Nant de Drance Hydropower Plant

Source 📝

401:-generators in the power plant. The large underground power house measures 194 m (636 ft) long, 52 m (171 ft) high and 32 m (105 ft) wide. After generating power, water from the power plant is discharged to the lower reservoir, releasing up to 20 GWh of energy. When power demand is low, such as at night, the turbines reverse and water can be pumped back up to the upper reservoir for use during high demand periods. As such, it serves as a 359: 714: 742: 330: 29: 728: 386:, is formed by a 45 m (148 ft) tall and 170 m (560 ft) long arch dam originally completed in 1955. The dam is 65 m (213 ft) tall. Lac du Vieux Emosson's storage capacity is 25,000,000 m (20,000 acre⋅ft) and has a surface area of 55 ha (140 acres). When full, the upper reservoir lies 2,225 m (7,300 ft) above sea level. 341:
granted a building permit to Nant de Drance SA for the construction of the plant with a 600 MW design. Preliminary construction began in September 2008 but a concession was granted in April 2011 which allowed for a larger 900 MW plant. Excavation of the tunnels began in 2009 and the caverns commenced
378:
which was completed in 1974. It withholds a reservoir with a storage capacity of 227,000,000 m (184,000 acre⋅ft) and surface area of 327 ha (810 acres). The lower reservoir is 4 km (2.5 mi) long and when full, lies 1,930 m (6,330 ft) above sea level.
338: 770: 349:
In December 2014, at the International Tunnelling & Underground Space Awards, the project was awarded the Major Tunnelling Project of the Year award in the category of projects over US$ 500 million.
765: 795: 393:
hydroelectric method. To accomplish this, when energy demand is high, water is released from the upper reservoir, down a series of 425 m (1,394 ft)
775: 408:
Under the guidance of AF-Consult Switzerland Ltd as general planner, the civil engineering works were carried out by GMI (a joint venture of Marti and
600: 70: 653: 473: 689: 790: 578: 627: 433: 287:. Construction on the power plant began in 2008 and it began operations in 2022. It is owned by Nant de Drance SA, a consortium of 549: 671: 780: 521: 343: 307: 317:(FMV) (10%). The US$ 1.9 billion plant has an installed capacity of 900 MW and an energy storage capacity of 20 280: 54: 296: 747: 292: 268: 601:"The Nant de Drance project wins at the International Tunnelling & Underground Space Awards 2014" 383: 158: 402: 785: 719: 226: 445: 367: 358: 181: 398: 631: 312: 390: 371: 264: 239: 201: 759: 329: 28: 733: 553: 219: 370:, is formed by the 180 m (590 ft) tall, 555 m (1,821 ft) long 346:
excavation was completed in April 2014. The first generators were tested in 2017.
741: 130: 709: 366:
The power plant uses two existing reservoirs to operate. The lower reservoir,
85: 72: 727: 654:"20GWh pumped hydro energy storage plant starting operations in Switzerland" 474:"20GWh pumped hydro energy storage plant starting operations in Switzerland" 449: 690:"The Nant de Drance Hydropower Scheme – brief overview of the civil works" 342:
in 2010. Raising of the upper Vieux Emosson Dam began in Spring 2013. The
409: 394: 375: 284: 232: 215: 339:
Federal Department of Environment, Transport, Energy and Communications
276: 50: 498: 272: 58: 134: 357: 328: 288: 522:"RPT-Cavernous Swiss power plant undermined by renewable energy" 362:
The plant will be located between the upper and lower reservoirs
333:
Lac du Vieux Emosson will be raised and form the upper reservoir
301: 318: 245: 434:"How giant 'water batteries' could make green power reliable" 771:
Pumped-storage hydroelectric power stations in Switzerland
412:) and the electro-mechanical works were done by GE Hydro. 389:
The power plant is between both reservoirs and uses the
238: 225: 210: 200: 195: 187: 177: 172: 164: 154: 149: 141: 125: 117: 109: 101: 64: 46: 38: 21: 275:in Switzerland. It is within the municipality of 283:and about 14 km (8.7 mi) southwest of 552:(in French). Nante de Drance SA. Archived from 630:(in French). Nant de Drance SA. Archived from 544: 542: 8: 766:Hydroelectric power stations in Switzerland 672:"Inside Switzerland's giant water battery" 499:"Projet Initié Par Alpiq, CFF, IWB ET FMV" 27: 18: 427: 425: 191:227,000,000 m (184,000 acre⋅ft) 796:Energy infrastructure under construction 622: 620: 618: 573: 571: 421: 168:25,000,000 m (20,000 acre⋅ft) 33:Lac d'Emosson forms the lower reservoir 520:De Clercq, Geert (1 September 2014). 7: 468: 466: 692:. Engineers' Journal. 20 March 2018 382:The upper reservoir for the plant, 776:Buildings and structures in Valais 432:Kunzig, Robert (25 January 2024). 14: 740: 726: 712: 261:Nant de Drance Hydropower Plant 501:(in French). Nant de Drance SA 1: 397:to the six 150 MW reversible 337:On 25 August 2008, the Swiss 603:. BG Group. 11 December 2014 550:"A New Pumped Storage Plant" 16:Dam in Saint-Maurice, Valais 628:"The Heart of the Mountain" 308:Forces Motrices Valaisannes 812: 791:Underground power stations 252: 26: 297:Industrielle Werke Basel 206:295 m (968 ft) 748:Renewable energy portal 450:10.1126/science.z3a3pmq 344:underground power house 227:Installed capacity 110:Construction began 363: 334: 240:Annual generation 126:Construction cost 405:with 80% efficiency. 361: 332: 267:power station in the 253:20 GWh energy storage 384:Lac du Vieux Emosson 159:Lac du Vieux Emosson 86:46.06361°N 6.91000°E 781:Dams in Switzerland 678:. 3 September 2021. 658:Energy Storage News 478:Energy Storage News 403:peaking power plant 188:Total capacity 165:Total capacity 82: /  720:Switzerland portal 556:on 10 October 2017 364: 335: 257: 256: 145:Nant de Drance SA 129:US$ 2.1 billion ( 118:Opening date 91:46.06361; 6.91000 803: 750: 745: 744: 736: 731: 730: 722: 717: 716: 715: 702: 701: 699: 697: 686: 680: 679: 676:SWI swissinfo.ch 668: 662: 661: 650: 644: 643: 641: 639: 624: 613: 612: 610: 608: 597: 591: 590: 588: 586: 579:"Nant de Drance" 575: 566: 565: 563: 561: 546: 537: 536: 534: 532: 517: 511: 510: 508: 506: 495: 489: 488: 486: 485: 470: 461: 460: 458: 456: 429: 316: 305: 97: 96: 94: 93: 92: 87: 83: 80: 79: 78: 75: 31: 19: 811: 810: 806: 805: 804: 802: 801: 800: 756: 755: 754: 753: 746: 739: 732: 725: 718: 713: 711: 706: 705: 695: 693: 688: 687: 683: 670: 669: 665: 660:. 29 June 2022. 652: 651: 647: 637: 635: 634:on 24 July 2017 626: 625: 616: 606: 604: 599: 598: 594: 584: 582: 577: 576: 569: 559: 557: 548: 547: 540: 530: 528: 519: 518: 514: 504: 502: 497: 496: 492: 483: 481: 472: 471: 464: 454: 452: 431: 430: 423: 418: 399:Francis turbine 356: 327: 310: 299: 211:Pump-generators 173:Lower reservoir 150:Upper reservoir 90: 88: 84: 81: 76: 73: 71: 69: 68: 34: 17: 12: 11: 5: 809: 807: 799: 798: 793: 788: 783: 778: 773: 768: 758: 757: 752: 751: 737: 723: 708: 707: 704: 703: 681: 663: 645: 614: 592: 567: 538: 512: 490: 462: 420: 419: 417: 414: 391:pumped-storage 355: 352: 326: 323: 279:, district of 265:pumped-storage 255: 254: 250: 249: 242: 236: 235: 229: 223: 222: 212: 208: 207: 204: 202:Hydraulic head 198: 197: 193: 192: 189: 185: 184: 179: 175: 174: 170: 169: 166: 162: 161: 156: 152: 151: 147: 146: 143: 139: 138: 127: 123: 122: 119: 115: 114: 113:September 2008 111: 107: 106: 103: 99: 98: 66: 62: 61: 48: 44: 43: 40: 36: 35: 32: 24: 23: 22:Nant de Drance 15: 13: 10: 9: 6: 4: 3: 2: 808: 797: 794: 792: 789: 787: 784: 782: 779: 777: 774: 772: 769: 767: 764: 763: 761: 749: 743: 738: 735: 729: 724: 721: 710: 691: 685: 682: 677: 673: 667: 664: 659: 655: 649: 646: 633: 629: 623: 621: 619: 615: 602: 596: 593: 580: 574: 572: 568: 555: 551: 545: 543: 539: 527: 523: 516: 513: 500: 494: 491: 479: 475: 469: 467: 463: 451: 447: 443: 439: 435: 428: 426: 422: 415: 413: 411: 406: 404: 400: 396: 392: 387: 385: 380: 377: 373: 369: 368:Lac d'Emosson 360: 353: 351: 347: 345: 340: 331: 324: 322: 320: 314: 309: 303: 298: 294: 290: 286: 282: 281:Saint-Maurice 278: 274: 270: 266: 262: 251: 247: 243: 241: 237: 234: 230: 228: 224: 221: 217: 213: 209: 205: 203: 199: 196:Power Station 194: 190: 186: 183: 182:Lac d'Emosson 180: 176: 171: 167: 163: 160: 157: 153: 148: 144: 140: 136: 133:1.9 billion, 132: 128: 124: 120: 116: 112: 108: 104: 100: 95: 67: 63: 60: 56: 55:Saint-Maurice 52: 49: 45: 41: 37: 30: 25: 20: 734:Water portal 694:. Retrieved 684: 675: 666: 657: 648: 636:. Retrieved 632:the original 605:. Retrieved 595: 583:. Retrieved 558:. Retrieved 554:the original 529:. Retrieved 525: 515: 503:. Retrieved 493: 482:. Retrieved 480:. 2022-06-29 477: 453:. Retrieved 441: 437: 407: 388: 381: 365: 348: 336: 260: 258: 220:Francis-type 137:1.5 billion) 372:Émosson Dam 311: [ 300: [ 218:reversible 105:Operational 89: / 65:Coordinates 42:Switzerland 760:Categories 696:31 October 638:11 January 607:11 January 585:11 January 560:11 January 531:11 January 505:11 January 484:2022-07-02 455:8 February 416:References 325:Background 306:(15%) and 77:06°54′36″E 74:46°03′49″N 786:Arch dams 395:penstocks 121:July 2022 444:(6681). 410:Implenia 376:arch dam 285:Martigny 214:6 x 150 142:Owner(s) 47:Location 581:. Alpiq 526:Reuters 438:Science 295:(36%), 291:(39%), 277:Finhaut 178:Creates 155:Creates 51:Finhaut 39:Country 354:Design 273:Valais 269:canton 248:(est.) 244:2,500 102:Status 59:Valais 374:, an 315:] 304:] 289:Alpiq 263:is a 698:2018 640:2015 609:2015 587:2015 562:2015 533:2015 507:2015 457:2024 259:The 231:900 446:doi 442:383 319:GWh 293:SBB 271:of 246:GWh 131:CHF 762:: 674:. 656:. 617:^ 570:^ 541:^ 524:. 476:. 465:^ 440:. 436:. 424:^ 321:. 313:fr 302:de 233:MW 216:MW 57:, 53:, 700:. 642:. 611:. 589:. 564:. 535:. 509:. 487:. 459:. 448:: 135:€

Index


Finhaut
Saint-Maurice
Valais
46°03′49″N 06°54′36″E / 46.06361°N 6.91000°E / 46.06361; 6.91000
CHF

Lac du Vieux Emosson
Lac d'Emosson
Hydraulic head
MW
Francis-type
Installed capacity
MW
Annual generation
GWh
pumped-storage
canton
Valais
Finhaut
Saint-Maurice
Martigny
Alpiq
SBB
Industrielle Werke Basel
de
Forces Motrices Valaisannes
fr
GWh

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.