Knowledge

Ngodwana Biomass Power Station

Source 📝

646: 403: 417: 505: 478: 243:
The power station will use bio-waste from the adjacent wood and paper mill to boil water and produce steam. The steam will drive turbines of generate electricity. The waste gases from burning wood will be treated to remove pollutants, contaminants and carcinogens, before release into the atmosphere.
228:, the commercial and financial capital of South Africa. The power station is located adjacent to the Sappi Ngodwana Paper Mill in Mpumalanga, South Africa, about 50 kilometres (31 mi), west of Mbombela. 247:
The power generated will be evacuated along a high voltage transmission line to a substation where the power will be integrated into the national power grid. The South African state-owned utility company
751: 862: 857: 673: 634: 240:(EPC) contract was awarded to a consortium comprising (a) ELB Engineering Services (Pty) Limited (b) KC Cottrell Company Limited and (c) ELB Educational Trust. 599: 237: 73: 680: 772: 430: 762: 456: 540: 747: 627: 377:
The total cost for the power plant is estimated at US$ 89 million. Of that, US$ 66.75 million (75 percent) will be borrowed from
612: 574: 213: 57: 852: 620: 197: 650: 388:
In April 2018, it was estimated that construction would take 27 months from start to commercial commissioning.
253: 706: 809: 726: 721: 716: 701: 788: 711: 742: 113: 575:"Sappi Southern Africa is set to build a 25MW biomass power plant at its Ngodwana Mill in Mpumalanga" 826: 757: 408: 217: 61: 200:
was awarded the concession to design, finance, construct, operate and maintain the power station.
793: 685: 159: 605: 867: 378: 385:. The remaining US$ 22.25 million (25 percent) will be raised by the power station owners. 224:, the provincial capital. This is approximately 298 kilometres (185 mi) northeast of 220:. Ngodwana is located approximately 44 kilometres (27 mi), by road, southwest of 846: 422: 225: 193: 39: 510: 483: 815: 654: 398: 264:
The table below illustrates the shareholding in Ngodwana Solar Power Station.
506:"Road Distance Between Johannesburg, South Africa And Ngodwana, South Africa" 88: 75: 831: 820: 416: 171: 600:
Update On 25MWE Biomass Power Plant For Sappi Ngodwana Pulp And Paper Mill
457:"South Africa: ELB–KCC to build a 25 MW biomass power plant in Mpumalanga" 803: 666: 221: 209: 53: 49: 782: 382: 189: 147: 256:. A biomass storage unit will be constructed as part of this project. 798: 249: 616: 479:"Road Distance Between Mbombela And Ngodwana in South Africa" 543:. Grand Forks, North Dakota, United States: Biomass Magazine 541:"EPC contractor appointed for South African biomass project" 208:
The power plant is under construction in the town of
771: 735: 694: 391:The start up of the power plant was in March 2022. 158: 153: 143: 138: 130: 122: 112: 104: 67: 45: 35: 23: 192:-fired thermal power plant under development in 863:Renewable energy power stations in South Africa 628: 8: 252:, will purchase the power under a long-term 573:South Africa Forestry Online (April 2018). 196:. Ngodwana Energy Limited, a South African 635: 621: 613: 539:ELB Engineering Services (27 April 2018). 268:Ownership of Ngodwana Solar Power Station 266: 20: 238:engineering, procurement and construction 455:Jean Marie Takouleu (10 October 2019). 442: 858:Biofuel power stations in South Africa 431:List of power stations in South Africa 16:Biomass power station in South Africa 7: 568: 566: 564: 562: 560: 558: 534: 532: 530: 528: 450: 448: 446: 186:Sappi Ngodwana Biomass Power Station 188:, is a 25 MW (34,000 hp) 14: 644: 415: 401: 139:Thermal power station 459:. Paris, France: Afrik21.africa 373:Construction costs and timeline 341:Ngodwana Energy Community Trust 326:Ngodwana Energy Employees Trust 577:. South Africa Forestry Online 182:Ngodwana Biomass Power Station 30:Ngodwana Biomass Power Station 24:Ngodwana Biomass Power Station 1: 164:25 MW (34,000 hp) 884: 665:Capital and largest city: 198:independent power producer 661: 168: 28: 254:power purchase agreement 290:Ngodwana Energy Limited 160:Nameplate capacity 134:Ngodwana Energy Limited 123:Construction cost 853:Economy of Mpumalanga 302:Fusion Energy Limited 154:Power generation 89:25.57556°S 30.66472°E 602:As of 12 March 2020. 114:Commission date 409:South Africa portal 269: 236:In April 2018, the 218:Mpumalanga Province 94:-25.57556; 30.66472 85: /  62:Mpumalanga Province 267: 214:Ehlanzeni District 108:Under construction 58:Ehlanzeni District 840: 839: 379:Absa Bank Limited 370: 369: 179: 178: 144:Primary fuel 875: 649: 648: 647: 637: 630: 623: 614: 587: 586: 584: 582: 570: 553: 552: 550: 548: 536: 523: 522: 520: 518: 502: 496: 495: 493: 491: 475: 469: 468: 466: 464: 452: 425: 420: 419: 411: 406: 405: 404: 270: 172:edit on Wikidata 118:To be determined 100: 99: 97: 96: 95: 90: 86: 83: 82: 81: 78: 21: 883: 882: 878: 877: 876: 874: 873: 872: 843: 842: 841: 836: 774: 767: 731: 690: 657: 645: 643: 641: 610: 596: 591: 590: 580: 578: 572: 571: 556: 546: 544: 538: 537: 526: 516: 514: 504: 503: 499: 489: 487: 477: 476: 472: 462: 460: 454: 453: 444: 439: 421: 414: 407: 402: 400: 397: 383:Nedbank Limited 375: 363: 346: 331: 262: 234: 206: 175: 93: 91: 87: 84: 79: 76: 74: 72: 71: 31: 17: 12: 11: 5: 881: 879: 871: 870: 865: 860: 855: 845: 844: 838: 837: 835: 834: 829: 824: 818: 813: 807: 801: 796: 791: 786: 779: 777: 769: 768: 766: 765: 763:Municipalities 760: 755: 745: 739: 737: 733: 732: 730: 729: 724: 719: 714: 709: 704: 698: 696: 692: 691: 689: 688: 683: 677: 670: 662: 659: 658: 642: 640: 639: 632: 625: 617: 608: 607: 603: 595: 594:External links 592: 589: 588: 554: 524: 497: 470: 441: 440: 438: 435: 434: 433: 427: 426: 412: 396: 393: 374: 371: 368: 367: 365: 361: 358: 353: 350: 349: 347: 344: 342: 339: 335: 334: 332: 329: 327: 324: 320: 319: 317: 315: 312: 308: 307: 305: 303: 300: 296: 295: 293: 291: 288: 284: 283: 280: 277: 274: 261: 258: 233: 230: 205: 202: 177: 176: 169: 166: 165: 162: 156: 155: 151: 150: 145: 141: 140: 136: 135: 132: 128: 127: 126:US$ 89 million 124: 120: 119: 116: 110: 109: 106: 102: 101: 69: 65: 64: 47: 43: 42: 37: 33: 32: 29: 26: 25: 15: 13: 10: 9: 6: 4: 3: 2: 880: 869: 866: 864: 861: 859: 856: 854: 851: 850: 848: 833: 830: 828: 825: 822: 819: 817: 814: 811: 808: 805: 802: 800: 797: 795: 792: 790: 787: 784: 781: 780: 778: 776: 770: 764: 761: 759: 756: 753: 749: 746: 744: 741: 740: 738: 734: 728: 725: 723: 720: 718: 715: 713: 710: 708: 705: 703: 700: 699: 697: 693: 687: 684: 682: 678: 675: 671: 668: 664: 663: 660: 656: 652: 638: 633: 631: 626: 624: 619: 618: 615: 611: 606: 604: 601: 598: 597: 593: 576: 569: 567: 565: 563: 561: 559: 555: 542: 535: 533: 531: 529: 525: 513: 512: 507: 501: 498: 486: 485: 480: 474: 471: 458: 451: 449: 447: 443: 436: 432: 429: 428: 424: 423:Energy portal 418: 413: 410: 399: 394: 392: 389: 386: 384: 380: 372: 366: 364: 359: 357: 354: 352: 351: 348: 343: 340: 337: 336: 333: 328: 325: 322: 321: 318: 316: 313: 310: 309: 306: 304: 301: 298: 297: 294: 292: 289: 286: 285: 281: 278: 275: 272: 271: 265: 259: 257: 255: 251: 245: 241: 239: 231: 229: 227: 223: 219: 215: 211: 203: 201: 199: 195: 191: 187: 183: 173: 167: 163: 161: 157: 152: 149: 146: 142: 137: 133: 129: 125: 121: 117: 115: 111: 107: 103: 98: 70: 66: 63: 59: 55: 51: 48: 44: 41: 38: 34: 27: 22: 19: 823:(Mashishing) 785:(Emalahleni) 672:Population: 609: 579:. Retrieved 545:. Retrieved 515:. Retrieved 509: 500: 488:. Retrieved 482: 473: 461:. Retrieved 390: 387: 376: 360: 355: 263: 246: 242: 235: 226:Johannesburg 207: 194:South Africa 185: 181: 180: 40:South Africa 18: 810:Piet Retief 775:major towns 748:Legislature 679:Land area: 511:Google Maps 484:Google Maps 276:Shareholder 92: / 68:Coordinates 847:Categories 816:Standerton 812:(eMkhondo) 806:(Mbombela) 789:Middelburg 773:Cities and 758:High Court 736:Government 707:Government 669:(Mbombela) 655:Mpumalanga 437:References 279:Percentage 80:30°39′53″E 77:25°34′32″S 832:Volksrust 821:Lydenburg 804:Nelspruit 681:76,495 km 674:3,657,181 667:Nelspruit 314:KC Africa 260:Ownership 868:Mbombela 752:Speakers 712:Politics 651:Province 395:See also 232:Overview 222:Mbombela 210:Ngodwana 204:Location 131:Owner(s) 54:Mbombela 50:Ngodwana 46:Location 827:Secunda 783:Witbank 743:Premier 727:Ecology 722:Climate 717:Economy 702:History 508:(Map). 481:(Map). 190:biomass 184:, also 148:Biomass 36:Country 799:Bethal 794:Ermelo 695:Topics 676:(2011) 581:1 June 547:1 June 517:1 June 490:1 June 463:1 June 362:100.00 282:Notes 105:Status 356:Total 250:Eskom 216:, in 212:, in 170:[ 686:Flag 583:2021 549:2021 519:2021 492:2021 465:2021 381:and 273:Rank 653:of 345:5.0 330:5.0 56:), 849:: 557:^ 527:^ 445:^ 60:, 754:) 750:( 636:e 629:t 622:v 585:. 551:. 521:. 494:. 467:. 338:5 323:4 311:3 299:2 287:1 174:] 52:(

Index

South Africa
Ngodwana
Mbombela
Ehlanzeni District
Mpumalanga Province
25°34′32″S 30°39′53″E / 25.57556°S 30.66472°E / -25.57556; 30.66472
Commission date
Biomass
Nameplate capacity
edit on Wikidata
biomass
South Africa
independent power producer
Ngodwana
Ehlanzeni District
Mpumalanga Province
Mbombela
Johannesburg
engineering, procurement and construction
Eskom
power purchase agreement
Absa Bank Limited
Nedbank Limited
South Africa portal
icon
Energy portal
List of power stations in South Africa


Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.