22:
109:. Other road projects include added carpool lanes and sound barriers. The total cost of the highway portion of the first phase was budgeted for $ 480 million. The highway expansion faces opposition from environmentalists, who argue that "expanding the amount of space we dedicate to cars not only fails to speed up traffic but also accelerates the breakdown of ecosystems that support life on earth."
131:
and San Elijo Lagoon, including replacement of the railroad bridge over the lagoon. The wooden trestle crossing San Elijo Lagoon was demolished in 2018, after 74 years in service, and was replaced by a modern double-track concrete structure. The wooden trestle had been built in 1944, replacing one
64:
that will upgrade road, rail, pedestrian, and bicycle transportation infrastructure, as well as fund environmental restoration. The project has a $ 6 billion budget, and after beginning the first phases of construction in late 2016 is planned to be completed over the following 40 years.
202:
will receive $ 80 million for restoration efforts, such as dredging and filling to bring sediment to natural levels, as well as additional conserved area to mitigate the impact of the new road and rail bridges. This work is scheduled to begin in 2017.
77:. The projects in this phase are scheduled to be completed by 2021. The state government is contributing $ 250 million to this project, mostly coming from the fuel tax levied by SB1, known as the
397:
128:
235:
155:
313:
337:
78:
127:
inter-city trains, are to be double tracked. Work began initially on a 2.4 kilometres (1.5 mi) segment of track between
290:
171:
261:
151:
57:
139:, including a bridge replacement and 1.2 kilometres (0.75 mi) of new double track. These projects, as well as
90:
190:$ 40 million is to be spent on bicycle path and pedestrian improvements, along with local community enhancements.
361:
118:
73:
The $ 700 million initial phase of construction began in 2016 with a groundbreaking on
November 29 at the
106:
166:. The upgrades to the North Coast Corridor are being done in conjunction with the extension of the
382:
117:
Two segments of the major passenger rail line following the coast from San Diego north, used by
167:
159:
136:
123:
102:
199:
74:
35:
Please help update this article to reflect recent events or newly available information.
140:
391:
94:
61:
147:
98:
175:
15:
291:"California launches $ US 6bn North Coast Corridor project"
314:"Lagoon's wooden railroad trestle replaced after 74 years"
262:"Caltrans, SANDAG Kick Off I-5 North County Expansion"
236:"Work begins on 700m in North Coast corridor projects"
56:
is an infrastructure improvement project in northern
293:. International railway Journal. December 1, 2016
398:Transportation in San Diego County, California
146:This railway line was originally known as the
8:
238:. San Diego Union-Tribune. November 29, 2016
135:Work is ongoing on a similar project at
212:
143:work, are budgeted for $ 102 million.
156:Atchison, Topeka and Santa Fe Railway
93:: one across the San Elijo Lagoon in
7:
285:
283:
281:
255:
253:
230:
228:
226:
224:
222:
220:
218:
216:
89:Two new bridges are to be built on
79:Road Repair and Accountability Act
14:
20:
162:, which forms the route of the
158:. It is currently part of the
1:
338:"Batiquitos Lagoon DT Intro"
152:California Southern Railroad
154:, which became part of the
414:
342:www.keepsandiegomoving.com
312:Diehl, Phil (2018-10-08).
150:built in the 1880s by the
29:This article needs to be
178:, which is known as the
318:San Diego Union-Tribune
101:, and one across the
186:Other transportation
121:commuter trains and
54:North Coast Corridor
362:"Mid-Coast Trolley"
180:Mid-Coast Corridor
129:Cardiff-by-the-Sea
266:KPBS Public Media
168:San Diego Trolley
164:Pacific Surfliner
137:Batiquitos Lagoon
124:Pacific Surfliner
103:Batiquitos Lagoon
50:
49:
405:
370:
369:
358:
352:
351:
349:
348:
334:
328:
327:
325:
324:
309:
303:
302:
300:
298:
287:
276:
275:
273:
272:
257:
248:
247:
245:
243:
232:
200:San Elijo Lagoon
75:San Elijo Lagoon
58:San Diego County
45:
42:
36:
24:
23:
16:
413:
412:
408:
407:
406:
404:
403:
402:
388:
387:
383:Project website
379:
374:
373:
360:
359:
355:
346:
344:
336:
335:
331:
322:
320:
311:
310:
306:
296:
294:
289:
288:
279:
270:
268:
260:Bowen, Andrew.
259:
258:
251:
241:
239:
234:
233:
214:
209:
196:
188:
160:LOSSAN Corridor
132:built in 1880.
115:
87:
71:
46:
40:
37:
34:
25:
21:
12:
11:
5:
411:
409:
401:
400:
390:
389:
386:
385:
378:
377:External links
375:
372:
371:
353:
329:
304:
277:
249:
211:
210:
208:
205:
195:
192:
187:
184:
141:grade crossing
114:
111:
86:
83:
70:
67:
48:
47:
28:
26:
19:
13:
10:
9:
6:
4:
3:
2:
410:
399:
396:
395:
393:
384:
381:
380:
376:
367:
363:
357:
354:
343:
339:
333:
330:
319:
315:
308:
305:
292:
286:
284:
282:
278:
267:
263:
256:
254:
250:
237:
231:
229:
227:
225:
223:
221:
219:
217:
213:
206:
204:
201:
193:
191:
185:
183:
181:
177:
173:
169:
165:
161:
157:
153:
149:
144:
142:
138:
133:
130:
126:
125:
120:
112:
110:
108:
104:
100:
96:
92:
84:
82:
80:
76:
68:
66:
63:
59:
55:
44:
32:
27:
18:
17:
365:
356:
345:. Retrieved
341:
332:
321:. Retrieved
317:
307:
295:. Retrieved
269:. Retrieved
265:
240:. Retrieved
197:
189:
179:
163:
145:
134:
122:
116:
95:Solana Beach
91:Interstate 5
88:
72:
53:
51:
38:
30:
297:December 7,
242:December 7,
194:Environment
69:First phase
347:2022-05-08
323:2022-05-08
271:2019-12-16
207:References
62:California
368:. SANDAG.
172:Blue Line
148:Surf Line
99:Encinitas
41:June 2022
392:Category
107:Carlsbad
119:Coaster
85:Highway
31:updated
366:SANDAG
299:2016
244:2016
198:The
176:UCSD
113:Rail
97:and
52:The
174:to
170:'s
105:in
394::
364:.
340:.
316:.
280:^
264:.
252:^
215:^
182:.
81:.
60:,
350:.
326:.
301:.
274:.
246:.
43:)
39:(
33:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.