35:
459:
133:
591:
246:
480:
On
January 23, 2015, several people were injured when the retractable edge of the outbound platform collapsed while passengers were deboarding. Both mini-high platforms were taken out of service for a number of months, with portable lifts used until the mini-high platforms were returned to service.
477:(B&B). In 1998, the North Billerica Depot underwent extensive renovations as part of the Massachusetts Bay Transportation Authority's efforts to restore and expand its Billerica commuter rail stop. The new depot and train station were rededicated on October 30, 1998.
622:
632:
627:
562:
617:
446:, and is located in the North Billerica village. The depot building, built in 1867, was renovated, expanded, and returned to station use in 1998. The station has
67:
249:
245:
34:
531:
136:
595:
334:
474:
470:
319:
276:
439:
55:
514:
349:
362:
329:
382:
539:
447:
435:
458:
375:
499:
367:
259:
611:
387:
354:
281:
113:
469:
station – later North
Billerica – was open by 1838. It served as a flag stop on the
443:
342:
269:
102:
602:
563:"Report: Platform Collapses at North Billerica Commuter Station, Several Hurt"
82:
69:
590:
457:
39:
The 1867-constructed station building at North
Billerica in 2016
623:
MBTA Commuter Rail stations in
Middlesex County, Massachusetts
473:'s main line and was the north terminal of the narrow gauge
318:
243:
633:
Railway stations in the United States opened in 1867
628:
Buildings and structures in
Billerica, Massachusetts
414:
231:
215:
206:
198:
190:
185:
177:
172:
164:
156:
148:
143:
127:
119:
108:
98:
61:
49:
44:
21:
498:Central Transportation Planning Staff (2019).
502:. Massachusetts Bay Transportation Authority.
16:Train station in Billerica, Massachusetts, US
8:
411:
312:
301:
237:
33:
18:
618:Former Boston and Maine Railroad stations
323:
315:
253:
240:
490:
132:
7:
516:The Boston Almanac for the Year 1838
530:Measmer, Liana (December 4, 2008).
561:Stewart, David (23 January 2015).
14:
589:
244:
131:
53:Ruggles Street at Station Street
462:North Billerica station in 1920
219:922 (weekday average boardings)
475:Billerica and Bedford Railroad
1:
103:New Hampshire Route Main Line
500:"2018 Commuter Rail Counts"
649:
471:Boston and Lowell Railroad
421:
410:
406:
402:
320:Boston and Maine Railroad
300:
296:
292:
236:
227:
223:
211:
32:
513:Dickinson, S.N. (1838).
440:Billerica, Massachusetts
56:Billerica, Massachusetts
596:North Billerica station
432:North Billerica station
152:541 spaces ($ 4.00 fee)
603:MBTA - North Billerica
536:Wicked Local Billerica
463:
598:at Wikimedia Commons
461:
343:Boston – Concord, NH
542:on October 29, 2019
532:"Commuter concerns"
450:for accessibility.
448:mini-high platforms
83:42.5935°N 71.2813°W
79: /
45:General information
464:
436:MBTA Commuter Rail
324:Following station
316:Preceding station
254:Following station
241:Preceding station
157:Bicycle facilities
594:Media related to
429:
428:
425:
424:
398:
397:
394:
393:
288:
287:
173:Other information
88:42.5935; -71.2813
640:
593:
578:
577:
575:
573:
558:
552:
551:
549:
547:
538:. Archived from
527:
521:
520:
510:
504:
503:
495:
442:. It serves the
412:
376:Lexington Branch
313:
302:
248:
238:
135:
134:
94:
93:
91:
90:
89:
84:
80:
77:
76:
75:
72:
37:
19:
648:
647:
643:
642:
641:
639:
638:
637:
608:
607:
587:
582:
581:
571:
569:
560:
559:
555:
545:
543:
529:
528:
524:
512:
511:
507:
497:
496:
492:
487:
467:Billerica Mills
456:
417:
390:
370:
357:
337:
307:
306:Former services
284:
264:
87:
85:
81:
78:
73:
70:
68:
66:
65:
54:
40:
28:
27:
26:
25:North Billerica
17:
12:
11:
5:
646:
644:
636:
635:
630:
625:
620:
610:
609:
606:
605:
586:
585:External links
583:
580:
579:
553:
522:
505:
489:
488:
486:
483:
455:
452:
427:
426:
423:
422:
419:
418:
415:
408:
407:
404:
403:
400:
399:
396:
395:
392:
391:
385:
380:
378:
373:
371:
365:
359:
358:
352:
350:East Billerica
347:
345:
340:
338:
332:
326:
325:
322:
317:
309:
308:
305:
298:
297:
294:
293:
290:
289:
286:
285:
279:
274:
272:
267:
265:
262:
256:
255:
252:
242:
234:
233:
229:
228:
225:
224:
221:
220:
217:
213:
212:
209:
208:
204:
203:
200:
196:
195:
192:
188:
187:
183:
182:
179:
175:
174:
170:
169:
166:
162:
161:
158:
154:
153:
150:
146:
145:
141:
140:
129:
125:
124:
121:
117:
116:
114:side platforms
110:
106:
105:
100:
96:
95:
63:
59:
58:
51:
47:
46:
42:
41:
38:
30:
29:
24:
23:
22:
15:
13:
10:
9:
6:
4:
3:
2:
645:
634:
631:
629:
626:
624:
621:
619:
616:
615:
613:
604:
601:
600:
599:
597:
592:
584:
568:
564:
557:
554:
541:
537:
533:
526:
523:
519:. p. 49.
518:
517:
509:
506:
501:
494:
491:
484:
482:
478:
476:
472:
468:
460:
453:
451:
449:
445:
441:
437:
433:
420:
413:
409:
405:
401:
389:
384:
381:
379:
377:
374:
372:
369:
364:
361:
360:
356:
351:
348:
346:
344:
341:
339:
336:
331:
328:
327:
321:
314:
311:
310:
304:
303:
299:
295:
291:
283:
282:North Station
278:
275:
273:
271:
268:
266:
261:
258:
257:
251:
247:
239:
235:
230:
226:
222:
218:
214:
210:
205:
201:
197:
193:
189:
184:
180:
176:
171:
167:
163:
159:
155:
151:
147:
142:
138:
130:
126:
122:
118:
115:
111:
107:
104:
101:
97:
92:
64:
60:
57:
52:
48:
43:
36:
31:
20:
588:
570:. Retrieved
567:Boston Globe
566:
556:
544:. Retrieved
540:the original
535:
525:
515:
508:
493:
479:
466:
465:
431:
430:
363:South Lowell
330:South Lowell
144:Construction
546:October 29,
444:Lowell Line
438:station in
335:Concord, NH
270:Lowell Line
128:Connections
86: /
62:Coordinates
612:Categories
572:24 January
485:References
277:Wilmington
207:Passengers
202:1867, 1998
165:Accessible
74:71°16′53″W
71:42°35′37″N
178:Fare zone
160:14 spaces
139:: 3/4, 13
109:Platforms
416:Location
263:Terminus
232:Services
50:Location
454:History
386:toward
366:toward
353:toward
333:toward
280:toward
199:Rebuilt
186:History
149:Parking
99:Line(s)
434:is an
388:Boston
383:Nasons
368:Lowell
355:Boston
260:Lowell
191:Opened
120:Tracks
194:1830s
574:2015
548:2019
250:MBTA
216:2018
137:LRTA
168:Yes
614::
565:.
534:.
112:2
576:.
550:.
181:5
123:2
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.