253:. Stratford residents and officials demanded the new bridge be built to the north of the existing span, closer to the Metro-North bridge and the power lines. A compromise was reached where the new bridge will use approximately the same alignment as the original one. To make this possible, the new bridge was built substantially wider than the old one, which will also allow a future expansion with restriping of the travel lanes. The project was completed in three stages: the first two stages consisted of constructing the outer parts of the new bridge that carry the two outer lanes and the outer shoulder, while three lanes of traffic were maintained on the existing bridge. During the final stage of construction, three lanes of traffic were shifted to the new outer spans, to allow crews to demolish the original span and complete the center portion of the new bridge.
288:
could rebuilt and expanded. On
January 17, 2013, southbound traffic was shifted onto the completed northern third of the new bridge and approaches. Northbound traffic was shifted onto the former southbound lanes of the old bridge on January 26, 2013. The Walsh/PCL construction team began demolishing the northbound portion of the old bridge and approaches in February 2013. Demolition of the old northbound span was completed in May 2013, and crews began erecting structural steel for the new northbound lanes in June 2013. In December 2013, northbound traffic was shifted from the old bridge to the new northbound lanes, at which point the remainder of the original 1958 structure was taken out of service and removed. During the summer of 2014, three large
204:. The current bridge is a 14-span continuous girder and floorbeam structure that carries three (expandable to four) lanes of traffic in each direction, with full inside and outside shoulders. The current bridge, completed in 2016, replaces a pre-existing structure that was completed as part of the original Connecticut Turnpike in 1958. The original bridge was a 34-span plate girder structure with a concrete deck with three 12-foot travel lanes in each direction and no shoulders. The central span of the original bridge over the river's navigation channel included a
314:
326:
257:
new 14-span structure: one option using segmented concrete hollow box girders, and the other using continuous steel plate girders. The bridge is designed for seismic loading to withstand a major earthquake. Additionally, it includes a fender system to protect the bridge piers from ship collisions. Aesthetic features are also included, among which is encasing the bridge piers with decorative granite and aesthetic lighting. The
338:
212:
74:
463:
448:
292:
were assembled in the median of I-95 to facilitate the removal of structural steel from the original span and construction of the center portion of the new span. By the end of 2015, construction of the new Moses
Wheeler Bridge reached substantial completion, with final paving and striping completed
301:
During the summer of 2007, CONNDOT performed a $ 6.9 million emergency repair project to the Moses
Wheeler Bridge after several large holes opened up in the bridge deck, and advanced deterioration of the structural steel was discovered during a routine inspection. The project involved a full-depth
256:
The new bridge, like the original one, accommodates six lanes of traffic, but has full left and right shoulders which the original bridge did not have. In addition, the left shoulders were built wide enough to accommodate a future widening to eight lanes. Two design options were developed for the
287:
Walsh/PCL commenced work to widen I-95 on the east and west approaches and began erecting the bridge piers for the new Moses
Wheeler Bridge in September 2011. Crews shifted I-95 traffic to the southern half of the roadway so the northern half of the highway, including several smaller overpasses
244:
in 1983. The
Connecticut Department of Transportation (CONNDOT) began drawing up plans to replace the bridge in 1996. Originally CONNDOT planned to construct the new bridge to the south of the existing one, away from 115 kilovolt
224:
Heavy traffic and harsh New
England weather had taken their toll on the original Moses Wheeler Bridge. It had been rated as 'structurally deficient' during recent inspections, with accelerating deterioration of the
268:-based O&G Industries for the initial phase of work in July 2009. Construction on the first phase of replacing the bridge, including the foundations for the new bridge piers and temporary work
491:
302:
patch and repair of the bridge deck, roadway resurfacing, and reinforcement of key superstructure components to ensure the bridge could remain in service until the new bridge can be built.
486:
284:-based PCL Constructors (also referred to in contract documents as Walsh/PCL Joint Venture II) in August 2011. Walsh/PCL opted to use the steel plate girder design option.
541:
521:
506:
501:
272:
in the
Housatonic River began in September 2009. The $ 166.5 million contract to build the remainder of the new bridge and demolish the existing span was awarded to a
36:
208:, which are no longer used in bridge construction in the United States. Construction on the Moses Wheeler Bridge began in 1955 and opened on January 2, 1958.
536:
526:
531:
347:
436:
119:
215:
The original Moses
Wheeler Bridge, as seen from Washington Bridge, in 2010. Cranes can be seen assembling piers and abutments for the new bridge
511:
496:
250:
457:
236:
being of particular concern; the latter problem gained increased attention due to the collapse of the similar-in-design
185:
77:
29:
379:
246:
264:
Environmental studies for the new bridge were completed in 2005, and CONNDOT awarded a $ 60 million contract to
265:
233:
205:
516:
241:
197:
97:
189:
101:
237:
342:
330:
277:
230:
419:
318:
281:
226:
193:
87:
383:
313:
258:
201:
405:
325:
480:
273:
412:
211:
289:
394:
51:
38:
376:
365:
395:
Moses
Wheeler Bridge Closes Lane, WVIT TV Hartford, CT, August 13, 2007
269:
210:
462:
447:
416:
170:
162:
157:
146:
138:
130:
125:
115:
107:
93:
83:
67:
28:
21:
492:Buildings and structures in Stratford, Connecticut
487:Buildings and structures in Milford, Connecticut
377:Moses Wheeler Bridge Replacement Project by STV
8:
134:Continuous steel plate girder and floorbeam
413:
18:
542:Plate girder bridges in the United States
348:List of crossings of the Housatonic River
522:Bridges on the Interstate Highway System
507:Bridges in New Haven County, Connecticut
502:Bridges in Fairfield County, Connecticut
120:Connecticut Department of Transportation
358:
280:-based Walsh Construction Company and
7:
406:CONNDOT Special Construction Notice
16:Bridge in Connecticut, United States
537:Steel bridges in the United States
527:Former toll bridges in Connecticut
261:designed the replacement bridge.
14:
532:Bridges over the Housatonic River
461:
446:
336:
324:
312:
251:Housatonic River Railroad Bridge
72:
166:1958 (Reconstructed 2011-2016)
147:
1:
428:
512:Road bridges in Connecticut
437:Metro North railroad bridge
558:
497:Bridges completed in 1958
452:
441:
431:
426:
249:that run atop the nearby
234:pin and hanger assemblies
175:
202:Devon section of Milford
266:Torrington, Connecticut
206:pin and hanger assembly
142:967 meters (3,196 feet)
343:Connecticut portal
331:Engineering portal
216:
98:Stratford, Connecticut
214:
52:41.20472°N 73.10944°W
443:Moses Wheeler Bridge
319:Transport portal
190:Connecticut Turnpike
182:Moses Wheeler Bridge
111:Moses Wheeler Bridge
102:Milford, Connecticut
23:Moses Wheeler Bridge
238:Mianus River Bridge
57:41.20472; -73.10944
48: /
382:2007-11-13 at the
247:high tension wires
220:Replacement Bridge
217:
474:
473:
469:
468:
458:Washington Bridge
418:Crossings of the
297:Emergency repairs
278:Chicago, Illinois
231:fracture critical
179:
178:
549:
465:
450:
429:
420:Housatonic River
414:
408:
403:
397:
392:
386:
374:
368:
363:
341:
340:
339:
329:
328:
317:
316:
293:in spring 2016.
282:Denver, Colorado
240:further west in
227:structural steel
194:Housatonic River
149:
88:Housatonic River
76:
75:
63:
62:
60:
59:
58:
53:
49:
46:
45:
44:
41:
19:
557:
556:
552:
551:
550:
548:
547:
546:
477:
476:
475:
470:
460:
456:
445:
439:
435:
422:
411:
404:
400:
393:
389:
384:Wayback Machine
375:
371:
364:
360:
356:
337:
335:
323:
311:
308:
299:
222:
126:Characteristics
73:
56:
54:
50:
47:
42:
39:
37:
35:
34:
24:
17:
12:
11:
5:
555:
553:
545:
544:
539:
534:
529:
524:
519:
514:
509:
504:
499:
494:
489:
479:
478:
472:
471:
467:
466:
451:
440:
427:
424:
423:
417:
410:
409:
398:
387:
369:
357:
355:
352:
351:
350:
345:
333:
321:
307:
304:
298:
295:
221:
218:
177:
176:
173:
172:
168:
167:
164:
160:
159:
155:
154:
151:
144:
143:
140:
136:
135:
132:
128:
127:
123:
122:
117:
113:
112:
109:
105:
104:
95:
91:
90:
85:
81:
80:
69:
65:
64:
32:
26:
25:
22:
15:
13:
10:
9:
6:
4:
3:
2:
554:
543:
540:
538:
535:
533:
530:
528:
525:
523:
520:
518:
517:Interstate 95
515:
513:
510:
508:
505:
503:
500:
498:
495:
493:
490:
488:
485:
484:
482:
464:
459:
455:
449:
444:
438:
434:
430:
425:
421:
415:
407:
402:
399:
396:
391:
388:
385:
381:
378:
373:
370:
367:
362:
359:
353:
349:
346:
344:
334:
332:
327:
322:
320:
315:
310:
309:
305:
303:
296:
294:
291:
290:gantry cranes
285:
283:
279:
275:
274:joint venture
271:
267:
262:
260:
254:
252:
248:
243:
239:
235:
232:
228:
219:
213:
209:
207:
203:
199:
195:
191:
187:
186:Interstate 95
183:
174:
169:
165:
161:
156:
152:
145:
141:
137:
133:
129:
124:
121:
118:
116:Maintained by
114:
110:
108:Official name
106:
103:
99:
96:
92:
89:
86:
82:
79:
70:
66:
61:
33:
31:
27:
20:
453:
442:
432:
401:
390:
372:
361:
300:
286:
263:
255:
223:
181:
180:
139:Total length
192:) over the
71:6 lanes of
55: /
30:Coordinates
481:Categories
454:Downstream
354:References
43:73°06′34″W
40:41°12′17″N
259:STV Group
242:Greenwich
198:Stratford
433:Upstream
380:Archived
306:See also
276:between
229:and the
200:and the
196:between
184:carries
171:Location
150:of spans
366:CONNDOT
270:trusses
158:History
84:Crosses
68:Carries
163:Opened
131:Design
94:Locale
78:I-95
148:No.
483::
153:14
188:(
100:/
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.