Interstate 540 (North Carolina)

Source 📝

1122:
bidding process for the segment began much earlier than anticipated in Summer 2023. The work was to be done in two sections; the first one would be from south of Rock Quarry Road northward to the I-540/I-87/US 64/US 264 interchange while the second one would be from I-40/US 70 (future I-42) to south of Rock Quarry Road. In September 2023, it was announced that Flatiron-Fred Smith Company Joint Venture had been awarded a $ 450 million contract to complete the first segment; S.T. Wooten-Branch Civil joint venture was awarded a $ 287 million contract for the second segment in October 2023. In December 2023, the Local Government Commission (LGC) approved an application by the NCTA for revenue bonds and a Transportation Infrastructure Finance & Innovation Act (TIFIA) loan through US-DOT to start construction. Construction began with a groundbreaking on May 16, 2024. Completion of the final segment is expected in 2028.
976:") using toll funds. The NCTA apparently never wanted an Interstate designation for the Western Wake Parkway. To lessen motorist confusion about where I-540 ended, the route was truncated to the I-40 interchange. All I-540 signs that were put up along the unopened stretch between I-40 and NC 55 were taken down in early July 2007; the new section is now signed as NC 540. (In addition, I-540 as a completed loop would violate the Interstate numbering convention regarding three-digit routes, as spurs begin with an odd number and loops with an even number, and, at one point, I-640—the last remaining available number within the state, as I-240, I-440, and I-840 are already taken—was proposed for the loop.) 1061: 1035:. The next day tolling began on the previously open section from NC 54 to NC 55. The final phase of the tolled section of NC 540, from US 64 to NC 55 north of Holly Springs, opened on December 20, 2012. Tolling for this section began January 2, 2013. On April 3, 2017, the Veridea Parkway interchange (exit 55; formally known as Old Holly Springs Apex Road) was opened to traffic. At a cost of $ 20 million (equivalent to $ 24.5 million in 2023), it was constructed by Blythe Construction and 831:(exit 54) just south of Apex, where it becomes the Western Wake Expressway. At this point, the road is heading due west and has two quick interchanges with Veridea Road (exit 55) and US 1 (exit 56) after turning to the northwest. Exit 56 connects to Salem Street, connecting to downtown Apex, while exit 59 connects to US 64 near the Beaver Creek Shopping Center. Now heading due north and between Green Level Church Road (to the west) and NC 55 (to the east), the road skirts the western edge of 888: 2106: 318: 569:, renumbering the route to I-640 when the beltway was complete; however, the NCDOT announced in 2002 that I-540 would not be renumbered in the future. When it became financially unfeasible to construct the entire route with public funds within a reasonable timeframe, it was decided that the remaining portion of the route (approximately two-thirds of the total completed mileage) would be constructed as a 1699: 44: 1491: 39: 2100: 4035: 4023: 1106:, reportedly, caused significant erosion along the unopened portion of the expressway further delaying the opening to vehicles. NCDOT later announced on September 4, 2024, a revised official opening date of September 25, 2024, with its official ribbon-cutting to be held on September 24, 2024. The extension opened to traffic at 6 a.m. that day. 2112: 1791: 1582: 1540: 1435: 487: 472: 324: 281: 225: 204: 130: 2145: 2058: 1981: 1866: 1750: 1653: 1576: 1535: 1497: 1312: 1261: 306: 247: 220: 182: 119: 1921: 1705: 1693: 1530: 1380: 1179: 292: 266: 261: 215: 193: 168: 4291: 2229: 2259: 1121:
The process of completing the final segment was sped up after the N.C. Turnpike Authority (NCTA) was able to get a single environmental permit, allowing for utility work to begin. That coupled with strong local support and expected toll revenues moved the project up NCDOT's list of priorities and the
1047:
A plan approved by the Raleigh city council in November 2013 includes asking for tolls for the existing highway in order to widen it to eight lanes by 2035 or 2040. This would require both state and federal approval. As a temporary solution to increased traffic on the northern section, NCDOT has
983:
In October 2008, the authority was unable to issue bonds to fund the Western Wake Turnpike project as planned due to market conditions affecting municipal bonds such as those. On July 29, 2009, the Authority closed on a revised $ 1.01-billion (equivalent to $ 1.39 billion in 2023) bond
1097:
After two years, the General Assembly chose to permit studying the Red Corridor, which meant possible routes could once again be considered. Documents released on September 9, 2013, changed the 30-mile (48 km) project from two phases to a single project, with construction expected to begin
1089:
asked for routes north of the Orange Route to be considered as a way to provide a shorter option, possibly minimizing impacts to natural resources. In September 2010, a new map showed several other routes, including the controversial Red Route, which many Garner-area residents protested in a
1101:
In April 2016, NCDOT announced that Detailed Study Alternative  was selected as the preferred alternative for the project. The route goes from west to east and combines the proposed orange, green (southern portion), mint, and green (northern portion) corridor segments. The portion of
898:
Planning for the highway originally started in the early 1970s; by 1976, the "Northern Wake Expressway" was added to the planning map. In the mid-1980s, realizing that the growth in western Wake County may require more roads than planned, highway planners decided to expand the project as a new
979:
Work to build the Western Wake Freeway, which would be renamed the "Western Wake Parkway" under the toll proposal, began August 12, 2009, with the Triangle Parkway portion opening in December 2011, and Western Wake portion scheduled to open in two phases in 2012.
1109:
By August 21, 2021, the final segment closing the loop to I-87/US 64/US 264 was scheduled to begin the bidding process in 2025 with construction not beginning until at least 2029. Public input over the growth and development of a 15,000-acre area of eastern
593:
was scheduled to open in late-August 2024, but was delayed to late-September 2024. The final project planned to complete the eastern leg from Garner to Knightdale under the same toll system also began construction in 2024 with a completion date of 2028.
1027:, with its connection to NC 540, opened on December 8, 2011, reestablishing exit 67. Collection of tolls began on January 3, 2012. On August 1, 2012, the first phase of the Western Wake Freeway opened, connecting NC 55 in 1102:
NC 540 from NC 55 to I-40 was scheduled to be open to traffic in 2023 but was later pushed to Spring 2024. After further delays, the extension was set to have its official ribbon-cutting and opening on August 27, 2024. However,
878:
or other interoperable ETC systems. Those that do not participate in the ETC program will receive a bill in the mail and will have 30 days from the date on said bill before additional fees and civil penalties are applied.
742:, located right at the Durham–Wake county line. It travels northeast to Aviation Parkway (exit 2), then turns east along the southside of the Brier Creek neighborhood, with interchanges at Lumley Road (exit 3) and 798:
NC 540 is the designation given to the Western Wake Expressway, Southern Wake Expressway and the future Eastern Wake Expressway. The Western Wake Expressway and the Southern Wake Expressway also forms a portion of the
850:
The current terminus of NC 540 was to be extended to I-40/US 70 on August 27, 2024. This extension will add five new interchanges to the route. However, it was delayed indefinitely after heavy rain from
855:
caused erosion issues that needed to be resolved for safety reasons. NCDOT later announced on September 4, 2024 a revised opening date of September 25, 2024. The extension opened to traffic at 6 a.m. that day.
774:. I-540 immediately has an interchange with Buffaloe Road (exit 20). I-540 continues south paralleling both the Neuse River and Forestville Road. As I-540 enters Knightdale, it has an interchange with 746:(exit 4). After crossing US 70, I-540 travels eastward across the mostly residential areas of North Raleigh, with several exits with major arterial roads, including Leesville Road (exit 7), 1020:
In 2010, NCDOT made an interchange improvement at I-540/I-40, adding another auxiliary lane from I-540 south to I-40 west at a cost of $ 4.8 million (equivalent to $ 6.55 million in 2023).
1013:. Construction would begin in 2014 and be completed by 2019; however, it was delayed in March 2011 by the enactment of North Carolina Session Law 2011-7 (N.C. S.L. 2011–7), which forbade the 581:. The first section of NC 540 was opened in July 2007, extending westward from the western terminus of I-540. Further extensions have carried NC 540 around the western side of 4346: 2332: 419: 2462: 4351: 972:
The Authority concluded in early 2007 that it would be financially feasible to build the western section (along with an extended Durham Freeway, which combined would be called the "
3101: 4012: 1501: 775: 4356: 3396: 2386: 3596: 4326: 1078:. The route for the southern leg, known as the Orange Route, has been protected from development by NCDOT since the 1990s, but it would cross the habitat for the 839:(since annexed by Cary) is a second interchange with NC 55 (exit 66). The Triangle Expressway toll road splits at NC 540 at exit 67 to follow 2290: 3067: 440: 2536: 3738: 778:(US 64 Bus.)/Knightdale Boulevard (exit 24). About two miles (3.2 km) after the US 64 Bus. interchange, I-540 has its western terminus at 750:/Creedmoor Road (exit 9), Six Forks Road (exit 11), and Falls of Neuse Road (exit 14). Turning southeast, there is a complex interchange with 965:(NCTA). Work on the western and southern portions of the beltway, if paid for by state funds, would possibly not open until 2030. At the request of several 2410: 1014: 870:
The I-540 toll section is between NC 54 (exit 69) and I-40/I-42 (exit 36), it also includes NC 885 at I-40 to Davis Rd. (exit 2). Tolls are implemented by
82: 3842: 961:
was opened. However, the route is signed not as I-540 but as NC 540. Officials decided to change the designation in early July at the urging of the
790:(exit 26), though the roadway continues on for a short distance, and several ghost ramps indicate the planned connection to the rest of the loop. 3157: 3018: 1224: 739: 546: 2427: 450: 4027: 445: 4336: 4321: 2075: 1938: 874:(ETC) and are enforced by video cameras. Several gantries are located along the route and entrance/exit ramps, where they collect toll via the 2322: 899:
beltway around Raleigh. In 1992, construction began on the first three-mile (4.8 km) section of the Northern Wake Expressway, connecting
4094: 3868: 409: 1060: 3789: 455: 414: 4039: 2129:
Was Davis Drive before June 1, 2010; reopened December 8, 2011 as Toll NC 147 north; renamed June 30, 2022 as Toll NC 885 north
3109: 4085: 3318: 424: 2323:"Table 2 – Auxiliary Routes – FHWA Route Log and Finder List – Interstate Highway System – National Highway System – Planning – FHWA" 835:, with interchanges at Green Level Road (exit 62) and Morrisville Parkway (exit 64). Just north of the former community of 3815: 2969: 962: 4186: 4162: 4148: 4134: 4120: 3036: 2865: 1036: 3893: 3621: 950:
From 1999 to 2002, each additional section of the freeway was designated as Future 540, until it connected with US 1.
4273: 4263: 4258: 4253: 4247: 3474: 3238: 3131: 2945: 2116: 1984: 1713: 1709: 1677: 1656: 1547: 1264: 1182: 1006: 993: 939: 904: 900: 808: 783: 743: 623: 554: 539: 328: 309: 273: 269: 250: 232: 185: 171: 74: 4278: 3004: 2327: 1924: 1543: 1383: 932: 779: 751: 550: 295: 228: 196: 2579: 1002:
was held on August 12, 2009, at the west end of I-540. "A dozen dignitaries" used shovels painted gold as 150 watched.
3574: 2546: 2472: 2437: 1881: 1877: 1829: 1798: 1160: 627: 574: 432: 373: 545:
The initial phase of construction is designated I-540 and was completed in January 2007. It runs from I-40 near the
3422: 1086: 1039:. An interchange with the newly extended Morrisville Parkway (exit 64) opened to traffic on February 3, 2020. 3967: 4142: 4114: 2300: 2152: 2083: 1734: 1563: 1395: 1204: 1111: 1028: 966: 619: 582: 404: 377: 332: 3677: 3517: 3075: 2498: 4331: 4239: 4229: 4224: 4213: 3648: 3292: 2896: 1725: 1509: 1474: 892: 871: 827:(exit 45), Bells Lake Road (exit 47), and Holly Springs Road (exit 50). The road eventually reaches 771: 562: 490: 475: 240: 4205: 4200: 4194: 4181: 4176: 4170: 2799: 2148: 2061: 1992: 1869: 1753: 1721: 1442: 1319: 1315: 844: 836: 828: 820: 566: 396: 4128: 2567: 1098:
in 2018 and be completed by 2022. Public meetings were scheduled in October 2013 for "Complete 540".
738:
The I-540 portion begins at an interchange designated as exit 1 near I-40 (I-40 exit 283B) near the
3269: 3502:
Siceloff, Bruce (September 9, 2013). "Road Worrier: NCDOT vows to complete 540 across south and east Wake".
3213: 2825: 2774: 1932: 1928: 1717: 1555: 1505: 1446: 1391: 1332: 1323: 1268: 1209: 1186: 603: 523: 152: 3166: 4341: 4156: 4078: 2503: 2295: 2124: 2069: 1802: 1559: 1272: 1194: 1190: 1103: 1075: 852: 816: 615: 590: 254: 175: 62:
I-540 highlighted in red; open segment of NC 540 in purple; unopen segment of NC 540 in orange
969:
mayors, the NCTA in 2006 began studying the use of tolls to complete these portions of the Outer Loop.
928:
June 29, 2001: From NC 50/Creedmoor Road (exit 9) to Falls of Neuse Road (exit 14).
918:
December 11, 1999: From US 70/Glenwood Avenue (exit 4) to Leesville Road (exit 7).
2156: 2065: 2021: 2006: 1988: 1965: 1873: 1850: 1417: 1032: 832: 759: 611: 607: 586: 299: 3944: 910:
In the following 10 years, the now known Northern Wake Freeway (so not to be confused with the
4219: 2162: 2120: 1603: 1069: 1024: 1010: 989: 973: 911: 865: 800: 578: 762:
shopping mall and commercial district along Capital Boulevard. Shortly after the interchange with
3919: 3712: 3545: 3448: 2368: 2180: 1079: 804: 602:
When completed, the beltway will total 70 miles (110 km) in length, surrounding the city of
3764: 17: 4071: 4003: 1387: 1082: 985: 755: 3371: 3044: 2873: 2605: 3564: 3349: 3326: 538:. When complete, the route will completely encircle the city, meeting its parent route of 4055: 4050: 3968:"Road Worrier: Commuters eager for toll-road alternative to the daily slog on NC 55" 3765:"NC awards contract for the last leg of Raleigh's Outer Loop. When it should be finished" 4234: 3678:"The end is in sight: State awards first of two contracts to finish Raleigh Outer Loop" 3391: 3389: 2983: 2962: 2931: 1794: 1551: 1438: 999: 943: 840: 824: 758:(exit 16) and Triangle Town Boulevard (exit 17), which provide access to the 531: 363: 284: 236: 207: 887: 702:
Eastern Wake Expressway (construction started in May 2024; estimated completion 2028)
4315: 4100: 984:
plan, consisting of $ 270 million (equivalent to $ 373 million in 2023) in
875: 812: 353: 4063: 3843:"Timeline: Triangle Expressway toll road project to improve Raleigh traffic by 2028" 3242: 3135: 1824:
Eastbound entrance and exit under construction. Expected completion in November 2024
3000: 2984:"Triangle Expressway System State Annual Appropriation Revenue Bonds, Series 2009B" 2191: 3001:"USDOT Approves $ 386 Million Loan to Build Triangle Expressway in North Carolina" 3449:"Be prepared to stop: Traffic lights on I-540 ramps go live on Tuesday, Sept. 26" 2583: 2499:"New date set for opening NC 540 across southern Wake County. For real this time" 2463:"New 18-mile extension of N.C. 540 will not open in August as previously planned" 1009:
began a year later for the Southern and Eastern Wake Freeways, also known as the
2926: 2391: 2264: 2234: 1998: 1115: 767: 3622:"Public Invited to Envision the Future of Eastern Wake along Lower Neuse River" 2730: 2707: 2684: 2661: 992:, and a $ 387-million (equivalent to $ 534 million in 2023) loan from the 819:. The road heads due west around suburban developments, having interchanges at 3293:"Two new interchanges will bring more paying customers to Triangle Expressway" 2850: 2409:(Map) (2013–14 ed.). Cartography by North Carolina State Tax Commission. 1118:
as well as the future southern loop of NC 540 was requested on June 23, 2023.
1049: 847:(exit 69) before meeting I-40 at exit 1 and continuing on as I-540. 3790:"$ 1.1B Raleigh Outer Loop financing approved by Local Government Commission" 2752: 2428:"New 18-mile extension of N.C. 540 with 5 new interchanges to open in August" 565:. The original plan was for the entire route to be designated as part of the 4011: 3597:"Complete 540 project in Wake County on track for partial opening in spring" 2568:
https://www.ncquickpass.com/app/uploads/2024/07/TriEx-Toll-Schedule-2024.pdf
2508: 1771: 1671: 1650: 1636: 1622: 1598: 570: 4045: 3649:"Closing the Loop: North Carolina's Complete 540 | Engineering News-Record" 2634: 2354: 1568:
Signed as exits 26A (west) and 26B (east). I-87 previously signed as I-495.
4034: 4022: 3191: 2537:"NC Toll 540 opens, expected to make 'a world of difference' for drivers" 1091: 519: 148: 2897:"North Carolina Turnpike Authority unable to sell bonds for toll road" 2803: 577:
rather than an Interstate Highway. The tolled portion is known as the
3894:"Phase 2 Begins for Complete 540 Extension Project in North Carolina" 3352:(Press release). Raleigh: North Carolina Department of Transportation 787: 763: 558: 3192:"Northern Wake Freeway Interchange Improvements at I-540 & I-40" 3024:(Press release). North Carolina Turnpike Authority. August 12, 2009. 996:
under the Transportation Infrastructure Finance and Innovation Act.
3739:"$ 2.2B Toll Expressway for Raleigh Outer Loop Moves to Next Phase" 988:, $ 353 million (equivalent to $ 487 million in 2023) in 3165:(Map). North Carolina Department of Transportation. Archived from 1059: 1005:
After work began on Western Wake Parkway in 2009, engineering and
958: 954: 922: 886: 747: 677: 659: 43: 1090:
December 2010 meeting; a total of 3,000  signatures on
1064:
Construction of the I-40/US 70/NC 540 interchange in January 2023
938:
January 16, 2007: From Triangle Town Boulevard (exit 17) to
931:
August 12, 2002: From Falls of Neuse Road (exit 14) to
3569: 2780:. North Carolina Department of Transportation. December 22, 2008 2541: 2467: 2432: 1774: 1768: 1668: 1647: 1633: 1619: 1601: 1595: 38: 4067: 3423:"Raleigh mulls widening I-540 and converting it to a toll road" 3219:. North Carolina Department of Transportation. December 9, 2011 2826:"Route Change Request in Wake and Durham Counties (2008-07-16)" 1820: 1527: 953:
On July 14, 2007, a section of the loop from I-40 west to
3816:"Construction begins in Garner on latest phase of Toll NC 540" 2291:"Toll collection starts Thursday on 9 miles of 540 Outer Loop" 1572: 3241:. North Carolina Department of Transportation. Archived from 3134:. North Carolina Department of Transportation. Archived from 3019:"Turnpike Authority Breaks Ground on the Triangle Expressway" 2802:. North Carolina Department of Transportation. Archived from 1775:
Exit under construction. Expected completion in November 2024
1074:
The Southern Wake Expressway will connect Holly Springs with
921:
December 21, 2000: From Leesville Road (exit 7) to
2831:. North Carolina Department of Transportation. July 16, 2008 2369:"Road Worrier: Road geeks quibble over I-495 numerical name" 2170:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
803:
toll road complex. The Southern Wake Expressway begins at a
527: 3319:"Work To Start on New Interchange for Triangle Expressway" 935:/Capital Boulevard/Triangle Town Boulevard (exit 16). 3350:"New Triangle Expressway Interchange Now Open to Traffic" 2355:"Interstate 540 / Toll NC 540 - AARoads - North Carolina" 1023:
The completed Triangle Parkway, the first section of the
907:. On January 21, 1997, the freeway opened as I-540. 622:. The designation from I-540 and NC 540 happens at 3999: 3994: 633:
The beltway is further broken down into four segments:
3397:"MORRISVILLE PARKWAY EXTENSION AND NC 540 INTERCHANGE" 2963:"Triangle Expressway System Senior Lien Revenue Bonds" 2851:"Stretch of state's first toll road opens in Triangle" 4013:
Template:Attached KML/Interstate 540 (North Carolina)
3706: 3704: 3702: 3700: 3698: 3565:"INSIDE LOOK: Phase 1 of Complete 540 project begins" 3100:
Siceloff, Bruce; Campbell, Colin (January 4, 2011).
3159:
Triangle Expressway Southeast Extension Project Map
2582:. North Carolina Turnpike Authority. Archived from 1823: 1817: 1567: 1524: 1514:
Signed eastbound as exits 24A (west) and 24B (east)
630:, where I-540 goes east and NC 540 goes west. 387: 369: 359: 349: 344: 158: 142: 109: 101: 88: 67: 34: 3270:"Toll road pits saving time versus spending money" 2920: 2918: 2916: 2914: 2912: 2910: 2531: 2529: 2527: 2525: 2492: 2490: 766:/Louisburg Road (exit 18), I-540 crosses the 2422: 2420: 3068:"Southern Wake loop's roadwork to start in 2014" 1807:Signed as Fuquay-Varina (west) and Garner (east) 4347:Transportation in Durham County, North Carolina 3869:"Raleigh Outer Loop project enters final phase" 2989:. North Carolina Turnpike Authority. July 2009. 2925:Johnston, Louis; Williamson, Samuel H. (2023). 2731:"New Section Of Raleigh's Outer Loop Now Open" 2254: 2252: 1052:on some onramps, the first ones in the state. 1017:(NCDOT) to consider a few alternative routes. 843:, along where the Triangle Expressway ends at 823:(exit 39), Old Stage Road (exit 43, 585:to its current southwestern terminus south of 4352:Transportation in Wake County, North Carolina 4079: 3947:. North Carolina Department of Transportation 3374:. North Carolina Department of Transportation 3194:. North Carolina Department of Transportation 2224: 2222: 1941:; signed as exits 56A (north) and 56B (south) 49:Interstate 540 and North Carolina Highway 540 8: 3671: 3669: 2284: 2282: 2165:. Road continues as I-540 (see exit 1 above) 3102:"Garner protest may kill one highway route" 2411:North Carolina Department of Transportation 2078:; signed as exits 66A (east) and 66B (west) 2001:; signed as exits 59A (east) and 59B (west) 1015:North Carolina Department of Transportation 4086: 4072: 4064: 3264: 3262: 3260: 3095: 3093: 1129: 464: 27:Beltway encircling Raleigh, North Carolina 4357:Transportation in Raleigh, North Carolina 4016: 3676:Stradling, Richard (September 24, 2023). 3447:Stradling, Richard (September 22, 2017). 3132:"Triangle Expressway Southeast Extension" 1886:Signed as exits 54A (west) and 54B (east) 1229:Signed as exits 2A (south) and 2B (north) 3918:Stradling, Richard (September 6, 2017). 3763:Stradling, Richard (November 27, 2023). 2755:. Raleigh, NC: WRAL-TV. January 16, 2007 2497:Stradling, Richard (September 4, 2024). 635: 2218: 1606:final phase); estimated completion 2028 1277:Signed as exits 4A (east) and 4B (west) 1199:Signed as exits 1A (east) and 1B (west) 1056:Triangle Expressway Southeast Extension 1011:Triangle Expressway Southeast Extension 3970:. Raleigh, NC: The News & Observer 2685:"DOT Unwraps Commuter Plans for I-540" 2629: 2627: 31: 4327:Interstate Highways in North Carolina 3421:Siceloff, Bruce (November 26, 2013). 2729:Calloway, Valonda (August 13, 2002). 2457: 2455: 2328:Federal Highway Administration (FHWA) 2142: 2133: 2096: 2087: 2055: 2046: 2038: 2029: 2019: 2010: 1978: 1969: 1957: 1948: 1918: 1909: 1899: 1890: 1863: 1854: 1842: 1833: 1811: 1788: 1779: 1762: 1747: 1738: 1690: 1681: 1662: 1641: 1627: 1613: 1589: 1518: 1487: 1478: 1466: 1457: 1432: 1423: 1412: 1403: 1377: 1368: 1361: 1352: 1345: 1336: 1309: 1300: 1290: 1281: 1258: 1249: 1242: 1233: 1222: 1213: 1176: 1167: 7: 3595:Retana, Judith (December 20, 2023). 740:Raleigh–Durham International Airport 708:I-40 to I-87/US 64/US 264 547:Raleigh–Durham International Airport 518:) are part of a partially completed 94:I-540: 25.84 mi (41.59 km) 3035:Siceloff, Bruce (August 13, 2009). 2895:Baysden, Chris (October 14, 2008). 2864:Siceloff, Bruce (August 13, 2009). 2775:"NC Wake-Extend I-540 (2008-12-22)" 96:NC 540: 32.9 mi (52.9 km) 3841:Thomas, Aaron (February 8, 2024). 3647:Loder, Stephanie (June 26, 2023). 3066:Siceloff, Bruce (March 30, 2010). 2683:Roberts, Mark (December 6, 2000). 2289:Siceloff, Bruce (August 2, 2012). 1144: 946:/Knightdale Bypass (exit 26). 92:58.74 mi (94.53 km) 25: 3966:Siceloff, Bruce (July 10, 2012). 3867:McLoud, Don (February 16, 2024). 2970:North Carolina Turnpike Authority 2708:"New Stretch Of Outer Loop Opens" 2660:Miller, Kay (December 11, 1999). 2387:"Interstate 540 (North Carolina)" 2335:from the original on July 3, 2017 2230:"Interstate 540 (North Carolina)" 963:North Carolina Turnpike Authority 4289: 4033: 4021: 3563:Scott, Tamara (March 23, 2023). 3518:"Detailed Study Alternative # 2" 2143: 2110: 2104: 2098: 2056: 1979: 1919: 1864: 1789: 1748: 1703: 1697: 1691: 1651: 1580: 1574: 1538: 1533: 1528: 1495: 1489: 1433: 1378: 1310: 1259: 1177: 1031:(exit 66) to US 64 in 485: 470: 322: 316: 304: 290: 279: 264: 259: 245: 223: 218: 213: 202: 191: 180: 166: 128: 117: 42: 37: 4028:Interstate 540 (North Carolina) 3737:McLoud, Don (October 4, 2023). 3214:"NC Route Changes (2011-12-09)" 2946:Gross Domestic Product deflator 2706:Lawrence, Tom (June 29, 2001). 994:US Department of Transportation 694:NC 55 to I-40 near Garner 662:to I-87/US 64/US 264 512:North Carolina Highway 540 18:North Carolina Highway 540 Toll 3920:"Have you driven on I-87 yet?" 3005:Federal Highway Administration 2161:End of NC 540 portion of 1602:Future interchanges (proposed 925:/Creedmoor Road (exit 9). 1: 4337:Beltways in the United States 4322:Auxiliary Interstate Highways 3575:ABC Owned Television Stations 3475:"Detailed Study Alternatives" 3372:"Veridea Parkway Interchange" 3108:. Raleigh, NC. Archived from 3074:. Raleigh, NC. Archived from 3043:. Raleigh, NC. Archived from 2927:"What Was the U.S. GDP Then?" 2872:. Raleigh, NC. Archived from 2547:ABC Owned Television Stations 2473:ABC Owned Television Stations 2438:ABC Owned Television Stations 2299:. Raleigh, NC. Archived from 2020:Green Level West Road – 1139: 776:U.S. Highway 64 Business 770:and then turns south towards 433:North Carolina Highway System 3037:"Future rides on toll roads" 2866:"Future rides on toll roads" 2753:"New Stretch of I-540 Opens" 2260:"North Carolina Highway 540" 1087:US Fish and Wildlife Service 726:70.8 mi (113.9 km) 711:12.9 mi (20.8 km) 697:16.5 mi (26.6 km) 683:12.4 mi (20.0 km) 1797:(Fayetteville Road) – 1554:(Knightdale Bypass) – 1094:opposed the route as well. 914:) made several extensions: 4373: 4046:I-540 on Wake County Roads 4040:North Carolina Highway 540 2800:"I-540 Raleigh Outer Loop" 1733: 1203: 1067: 872:electronic toll collection 863: 794:North Carolina Highway 540 4298: 4287: 4109: 2901:Triangle Business Journal 2169: 2160: 2139: 2136: 2128: 2093: 2090: 2082: 2073: 2052: 2049: 2041: 2035: 2032: 2025: 2016: 2013: 2005: 1996: 1975: 1972: 1964: 1960: 1954: 1951: 1945: 1936: 1915: 1912: 1906: 1902: 1896: 1893: 1885: 1860: 1857: 1849: 1845: 1839: 1836: 1828: 1814: 1806: 1785: 1782: 1765: 1758: 1744: 1741: 1729: 1687: 1684: 1676: 1665: 1644: 1630: 1616: 1610: 1592: 1521: 1513: 1484: 1481: 1473: 1469: 1463: 1460: 1454: 1450: 1429: 1426: 1415: 1409: 1406: 1399: 1374: 1371: 1364: 1358: 1355: 1348: 1342: 1339: 1331: 1327: 1306: 1303: 1297: 1293: 1287: 1284: 1276: 1267:(Glenwood Avenue) – 1255: 1252: 1245: 1239: 1236: 1228: 1219: 1216: 1208: 1198: 1173: 1170: 1164: 1159: 1154: 1151: 1148: 1143: 1138: 1135: 1132: 688:Southern Wake Expressway 653:Northern Wake Expressway 567:Interstate Highway System 463: 397:Interstate Highway System 392: 383: 340: 147: 80: 72: 60: 55: 2407:State Transportation Map 2199:     2187:     2176:     1441:(Louisburg Road) – 1318:(Creedmoor Road) – 1223:Aviation Parkway – 670:Western Wake Expressway 665:29 mi (47 km) 3453:The News & Observer 3348:Staff (April 3, 2017). 3297:The News & Observer 3106:The News & Observer 3072:The News & Observer 3041:The News & Observer 2870:The News & Observer 2853:. Raleigh, NC: WRAL-TV. 2662:"I-540 Loop Now Longer" 2504:The News & Observer 2296:The News & Observer 2042:Opened February 3, 2020 1413:Triangle Town Boulevard 3945:"Western Wake Freeway" 3626:Wake County Government 3272:. Raleigh, NC: WRAL-TV 2733:. Raleigh, NC: WRAL-TV 2710:. Raleigh, NC: WRAL-TV 2687:. Raleigh, NC: WRAL-TV 2664:. Raleigh, NC: WRAL-TV 1623:Auburn Knightdale Road 1573:Route transition from 1065: 895: 676:NC 54 in Cary to 575:North Carolina highway 4056:NCRoads.com: N.C. 540 3769:The News&Observer 3682:The News&Observer 3546:"NCDOT: Complete 540" 3239:"Triangle Expressway" 2606:"I-440, 540, and 640" 2580:"NC Quick Pass FAQ's" 1063: 1007:environmental studies 890: 4042:at Wikimedia Commons 4030:at Wikimedia Commons 4017:KML is from Wikidata 3245:on November 23, 2011 3172:on November 23, 2011 3047:on September 8, 2012 2876:on September 8, 2012 2806:on November 24, 2011 2549:. September 25, 2024 1418:Triangle Town Center 1104:Tropical Storm Debby 853:Tropical Storm Debby 760:Triangle Town Center 573:and designated as a 555:U.S. Highway 64 3796:. December 27, 2023 3504:News & Observer 3138:on October 30, 2011 2948:figures follow the 2163:Triangle Expressway 2121:Triangle Expressway 2039:Morrisville Parkway 1604:Triangle Expressway 1362:Falls of Neuse Road 1070:Triangle Expressway 1025:Triangle Expressway 990:Build America Bonds 974:Triangle Expressway 912:Triangle Expressway 866:Triangle Expressway 805:turbine interchange 801:Triangle Expressway 656:I-540, NC 540 579:Triangle Expressway 522:around the city of 504:Interstate 540 160:Major intersections 124:(Durham–Knightdale) 73:Auxiliary route of 4051:NCRoads.com: I-540 3794:Sandhills Sentinel 3112:on January 7, 2011 1958:South Salem Street 1843:Holly Springs Road 1066: 986:toll revenue bonds 896: 589:; an extension to 542:in two locations. 536:Raleigh Outer Loop 56:Raleigh Outer Loop 4332:Research Triangle 4309: 4308: 4038:Media related to 4026:Media related to 3924:News and Observer 3427:News and Observer 3291:Siceloff, Bruce. 3003:(Press release). 2639:Wake County Roads 2586:on April 14, 2014 2475:. August 14, 2024 2440:. August 11, 2024 2303:on August 3, 2012 2211: 2210: 2181:Incomplete access 1388:Capital Boulevard 1083:dwarf wedgemussel 891:I-540 West, near 756:Capital Boulevard 731: 730: 606:and the towns of 598:Route description 501: 500: 497: 496: 136: 125: 68:Route information 16:(Redirected from 4364: 4293: 4292: 4103: 4097: 4096:Auxiliary routes 4088: 4081: 4074: 4065: 4037: 4025: 4007: 3980: 3979: 3977: 3975: 3963: 3957: 3956: 3954: 3952: 3941: 3935: 3934: 3932: 3930: 3915: 3909: 3908: 3906: 3904: 3890: 3884: 3883: 3881: 3879: 3864: 3858: 3857: 3855: 3853: 3838: 3832: 3831: 3829: 3827: 3812: 3806: 3805: 3803: 3801: 3786: 3780: 3779: 3777: 3775: 3760: 3754: 3753: 3751: 3749: 3734: 3728: 3727: 3725: 3723: 3708: 3693: 3692: 3690: 3688: 3673: 3664: 3663: 3661: 3659: 3644: 3638: 3637: 3635: 3633: 3618: 3612: 3611: 3609: 3607: 3592: 3586: 3585: 3583: 3581: 3560: 3554: 3553: 3552:. July 10, 2024. 3542: 3536: 3535: 3533: 3531: 3522: 3514: 3508: 3507: 3499: 3493: 3492: 3490: 3488: 3479: 3471: 3465: 3464: 3462: 3460: 3444: 3438: 3437: 3435: 3433: 3418: 3412: 3411: 3409: 3407: 3393: 3384: 3383: 3381: 3379: 3368: 3362: 3361: 3359: 3357: 3345: 3339: 3338: 3336: 3334: 3329:on April 9, 2016 3325:. Archived from 3314: 3308: 3307: 3305: 3303: 3288: 3282: 3281: 3279: 3277: 3266: 3255: 3254: 3252: 3250: 3235: 3229: 3228: 3226: 3224: 3218: 3210: 3204: 3203: 3201: 3199: 3188: 3182: 3181: 3179: 3177: 3171: 3164: 3154: 3148: 3147: 3145: 3143: 3128: 3122: 3121: 3119: 3117: 3097: 3088: 3087: 3085: 3083: 3078:on April 2, 2010 3063: 3057: 3056: 3054: 3052: 3032: 3026: 3025: 3023: 3015: 3009: 3008: 3007:. July 13, 2009. 2997: 2991: 2990: 2988: 2980: 2974: 2973: 2967: 2959: 2953: 2943: 2941: 2939: 2922: 2905: 2904: 2892: 2886: 2885: 2883: 2881: 2861: 2855: 2854: 2847: 2841: 2840: 2838: 2836: 2830: 2822: 2816: 2815: 2813: 2811: 2796: 2790: 2789: 2787: 2785: 2779: 2771: 2765: 2764: 2762: 2760: 2749: 2743: 2742: 2740: 2738: 2726: 2720: 2719: 2717: 2715: 2703: 2697: 2696: 2694: 2692: 2680: 2674: 2673: 2671: 2669: 2657: 2651: 2650: 2648: 2646: 2641:. Self-published 2631: 2622: 2621: 2619: 2617: 2612:. Self-published 2602: 2596: 2595: 2593: 2591: 2576: 2570: 2565: 2559: 2558: 2556: 2554: 2533: 2520: 2519: 2517: 2515: 2494: 2485: 2484: 2482: 2480: 2459: 2450: 2449: 2447: 2445: 2424: 2415: 2414: 2403: 2397: 2396: 2383: 2377: 2376: 2365: 2359: 2358: 2351: 2345: 2344: 2342: 2340: 2319: 2313: 2312: 2310: 2308: 2286: 2277: 2276: 2274: 2272: 2256: 2247: 2246: 2244: 2242: 2226: 2204: 2200: 2195: 2188: 2183: 2177: 2147: 2146: 2117:NC 885 Toll 2115: 2114: 2113: 2108: 2107: 2102: 2101: 2060: 2059: 1983: 1982: 1923: 1922: 1868: 1867: 1793: 1792: 1752: 1751: 1708: 1707: 1706: 1701: 1700: 1695: 1694: 1655: 1654: 1637:Rock Quarry Road 1584: 1583: 1578: 1577: 1542: 1541: 1537: 1536: 1532: 1531: 1500: 1499: 1498: 1493: 1492: 1437: 1436: 1382: 1381: 1314: 1313: 1263: 1262: 1181: 1180: 1146: 1141: 1130: 1114:along the lower 636: 493: 489: 488: 478: 474: 473: 465: 329:NC 885 Toll 327: 326: 325: 320: 319: 308: 307: 294: 293: 283: 282: 268: 267: 263: 262: 249: 248: 227: 226: 222: 221: 217: 216: 206: 205: 195: 194: 184: 183: 170: 169: 161: 134: 132: 131: 123: 121: 120: 46: 41: 32: 21: 4372: 4371: 4367: 4366: 4365: 4363: 4362: 4361: 4312: 4311: 4310: 4305: 4294: 4290: 4285: 4105: 4101: 4095: 4092: 4061: 4018: 4015: 4010: 4009: 4008: 3992: 3988: 3983: 3973: 3971: 3965: 3964: 3960: 3950: 3948: 3943: 3942: 3938: 3928: 3926: 3917: 3916: 3912: 3902: 3900: 3892: 3891: 3887: 3877: 3875: 3873:Equipment World 3866: 3865: 3861: 3851: 3849: 3840: 3839: 3835: 3825: 3823: 3814: 3813: 3809: 3799: 3797: 3788: 3787: 3783: 3773: 3771: 3762: 3761: 3757: 3747: 3745: 3743:Equipment World 3736: 3735: 3731: 3721: 3719: 3710: 3709: 3696: 3686: 3684: 3675: 3674: 3667: 3657: 3655: 3646: 3645: 3641: 3631: 3629: 3628:. June 23, 2023 3620: 3619: 3615: 3605: 3603: 3594: 3593: 3589: 3579: 3577: 3562: 3561: 3557: 3544: 3543: 3539: 3529: 3527: 3520: 3516: 3515: 3511: 3501: 3500: 3496: 3486: 3484: 3477: 3473: 3472: 3468: 3458: 3456: 3446: 3445: 3441: 3431: 3429: 3420: 3419: 3415: 3405: 3403: 3395: 3394: 3387: 3377: 3375: 3370: 3369: 3365: 3355: 3353: 3347: 3346: 3342: 3332: 3330: 3316: 3315: 3311: 3301: 3299: 3290: 3289: 3285: 3275: 3273: 3268: 3267: 3258: 3248: 3246: 3237: 3236: 3232: 3222: 3220: 3216: 3212: 3211: 3207: 3197: 3195: 3190: 3189: 3185: 3175: 3173: 3169: 3162: 3156: 3155: 3151: 3141: 3139: 3130: 3129: 3125: 3115: 3113: 3099: 3098: 3091: 3081: 3079: 3065: 3064: 3060: 3050: 3048: 3034: 3033: 3029: 3021: 3017: 3016: 3012: 2999: 2998: 2994: 2986: 2982: 2981: 2977: 2965: 2961: 2960: 2956: 2937: 2935: 2924: 2923: 2908: 2894: 2893: 2889: 2879: 2877: 2863: 2862: 2858: 2849: 2848: 2844: 2834: 2832: 2828: 2824: 2823: 2819: 2809: 2807: 2798: 2797: 2793: 2783: 2781: 2777: 2773: 2772: 2768: 2758: 2756: 2751: 2750: 2746: 2736: 2734: 2728: 2727: 2723: 2713: 2711: 2705: 2704: 2700: 2690: 2688: 2682: 2681: 2677: 2667: 2665: 2659: 2658: 2654: 2644: 2642: 2633: 2632: 2625: 2615: 2613: 2604: 2603: 2599: 2589: 2587: 2578: 2577: 2573: 2566: 2562: 2552: 2550: 2535: 2534: 2523: 2513: 2511: 2496: 2495: 2488: 2478: 2476: 2461: 2460: 2453: 2443: 2441: 2426: 2425: 2418: 2405: 2404: 2400: 2385: 2384: 2380: 2367: 2366: 2362: 2353: 2352: 2348: 2338: 2336: 2321: 2320: 2316: 2306: 2304: 2288: 2287: 2280: 2270: 2268: 2258: 2257: 2250: 2240: 2238: 2228: 2227: 2220: 2216: 2207: 2202: 2198: 2190: 2186: 2179: 2175: 2171: 2144: 2111: 2109: 2105: 2103: 2099: 2097: 2057: 1980: 1920: 1900:Veridea Parkway 1865: 1821:Bells Lake Road 1790: 1749: 1704: 1702: 1698: 1696: 1692: 1652: 1581: 1575: 1539: 1534: 1529: 1502:US 64 Bus. 1496: 1494: 1490: 1488: 1434: 1379: 1311: 1260: 1178: 1128: 1072: 1058: 1045: 885: 868: 862: 796: 736: 600: 486: 484: 471: 469: 323: 321: 317: 315: 305: 291: 280: 265: 260: 246: 224: 219: 214: 203: 192: 181: 167: 159: 143:Major junctions 129: 118: 111: 97: 95: 63: 51: 50: 47: 28: 23: 22: 15: 12: 11: 5: 4370: 4368: 4360: 4359: 4354: 4349: 4344: 4339: 4334: 4329: 4324: 4314: 4313: 4307: 4306: 4304: 4303: 4299: 4296: 4295: 4288: 4286: 4284: 4283: 4282: 4281: 4276: 4271: 4266: 4261: 4256: 4248:North Carolina 4244: 4243: 4242: 4237: 4232: 4227: 4222: 4210: 4209: 4208: 4203: 4191: 4190: 4189: 4184: 4179: 4167: 4166: 4165: 4153: 4152: 4151: 4139: 4138: 4137: 4125: 4124: 4123: 4110: 4107: 4106: 4093: 4091: 4090: 4083: 4076: 4068: 4059: 4058: 4053: 4048: 4043: 4031: 3991: 3990: 3989: 3987: 3986:External links 3984: 3982: 3981: 3958: 3936: 3910: 3885: 3859: 3833: 3822:. May 16, 2024 3807: 3781: 3755: 3729: 3713:"Complete 540" 3694: 3665: 3639: 3613: 3587: 3555: 3537: 3509: 3494: 3466: 3439: 3413: 3385: 3363: 3340: 3309: 3283: 3256: 3230: 3205: 3183: 3149: 3123: 3089: 3058: 3027: 3010: 2992: 2975: 2954: 2950:MeasuringWorth 2944:United States 2932:MeasuringWorth 2906: 2887: 2856: 2842: 2817: 2791: 2766: 2744: 2721: 2698: 2675: 2652: 2635:"I-540/NC 540" 2623: 2597: 2571: 2560: 2521: 2486: 2451: 2416: 2398: 2378: 2360: 2346: 2314: 2278: 2248: 2217: 2215: 2212: 2209: 2208: 2206: 2205: 2196: 2184: 2172: 2167: 2166: 2159: 2141: 2138: 2135: 2131: 2130: 2127: 2095: 2092: 2089: 2086: 2080: 2079: 2072: 2054: 2051: 2048: 2044: 2043: 2040: 2037: 2034: 2031: 2027: 2026: 2024: 2018: 2015: 2012: 2009: 2003: 2002: 1995: 1977: 1974: 1971: 1968: 1962: 1961: 1959: 1956: 1953: 1950: 1947: 1943: 1942: 1935: 1917: 1914: 1911: 1908: 1904: 1903: 1901: 1898: 1895: 1892: 1888: 1887: 1884: 1862: 1859: 1856: 1853: 1847: 1846: 1844: 1841: 1838: 1835: 1832: 1826: 1825: 1822: 1819: 1816: 1813: 1809: 1808: 1805: 1787: 1784: 1781: 1777: 1776: 1773: 1772:Old Stage Road 1770: 1767: 1764: 1760: 1759: 1757: 1746: 1743: 1740: 1737: 1731: 1730: 1728: 1689: 1686: 1683: 1680: 1674: 1673: 1672:White Oak Road 1670: 1667: 1664: 1660: 1659: 1649: 1646: 1643: 1639: 1638: 1635: 1632: 1629: 1625: 1624: 1621: 1618: 1615: 1612: 1608: 1607: 1600: 1597: 1594: 1591: 1587: 1586: 1570: 1569: 1566: 1526: 1523: 1520: 1516: 1515: 1512: 1486: 1483: 1480: 1477: 1471: 1470: 1468: 1465: 1462: 1459: 1456: 1452: 1451: 1449: 1431: 1428: 1425: 1421: 1420: 1414: 1411: 1408: 1405: 1401: 1400: 1398: 1376: 1373: 1370: 1366: 1365: 1363: 1360: 1357: 1354: 1350: 1349: 1347: 1346:Six Forks Road 1344: 1341: 1338: 1335: 1329: 1328: 1326: 1308: 1305: 1302: 1299: 1295: 1294: 1292: 1291:Leesville Road 1289: 1286: 1283: 1279: 1278: 1275: 1257: 1254: 1251: 1247: 1246: 1244: 1241: 1238: 1235: 1231: 1230: 1227: 1221: 1218: 1215: 1212: 1207: 1201: 1200: 1197: 1175: 1172: 1169: 1166: 1163: 1157: 1156: 1153: 1150: 1147: 1142: 1137: 1134: 1127: 1124: 1057: 1054: 1044: 1041: 1000:Groundbreaking 948: 947: 936: 929: 926: 919: 884: 881: 864:Main article: 861: 858: 825:US&nbsp401 795: 792: 735: 734:Interstate 540 732: 729: 728: 723: 721: 719: 713: 712: 709: 706: 703: 699: 698: 695: 692: 689: 685: 684: 681: 680:south of Apex 674: 671: 667: 666: 663: 657: 654: 650: 649: 646: 643: 640: 599: 596: 534:, forming the 532:North Carolina 499: 498: 495: 494: 481: 479: 461: 460: 459: 458: 453: 448: 443: 437: 436: 428: 427: 422: 417: 412: 407: 401: 400: 390: 389: 388:Highway system 385: 384: 381: 380: 371: 367: 366: 364:North Carolina 361: 357: 356: 351: 347: 346: 342: 341: 338: 337: 336: 335: 313: 302: 288: 277: 257: 243: 211: 200: 189: 178: 162: 156: 155: 145: 144: 140: 139: 138: 137: 126: 113: 107: 106: 103: 99: 98: 93: 90: 86: 85: 81:Maintained by 78: 77: 70: 69: 65: 64: 61: 58: 57: 53: 52: 48: 36: 35: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 4369: 4358: 4355: 4353: 4350: 4348: 4345: 4343: 4342:Interstate 40 4340: 4338: 4335: 4333: 4330: 4328: 4325: 4323: 4320: 4319: 4317: 4301: 4300: 4297: 4280: 4277: 4275: 4272: 4270: 4267: 4265: 4262: 4260: 4257: 4255: 4252: 4251: 4250: 4249: 4245: 4241: 4238: 4236: 4233: 4231: 4228: 4226: 4223: 4221: 4218: 4217: 4216: 4215: 4211: 4207: 4204: 4202: 4199: 4198: 4197: 4196: 4192: 4188: 4185: 4183: 4180: 4178: 4175: 4174: 4173: 4172: 4168: 4164: 4161: 4160: 4159: 4158: 4154: 4150: 4147: 4146: 4145: 4144: 4140: 4136: 4133: 4132: 4131: 4130: 4126: 4122: 4119: 4118: 4117: 4116: 4112: 4111: 4108: 4104: 4102:Interstate 40 4098: 4089: 4084: 4082: 4077: 4075: 4070: 4069: 4066: 4062: 4057: 4054: 4052: 4049: 4047: 4044: 4041: 4036: 4032: 4029: 4024: 4020: 4019: 4014: 4005: 4001: 3997: 3996: 3985: 3969: 3962: 3959: 3946: 3940: 3937: 3925: 3921: 3914: 3911: 3899: 3895: 3889: 3886: 3874: 3870: 3863: 3860: 3848: 3844: 3837: 3834: 3821: 3817: 3811: 3808: 3795: 3791: 3785: 3782: 3770: 3766: 3759: 3756: 3744: 3740: 3733: 3730: 3718: 3714: 3707: 3705: 3703: 3701: 3699: 3695: 3683: 3679: 3672: 3670: 3666: 3654: 3650: 3643: 3640: 3627: 3623: 3617: 3614: 3602: 3598: 3591: 3588: 3576: 3572: 3571: 3566: 3559: 3556: 3551: 3547: 3541: 3538: 3526: 3519: 3513: 3510: 3505: 3498: 3495: 3483: 3476: 3470: 3467: 3455:. Raleigh, NC 3454: 3450: 3443: 3440: 3428: 3424: 3417: 3414: 3402: 3398: 3392: 3390: 3386: 3373: 3367: 3364: 3351: 3344: 3341: 3328: 3324: 3320: 3313: 3310: 3298: 3294: 3287: 3284: 3271: 3265: 3263: 3261: 3257: 3244: 3240: 3234: 3231: 3215: 3209: 3206: 3193: 3187: 3184: 3168: 3161: 3160: 3153: 3150: 3137: 3133: 3127: 3124: 3111: 3107: 3103: 3096: 3094: 3090: 3077: 3073: 3069: 3062: 3059: 3046: 3042: 3038: 3031: 3028: 3020: 3014: 3011: 3006: 3002: 2996: 2993: 2985: 2979: 2976: 2971: 2964: 2958: 2955: 2951: 2947: 2934: 2933: 2928: 2921: 2919: 2917: 2915: 2913: 2911: 2907: 2902: 2898: 2891: 2888: 2875: 2871: 2867: 2860: 2857: 2852: 2846: 2843: 2827: 2821: 2818: 2805: 2801: 2795: 2792: 2776: 2770: 2767: 2754: 2748: 2745: 2732: 2725: 2722: 2709: 2702: 2699: 2686: 2679: 2676: 2663: 2656: 2653: 2640: 2636: 2630: 2628: 2624: 2611: 2607: 2601: 2598: 2585: 2581: 2575: 2572: 2569: 2564: 2561: 2553:September 25, 2548: 2544: 2543: 2538: 2532: 2530: 2528: 2526: 2522: 2510: 2506: 2505: 2500: 2493: 2491: 2487: 2474: 2470: 2469: 2464: 2458: 2456: 2452: 2439: 2435: 2434: 2429: 2423: 2421: 2417: 2412: 2408: 2402: 2399: 2394: 2393: 2388: 2382: 2379: 2374: 2370: 2364: 2361: 2356: 2350: 2347: 2334: 2330: 2329: 2324: 2318: 2315: 2302: 2298: 2297: 2292: 2285: 2283: 2279: 2267: 2266: 2261: 2255: 2253: 2249: 2237: 2236: 2231: 2225: 2223: 2219: 2213: 2197: 2193: 2185: 2182: 2174: 2173: 2168: 2164: 2158: 2154: 2150: 2132: 2126: 2122: 2118: 2085: 2081: 2077: 2071: 2067: 2063: 2045: 2028: 2023: 2008: 2004: 2000: 1994: 1990: 1986: 1967: 1963: 1944: 1940: 1934: 1930: 1926: 1905: 1889: 1883: 1882:Fuquay-Varina 1879: 1878:Holly Springs 1875: 1871: 1852: 1848: 1831: 1830:Holly Springs 1827: 1810: 1804: 1800: 1799:Fuquay-Varina 1796: 1778: 1761: 1756:(Benson Road) 1755: 1736: 1732: 1727: 1723: 1719: 1715: 1711: 1679: 1675: 1661: 1658: 1640: 1626: 1609: 1605: 1588: 1571: 1565: 1561: 1557: 1553: 1549: 1545: 1517: 1511: 1507: 1503: 1476: 1472: 1467:Buffaloe Road 1453: 1448: 1444: 1440: 1422: 1419: 1402: 1397: 1393: 1389: 1385: 1367: 1351: 1334: 1330: 1325: 1321: 1317: 1296: 1280: 1274: 1270: 1266: 1248: 1232: 1226: 1211: 1206: 1202: 1196: 1192: 1188: 1184: 1162: 1158: 1131: 1125: 1123: 1119: 1117: 1113: 1107: 1105: 1099: 1095: 1093: 1088: 1084: 1081: 1077: 1071: 1062: 1055: 1053: 1051: 1042: 1040: 1038: 1034: 1030: 1026: 1021: 1018: 1016: 1012: 1008: 1003: 1001: 997: 995: 991: 987: 981: 977: 975: 970: 968: 964: 960: 956: 951: 945: 941: 937: 934: 930: 927: 924: 920: 917: 916: 915: 913: 908: 906: 902: 894: 889: 882: 880: 877: 876:NC Quick Pass 873: 867: 859: 857: 854: 848: 846: 842: 838: 834: 830: 826: 822: 818: 815:southeast of 814: 810: 806: 802: 793: 791: 789: 785: 781: 777: 773: 769: 765: 761: 757: 753: 749: 745: 741: 733: 727: 724: 722: 720: 718: 715: 714: 710: 707: 704: 701: 700: 696: 693: 690: 687: 686: 682: 679: 675: 672: 669: 668: 664: 661: 658: 655: 652: 651: 647: 644: 641: 639:Segment Name 638: 637: 634: 631: 629: 628:Durham County 625: 621: 617: 613: 609: 605: 597: 595: 592: 588: 584: 580: 576: 572: 568: 564: 560: 557:(US 64)/ 556: 552: 548: 543: 541: 537: 533: 529: 525: 521: 517: 513: 509: 505: 492: 482: 480: 477: 467: 466: 462: 457: 454: 452: 449: 447: 444: 442: 439: 438: 435: 434: 430: 429: 426: 423: 421: 418: 416: 413: 411: 408: 406: 403: 402: 399: 398: 394: 393: 391: 386: 382: 379: 375: 372: 368: 365: 362: 358: 355: 354:United States 352: 348: 343: 339: 334: 330: 314: 311: 303: 301: 297: 289: 286: 278: 275: 271: 258: 256: 252: 244: 242: 238: 234: 230: 212: 209: 201: 198: 190: 187: 179: 177: 173: 165: 164: 163: 157: 154: 150: 146: 141: 135:(Apex–Durham) 127: 116: 115: 114: 108: 104: 100: 91: 87: 84: 79: 76: 71: 66: 59: 54: 45: 40: 33: 30: 19: 4268: 4246: 4212: 4193: 4169: 4155: 4141: 4127: 4113: 4060: 3993: 3972:. Retrieved 3961: 3951:November 22, 3949:. Retrieved 3939: 3929:September 6, 3927:. Retrieved 3923: 3913: 3901:. Retrieved 3898:www.wsp.com/ 3897: 3888: 3876:. Retrieved 3872: 3862: 3850:. Retrieved 3846: 3836: 3824:. Retrieved 3819: 3810: 3798:. Retrieved 3793: 3784: 3772:. Retrieved 3768: 3758: 3746:. Retrieved 3742: 3732: 3722:February 28, 3720:. Retrieved 3716: 3685:. Retrieved 3681: 3656:. Retrieved 3652: 3642: 3630:. Retrieved 3625: 3616: 3604:. Retrieved 3600: 3590: 3578:. Retrieved 3568: 3558: 3549: 3540: 3528:. Retrieved 3524: 3512: 3503: 3497: 3485:. Retrieved 3481: 3469: 3459:February 26, 3457:. Retrieved 3452: 3442: 3432:November 27, 3430:. Retrieved 3426: 3416: 3406:February 18, 3404:. Retrieved 3401:Town of Cary 3400: 3376:. Retrieved 3366: 3354:. Retrieved 3343: 3331:. Retrieved 3327:the original 3322: 3312: 3300:. Retrieved 3296: 3286: 3276:December 20, 3274:. Retrieved 3249:November 22, 3247:. Retrieved 3243:the original 3233: 3221:. Retrieved 3208: 3198:November 22, 3196:. Retrieved 3186: 3174:. Retrieved 3167:the original 3158: 3152: 3142:November 22, 3140:. Retrieved 3136:the original 3126: 3114:. Retrieved 3110:the original 3105: 3080:. Retrieved 3076:the original 3071: 3061: 3049:. Retrieved 3045:the original 3040: 3030: 3013: 2995: 2978: 2972:. July 2009. 2957: 2949: 2938:November 30, 2936:. Retrieved 2930: 2900: 2890: 2878:. Retrieved 2874:the original 2869: 2859: 2845: 2833:. Retrieved 2820: 2810:November 22, 2808:. Retrieved 2804:the original 2794: 2782:. Retrieved 2769: 2757:. Retrieved 2747: 2735:. Retrieved 2724: 2712:. Retrieved 2701: 2689:. Retrieved 2678: 2666:. Retrieved 2655: 2645:November 22, 2643:. Retrieved 2638: 2616:November 22, 2614:. Retrieved 2609: 2600: 2588:. Retrieved 2584:the original 2574: 2563: 2551:. Retrieved 2540: 2514:September 4, 2512:. Retrieved 2502: 2477:. Retrieved 2466: 2442:. Retrieved 2431: 2406: 2401: 2390: 2381: 2373:newsobserver 2372: 2363: 2349: 2337:. Retrieved 2326: 2317: 2305:. Retrieved 2301:the original 2294: 2269:. Retrieved 2263: 2239:. Retrieved 2233: 2201:   2189:   2178:   2076:USA Baseball 1716:east – 1152:Destinations 1120: 1108: 1100: 1096: 1073: 1046: 1022: 1019: 1004: 998: 982: 978: 971: 952: 949: 909: 897: 869: 849: 797: 737: 725: 716: 705:NC 540 691:NC 540 673:NC 540 642:Designation 632: 601: 544: 535: 515: 511: 507: 503: 502: 431: 395: 188:near Raleigh 133:NC 540 105:1997–present 29: 3800:January 19, 3774:January 19, 3748:January 19, 3687:January 19, 3653:www.enr.com 3606:January 19, 3176:November 6, 2392:Google Maps 2265:Google Maps 2235:Google Maps 2153:Chapel Hill 2084:Morrisville 1999:Jordan Lake 1939:Harris Lake 1795:US 401 1585:NC 540 1564:Rocky Mount 1552:US 264 1439:US 401 1396:Wake Forest 1243:Lumley Road 1225:RDU Airport 1116:Neuse River 1112:Wake County 1050:ramp meters 1037:Kimley-Horn 1029:Morrisville 967:Wake County 944:US 264 768:Neuse River 620:Morrisville 583:Wake County 516:NC 540 491:NC 561 476:NC 522 333:Morrisville 287:near Garner 285:US 401 276:near Garner 237:US 264 208:US 401 4316:Categories 4143:New Mexico 4115:California 3826:August 13, 3116:January 4, 3051:August 14, 2880:August 14, 2479:August 15, 2444:August 13, 2214:References 2194:transition 2149:NC 54 2062:NC 55 1985:US 64 1870:NC 55 1754:NC 50 1726:Wilmington 1657:US 70 1599:Poole Road 1548:US 64 1510:Knightdale 1475:Knightdale 1316:NC 50 1265:US 70 1080:endangered 1068:See also: 1048:installed 940:US 64 905:US 70 893:Knightdale 845:NC 54 829:NC 55 821:NC 50 784:US 64 772:Knightdale 744:US 70 563:Knightdale 441:Interstate 310:US 64 251:US 70 241:Knightdale 233:US 64 210:in Raleigh 199:in Raleigh 186:US 70 4214:Tennessee 3878:April 11, 3852:April 11, 3601:CBS17.com 3082:March 30, 2590:April 13, 2509:McClatchy 2307:August 2, 2123:) – 1993:Pittsboro 1925:US 1 1722:Goldsboro 1579:I-540 to 1443:Louisburg 1390:) – 1384:US 1 1320:Creedmoor 1126:Exit list 1092:petitions 933:US 1 837:Carpenter 752:US 1 645:Location 571:toll road 561:south of 530:state of 410:Auxiliary 296:US 1 197:US 1 110:Component 4279:Business 4195:Arkansas 4187:Business 4171:Oklahoma 4163:Business 4149:Business 4135:Business 4121:Business 3995:KML file 3974:July 16, 3903:June 19, 3847:WRAL.com 3820:WRAL.com 3658:July 18, 3632:July 18, 3530:June 23, 3487:June 23, 3378:April 3, 3356:April 3, 3333:April 2, 3302:July 10, 3223:March 4, 2952:series. 2835:March 4, 2784:March 4, 2759:March 4, 2737:March 4, 2714:March 4, 2691:March 4, 2668:March 4, 2610:NC Roads 2333:Archived 2271:March 4, 2241:March 4, 2203:Unopened 2151: – 2064: – 1987: – 1927: – 1872: – 1712: / 1678:Johnston 1550: / 1546: / 1504: – 1185: – 1136:Location 420:Business 415:Suffixed 370:Counties 345:Location 272: / 235: / 231: / 112:highways 4129:Arizona 3711:NCDOT. 3580:May 13, 3317:NCDOT. 2413:. 2013. 2389:(Map). 2339:June 8, 2262:(Map). 2232:(Map). 2119:north ( 1946:​ 1933:Sanford 1929:Raleigh 1907:​ 1718:Raleigh 1611:​ 1556:Raleigh 1506:Raleigh 1455:​ 1447:Raleigh 1392:Raleigh 1333:Raleigh 1324:Raleigh 1298:​ 1269:Raleigh 1210:Raleigh 1187:Raleigh 1165:​ 883:History 648:Length 604:Raleigh 526:in the 524:Raleigh 520:beltway 350:Country 312:in Apex 153:Raleigh 151:around 149:Beltway 102:Existed 4302:Former 3525:NC DOT 3482:NC DOT 2125:Durham 2070:Durham 1803:Garner 1560:Wilson 1273:Durham 1191:Durham 1161:Durham 1133:County 1085:. The 1076:Garner 1043:Future 841:NC 885 817:Garner 788:US 264 764:US 401 618:, and 616:Garner 591:Garner 559:US 264 510:) and 456:Scenic 425:Future 374:Durham 255:Garner 176:Durham 122:I-540 89:Length 4157:Texas 3717:NCDOT 3550:NCDOT 3521:(PDF) 3478:(PDF) 3323:NCDOT 3217:(PDF) 3170:(PDF) 3163:(PDF) 3022:(PDF) 2987:(PDF) 2966:(PDF) 2829:(PDF) 2778:(PDF) 2192:Route 2137:111.4 2091:109.8 2050:106.9 2033:102.4 1155:Notes 959:NC 55 955:NC 54 923:NC 50 903:with 860:Tolls 807:with 748:NC 50 717:Total 678:NC 55 660:NC 54 626:, in 508:I-540 451:State 360:State 298:near 253:near 83:NCDOT 4004:help 4000:edit 3976:2012 3953:2011 3931:2017 3905:2024 3880:2024 3854:2024 3828:2024 3802:2024 3776:2024 3750:2024 3724:2022 3689:2024 3660:2023 3634:2023 3608:2024 3582:2023 3570:WTVD 3532:2023 3489:2023 3461:2018 3434:2013 3408:2020 3380:2017 3358:2017 3335:2016 3304:2015 3278:2012 3251:2011 3225:2014 3200:2011 3178:2011 3144:2011 3118:2011 3084:2010 3053:2009 2940:2023 2882:2009 2837:2014 2812:2011 2786:2014 2761:2014 2739:2014 2716:2014 2693:2014 2670:2014 2647:2011 2618:2011 2592:2014 2555:2024 2542:WTVD 2516:2024 2481:2024 2468:WTVD 2446:2024 2433:WTVD 2341:2019 2309:2012 2273:2014 2243:2014 2157:Cary 2134:69.2 2088:68.2 2066:Cary 2047:66.4 2030:63.6 2022:Cary 2014:99.6 2011:61.9 2007:Cary 1989:Apex 1973:95.6 1970:59.4 1966:Apex 1952:91.1 1949:56.6 1913:89.5 1910:55.6 1894:88.2 1891:54.8 1874:Apex 1858:86.3 1855:53.6 1851:Apex 1837:81.4 1834:50.6 1783:72.9 1780:45.3 1766:69.5 1763:43.2 1742:63.1 1739:39.2 1735:Wake 1714:I-42 1710:I-40 1685:59.2 1682:36.8 1666:56.2 1663:34.9 1645:53.1 1642:33.0 1631:51.0 1628:31.7 1617:47.3 1614:29.4 1593:44.3 1590:27.5 1544:I-87 1522:41.5 1519:25.8 1482:39.6 1479:24.6 1461:32.5 1458:20.2 1427:29.6 1424:18.4 1407:27.4 1404:17.0 1372:27.0 1369:16.8 1356:22.2 1353:13.8 1340:18.3 1337:11.4 1304:14.8 1285:11.3 1205:Wake 1183:I-40 1149:Exit 1033:Apex 957:and 901:I-40 833:Cary 813:I-42 811:and 809:I-40 780:I-87 624:I-40 612:Cary 608:Apex 587:Apex 551:I-87 540:I-40 405:Main 378:Wake 300:Apex 274:I-42 270:I-40 229:I-87 172:I-40 75:I-40 4274:840 4269:540 4264:440 4259:240 4254:140 4240:840 4235:640 4230:440 4225:240 4220:140 4206:540 4201:440 4182:440 4177:240 4099:of 2074:To 1997:To 1937:To 1416:To 1301:9.2 1282:7.0 1253:6.8 1250:4.2 1237:6.4 1234:4.0 1217:3.2 1214:2.0 1195:RTP 1171:0.0 1168:0.0 549:to 331:in 239:in 174:in 4318:: 4002:• 3922:. 3896:. 3871:. 3845:. 3818:. 3792:. 3767:. 3741:. 3715:. 3697:^ 3680:. 3668:^ 3651:. 3624:. 3599:. 3573:. 3567:. 3548:. 3523:. 3480:. 3451:. 3425:. 3399:. 3388:^ 3321:. 3295:. 3259:^ 3104:. 3092:^ 3070:. 3039:. 2968:. 2929:. 2909:^ 2899:. 2868:. 2637:. 2626:^ 2608:. 2545:. 2539:. 2524:^ 2507:. 2501:. 2489:^ 2471:. 2465:. 2454:^ 2436:. 2430:. 2419:^ 2371:. 2331:. 2325:. 2293:. 2281:^ 2251:^ 2221:^ 2155:, 2140:69 2094:67 2068:, 2053:66 2036:64 2017:62 1991:, 1976:59 1955:57 1931:, 1916:56 1897:55 1880:, 1876:, 1861:54 1840:50 1818:47 1815:76 1812:47 1801:, 1786:45 1769:43 1745:39 1724:, 1720:, 1688:36 1669:35 1648:33 1634:32 1620:29 1596:27 1562:, 1558:, 1525:26 1508:, 1485:24 1464:20 1445:, 1430:18 1410:17 1394:, 1375:16 1359:14 1343:11 1322:, 1271:, 1193:, 1189:, 1145:km 1140:mi 614:, 610:, 528:US 483:→ 468:← 446:US 376:, 4087:e 4080:t 4073:v 4006:) 3998:( 3978:. 3955:. 3933:. 3907:. 3882:. 3856:. 3830:. 3804:. 3778:. 3752:. 3726:. 3691:. 3662:. 3636:. 3610:. 3584:. 3534:. 3506:. 3491:. 3463:. 3436:. 3410:. 3382:. 3360:. 3337:. 3306:. 3280:. 3253:. 3227:. 3202:. 3180:. 3146:. 3120:. 3086:. 3055:. 2942:. 2903:. 2884:. 2839:. 2814:. 2788:. 2763:. 2741:. 2718:. 2695:. 2672:. 2649:. 2620:. 2594:. 2557:. 2518:. 2483:. 2448:. 2395:. 2375:. 2357:. 2343:. 2311:. 2275:. 2245:. 1386:( 1307:9 1288:7 1256:4 1240:3 1220:2 1174:1 942:/ 786:/ 782:/ 754:/ 553:/ 514:( 506:( 20:)

Index

North Carolina Highway 540 Toll
Interstate 540 and North Carolina Highway 540 marker
Interstate 540 and North Carolina Highway 540 marker
I-40
NCDOT
Beltway
Raleigh
I-40
Durham
US 70
US 1
US 401
I-87
US 64
US 264
Knightdale
US 70
Garner
I-40
I-42
US 401
US 1
Apex
US 64
NC 885 Toll
Morrisville
United States
North Carolina
Durham
Wake

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.