484:. The cables are installed in ducts that were originally placed during the construction of the busway in 2005. Cable joint bays are installed at 500–800 m intervals. The cables are deviated from the Northern Busway at Wairau Road to connect to a new grid exit point (Wairau Road) adjacent to Vector's Wairau Valley zone substation, containing a single 120 MVA 220/33 kV connecting into the Wairau Valley zone substation and supplying the southern North Shore. Vector's work at this site includes the conversion of the existing outdoor 33 kV switchyard into an indoor switchroom. From Wairau Road, the cable route again follows the Northern Busway to Constellation Drive. 469: 714: 487:
The NAaN cables leave the Northern Motorway at Constellation Drive, and are installed in trenches and ducts beneath roads in Albany to Transpower's Albany Substation. Vector has three existing 110 kV overhead line circuits connecting Albany to Wairau Valley to provide redundancy on this section.
363:
The vulnerability of the transmission line was subsequently shown on 30 October 2009 at around 8:00am, when power was cut to the whole of Northland and most of the northern half of Auckland, affecting 280,000 consumers (14.5% of the country). A forklift carrying a shipping container accidentally hit
339:
line. This is a high capacity line, rated to operate at 938/984 MVA (summer/winter) per circuit in normal circumstances and slightly higher during contingencies, but restricted to 915 MVA due to constraints at Henderson substation. There were also two double circuit 110 kV lines that
431:
The 9 km long route of the underground cables between Pakuranga and Penrose is mainly in the road carriageway of Ti Rakau Drive and the South Eastern Highway. For the final section approaching Penrose, the route is adjacent to existing overhead transmission lines in a designated transmission
297:
opened in 1959, the North Shore alone has expanded nearly five-fold, from a population of 50,000 in the late 1950s to 229,000 in June 2011. The after diversity maximum demand (ADMD) for electricity in the North Auckland and Northland region is forecast to grow from 908 megawatts in 2012 to
733:
over-sheaths. They are about 160 mm in diameter and weigh about 40 kg a metre. Each section of the route is a single circuit, with three separate cables – one for each phase. In the trenched sections of the route, the cables are typically installed in ducts in trefoil configuration.
260:
provided capacity and security to Vector's Hobson Street and Wairau Road substations through a 220 kV connection to the Albany–Penrose circuit, and enabled Vector to redistribute load from existing grid exit points, particularly the Albany 33 kV and 110 kV (Wairau Road) loads and
355:
Therefore, the Henderson-Otahuhu double circuit 220 kV line represented a single mode of failure for the supply of electricity to the entire North Auckland and Northland region. A study of the High Impact, Low Probability (HILP) risks associated with the Henderson to Otahuhu 220 kV
327:, but these were subsequently scrapped in 2007 after widespread protest. Because of the lack of generation in the North Auckland and Northland region, nearly all of the electricity used in the area must be supplied via transmission lines that run through Auckland, carrying electricity from 444:
Between Penrose and Hobson Street, the NAan project cables are installed in Vector's 9 km long tunnel from Penrose to Hobson St. The tunnel is about 3 m in diameter and was completed in 2001 to secure electricity supply into central Auckland, especially after the
301:
There are no large generating stations operating in the region, although there are local generation schemes with a combined total output of around 54 megawatts. Two large generating stations were built in Northland in the late 1960s and early 1970s – the 250 MW
226:
The NAan project established a 220 kV connection between the Pakuranga and Penrose substations, and a further 220 kV connection between the Penrose and Albany substations. The Penrose to Albany section included connections to the zone substations owned by
322:
saw Marsden B mothballed before it was commissioned. Marsden A was relegated to a reserve generator during drought years before being decommissioned in 1997. Plans were developed in 2004 to refurbish and modify the Marsden B station to become a 300 MW
476:
From the Hobson Street substation, the NAan cables are installed in ducts along a route through Fanshawe Street and Westhaven to the Auckland Harbour Bridge. The route across the bridge is on a purpose built cable support structure.
364:
one of the Henderson to Otahuhu circuits while the other circuit was out for maintenance, leaving the region supplied by the four low capacity 110 kV circuits. Power was restored to the entire region around 11:00am.
256:
built on the NIGU project and increased the diversity for transmission from the south into the Northland region (including the North Isthmus), by establishing 220 kV transmission from Pakuranga, through Penrose, to
245:(known as the North Island Grid Upgrade or NIGU project), increasing the diversity of transmission from the south into the Auckland region by establishing a 220 kV transmission connection from Pakuranga to Penrose. 456:
At Hobson Street, a new grid exit point with a single 250 MVA 220/110 kV was to be established, connecting to Vector's Hobson Street zone substation and supplying Vector's central city distribution network.
584: 542: 500: 383:
21 September 2007 – Transpower submitted a Grid Upgrade Plan proposal to the Electricity Commission, following a period of consultation with stakeholders. The estimated cost of the project at that time was $ 521
626: 668: 334:
Prior to the commissioning of the NAaN project, the main route for electricity transmission into the North Auckland and Northland region was through the double-circuit 220 kV Henderson to Otahuhu via
360:
in early 2009, in support of the need for the NAan project. The line was also fast approaching capacity with the load growth, with some circuits expected to overload from 2017 during certain outages.
460:
Vector had two existing 110 kV cables paralleling the Transpower cable, connecting Penrose and Hobson Street via Liverpool Street, which continue to provide extra capacity and redundancy.
1387: 453:
between Penrose and the Symonds Street interchange, where the tunnel passes through central city streets, via Vector's Liverpool Street zone substation, to the Hobson Street substation.
408:
30 April 2009 – the Commission decided to approve NAaN proposal, and published a final decision, following consideration of additional material made available at the public conference.
253:
increased capacity to the Northland region (including the North Isthmus) by adding a third 220 kV circuit to the existing 220 kV double-circuit line from Otahuhu to Henderson
1085: 959: 1060: 936: 399:
23 December 2009 – the Commission received requests from Transpower and Vector for a public conference to provide a final opportunity for comment on the proposed investment.
396:
19 December 2008 – the Commission published a notice of its intention to decline Transpower's NAaN proposal, and gave further opportunities for affected parties to comment
1392: 1006: 242: 352:. However, these lines are of relatively low capacity and on their own could support only a very small proportion of the total load north of Mount Roskill. 1397: 298:
1254 megawatts by 2027. This is an average annual growth rate of 2.2 percent, which is higher than the national average of 1.7 percent per annum.
390:
9 May 2008 – Transpower submitted revised versions of the NAaN proposals to the Commission, seeking approval for $ 577 million for the main proposal.
238:
increased capacity to the Penrose substation by adding a third 220 kV circuit alongside the existing 220 kV Otahuhu–Penrose double-circuit line
231:
at Hobson Street in the Auckland CBD, and Wairau Road in the North Shore, and established new grid exit points at both of those locations.
411:
15 June 2010 – Vector and Transpower sign security of supply agreement for access to the Vector tunnel between Penrose and Hobson Street.
393:
May 2008 – the Commission gave designated transmission customers and parties affected by the revised proposals an opportunity to comment.
812: 436:
they are attached to the relevant road bridge. The original Pakuranga-Penrose A 110 kV overhead transmission line is removed.
859: 79: 1223: 1013: 1038: 1107: 1317: 1198: 817: 807: 357: 282:
and the entire Northland region. The main electricity load centres in the region are the North Auckland urban areas,
181: 1132: 742: 450: 446: 287: 218:
The project was completed and the connection was commissioned in February 2014 at a final cost of NZ$ 473 million.
726: 481: 377: 906: 881: 324: 468: 1270: 1248: 981: 1292: 713: 336: 294: 212: 204: 1342: 387:
9 November 2007 – Vector made a submission to the Electricity Commission supporting the main NAan proposal.
376:
2005 – Cable ducts installed alongside the route of the Northern Motorway, during the construction of the
271: 722: 1154: 193: 402:
13 February 2009 – the Commission held a technical briefing in Auckland and called for submissions.
275: 197: 64: 1086:"Final decision on Proposal One in Transpower's North Auckland and Northland Investment Proposal" 802: 738: 315: 185: 172:
The North Auckland and Northland (NAaN) grid upgrade project reinforced transmission into the
270:
The North Auckland and Northland region covers the upper parts of the North Island, north of
208: 177: 433: 414:
31 May 2011 – Tunnel access agreement between Transpower and Vector becomes unconditional.
311: 279: 173: 747:
The ratings of the four cable sections vary slightly, as shown in the following table.
319: 228: 1381: 345: 958:
Mike Wood – Broadleaf Capital International New Zealand Limited (26 February 2009).
730: 356:
transmission line was included as one of the submissions made by Transpower to the
283: 1176: 215:. The estimated total cost of the cable aspects of the works was $ 415 million. 349: 684: 670: 642: 628: 600: 586: 558: 544: 516: 502: 837: 307: 303: 189: 50: 341: 54: 1007:"Transpower's cabling work in the Northern Busway – March to early 2013" 417:
30 March 2012 – First section of cable installed in the Northern Busway
328: 1177:"First section of high voltage cable installed in the Northern Busway" 1061:"Submission on the North Auckland and Northland Grid Upgrade Proposal" 1372: 907:"Annual Planning Report 2012 – Chapter 7 – Northland Regional Plan" 882:"Annual Planning Report 2012 – Chapter 8 – Auckland Regional Plan" 712: 467: 310:
oil-fired thermal power stations at Marsden point . However, the
860:"Transpower commissions the North Auckland and Northland Project" 1367: 380:, between the Auckland Harbour Bridge and Constellation Drive. 1249:"NAan Project : Hobson St to Wairau Rd – Nuts and Bolts" 1199:"Underground cabling factsheet – Pakuranga to Hobson Street" 293:
The North Auckland urban area is growing rapidly. Since the
1343:"NAan Project : Pakuranga to Penrose – Nuts and Bolts" 729:(XLPE) insulated, metal sheathed cables with high density 1318:"Underground cabling factsheet – Albany to Hobson Street" 1108:"Vector and Transpower sign security of supply agreement" 180:. It added new 220 kV transmission capacity to the 340:
run parallel to the 220 kV line via Hepburn Road (
432:
corridor. Where the cables cross the Tamaki River and
982:"Forklift sparks blackout for thousands – tvnz.co.nz" 838:"North Auckland and Northland Grid Upgrade Project" 234:The 220 kV circuit from Pakuranga to Penrose: 159: 151: 143: 135: 127: 119: 114: 106: 98: 93: 85: 75: 70: 60: 46: 38: 30: 25: 20: 1388:Electric power transmission systems in New Zealand 372:Key milestones in the history of the project are: 1224:"Hobson St Substation Redevelopment – Fact Sheet" 960:"Henderson – Otahuhu line – Review of HILP Risks" 937:"North Auckland and Northland Proposal – history" 862:. Transpower – transpower.co.nz. 26 February 2014 176:and across the harbour to North Auckland and the 1133:"Transpower cable $ 53 million boost for Vector" 249:The 220 kV circuit from Penrose to Albany: 1271:"$ 415m cable project to protect power supply" 1039:"Transpower submits $ 521m grid upgrade plans" 480:From the Harbour Bridge the route follows the 243:Whakamaru to Brownhill Road transmission line 203:The project included new grid exit points at 8: 1373:Transpower's National Grid projects website 717:220 kV cable ducts in trefoil configuration 405:2 March 2009 – a public conference was held 931: 929: 927: 1127: 1125: 984:. Television New Zealand. 30 October 2009 21:North Auckland and Northland Grid Upgrade 1155:"Tunnel agreement becomes unconditional" 1001: 999: 749: 331:, and generators in the Waikato region. 1393:Energy infrastructure completed in 2014 1088:. Electricity Commission. 30 April 2009 829: 184:by providing 37 km of underground 241:added to the security provided by the 17: 7: 1012:. Auckland Transport. Archived from 912:. Transpower New Zealand. March 2012 887:. Transpower New Zealand. March 2012 1398:2014 establishments in New Zealand 1298:. Transpower New Zealand. May 2011 274:. It includes the North Shore and 14: 1066:. Vector Limited. 9 November 2007 813:Electricity sector in New Zealand 207:(Auckland CBD) and Wairau Road ( 1110:. Vector Limited. 15 June 2010 1041:. NZ Herald. 25 September 2007 160: 1: 1157:. Vector Limited. 31 May 2011 779:Hobson Street to Wairau Road 1273:. NZ Herald. 21 October 2011 1229:. Vector Limited. June 2011 818:Electric power transmission 808:National Grid (New Zealand) 581:Hobson Street sub-station: 1414: 1179:. Transpower. 3 March 2012 751:Ratings of cable sections 743:Three-phase electric power 736: 451:Auckland Southern Motorway 447:1998 Auckland power crisis 348:, with one line going via 288:Marsden Point Oil Refinery 1135:. NZ Herald. 16 June 2011 786: 778: 771:Penrose to Hobson Street 770: 762: 757: 727:cross linked polyethylene 623:Wairau Road sub-station: 612:Hobson Street sub-station 570:Hobson Street sub-station 528:Hobson Street sub-station 449:. The tunnel follows the 211:) and a cable across the 1345:. Transpower New Zealand 1323:. Transpower New Zealand 1293:"Wairau_Road_Fact_Sheet" 1251:. Transpower New Zealand 1204:. Transpower New Zealand 962:. Transpower New Zealand 440:Penrose to Hobson Street 325:coal-fired power station 94:Construction information 939:. Electricity Authority 654:Wairau Road sub-station 497:Pakuranga sub-station: 472:Auckland Harbour Bridge 464:Hobson Street to Albany 318:, and the discovery of 295:Auckland Harbour Bridge 213:Auckland Harbour Bridge 139:37 km (23 mi) 1368:Transpower New Zealand 787:Wairau Road to Albany 718: 473: 358:Electricity Commission 89:Transpower New Zealand 80:Transpower New Zealand 763:Pakuranga to Penrose 737:Further information: 716: 539:Penrose sub-station: 471: 115:Technical information 71:Ownership information 685:36.7395°S 174.6907°E 665:Albany sub-station: 643:36.7805°S 174.7469°E 601:36.8454°S 174.7623°E 559:36.9055°S 174.8177°E 517:36.9261°S 174.9063°E 427:Pakuranga to Penrose 147:800 to 1000 MVA 99:Construction started 1019:on 10 February 2013 752: 680: /  638: /  596: /  554: /  512: /  261:Auckland CBD loads. 803:High-voltage cable 750: 739:High-voltage cable 719: 696:Albany sub-station 690:-36.7395; 174.6907 648:-36.7805; 174.7469 606:-36.8454; 174.7623 564:-36.9055; 174.8177 522:-36.9261; 174.9063 474: 316:1979 energy crisis 794: 793: 170: 169: 123:Underground cable 39:General direction 1405: 1355: 1354: 1352: 1350: 1339: 1333: 1332: 1330: 1328: 1322: 1314: 1308: 1307: 1305: 1303: 1297: 1289: 1283: 1282: 1280: 1278: 1267: 1261: 1260: 1258: 1256: 1245: 1239: 1238: 1236: 1234: 1228: 1220: 1214: 1213: 1211: 1209: 1203: 1195: 1189: 1188: 1186: 1184: 1173: 1167: 1166: 1164: 1162: 1151: 1145: 1144: 1142: 1140: 1129: 1120: 1119: 1117: 1115: 1104: 1098: 1097: 1095: 1093: 1082: 1076: 1075: 1073: 1071: 1065: 1057: 1051: 1050: 1048: 1046: 1035: 1029: 1028: 1026: 1024: 1018: 1011: 1003: 994: 993: 991: 989: 978: 972: 971: 969: 967: 955: 949: 948: 946: 944: 933: 922: 921: 919: 917: 911: 903: 897: 896: 894: 892: 886: 878: 872: 871: 869: 867: 856: 850: 849: 847: 845: 834: 753: 704: 703: 701: 700: 699: 697: 692: 691: 686: 681: 678: 677: 676: 673: 662: 661: 659: 658: 657: 655: 650: 649: 644: 639: 636: 635: 634: 631: 620: 619: 617: 616: 615: 613: 608: 607: 602: 597: 594: 593: 592: 589: 578: 577: 575: 574: 573: 571: 566: 565: 560: 555: 552: 551: 550: 547: 536: 535: 533: 532: 531: 529: 524: 523: 518: 513: 510: 509: 508: 505: 368:Project timeline 178:Northland Region 162: 18: 1413: 1412: 1408: 1407: 1406: 1404: 1403: 1402: 1378: 1377: 1364: 1359: 1358: 1348: 1346: 1341: 1340: 1336: 1326: 1324: 1320: 1316: 1315: 1311: 1301: 1299: 1295: 1291: 1290: 1286: 1276: 1274: 1269: 1268: 1264: 1254: 1252: 1247: 1246: 1242: 1232: 1230: 1226: 1222: 1221: 1217: 1207: 1205: 1201: 1197: 1196: 1192: 1182: 1180: 1175: 1174: 1170: 1160: 1158: 1153: 1152: 1148: 1138: 1136: 1131: 1130: 1123: 1113: 1111: 1106: 1105: 1101: 1091: 1089: 1084: 1083: 1079: 1069: 1067: 1063: 1059: 1058: 1054: 1044: 1042: 1037: 1036: 1032: 1022: 1020: 1016: 1009: 1005: 1004: 997: 987: 985: 980: 979: 975: 965: 963: 957: 956: 952: 942: 940: 935: 934: 925: 915: 913: 909: 905: 904: 900: 890: 888: 884: 880: 879: 875: 865: 863: 858: 857: 853: 843: 841: 836: 835: 831: 826: 799: 745: 721:The cables are 711: 695: 693: 689: 687: 683: 682: 679: 674: 671: 669: 667: 666: 653: 651: 647: 645: 641: 640: 637: 632: 629: 627: 625: 624: 611: 609: 605: 603: 599: 598: 595: 590: 587: 585: 583: 582: 569: 567: 563: 561: 557: 556: 553: 548: 545: 543: 541: 540: 527: 525: 521: 519: 515: 514: 511: 506: 503: 501: 499: 498: 494: 482:Northern Busway 466: 442: 434:Pakuranga Creek 429: 424: 378:Northern Busway 370: 312:1973 oil crisis 280:Rodney District 268: 224: 174:Auckland Region 128:Type of current 12: 11: 5: 1411: 1409: 1401: 1400: 1395: 1390: 1380: 1379: 1376: 1375: 1370: 1363: 1362:External links 1360: 1357: 1356: 1334: 1309: 1284: 1262: 1240: 1215: 1190: 1168: 1146: 1121: 1099: 1077: 1052: 1030: 995: 973: 950: 923: 898: 873: 851: 828: 827: 825: 822: 821: 820: 815: 810: 805: 798: 795: 792: 791: 788: 784: 783: 780: 776: 775: 774:1000 MVA 772: 768: 767: 764: 760: 759: 756: 710: 707: 706: 705: 663: 621: 579: 537: 493: 490: 465: 462: 441: 438: 428: 425: 423: 420: 419: 418: 415: 412: 409: 406: 403: 400: 397: 394: 391: 388: 385: 381: 369: 366: 278:township, the 267: 264: 263: 262: 258: 254: 247: 246: 239: 223: 220: 168: 167: 164: 157: 156: 153: 149: 148: 145: 141: 140: 137: 133: 132: 129: 125: 124: 121: 117: 116: 112: 111: 108: 104: 103: 100: 96: 95: 91: 90: 87: 83: 82: 77: 73: 72: 68: 67: 62: 58: 57: 48: 44: 43: 40: 36: 35: 32: 28: 27: 23: 22: 13: 10: 9: 6: 4: 3: 2: 1410: 1399: 1396: 1394: 1391: 1389: 1386: 1385: 1383: 1374: 1371: 1369: 1366: 1365: 1361: 1344: 1338: 1335: 1319: 1313: 1310: 1294: 1288: 1285: 1272: 1266: 1263: 1250: 1244: 1241: 1225: 1219: 1216: 1200: 1194: 1191: 1178: 1172: 1169: 1156: 1150: 1147: 1134: 1128: 1126: 1122: 1109: 1103: 1100: 1087: 1081: 1078: 1062: 1056: 1053: 1040: 1034: 1031: 1015: 1008: 1002: 1000: 996: 983: 977: 974: 961: 954: 951: 938: 932: 930: 928: 924: 908: 902: 899: 883: 877: 874: 861: 855: 852: 839: 833: 830: 823: 819: 816: 814: 811: 809: 806: 804: 801: 800: 796: 790:800 MVA 789: 785: 782:800 MVA 781: 777: 773: 769: 766:900 MVA 765: 761: 755: 754: 748: 744: 740: 735: 732: 728: 724: 715: 709:Cable ratings 708: 702: 664: 660: 622: 618: 580: 576: 538: 534: 496: 495: 491: 489: 485: 483: 478: 470: 463: 461: 458: 454: 452: 448: 439: 437: 435: 426: 421: 416: 413: 410: 407: 404: 401: 398: 395: 392: 389: 386: 382: 379: 375: 374: 373: 367: 365: 361: 359: 353: 351: 347: 346:Mount Roskill 343: 338: 332: 330: 326: 321: 317: 313: 309: 305: 299: 296: 291: 289: 285: 281: 277: 273: 265: 259: 255: 252: 251: 250: 244: 240: 237: 236: 235: 232: 230: 221: 219: 216: 214: 210: 206: 205:Hobson Street 201: 200:substations. 199: 195: 191: 187: 183: 182:National Grid 179: 175: 165: 158: 154: 150: 146: 142: 138: 134: 130: 126: 122: 118: 113: 110:December 2013 109: 105: 101: 97: 92: 88: 84: 81: 78: 74: 69: 66: 63: 59: 56: 52: 49: 45: 41: 37: 33: 29: 24: 19: 16: 1347:. Retrieved 1337: 1325:. Retrieved 1312: 1300:. Retrieved 1287: 1275:. Retrieved 1265: 1253:. Retrieved 1243: 1231:. Retrieved 1218: 1206:. Retrieved 1193: 1181:. Retrieved 1171: 1159:. Retrieved 1149: 1137:. Retrieved 1112:. Retrieved 1102: 1090:. Retrieved 1080: 1068:. Retrieved 1055: 1043:. Retrieved 1033: 1021:. Retrieved 1014:the original 988:29 September 986:. Retrieved 976: 964:. Retrieved 953: 941:. Retrieved 914:. Retrieved 901: 889:. Retrieved 876: 864:. Retrieved 854: 842:. Retrieved 840:. Transpower 832: 746: 731:polyethylene 720: 486: 479: 475: 459: 455: 443: 430: 371: 362: 354: 333: 300: 292: 269: 248: 233: 225: 217: 202: 188:between the 171: 144:Power rating 136:Total length 102:October 2011 15: 866:22 November 725:conductor, 688: / 675:174°41′27″E 646: / 633:174°44′49″E 604: / 591:174°45′44″E 562: / 549:174°49′04″E 520: / 507:174°54′23″E 209:North Shore 163:of circuits 155:220 kV 42:South-North 34:New Zealand 1382:Categories 824:References 694: ( 672:36°44′22″S 652: ( 630:36°46′50″S 610: ( 588:36°50′43″S 568: ( 546:36°54′20″S 526: ( 504:36°55′34″S 286:, and the 266:Background 152:AC voltage 422:The route 337:Southdown 308:Marsden B 304:Marsden A 284:Whangārei 276:Waitakere 272:Henderson 190:Pakuranga 51:Pakuranga 1327:31 March 1302:30 March 1277:31 March 1233:29 March 1208:30 March 1161:29 March 1139:30 March 1114:29 March 1092:28 March 1070:29 March 1045:29 March 1023:31 March 966:29 March 943:28 March 844:29 March 797:See also 384:million. 342:Glendene 320:Maui gas 222:Overview 107:Expected 86:Operator 55:Auckland 26:Location 1349:4 April 1255:4 April 916:4 April 891:4 April 758:Rating 350:Māngere 329:Otahuhu 194:Penrose 31:Country 1183:19 May 723:copper 344:) and 314:, the 257:Albany 229:Vector 198:Albany 196:, and 65:Albany 1321:(PDF) 1296:(PDF) 1227:(PDF) 1202:(PDF) 1064:(PDF) 1017:(PDF) 1010:(PDF) 910:(PDF) 885:(PDF) 492:Sites 186:cable 76:Owner 1351:2012 1329:2012 1304:2012 1279:2012 1257:2012 1235:2012 1210:2012 1185:2012 1163:2012 1141:2012 1116:2012 1094:2012 1072:2012 1047:2012 1025:2012 990:2011 968:2012 945:2012 918:2012 893:2012 868:2017 846:2012 741:and 306:and 131:HVAC 120:Type 47:From 166:One 161:No. 1384:: 1124:^ 998:^ 926:^ 290:. 192:, 61:To 53:, 1353:. 1331:. 1306:. 1281:. 1259:. 1237:. 1212:. 1187:. 1165:. 1143:. 1118:. 1096:. 1074:. 1049:. 1027:. 992:. 970:. 947:. 920:. 895:. 870:. 848:. 698:) 656:) 614:) 572:) 530:)

Index

Pakuranga
Auckland
Albany
Transpower New Zealand
Auckland Region
Northland Region
National Grid
cable
Pakuranga
Penrose
Albany
Hobson Street
North Shore
Auckland Harbour Bridge
Vector
Whakamaru to Brownhill Road transmission line
Henderson
Waitakere
Rodney District
Whangārei
Marsden Point Oil Refinery
Auckland Harbour Bridge
Marsden A
Marsden B
1973 oil crisis
1979 energy crisis
Maui gas
coal-fired power station
Otahuhu
Southdown