349: 391: 345:. The shore-side ends of the cables were winched through 650m long horizontal drill ducts under the beach to join with the onshore cable. The offshore cables were then laid across the sea-bed by the installation vessel 'Cable Enterprise', before being buried under the seabed by remotely-operated submarine. The first of the cables was laid out to its offshore substation by 18 June 2021, with the second expected during July 2021. 1605: 405: 377: 1593: 1617: 289:
was awarded exclusive rights to develop the wind farm in February 2009. They proposed using 125 3.6MW turbines or 75 6MW turbines to achieve a total capacity of between 420 and 450 megawatts. In 2011, surveyors conducting a detailed preparatory survey of the sea floor published sonar images of the
324:
The project was acquired in May 2018 by EDF and is expected to be commissioned in 2023. In December 2018, permission was received from the Scottish government to reduce the number of turbines to 54 while maintaining the same overall capacity. Construction began in August 2020. The wind farm was
356:
Work continued in September 2021 when two shunt reactors were delivered to the Lammermuir Hills site by Collett Transport. Originating overseas, the shunt reactors travelled over 5000 miles to the Port of Leith in Scotland before onward transport to the substation site.
305:
A planning application was submitted in July 2012. The developers said that the wind farm would occupy an area of around 65 square miles, would require between 64 and 125 turbines, and would have a rated capacity of 450MW. The estimated cost was £1.4 billion.
641:"RECLAIMING MOTIONS IN THE PETITIONS BY THE ROYAL SOCIETY FOR THE PROTECTION OF BIRDS AGAINST THE SCOTTISH MINISTERS AND (FIRST) INCH CAPE OFFSHORE LTD; (SECOND) NEART NA GAOITHE OFFSHORE WIND LTD; AND (THIRD) SEAGREEN WIND ENERGY LTD FOR JUDICIAL REVIEW" 278:. It has a potential capacity of 450 MW. It is being developed by EDF Renewables and ESB. Offshore work began in 2020, with completion originally planned for 2023 but delayed due to supply chain challenges until 2024. 882: 533: 313:
SWT-6.0-154 turbines each with a 6 megawatt capacity. A UK government contract was awarded in February 2015. Construction was expected to begin in 2015, but in January 2015 the
922: 1566: 1265: 990: 333:
Work on the offshore elements of the wind farm began in August 2020. Two 37 km long high-voltage export cables will bring the electricity back to the landfall at
875: 1643: 360:
In January 2022 two 180-tonne super grid transformers were delivered to the onshore substation. The first substation installation completed on 8 June 2022.
752: 733: 1609: 912: 868: 314: 1620: 715: 1648: 1305: 907: 598: 325:
expected to be operational by 2023 but due to supply chain challenges EDF announced in 2022 that completion would be delayed to summer 2024.
321:
in Edinburgh in May 2015. In May 2017 the same court overturned a July 2016 block of the project. An RSPB appeal was denied in July 2017.
466: 1400: 1350: 1315: 658: 824: 688: 640: 1526: 1335: 891: 1220: 1420: 1360: 1295: 1165: 788: 902: 1395: 1020: 838: 425: 55: 1456: 1425: 1300: 286: 1355: 1310: 1280: 1466: 1325: 1290: 1230: 1210: 1130: 1050: 1045: 262: 1571: 1497: 1205: 1170: 1140: 1040: 1025: 410: 1576: 1502: 1390: 1185: 1155: 1135: 1100: 420: 1507: 1441: 1215: 1150: 1115: 1095: 1080: 1055: 1548: 806: 1385: 1200: 1190: 1070: 1035: 299: 770: 575: 549: 513: 483: 1370: 1246: 1195: 1160: 1030: 1015: 1010: 1005: 945: 390: 317:
submitted a legal challenge citing concerns over the impact on seabirds. The case was heard at the
613: 334: 1541: 1405: 1285: 1225: 1105: 310: 196: 143: 535:
Critical period for Fife's £1.4 billion Neart Na Gaoithe windfarm as preferred contractors named
1597: 1534: 1451: 1446: 1375: 1365: 1415: 1410: 1251: 1120: 348: 318: 1340: 1330: 1125: 1075: 1065: 970: 382: 254: 666: 1487: 1320: 1110: 1085: 965: 960: 396: 271: 115: 43: 1637: 1175: 1060: 980: 950: 1492: 1471: 1345: 860: 342: 1145: 404: 1512: 1380: 1180: 1090: 930: 716:"EDF Group Acquires Troubled 450 Megawatt Neart na Gaoithe Offshore Wind Farm" 372: 70: 57: 275: 267: 135: 120: 1592: 753:"Scottish Government gives consent for Neart na Gaoithe offshore wind farm" 233: 580: 518: 338: 33: 935: 295: 734:"Neart na Gaoithe project enters first phase of offshore construction" 975: 940: 689:"Go-Ahead Given For 450 Megawatt Neart na Gaoithe Offshore Wind Farm" 659:"Inner House of the Court of Session in favour of Scottish Ministers" 618: 291: 599:"RSPB confident over legal challenge to massive windfarm projects" 347: 352:
Two 160Te Shunt Reactors for Neart na Gaoithe Offshore Wind Farm
864: 445: 221: 955: 855: 789:"37km offshore cable will connect NnG to onshore substation" 309:
In February 2014 they confirmed that they would be using 75
363:
The first turbine installation was completed in July 2023
484:"Sea search stumbles upon submarines Navy tried to forget" 576:"UK green policy risks development, say Scots ministers" 1559: 1525: 1480: 1434: 1273: 1264: 1239: 998: 989: 921: 514:"Mainstream submits £1.4bn plan for Fife wind farm" 216: 211: 195: 174: 160: 152: 134: 129: 108: 94: 86: 49: 39: 29: 20: 1567:List of offshore wind farms in the United Kingdom 614:"Judge overturns block on Scottish wind farms" 550:"Scottish wind farm projects secure contracts" 876: 593: 591: 8: 856:Neart na Gaoithe Offshore Wind Farm Website 807:"Collett delivers NNG onshore transformers" 508: 506: 504: 461: 459: 446:"Neart na Gaoithe (NNG) Offshore Wind Farm" 1270: 995: 883: 869: 861: 17: 913:Offshore wind power in the United Kingdom 1306:European Offshore Wind Deployment Centre 274:, 15.5 kilometres (9.6 mi) east of 437: 908:Renewable energy in the United Kingdom 771:"Offshore Cable Installation Campaign" 471:, East Lothian Courier, 28 April 2011 261: 7: 1644:Offshore wind farms in the North Sea 1616: 482:Macdonell, Hamish (13 August 2011). 14: 1615: 1604: 1603: 1591: 892:Wind power in the United Kingdom 825:"NNG First substation installed" 612:Thomas, Nathalie (17 May 2017). 601:. thecourier.co.uk. 22 May 2015. 403: 389: 375: 270:under construction in the outer 1649:Proposed wind farms in Scotland 290:wrecks of the two submarines – 714:Hill, Joshua S. (4 May 2018). 538:, TheCourier, 20 February 2014 1: 839:"NNG First turbine installed" 665:. 16 May 2017. Archived from 153:Distance from shore 903:Energy in the United Kingdom 751:Now, Scottish Construction. 188:Units under const. 426:List of offshore wind farms 253:("strength of the wind" in 1665: 287:Mainstream Renewable Power 1585: 898: 757:Scottish Construction Now 230: 183: 179: 25: 1467:Sofia Offshore Wind Farm 167:167 m (548 ft) 1572:North Sea Offshore Grid 411:Renewable energy portal 263:[ˈɲarʃdnəgɤ.jə] 197:Nameplate capacity 156:20 km (12 mi) 95:Construction began 90:Under construction 1577:Wind power in Scotland 1351:Lynn and Inner Dowsing 421:Wind power in Scotland 353: 1598:Wind power portal 645:www.scotcourts.gov.uk 351: 175:Power generation 1527:Installation vessels 1421:West of Duddon Sands 300:Battle of May Island 1266:Offshore wind farms 1166:Little Cheyne Court 212:External links 161:Rotor diameter 67: /  991:Onshore wind farms 813:. 29 January 2022. 663:neartnagaoithe.com 556:. 26 February 2015 488:The Times Scotland 354: 298:– sunk during the 71:56.2678°N 2.3208°W 1631: 1630: 1521: 1520: 1260: 1259: 1021:Askam and Ireleth 793:NnG Offshore Wind 775:NnG Offshore Wind 584:, 4 December 2013 468:Wind views wanted 450:NNG Offshore Wind 266:) is an offshore 241: 240: 1656: 1619: 1618: 1607: 1606: 1596: 1595: 1462:Neart Na Gaoithe 1426:Westermost Rough 1401:Sheringham Shoal 1271: 996: 885: 878: 871: 862: 843: 842: 835: 829: 828: 821: 815: 814: 803: 797: 796: 785: 779: 778: 767: 761: 760: 748: 742: 741: 730: 724: 723: 711: 705: 704: 702: 700: 685: 679: 678: 676: 674: 669:on 16 March 2022 655: 649: 648: 637: 631: 630: 628: 626: 609: 603: 602: 595: 586: 585: 572: 566: 565: 563: 561: 546: 540: 539: 530: 524: 523: 510: 499: 498: 496: 494: 479: 473: 472: 463: 454: 453: 442: 413: 408: 407: 399: 394: 393: 385: 380: 379: 378: 341:on the coast of 319:Court of Session 265: 260: 251:Neart Na Gaoithe 245:Wind farm layout 234:edit on Wikidata 226: 223: 82: 81: 79: 78: 77: 76:56.2678; -2.3208 72: 68: 65: 64: 63: 60: 21:Neart Na Gaoithe 18: 1664: 1663: 1659: 1658: 1657: 1655: 1654: 1653: 1634: 1633: 1632: 1627: 1590: 1581: 1555: 1517: 1476: 1430: 1331:Hywind Scotland 1311:Greater Gabbard 1256: 1235: 1126:Goonhilly Downs 985: 971:Talisman Energy 917: 894: 889: 852: 847: 846: 837: 836: 832: 823: 822: 818: 805: 804: 800: 795:. 18 June 2021. 787: 786: 782: 777:. 18 June 2021. 769: 768: 764: 750: 749: 745: 732: 731: 727: 713: 712: 708: 698: 696: 687: 686: 682: 672: 670: 657: 656: 652: 639: 638: 634: 624: 622: 611: 610: 606: 597: 596: 589: 574: 573: 569: 559: 557: 548: 547: 543: 532: 531: 527: 512: 511: 502: 492: 490: 481: 480: 476: 465: 464: 457: 444: 443: 439: 434: 417: 416: 409: 402: 395: 388: 383:Scotland portal 381: 376: 374: 369: 331: 284: 258: 248: 247: 246: 237: 222:nngoffshorewind 220: 207: 170: 148: 130:Wind farm 125: 104: 75: 73: 69: 66: 61: 58: 56: 54: 53: 12: 11: 5: 1662: 1660: 1652: 1651: 1646: 1636: 1635: 1629: 1628: 1626: 1625: 1613: 1601: 1586: 1583: 1582: 1580: 1579: 1574: 1569: 1563: 1561: 1557: 1556: 1554: 1553: 1546: 1543:MPI Resolution 1539: 1531: 1529: 1523: 1522: 1519: 1518: 1516: 1515: 1510: 1505: 1500: 1495: 1490: 1488:Atlantic Array 1484: 1482: 1478: 1477: 1475: 1474: 1469: 1464: 1459: 1454: 1449: 1444: 1438: 1436: 1432: 1431: 1429: 1428: 1423: 1418: 1413: 1408: 1403: 1398: 1393: 1388: 1383: 1378: 1373: 1368: 1363: 1358: 1353: 1348: 1343: 1338: 1333: 1328: 1326:Humber Gateway 1323: 1318: 1316:Gunfleet Sands 1313: 1308: 1303: 1298: 1293: 1288: 1283: 1277: 1275: 1268: 1262: 1261: 1258: 1257: 1255: 1254: 1249: 1243: 1241: 1237: 1236: 1234: 1233: 1231:Winscales Moor 1228: 1223: 1218: 1213: 1211:Trimdon Grange 1208: 1203: 1198: 1193: 1188: 1183: 1178: 1173: 1168: 1163: 1158: 1153: 1148: 1143: 1138: 1133: 1131:Great Eppleton 1128: 1123: 1118: 1113: 1108: 1103: 1098: 1093: 1088: 1086:Cold Northcott 1083: 1078: 1073: 1068: 1063: 1058: 1053: 1051:Brechfa Forest 1048: 1046:Braes of Doune 1043: 1038: 1033: 1028: 1026:Beinn an Tuirc 1023: 1018: 1013: 1008: 1002: 1000: 993: 987: 986: 984: 983: 978: 973: 968: 966:SSE Renewables 963: 961:Siemens Gamesa 958: 953: 948: 943: 938: 933: 927: 925: 919: 918: 916: 915: 910: 905: 899: 896: 895: 890: 888: 887: 880: 873: 865: 859: 858: 851: 850:External links 848: 845: 844: 830: 816: 798: 780: 762: 743: 725: 706: 695:. 21 July 2017 680: 650: 632: 604: 587: 567: 541: 525: 522:, 29 July 2012 500: 474: 455: 436: 435: 433: 430: 429: 428: 423: 415: 414: 400: 397:Weather portal 386: 371: 370: 368: 365: 330: 327: 283: 280: 272:Firth of Forth 244: 243: 242: 239: 238: 231: 228: 227: 218: 214: 213: 209: 208: 206: 205: 201: 199: 193: 192: 191:54 × 8 MW 189: 185: 184: 181: 180: 177: 176: 172: 171: 169: 168: 164: 162: 158: 157: 154: 150: 149: 147: 146: 140: 138: 132: 131: 127: 126: 124: 123: 118: 116:EDF Renewables 112: 110: 106: 105: 103: 102: 101:13 August 2020 98: 96: 92: 91: 88: 84: 83: 51: 47: 46: 44:Firth of Forth 41: 37: 36: 31: 27: 26: 23: 22: 13: 10: 9: 6: 4: 3: 2: 1661: 1650: 1647: 1645: 1642: 1641: 1639: 1624: 1623: 1614: 1612: 1611: 1602: 1600: 1599: 1594: 1588: 1587: 1584: 1578: 1575: 1573: 1570: 1568: 1565: 1564: 1562: 1558: 1552: 1551: 1550:MPI Discovery 1547: 1545: 1544: 1540: 1538: 1537: 1536:MPI Adventure 1533: 1532: 1530: 1528: 1524: 1514: 1511: 1509: 1506: 1504: 1501: 1499: 1498:Docking Shoal 1496: 1494: 1491: 1489: 1486: 1485: 1483: 1479: 1473: 1470: 1468: 1465: 1463: 1460: 1458: 1455: 1453: 1450: 1448: 1445: 1443: 1440: 1439: 1437: 1433: 1427: 1424: 1422: 1419: 1417: 1414: 1412: 1409: 1407: 1404: 1402: 1399: 1397: 1394: 1392: 1389: 1387: 1384: 1382: 1379: 1377: 1374: 1372: 1369: 1367: 1364: 1362: 1359: 1357: 1354: 1352: 1349: 1347: 1344: 1342: 1339: 1337: 1336:Kentish Flats 1334: 1332: 1329: 1327: 1324: 1322: 1319: 1317: 1314: 1312: 1309: 1307: 1304: 1302: 1299: 1297: 1294: 1292: 1289: 1287: 1284: 1282: 1279: 1278: 1276: 1272: 1269: 1267: 1263: 1253: 1250: 1248: 1245: 1244: 1242: 1238: 1232: 1229: 1227: 1224: 1222: 1219: 1217: 1214: 1212: 1209: 1207: 1206:Slieve Rushen 1204: 1202: 1199: 1197: 1194: 1192: 1189: 1187: 1184: 1182: 1179: 1177: 1176:Moel Maelogan 1174: 1172: 1171:Milton Keynes 1169: 1167: 1164: 1162: 1159: 1157: 1154: 1152: 1149: 1147: 1144: 1142: 1141:Holmside Hall 1139: 1137: 1134: 1132: 1129: 1127: 1124: 1122: 1119: 1117: 1114: 1112: 1109: 1107: 1104: 1102: 1099: 1097: 1094: 1092: 1089: 1087: 1084: 1082: 1079: 1077: 1074: 1072: 1069: 1067: 1064: 1062: 1061:Carland Cross 1059: 1057: 1054: 1052: 1049: 1047: 1044: 1042: 1041:Blyth Harbour 1039: 1037: 1034: 1032: 1029: 1027: 1024: 1022: 1019: 1017: 1014: 1012: 1009: 1007: 1004: 1003: 1001: 997: 994: 992: 988: 982: 981:ScottishPower 979: 977: 974: 972: 969: 967: 964: 962: 959: 957: 954: 952: 951:REG WindPower 949: 947: 944: 942: 939: 937: 934: 932: 929: 928: 926: 924: 920: 914: 911: 909: 906: 904: 901: 900: 897: 893: 886: 881: 879: 874: 872: 867: 866: 863: 857: 854: 853: 849: 840: 834: 831: 826: 820: 817: 812: 808: 802: 799: 794: 790: 784: 781: 776: 772: 766: 763: 758: 754: 747: 744: 739: 735: 729: 726: 721: 720:CleanTechnica 717: 710: 707: 694: 693:CleanTechnica 690: 684: 681: 668: 664: 660: 654: 651: 646: 642: 636: 633: 621: 620: 615: 608: 605: 600: 594: 592: 588: 583: 582: 577: 571: 568: 555: 551: 545: 542: 537: 536: 529: 526: 521: 520: 515: 509: 507: 505: 501: 489: 485: 478: 475: 470: 469: 462: 460: 456: 451: 447: 441: 438: 431: 427: 424: 422: 419: 418: 412: 406: 401: 398: 392: 387: 384: 373: 366: 364: 361: 358: 350: 346: 344: 340: 336: 328: 326: 322: 320: 316: 312: 307: 303: 301: 297: 293: 288: 281: 279: 277: 273: 269: 264: 256: 252: 235: 229: 225: 219: 215: 210: 203: 202: 200: 198: 194: 190: 187: 186: 182: 178: 173: 166: 165: 163: 159: 155: 151: 145: 142: 141: 139: 137: 133: 128: 122: 119: 117: 114: 113: 111: 107: 100: 99: 97: 93: 89: 85: 80: 52: 48: 45: 42: 38: 35: 32: 28: 24: 19: 16: 1621: 1608: 1589: 1549: 1542: 1535: 1503:First Flight 1493:Celtic Array 1472:Triton Knoll 1461: 1391:Scroby Sands 1346:London Array 1186:Ovenden Moor 1156:Langley Park 1136:Hadyard Hill 833: 819: 810: 801: 792: 783: 774: 765: 756: 746: 737: 728: 719: 709: 697:. Retrieved 692: 683: 671:. Retrieved 667:the original 662: 653: 644: 635: 623:. Retrieved 617: 607: 579: 570: 558:. Retrieved 553: 544: 534: 528: 517: 491:. Retrieved 487: 477: 467: 449: 440: 362: 359: 355: 343:East Lothian 337:Beach, near 335:Thorntonloch 332: 329:Construction 323: 308: 304: 285: 250: 249: 15: 1508:Navitus Bay 1447:East Anglia 1442:Dogger Bank 1361:North Hoyle 1321:Gwynt y Môr 1216:West Durham 1151:Knabs Ridge 1146:Kilgallioch 1116:Fraisthorpe 1096:Crystal Rig 1081:Coal Clough 1056:Burton Wold 204:450 MW 74: / 50:Coordinates 1638:Categories 1513:Shell Flat 1457:Moray East 1386:Robin Rigg 1381:Rhyl Flats 1296:Burbo Bank 1201:Scout Moor 1191:Pates Hill 1181:Out Newton 1091:Conisholme 1071:Cefn Croes 1036:Blood Hill 931:Ecotricity 811:reNEWS.BIZ 432:References 259:pronounced 59:56°16′04″N 1481:Cancelled 1371:Race Bank 1247:Den Brook 1196:Royd Moor 1161:Lindhurst 1031:Black Law 1016:Arecleoch 1011:Ardrossan 1006:Alltwalis 923:Companies 493:13 August 302:in 1918. 276:Fife Ness 268:wind farm 121:ESB Group 62:2°19′15″W 1610:Category 1435:Proposed 1406:Teesside 1396:Seagreen 1286:Beatrice 1240:Proposed 1226:Whitelee 1221:Westmill 1106:Delabole 1101:Dagenham 581:BBC News 554:BBC News 519:BBC News 367:See also 339:Bilsdean 282:Planning 144:Offshore 109:Owner(s) 40:Location 34:Scotland 1622:Commons 1452:Hornsea 1376:Rampion 1366:Ormonde 1301:Dudgeon 936:Equinor 699:22 July 560:5 March 311:Siemens 217:Website 30:Country 1416:Walney 1411:Thanet 1356:Methil 1281:Barrow 1274:Active 1252:Viking 1121:Garves 999:Active 976:Vestas 946:Ørsted 941:Innogy 673:20 May 625:20 May 619:ft.com 255:Gaelic 87:Status 1560:Other 1341:Lincs 1291:Blyth 1076:Clyde 1066:Carno 232:[ 1111:Farr 701:2017 675:2017 627:2017 562:2015 495:2011 315:RSPB 296:K-17 294:and 224:.com 136:Type 956:RWE 738:EDF 292:K-4 1640:: 809:. 791:. 773:. 755:. 736:. 718:. 691:. 661:. 643:. 616:. 590:^ 578:, 552:. 516:, 503:^ 486:. 458:^ 448:. 257:, 884:e 877:t 870:v 841:. 827:. 759:. 740:. 722:. 703:. 677:. 647:. 629:. 564:. 497:. 452:. 236:]

Index

Scotland
Firth of Forth
56°16′04″N 2°19′15″W / 56.2678°N 2.3208°W / 56.2678; -2.3208
EDF Renewables
ESB Group
Type
Offshore
Nameplate capacity
nngoffshorewind.com
edit on Wikidata
Gaelic
[ˈɲarʃdnəgɤ.jə]
wind farm
Firth of Forth
Fife Ness
Mainstream Renewable Power
K-4
K-17
Battle of May Island
Siemens
RSPB
Court of Session
Thorntonloch
Bilsdean
East Lothian
Two 160Te Shunt Reactors for Neart na Gaoithe Offshore Wind Farm