to establish the plant was done in 2015. The construction of the plant was officiated on 2 February 2019 and constructed officially started on 28 February 2019 in a groundbreaking ceremony officiated by
419: 138: 444: 400: 335: 439: 393: 429: 272: 386: 131: 232: 434: 229: 243:
The plant is constructed in a 17.7 hectares of land. There are 35 buildings being constructed at the plant site.
327: 54: 235:. On 31 March 2022, concrete started to be poured into the inner walls of the plant three reaction tanks. 200: 95: 362: 260: 251:
Once completed, the plant will have a processing capacity of 250,000 m of wastewater per day.
224: 204: 106: 35: 370: 413: 208: 116: 259:
The plant costs US$ 262.7 million which was financed by a loan provided by the
321: 319: 153: 140: 44: 24: 292: 290: 288: 212: 16:
Wastewater treatment plant in Songino Khairkhan, Ulaanbaatar, Mongolia
298: 328:"CREC4-built sewage plant in Ulaanbaatar reaches new milestone" 18: 299:"Construction of new sewage treatment plant is slow as usual" 369:
This article about a building or structure in Mongolia is a
425:
Buildings and structures under construction in Mongolia
374: 49: 39: 185: 177: 169: 130: 122: 112: 102: 91: 86: 77: 326:Ma, Chengguang; Zhuang, Qiange (6 July 2022). 394: 8: 401: 387: 297:Munkhbat, Amarjargal (22 September 2023). 74: 420:Buildings and structures in Ulaanbaatar 284: 445:Mongolian building and structure stubs 197:New Central Wastewater Treatment Plant 78:New Central Wastewater Treatment Plant 338:from the original on 27 November 2023 7: 359: 357: 14: 361: 273:Environmental issues in Mongolia 23: 263:to the Government of Mongolia. 1: 440:Waste management in Mongolia 373:. You can help Knowledge by 203:plant under construction in 461: 356: 205:Songino Khairkhan District 82: 247:Technical specifications 430:Sewage treatment plants 38:, as no other articles 154:47.90250°N 106.76250°E 233:Ukhnaagiin Khürelsükh 201:wastewater treatment 96:wastewater treatment 261:Government of China 159:47.90250; 106.76250 150: /  87:General information 57:for suggestions. 47:to this page from 435:Songino Khairkhan 382: 381: 225:feasibility study 193: 192: 181:US$ 262.7 million 107:Songino Khairkhan 71: 70: 452: 403: 396: 389: 365: 358: 348: 347: 345: 343: 323: 314: 313: 311: 309: 294: 173:28 February 2019 165: 164: 162: 161: 160: 155: 151: 148: 147: 146: 143: 75: 66: 63: 52: 50:related articles 27: 19: 460: 459: 455: 454: 453: 451: 450: 449: 410: 409: 408: 407: 354: 352: 351: 341: 339: 325: 324: 317: 307: 305: 296: 295: 286: 281: 269: 257: 249: 241: 221: 158: 156: 152: 149: 144: 141: 139: 137: 136: 67: 61: 58: 48: 45:introduce links 28: 17: 12: 11: 5: 458: 456: 448: 447: 442: 437: 432: 427: 422: 412: 411: 406: 405: 398: 391: 383: 380: 379: 366: 350: 349: 315: 283: 282: 280: 277: 276: 275: 268: 265: 256: 253: 248: 245: 240: 237: 230:Prime Minister 220: 217: 191: 190: 187: 183: 182: 179: 175: 174: 171: 170:Groundbreaking 167: 166: 134: 128: 127: 124: 120: 119: 114: 110: 109: 104: 100: 99: 93: 89: 88: 84: 83: 80: 79: 69: 68: 55:Find link tool 31: 29: 22: 15: 13: 10: 9: 6: 4: 3: 2: 457: 446: 443: 441: 438: 436: 433: 431: 428: 426: 423: 421: 418: 417: 415: 404: 399: 397: 392: 390: 385: 384: 378: 376: 372: 367: 364: 360: 355: 337: 333: 329: 322: 320: 316: 304: 300: 293: 291: 289: 285: 278: 274: 271: 270: 266: 264: 262: 254: 252: 246: 244: 238: 236: 234: 231: 226: 218: 216: 214: 210: 206: 202: 198: 189:17.7 hectares 188: 184: 180: 176: 172: 168: 163: 135: 133: 129: 125: 121: 118: 115: 111: 108: 105: 101: 97: 94: 90: 85: 81: 76: 73: 65: 62:November 2023 56: 51: 46: 42: 41: 37: 32:This article 30: 26: 21: 20: 375:expanding it 368: 353: 340:. Retrieved 331: 308:12 September 306:. Retrieved 302: 258: 250: 242: 239:Architecture 222: 196: 194: 113:Town or city 72: 59: 33: 342:27 November 332:China Daily 209:Ulaanbaatar 157: / 145:106°45′45″E 132:Coordinates 117:Ulaanbaatar 414:Categories 279:References 142:47°54′09″N 53:; try the 40:link to it 43:. Please 336:Archived 267:See also 213:Mongolia 126:Mongolia 103:Location 303:UB Post 255:Finance 219:History 186:Grounds 123:Country 36:orphan 34:is an 199:is a 98:plant 371:stub 344:2023 310:2024 223:The 195:The 178:Cost 92:Type 416:: 334:. 330:. 318:^ 301:. 287:^ 215:. 211:, 207:, 402:e 395:t 388:v 377:. 346:. 312:. 64:) 60:(

Index


orphan
link to it
introduce links
related articles
Find link tool
wastewater treatment
Songino Khairkhan
Ulaanbaatar
Coordinates
47°54′09″N 106°45′45″E / 47.90250°N 106.76250°E / 47.90250; 106.76250
wastewater treatment
Songino Khairkhan District
Ulaanbaatar
Mongolia
feasibility study
Prime Minister
Ukhnaagiin Khürelsükh
Government of China
Environmental issues in Mongolia



"Construction of new sewage treatment plant is slow as usual"