitate the removal of structural steel from the original span and construction of the center portion of the new span. By the end of 2015, construction of the new Moses Wheeler Bridge reached substantial completion, with final paving and striping completed
301:
During the summer of 2007, CONNDOT performed a $ 6.9 million emergency repair project to the Moses Wheeler Bridge after several large holes opened up in the bridge deck, and advanced deterioration of the structural steel was discovered during a routine inspection. The project involved a full-depth
256:
The new bridge, like the original one, accommodates six lanes of traffic, but has full left and right shoulders which the original bridge did not have. In addition, the left shoulders were built wide enough to accommodate a future widening to eight lanes. Two design options were developed for the
287:
Walsh/PCL commenced work to widen I-95 on the east and west approaches and began erecting the bridge piers for the new Moses Wheeler Bridge in September 2011. Crews shifted I-95 traffic to the southern half of the roadway so the northern half of the highway, including several smaller overpasses
244:
in 1983. The Connecticut Department of Transportation (CONNDOT) began drawing up plans to replace the bridge in 1996. Originally CONNDOT planned to construct the new bridge to the south of the existing one, away from 115 kilovolt
224:
Heavy traffic and harsh New England weather had taken their toll on the original Moses Wheeler Bridge. It had been rated as 'structurally deficient' during recent inspections, with accelerating deterioration of the
268:-based O&G Industries for the initial phase of work in July 2009. Construction on the first phase of replacing the bridge, including the foundations for the new bridge piers and temporary work 491: 302:
patch and repair of the bridge deck, roadway resurfacing, and reinforcement of key superstructure components to ensure the bridge could remain in service until the new bridge can be built.
486: 284:-based PCL Constructors (also referred to in contract documents as Walsh/PCL Joint Venture II) in August 2011. Walsh/PCL opted to use the steel plate girder design option. 541: 521: 506: 501: 272:
in the Housatonic River began in September 2009. The $ 166.5 million contract to build the remainder of the new bridge and demolish the existing span was awarded to a
36: 208:, which are no longer used in bridge construction in the United States. Construction on the Moses Wheeler Bridge began in 1955 and opened on January 2, 1958. 536: 526: 531: 347: 436: 119: 215:
The original Moses Wheeler Bridge, as seen from Washington Bridge, in 2010. Cranes can be seen assembling piers and abutments for the new bridge
511: 496: 250: 457: 236:
being of particular concern; the latter problem gained increased attention due to the collapse of the similar-in-design
185: 77: 29: 379: 246: 264:
Environmental studies for the new bridge were completed in 2005, and CONNDOT awarded a $ 60 million contract to
265: 233: 205: 516: 241: 197: 97: 189: 101: 237: 342: 330: 277: 230: 419: 318: 281: 226: 193: 87: 383: 313: 258: 201: 405: 325: 480: 273: 412: 211: 289: 394: 51: 38: 376: 365: 395:
Moses Wheeler Bridge Closes Lane, WVIT TV Hartford, CT, August 13, 2007
269: 210: 462: 447: 416: 170: 162: 157: 146: 138: 130: 125: 115: 107: 93: 83: 67: 28: 21: 492:Buildings and structures in Stratford, Connecticut 487:Buildings and structures in Milford, Connecticut 377:Moses Wheeler Bridge Replacement Project by STV 8: 134:Continuous steel plate girder and floorbeam 413: 18: 542:Plate girder bridges in the United States 348:List of crossings of the Housatonic River 522:Bridges on the Interstate Highway System 507:Bridges in New Haven County, Connecticut 502:Bridges in Fairfield County, Connecticut 120:Connecticut Department of Transportation 358: 280:-based Walsh Construction Company and 7: 406:CONNDOT Special Construction Notice 16:Bridge in Connecticut, United States 537:Steel bridges in the United States 527:Former toll bridges in Connecticut 261:designed the replacement bridge. 14: 532:Bridges over the Housatonic River 461: 446: 336: 324: 312: 251:Housatonic River Railroad Bridge 72: 166:1958 (Reconstructed 2011-2016) 147: 1: 428: 512:Road bridges in Connecticut 437:Metro North railroad bridge 558: 497:Bridges completed in 1958 452: 441: 431: 426: 249:that run atop the nearby 234:pin and hanger assemblies 175: 202:Devon section of Milford 266:Torrington, Connecticut 206:pin and hanger assembly 142:967 meters (3,196 feet) 343:Connecticut portal 331:Engineering portal 216: 98:Stratford, Connecticut 214: 52:41.20472°N 73.10944°W 443:Moses Wheeler Bridge 319:Transport portal 190:Connecticut Turnpike 182:Moses Wheeler Bridge 111:Moses Wheeler Bridge 102:Milford, Connecticut 23:Moses Wheeler Bridge 238:Mianus River Bridge 57:41.20472; -73.10944 48: /  382:2007-11-13 at the 247:high tension wires 220:Replacement Bridge 217: 474: 473: 469: 468: 458:Washington Bridge 418:Crossings of the 297:Emergency repairs 278:Chicago, Illinois 231:fracture critical 179: 178: 549: 465: 450: 429: 420:Housatonic River 414: 408: 403: 397: 392: 386: 374: 368: 363: 341: 340: 339: 329: 328: 317: 316: 293:in spring 2016. 282:Denver, Colorado 240:further west in 227:structural steel 194:Housatonic River 149: 88:Housatonic River 76: 75: 63: 62: 60: 59: 58: 53: 49: 46: 45: 44: 41: 19: 557: 556: 552: 551: 550: 548: 547: 546: 477: 476: 475: 470: 460: 456: 445: 439: 435: 422: 411: 404: 400: 393: 389: 384:Wayback Machine 375: 371: 364: 360: 356: 337: 335: 323: 311: 308: 299: 222: 126:Characteristics 73: 56: 54: 50: 47: 42: 39: 37: 35: 34: 24: 17: 12: 11: 5: 555: 553: 545: 544: 539: 534: 529: 524: 519: 514: 509: 504: 499: 494: 489: 479: 478: 472: 471: 467: 466: 451: 440: 427: 424: 423: 417: 410: 409: 398: 387: 369: 357: 355: 352: 351: 350: 345: 333: 321: 307: 304: 298: 295: 221: 218: 177: 176: 173: 172: 168: 167: 164: 160: 159: 155: 154: 151: 144: 143: 140: 136: 135: 132: 128: 127: 123: 122: 117: 113: 112: 109: 105: 104: 95: 91: 90: 85: 81: 80: 69: 65: 64: 32: 26: 25: 22: 15: 13: 10: 9: 6: 4: 3: 2: 554: 543: 540: 538: 535: 533: 530: 528: 525: 523: 520: 518: 517:Interstate 95 515: 513: 510: 508: 505: 503: 500: 498: 495: 493: 490: 488: 485: 484: 482: 464: 459: 455: 449: 444: 438: 434: 430: 425: 421: 415: 407: 402: 399: 396: 391: 388: 385: 381: 378: 373: 370: 367: 362: 359: 353: 349: 346: 344: 334: 332: 327: 322: 320: 315: 310: 309: 305: 303: 296: 294: 291: 290:gantry cranes 285: 283: 279: 275: 274:joint venture 271: 267: 262: 260: 254: 252: 248: 243: 239: 235: 232: 228: 219: 213: 209: 207: 203: 199: 195: 191: 187: 186:Interstate 95 183: 174: 169: 165: 161: 156: 152: 145: 141: 137: 133: 129: 124: 121: 118: 116:Maintained by 114: 110: 108:Official name 106: 103: 99: 96: 92: 89: 86: 82: 79: 70: 66: 61: 33: 31: 27: 20: 453: 442: 432: 401: 390: 372: 361: 300: 286: 263: 255: 223: 181: 180: 139:Total length 192:) over the 71:6 lanes of 55: / 30:Coordinates 481:Categories 454:Downstream 354:References 43:73°06′34″W 40:41°12′17″N 259:STV Group 242:Greenwich 198:Stratford 433:Upstream 380:Archived 306:See also 276:between 229:and the 200:and the 196:between 184:carries 171:Location 150:of spans 366:CONNDOT 270:trusses 158:History 84:Crosses 68:Carries 163:Opened 131:Design 94:Locale 78:I-95 148:No. 483:: 153:14 188:( 100:/

Index

Coordinates
41°12′17″N 73°06′34″W / 41.20472°N 73.10944°W / 41.20472; -73.10944
I-95
Housatonic River
Stratford, Connecticut
Milford, Connecticut
Connecticut Department of Transportation
Interstate 95
Connecticut Turnpike
Housatonic River
Stratford
Devon section of Milford
pin and hanger assembly

structural steel
fracture critical
pin and hanger assemblies
Mianus River Bridge
Greenwich
high tension wires
Housatonic River Railroad Bridge
STV Group
Torrington, Connecticut
trusses
joint venture
Chicago, Illinois
Denver, Colorado
gantry cranes
icon
Transport portal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.