Knowledge (XXG)

Neuchâtel–Pontarlier railway

Source 📝

1061: 1184: 1172: 1045: 1053: 867: 1192: 929: 874: 936: 748: 578: 427: 311: 961: 571: 420: 318: 225: 843: 715: 693: 633: 602: 899: 663: 541: 511: 481: 451: 375: 345: 283: 253: 40: 1158:
The French section of the line was nationalised along with the rest of the PLM on 1 January 1938 and integrated into the SNCF. To speed up the electrification of Les Verrières via Pontarlier to Dole, SNCF received financial support from Switzerland. The section from Les Verrières to Pontarlier has
1258:
without stopping; the border station serves only goods traffic. The trains continue to Pontarlier on French soil, but still using the Swiss electrical system. The electrification changes in Pontarlier station from the Swiss to the French system.
1119:
retreated into Switzerland and were disarmed and interned in Les Verrières. On 22 March when the interned troops were released and were being repatriated by train a collision occurred due to an incorrect setting of
1329:
The Les Verrières–Pontarlier section is the only line that is operated by the French infrastructure manager RFF that is electrified on the 15,000 V 16.7 Hz system. It is therefore used for test runs of
1147:(Jura-Simplon-Bahn, JS). Due to the nationalisation of the JS on 1 May 1903, the Swiss part of the line was transferred to the Swiss Federal Railways (SBB), which has operated the line electrically at 1097: 1159:
been equipped since 3 June 1956 with the Swiss power system of 15,000 V 16.7 Hz so that the Swiss traction can run through to Pontarlier. Electrical operations commenced with
1152: 1559: 1574: 330: 1579: 1569: 1081: 356: 1140: 48: 1564: 1554: 1460: 1376: 970: 852: 53: 1471: 1160: 1148: 157: 492: 1396: 775: 238: 1425: 1077: 264: 184: 83: 1505: 1033: 803: 210: 1239: 587: 1222:. Continuing up the Areuse gorge, the line passes between rocks and over numerous bridges. Regional trains cross in 1064:
Locomotive Ae 3/6 I 10693 on the occasion of the opening of the electrification between Neuchâtel and Les Verrières
1522: 884: 522: 401: 1144: 1060: 946: 1104:
line opened by FS on 7 November 1859. Initially, the PLM was responsible for the operation of the whole line.
1125: 552: 462: 152: 1132: 1116: 1029: 1025: 1183: 1323: 1315: 1296: 1235: 1196: 1112: 1089: 1331: 1171: 1108: 1339: 1292: 910: 1456: 1372: 1219: 1211: 1207: 1101: 436: 234: 1076:
line was opened on 25 July 1860. Even during the construction, there were disputes where the
1255: 1085: 726: 17: 1044: 1121: 1128:. The driver and 22 internees were killed and 72 soldiers were injured, some seriously. 1478: 1238:, where most of the trains operated by Transports Régionaux Neuchâtelois branch off on 1203: 124: 1052: 1548: 1319: 44: 1268: 1227: 1223: 1176: 1131:
The Swiss section was transferred as a result of a merger on 1 January 1872 to the
1392: 1306:(TRN), ran every 30 minutes on the Neuchâtel–Travers section, continuing over the 1191: 1251: 701: 119: 1421: 1155:(SNCF) took over the operation of trains in Les Verrières for the time being. 1096:, FS) and the section from Les Verrières to Pontarlier belonged to the French 1073: 88: 1497: 1280: 1279:
route with stops in Neuchâtel and Pontarlier, connecting in Frasne with the
1247: 1231: 1080:
should lie. An already built section was abandoned and used instead for the
1069: 644: 1342:
electric locomotive were tested on it under 16.7 Hz power when new.
1311: 1284: 1215: 179: 811: 794: 777: 756: 383: 1335: 1276: 1243: 613: 1214:
as far as Auvernier. The line then runs through the vineyards up to
39: 1288: 1190: 1182: 1170: 1059: 1051: 1043: 1272: 1242:. The line continues to Pontarlier, past the former stations of 1048:
Steam train in the Areuse gorge between Bôle and Champ-du-Moulin
1143:(Suisse-Occidentale–Simplon, SOS) and on 1 January 1890 to the 1032:(SBB) and the French public railway infrastructure company 1100:(PLM). The section to Auvernier was built as part of the 1318:. During peak hours, additional services run, using TRN 1302:
In 2018, Regio services, operated in collaboration with
1163:
on the line from Pontarlier to Dole on 25 April 1958.
1111:, when during January and February 1871, the French 1504:(in German). Association RVT-Historique, Travers. 1098:
Chemins de fer de Paris à Lyon et à la Méditerranée
151: 118: 110: 102: 97: 76: 68: 63: 32: 1187:Elevation profile of the Neuchâtel–Pontarlier line 1151:since 22 November 1942. Steam locomotives of the 1226:station, where it is possible to see the famous 1453:Schienennetz Schweiz und Bahnprofil Schweiz CH+ 1371:]. Schweers + Wall. 2012. pp. 16–7. 1334:rolling stock. As a result, the four-system 1153:Société nationale des chemins de fer français 8: 1295:route. It is operated by SBB Regional using 1107:The railway played an important role in the 1530:Erster Teil. Geschichte des Eisenbahnwesens 1416: 1414: 192: 165: 1575:Cross-border railway lines in Switzerland 58:in Neuchâtel on the way to Travers–Buttes 1560:Railway lines in Bourgogne-Franche-Comté 1470:Siegfried, Pascal (25 September 2007). 1356: 1137:Chemins de fer de la Suisse Occidentale 1024:(Franco-Swiss) line, is a single-track 167: 1195:Pontarlier station with Z2 railcar of 1084:. The line to the frontier station at 29: 27:Railway line in Switzerland and France 1508:from the original on 4 September 2018 1428:from the original on 23 February 2018 1338:high-speed sets and a variant of the 7: 1580:Cross-border railway lines in France 1399:from the original on 18 January 2018 1254:. All passenger trains pass through 1056:Steam train on the viaduct of Couvet 1472:"Internationale Bahnlinien im Jura" 1141:Western Switzerland–Simplon Company 1082:La Chaux-de-Fonds–Neuchâtel railway 1570:1860 establishments in Switzerland 25: 1304:Transports Régionaux Neuchâtelois 1139:, SO) on 28 June 1881 and to the 49:Transports Régionaux Neuchâtelois 1523:"Das Eisenbahnwesen der Schweiz" 1455:(in German). Zürich: AS Verlag. 959: 934: 928: 927: 897: 873: 872: 865: 841: 746: 713: 691: 661: 631: 600: 576: 569: 539: 509: 479: 449: 425: 418: 373: 343: 316: 309: 281: 251: 223: 38: 866: 1179:in the background, around 1930 935: 747: 577: 426: 310: 1: 1424:(in French). Travers - Info. 1395:(in French). Travers - Info. 1271:services run each day on the 1175:Champ-du-Moulin station with 960: 570: 419: 317: 224: 106:36.09 km (22.43 mi) 1565:Railway lines opened in 1860 1555:Railway lines in Switzerland 1521:Weissenbach, Placid (1913). 1218:and provides a good view of 1014:Neuchâtel–Pontarlier railway 998:Source: Swiss railway atlas 853:Frasne–Les Verrières railway 842: 714: 692: 632: 601: 33:Neuchâtel–Pontarlier railway 18:Neuchâtel-Pontarlier railway 1498:"Die Val-de-Travers-Linie" 1477:(in German). Archived from 898: 662: 540: 510: 480: 450: 374: 344: 282: 252: 1596: 1308:Régional du Val-de-Travers 1149:15,000 V 16.7 Hz 1230:. The line continues via 1202:Trains travelling to the 1078:Neuchâtel railway station 968: 953: 943: 921: 891: 881: 859: 850: 835: 740: 707: 700: 685: 655: 625: 594: 585: 563: 533: 503: 473: 443: 434: 412: 367: 337: 328: 303: 275: 245: 232: 217: 195: 164: 37: 1161:25,000 V 50 Hz 588:to Buttes and St-Sulpice 1532:(in German). p. 66 1451:Wägli, Hans G. (2010). 1094:Compagnie Franco-Suisse 1365:Eisenbahnatlas Schweiz 1199: 1188: 1180: 1133:Western Swiss Railways 1115:with 87,000 men under 1065: 1057: 1049: 1034:Réseau ferré de France 1030:Swiss Federal Railways 1026:standard-gauge railway 1194: 1186: 1174: 1063: 1055: 1047: 1145:Jura–Simplon Railway 1090:Franco-Swiss Company 1016:, also known as the 437:to Yverdon-les-Bains 331:to La Chaux-de-Fonds 1369:Swiss railway atlas 1109:Franco-Prussian War 1102:Neuchâtel–Vaumarcus 357:Neuchâtel-Serrières 294:Neuchâtel-Vauseyon 1526:(PDF 14.8 MB) 1293:Paris Gare de Lyon 1240:the line to Buttes 1200: 1189: 1181: 1066: 1058: 1050: 885:line from Vallorbe 1462:978-3-909111-74-9 1378:978-3-89494-130-7 1208:Jura Foot Railway 1197:TER Franche-Comté 1167:Route description 1010: 1009: 1006: 1005: 1002: 1001: 993: 992: 824: 823: 809: 808: 790: 789: 769: 768: 396: 395: 160:overhead catenary 16:(Redirected from 1587: 1541: 1539: 1537: 1527: 1517: 1515: 1513: 1493: 1491: 1489: 1483: 1476: 1466: 1438: 1437: 1435: 1433: 1422:"2018 timetable" 1418: 1409: 1408: 1406: 1404: 1393:"2018 timetable" 1389: 1383: 1382: 1361: 1210:running towards 1117:General Bourbaki 1088:belonged to the 1028:line run by the 963: 962: 938: 937: 931: 930: 901: 900: 876: 875: 869: 868: 845: 844: 812: 795: 778: 757: 750: 749: 717: 716: 695: 694: 665: 664: 635: 634: 604: 603: 580: 579: 573: 572: 543: 542: 513: 512: 483: 482: 453: 452: 429: 428: 422: 421: 384: 377: 376: 347: 346: 320: 319: 313: 312: 285: 284: 255: 254: 235:from Biel/Bienne 227: 226: 193: 180: 166: 158:15 kV/16.7 Hz AC 146: 144: 143: 139: 136: 127: 111:Number of tracks 57: 42: 30: 21: 1595: 1594: 1590: 1589: 1588: 1586: 1585: 1584: 1545: 1544: 1535: 1533: 1525: 1520: 1511: 1509: 1496: 1487: 1485: 1484:on 17 June 2018 1481: 1474: 1469: 1463: 1450: 1447: 1442: 1441: 1431: 1429: 1420: 1419: 1412: 1402: 1400: 1391: 1390: 1386: 1379: 1363: 1362: 1358: 1353: 1348: 1265: 1224:Champ-du-Moulin 1169: 1042: 973: 964: 949: 939: 932: 917: 907: 902: 887: 877: 870: 855: 846: 831: 826: 771: 751: 736: 731: 723: 718: 696: 681: 676: 671: 666: 651: 641: 636: 621: 610: 605: 590: 581: 574: 559: 549: 544: 529: 519: 514: 499: 493:Champ-du-Moulin 489: 484: 469: 459: 454: 439: 430: 423: 408: 398: 378: 363: 353: 348: 333: 326: 321: 314: 299: 291: 286: 271: 261: 256: 241: 228: 213: 204: 187: 171: 153:Electrification 141: 137: 134: 132: 131:4 ft  130: 125: 93: 59: 51: 28: 23: 22: 15: 12: 11: 5: 1593: 1591: 1583: 1582: 1577: 1572: 1567: 1562: 1557: 1547: 1546: 1543: 1542: 1518: 1494: 1467: 1461: 1446: 1443: 1440: 1439: 1410: 1384: 1377: 1355: 1354: 1352: 1349: 1347: 1344: 1283:trains on the 1264: 1261: 1220:Lake Neuchâtel 1204:Val de Travers 1168: 1165: 1113:Armée de l'Est 1041: 1038: 1018:Val-de-Travers 1008: 1007: 1004: 1003: 1000: 999: 995: 994: 991: 990: 988: 986: 984: 982: 980: 978: 975: 974: 969: 967: 965: 958: 956: 954: 951: 950: 947:line to Gilley 944: 942: 940: 933: 926: 924: 922: 919: 918: 915: 913: 908: 905: 903: 896: 894: 892: 889: 888: 882: 880: 878: 871: 864: 862: 860: 857: 856: 851: 849: 847: 840: 838: 836: 833: 832: 829: 827: 822: 821: 817: 816: 807: 806: 800: 799: 788: 787: 783: 782: 774: 772: 767: 766: 762: 761: 754: 752: 745: 743: 741: 738: 737: 734: 732: 730:border station 729: 724: 721: 719: 712: 710: 708: 705: 704: 699: 697: 690: 688: 686: 683: 682: 679: 677: 674: 672: 669: 667: 660: 658: 656: 653: 652: 649: 647: 642: 639: 637: 630: 628: 626: 623: 622: 619: 617: 611: 608: 606: 599: 597: 595: 592: 591: 586: 584: 582: 575: 568: 566: 564: 561: 560: 557: 555: 550: 547: 545: 538: 536: 534: 531: 530: 527: 525: 520: 517: 515: 508: 506: 504: 501: 500: 497: 495: 490: 487: 485: 478: 476: 474: 471: 470: 467: 465: 460: 457: 455: 448: 446: 444: 441: 440: 435: 433: 431: 424: 417: 415: 413: 410: 409: 406: 404: 399: 394: 393: 389: 388: 381: 379: 372: 370: 368: 365: 364: 361: 359: 354: 351: 349: 342: 340: 338: 335: 334: 329: 327: 324: 322: 315: 308: 306: 304: 301: 300: 297: 295: 292: 289: 287: 280: 278: 276: 273: 272: 269: 267: 262: 259: 257: 250: 248: 246: 243: 242: 233: 231: 229: 222: 220: 218: 215: 214: 209: 207: 205: 202: 200: 198: 196: 189: 188: 183: 173: 172: 169: 162: 161: 155: 149: 148: 122: 116: 115: 112: 108: 107: 104: 100: 99: 95: 94: 92: 91: 86: 80: 78: 74: 73: 70: 66: 65: 61: 60: 43: 35: 34: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1592: 1581: 1578: 1576: 1573: 1571: 1568: 1566: 1563: 1561: 1558: 1556: 1553: 1552: 1550: 1531: 1524: 1519: 1507: 1503: 1499: 1495: 1480: 1473: 1468: 1464: 1458: 1454: 1449: 1448: 1444: 1427: 1423: 1417: 1415: 1411: 1398: 1394: 1388: 1385: 1380: 1374: 1370: 1366: 1360: 1357: 1350: 1345: 1343: 1341: 1337: 1333: 1327: 1325: 1324:Domino trains 1322:sets and SBB 1321: 1317: 1313: 1309: 1305: 1300: 1298: 1294: 1290: 1286: 1282: 1278: 1274: 1270: 1262: 1260: 1257: 1256:Les Verrières 1253: 1249: 1245: 1241: 1237: 1233: 1229: 1225: 1221: 1217: 1213: 1209: 1205: 1198: 1193: 1185: 1178: 1173: 1166: 1164: 1162: 1156: 1154: 1150: 1146: 1142: 1138: 1134: 1129: 1127: 1123: 1118: 1114: 1110: 1105: 1103: 1099: 1095: 1091: 1087: 1086:Les Verrières 1083: 1079: 1075: 1071: 1062: 1054: 1046: 1039: 1037: 1035: 1031: 1027: 1023: 1022:Franco-Suisse 1019: 1015: 997: 996: 989: 987: 985: 983: 981: 979: 977: 976: 972: 966: 957: 955: 952: 948: 941: 925: 923: 920: 914: 912: 909: 904: 895: 893: 890: 886: 879: 863: 861: 858: 854: 848: 839: 837: 834: 828: 819: 818: 814: 813: 805: 802: 801: 797: 796: 792: 785: 784: 780: 779: 773: 764: 763: 759: 758: 753: 744: 742: 739: 733: 728: 727:Les Verrières 725: 720: 711: 709: 706: 703: 698: 689: 687: 684: 678: 675:Highest point 673: 668: 659: 657: 654: 648: 646: 643: 638: 629: 627: 624: 618: 615: 612: 607: 598: 596: 593: 589: 583: 567: 565: 562: 556: 554: 551: 546: 537: 535: 532: 526: 524: 521: 516: 507: 505: 502: 496: 494: 491: 486: 477: 475: 472: 466: 464: 461: 456: 447: 445: 442: 438: 432: 416: 414: 411: 405: 403: 400: 391: 390: 386: 385: 380: 371: 369: 366: 360: 358: 355: 350: 341: 339: 336: 332: 323: 307: 305: 302: 296: 293: 288: 279: 277: 274: 268: 266: 263: 258: 249: 247: 244: 240: 236: 230: 221: 219: 216: 212: 208: 206: 201: 199: 197: 194: 191: 190: 186: 182: 181: 178: 175: 174: 168: 163: 159: 156: 154: 150: 128: 126:1,435 mm 123: 121: 117: 113: 109: 105: 101: 96: 90: 87: 85: 82: 81: 79: 75: 71: 67: 62: 55: 50: 46: 41: 36: 31: 19: 1534:. Retrieved 1529: 1510:. Retrieved 1502:Travers-Info 1501: 1486:. Retrieved 1482:(PDF 3.2 MB) 1479:the original 1452: 1430:. Retrieved 1401:. Retrieved 1387: 1368: 1364: 1359: 1332:multi-system 1328: 1307: 1303: 1301: 1269:RegioExpress 1266: 1228:Creux du Van 1201: 1177:Creux du Van 1157: 1136: 1130: 1106: 1093: 1067: 1021: 1020:line or the 1017: 1013: 1011: 176: 1275:–Neuchâtel– 1252:Les Bayards 810: 781:Switzerland 702:Les Bayards 120:Track gauge 103:Line length 72:Switzerland 52: [ 1549:Categories 1536:16 October 1512:16 October 1488:16 October 1432:16 October 1403:16 October 1346:References 1263:Operations 1074:Pontarlier 911:Pontarlier 89:Pontarlier 1351:Footnotes 1281:TGV Lyria 1248:Boveresse 1232:Noiraigue 1126:Colombier 1070:Auvernier 971:to Frasne 645:Boveresse 523:Noiraigue 402:Auvernier 265:Neuchâtel 239:from Bern 170:Route map 98:Technical 84:Neuchâtel 1506:Archived 1426:Archived 1397:Archived 1320:RABe 527 1312:Fleurier 1310:line to 1297:RBDe 562 1285:Lausanne 1206:use the 820:boundary 815:property 145: in 64:Overview 45:RABe 527 1445:Sources 1236:Travers 1212:Yverdon 1040:History 1036:(RFF). 945:former 883:former 793:, 553:Travers 140:⁄ 77:Termini 47:of the 1459:  1375:  1336:Thalys 1316:Buttes 1299:sets. 1277:Frasne 1267:Three 1244:Couvet 1122:points 906:453.56 786:France 765:464.84 614:Couvet 185:Legend 177: 69:Locale 1475:(PDF) 1367:[ 1340:Prima 1289:Dijon 1246:CFF, 825: 791: 776: 770: 760:41.07 755: 722:39.36 670:35.54 640:29.47 609:26.04 548:22.45 518:18.11 488:13.65 397: 387:70.34 382: 352:72.39 325:73.96 290:73.96 260:75.29 56:] 1538:2018 1514:2018 1490:2018 1457:ISBN 1434:2018 1405:2018 1373:ISBN 1314:and 1273:Bern 1250:and 1216:Bôle 1068:The 1012:The 916:838m 830:920m 735:931m 680:938m 650:835m 620:775m 616:CFF 558:749m 528:728m 498:649m 468:544m 463:Bôle 458:8.37 407:492m 392:4.98 362:476m 298:475m 270:479m 237:and 211:elev 1234:to 1124:at 804:RFF 798:SBB 1551:: 1528:. 1500:. 1413:^ 1326:. 203:km 54:de 1540:. 1516:. 1492:. 1465:. 1436:. 1407:. 1381:. 1291:– 1287:– 1135:( 1092:( 1072:– 147:) 142:2 138:1 135:+ 133:8 129:( 114:1 20:)

Index

Neuchâtel-Pontarlier railway

RABe 527
Transports Régionaux Neuchâtelois
de
Neuchâtel
Pontarlier
Track gauge
1,435 mm
Electrification
15 kV/16.7 Hz AC
Legend
elev
from Biel/Bienne
from Bern
Neuchâtel
to La Chaux-de-Fonds
Neuchâtel-Serrières
Auvernier
to Yverdon-les-Bains
Bôle
Champ-du-Moulin
Noiraigue
Travers
to Buttes and St-Sulpice
Couvet
Boveresse
Les Bayards
Les Verrières
Switzerland
France

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.