North Lantau Highway

Source 📝

323: 911: 874: 629: 331: 46: 315: 686: 564:. In the same year, new motorways design standards were introduced in Hong Kong. In 1990, the highway was redesigned to reflect these new standards, and to take into account higher projected usage. The North Lantau Highway, as built, is a three-lane dual carriageway with a gentler grade and curvature than the earlier iteration. Hard shoulders of 3.3 metres are also provided on either side of the expressway. 27: 1279: 589: 934: 1486: 570:
The most significant bridge along the length of the road is located at the very end of the highway, linking Lantau and Chek Lap Kok. This multi-span structure, approximately 320 metres long, also carries a utility conduit serving the airport containing electricity, water, sewerage, telephone, and raw
529:
inaccessible by road. With a water depth of 3 metres (9.8 ft), and the flood extending 500 metres (550 yd) in length, some 20 vehicles were trapped on the scene by the floodwater. Another thousand vehicles were trapped in the resulting traffic jam, extending about 10 km (6.2 mi)
438:
Rather than tendering the project as a single contract, which would have drawn bids from only the largest international contractors, the Hong Kong government opted to split the expressway into three separate phases that would be more manageable in scale to local companies, thereby drawing a more
556:
An early design for the North Lantau Highway was completed in the early 1980s. It was envisaged as a two-lane dual carriageway " the rugged northern coastline of Lantau". However, the plan did not proceed at that time as the airport project was shelved by the government for financial reasons.
1018:
From the new interchange, a two-lane dual carriageway will run on viaducts, over the sea, to the BCF Island. The project (including the viaducts, the interchange, and modifications to the North Lantau Highway and Cheung Tung Road) is being built by Hong Kong contractor
425:
in the 1990s. The ultimate aim of the new motorway was to connect Hong Kong's urban core with the new international airport (opened 1998) as well as associated new town development in Tung Chung. Construction commenced in June 1992 to a design by
976:
offers traffic figures at two sections of the North Lantau Highway. The section between the western end of the highway (i.e. Airport Road) and the Tung Chung Eastern Interchange registered
567:
Most of the highway is built on reclaimed land. The fill for the land reclamation came from slope cuttings or marine borrow areas in Hong Kong, or was river sand imported from China.
451:, Franki Contractors, and Tobishima Corporation. Lastly, the Tung Chung Section contract, worth $ 969.1 million, was awarded on 27 September 1993 to a joint venture composed of 467: 1383: 1378: 1352: 164: 1292: 1077:
Lloyd, R.H. (1998). "Design and construction of the West Kowloon Expressway, Kwai Chung and Tsing yi section of Route 3 and the North Lantau Expressway".
1530: 1004: 984: 846: 795: 561: 169: 452: 447:
was the lead contractor. The Yam O Section contract, worth $ 1.328 billion, was awarded on 14 September 1992 to a joint venture comprising
1343: 1515: 470:
rounded up about 30 cattle who had wandered onto the highway during construction, when the perimeter fence was not fully enclosed.
999:
is under construction. This will connect the North Lantau Expressway to the Border Crossing Facilities Island (BCF Island), a new
681: 677: 522: 350: 1008: 830: 775: 1283: 277: 191: 521:
at 6am, under rainfall as high as 145 mm (5.7 in) per hour. The highway was forced to close completely, rendering
393: 205: 1520: 1217: 977: 983:
Traffic on the highway has increased in recent years. Some residents and legislators have raised concerns that the new
322: 980:(AADT) of 54,410 in 2016. The section between Tung Chung and Ngong Shuen Au was busier, carrying 66,110 AADT in 2016. 881: 478:
The Sunny Bay Interchange came into operation in 2005, allowing traffic to exit the North Lantau Highway onto the new
1425: 1235: 799: 1007:
project. The connection between the new island and the North Lantau Expressway is actually being built under the
894: 357:
with the rest of the territory. The road has three lanes in each direction for its entire length with full-width
342: 1106: 1393: 910: 873: 628: 369: 1336: 443:
Section, worth HK$ 3.5 billion, was awarded on 8 June 1992 to the Lantau Expressway Joint Venture, of which
1413: 1403: 330: 1525: 877: 479: 422: 256: 156: 1388: 1023:
for a contract value of HK$ 8.66 billion. The Highways Departments expects this to be complete by 2019.
542: 466:
The expressway opened to traffic on 22 May 1997. In the days leading up to the opening, officers of the
381: 365:
is 110 kilometres per hour (68 mph) for most of its length, the highest of any road in Hong Kong.
503: 1420: 973: 487: 389: 401: 1480: 1448: 1398: 1360: 1321: 1020: 937: 346: 62: 37: 1329: 955: 853: 1368: 1086: 1000: 926: 660: 448: 228: 602: 314: 1438: 538: 514: 385: 358: 45: 1253: 1254:"Contract No. HY/2012/07 Tuen Mun–Chek Lap Kok Link Southern Connection Viaduct Section" 1443: 1408: 1373: 685: 508: 483: 427: 1042: 1509: 456: 354: 249: 1124: 665: 560:
The Chek Lap Kok airport project was resurrected in 1989 under the governorship of
526: 499: 444: 373: 235: 93: 1473: 1433: 914: 902: 531: 405: 397: 362: 380:. The road then travels along the northern coast of Lantau Island, next to the 996: 762: 750: 746: 724: 696: 572: 518: 440: 377: 368:
North Lantau Highway is 12.5 kilometres (7.8 mi) in length, beginning at
1307: 1294: 1090: 270: 137: 1278: 1012: 918: 779: 460: 291: 922: 1485: 1104:
Yue, S.Y. (7 March 1992). "Expressway contract split to help locals".
596:
This article contains a bulleted list or table of intersections which
26: 834: 783: 103: 1131:. New Airport Projects Co-ordination Office, Government Secretariat 1049:. New Airport Projects Co-ordination Office, Government Secretariat 548:
The highway was partially reopened starting from 4:00 pm that day.
885: 858: 838: 787: 321: 313: 127: 107: 1325: 1165:
Delfino, Brendan (22 May 1997). "Drivers' beef with new road".
582: 535: 945:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
396:
and through various cuttings. Finally, the road climbs over
598:
should be presented in a properly formatted junction table.
1180:"百年一遇 暴雨沖潰機場命脈 北大嶼山公路成河道 交通癱瘓10小時". Ming Pao. 8 June 2008. 439:
competitive range of bids. The contract to construct the
296: 282: 376:. The road then crosses onto Lantau Island and bypasses 606: 1037: 1035: 691:
Western terminus; start of Route 8 distance markers.
240: 1359: 290: 276: 269: 261: 255: 248: 234: 227: 222: 204: 190: 181: 147: 133: 123: 118: 99: 89: 84: 76: 68: 55: 23: 1236:"N. Lantau Highway traffic up 40% over four years" 710:Start of expressway; western terminus of Route 8. 421:The North Lantau Highway was built as part of the 1079:Proceedings of the Institution of Civil Engineers 1353:Hong Kong Strategic Route and Exit Number System 1119: 1117: 815:Unnamed access road – Siu Ho Wan MTR Depot 571:water connections. There are smaller bridges at 987:(see below) will increase traffic congestion. 1337: 605:for information on how to create one. Please 498:On 7 June 2008, North Lantau Highway and its 210: 196: 8: 1344: 1330: 1322: 1191:"洪水五秒癱瘓機場公路". Sing Tao Daily. 8 June 2008. 1125:"List of Current Contracts as at 31/12/96" 625: 219: 1003:being built as part of the controversial 486:, which was reclaimed mainly for the new 1466: 329: 1031: 1072: 1070: 1068: 1066: 1064: 1011:project, a new road tunnel connecting 178: 20: 843:Westbound exit and eastbound entrance 792:Eastbound exit and westbound entrance 755:Westbound exit and eastbound entrance 729:Westbound exit and eastbound entrance 7: 1223:. Transport Department. August 2017. 1202:"Work on highway split into three". 468:Agriculture and Fisheries Department 361:for emergencies and breakdowns. The 334:Aerial view of Sunny Bay Interchange 326:North Lantau Highway near Tung Chung 931:Eastern terminus (at toll booths); 723:Tung Chung Waterfront Road – 14: 1234:Clark, Robert (18 January 2018). 50:North Lantau Highway coloured red 1531:Extra areas operated by NT taxis 1484: 1277: 1218:"The Annual Traffic Census 2016" 1150:"Tai Ho route almost finished". 1129:Hong Kong Airport Core Programme 1047:Hong Kong Airport Core Programme 932: 909: 872: 684: 627: 587: 392:(MTR). This section is built on 298:Bak1 daai6 jyu4 saan1 gung1 lou6 44: 25: 739:Tung Chung Eastern Interchange 534:. Service was increased on the 523:Hong Kong International Airport 351:Hong Kong International Airport 297: 283: 262: 72:12.8 km (8.0 mi) 16:Expressway in western Hong Kong 1426:Northwest Tsing Yi Interchange 241: 211: 197: 1: 1005:Hong Kong–Zhuhai–Macau Bridge 985:Hong Kong–Zhuhai–Macau Bridge 847:Hong Kong–Zhuhai–Macau Bridge 796:Hong Kong–Zhuhai–Macau Bridge 545:to alleviate passenger flow. 513:, were completely flooded at 134:Special administrative region 978:annual average daily traffic 345:forming part of Hong Kong's 284:Bāk daaih yùh sāan gūng louh 263:Bet5 tai4 yi2 san1 gung1 lu4 482:. This opened up access to 1547: 1009:Tuen Mun–Chek Lap Kok Link 800:Tuen Mun-Chek Lap Kok Link 530:back to the toll plaza of 1043:"North Lantau Expressway" 944: 852: 761: 695: 659: 654: 651: 648: 645: 642: 639: 636: 308: 218: 186: 152: 143: 114: 60: 43: 35: 1516:Expressways in Hong Kong 1394:Ngong Shuen Chau Viaduct 1204:South China Morning Post 1167:South China Morning Post 1152:South China Morning Post 1107:South China Morning Post 951:     434:Construction and opening 428:Mott MacDonald Hong Kong 192:Traditional Chinese 809:Siu Ho Wan Interchange 206:Simplified Chinese 1379:Sha Tin Heights Tunnel 866:Sunny Bay Interchange 747:Tung Chung Town Centre 423:Airport Core Programme 335: 327: 319: 157:Transport in Hong Kong 1414:West Tsing Yi Viaduct 1404:East Tsing Yi Viaduct 1256:. Highways Department 995:A new interchange at 757:Formerly numbered 6A 731:Formerly numbered 6B 632:North Lantau Highway 474:Sunny Bay Interchange 333: 325: 317: 1490:North Lantau Highway 1456:North Lantau Highway 1421:Cheung Tsing Highway 1308:22.3143°N 113.9924°E 1286:at Wikimedia Commons 1284:North Lantau Highway 991:Current developments 974:Transport Department 745:Yu Tung Road – 607:improve this article 488:Hong Kong Disneyland 390:Mass Transit Railway 339:North Lantau Highway 318:North Lantau Highway 182:North Lantau Highway 31:North Lantau Highway 1521:Route 8 (Hong Kong) 1449:Kap Shui Mun Bridge 1399:Stonecutters Bridge 1389:Lai Chi Kok Viaduct 1384:Eagle's Nest Tunnel 1304: /  1021:Gammon Construction 1015:to the BCF Island. 878:Penny's Bay Highway 633: 575:and Sham Shui Kok. 480:Penny's Bay Highway 378:Tung Chung New Town 242:Běi Dàyǔshān Gōnglù 63:Highways Department 1206:. 14 October 1991. 1154:. 28 October 1993. 725:Tung Chung (North) 626: 336: 328: 320: 1504: 1503: 1494:Succeeded by 1481:Hong Kong Route 8 1464: 1463: 1430: 1369:Tsing Sha Highway 1313:22.3143; 113.9924 1282:Media related to 1001:artificial island 965: 964: 956:Incomplete access 903:Lantau Toll Plaza 882:Disneyland Resort 751:Tung Chung (West) 646:Interchange name 624: 623: 408:and its bridges. 312: 311: 304: 303: 278:Yale Romanization 229:Standard Mandarin 177: 176: 170:Roads and Streets 56:Route information 1538: 1498:Western Terminus 1488: 1470:Preceded by 1467: 1428: 1346: 1339: 1332: 1323: 1319: 1318: 1316: 1315: 1314: 1309: 1305: 1302: 1301: 1300: 1297: 1281: 1266: 1265: 1263: 1261: 1250: 1244: 1243: 1231: 1225: 1224: 1222: 1214: 1208: 1207: 1199: 1193: 1192: 1188: 1182: 1181: 1177: 1171: 1170: 1162: 1156: 1155: 1147: 1141: 1140: 1138: 1136: 1121: 1112: 1111: 1101: 1095: 1094: 1074: 1059: 1058: 1056: 1054: 1039: 958: 952: 936: 935: 913: 876: 688: 634: 631: 619: 616: 610: 591: 590: 583: 512: 504:Cheung Tung Road 449:Aoki Corporation 300: 299: 286: 285: 265: 264: 244: 243: 220: 214: 213: 200: 199: 179: 48: 29: 21: 1546: 1545: 1541: 1540: 1539: 1537: 1536: 1535: 1506: 1505: 1495: 1489: 1483: 1471: 1465: 1460: 1439:Tsing Ma Bridge 1355: 1350: 1312: 1310: 1306: 1303: 1298: 1295: 1293: 1291: 1290: 1274: 1269: 1259: 1257: 1252: 1251: 1247: 1233: 1232: 1228: 1220: 1216: 1215: 1211: 1201: 1200: 1196: 1190: 1189: 1185: 1179: 1178: 1174: 1164: 1163: 1159: 1149: 1148: 1144: 1134: 1132: 1123: 1122: 1115: 1103: 1102: 1098: 1076: 1075: 1062: 1052: 1050: 1041: 1040: 1033: 1029: 993: 970: 961: 954: 950: 946: 933: 895:Tsing Chau Tsai 845:Linkage to the 844: 794:Linkage to the 793: 756: 730: 620: 614: 611: 601:Please consult 600: 592: 588: 581: 554: 543:Airport Express 539:Tung Chung line 515:Caribbean Coast 506: 496: 476: 436: 419: 414: 386:Tung Chung line 382:Airport Express 85:Major junctions 51: 30: 17: 12: 11: 5: 1544: 1542: 1534: 1533: 1528: 1523: 1518: 1508: 1507: 1502: 1501: 1492: 1477: 1462: 1461: 1459: 1458: 1453: 1452: 1451: 1446: 1444:Ma Wan Viaduct 1441: 1431: 1423: 1418: 1417: 1416: 1411: 1409:Nam Wan Tunnel 1406: 1401: 1396: 1391: 1386: 1381: 1376: 1374:Tai Wai Tunnel 1365: 1363: 1357: 1356: 1351: 1349: 1348: 1341: 1334: 1326: 1288: 1287: 1273: 1272:External links 1270: 1268: 1267: 1245: 1226: 1209: 1194: 1183: 1172: 1157: 1142: 1113: 1096: 1060: 1030: 1028: 1025: 992: 989: 969: 966: 963: 962: 960: 959: 947: 942: 941: 929: 907: 905: 900: 897: 891: 890: 888: 870: 867: 864: 861: 856: 850: 849: 841: 831:Shun Long Road 828: 825: 823: 819: 818: 816: 813: 810: 807: 803: 802: 790: 776:Shun Long Road 773: 770: 768: 765: 759: 758: 753: 743: 740: 737: 733: 732: 727: 721: 718: 716: 712: 711: 708: 706: 704: 702: 699: 693: 692: 689: 675: 673: 671: 668: 663: 657: 656: 653: 650: 647: 644: 641: 638: 622: 621: 603:this guideline 595: 593: 586: 580: 577: 553: 550: 495: 492: 475: 472: 435: 432: 418: 415: 413: 410: 402:Tsing Chau Wan 394:reclaimed land 359:hard shoulders 310: 309: 306: 305: 302: 301: 294: 288: 287: 280: 274: 273: 271:Yue: Cantonese 267: 266: 259: 253: 252: 246: 245: 238: 232: 231: 225: 224: 223:Transcriptions 216: 215: 208: 202: 201: 194: 188: 187: 184: 183: 175: 174: 173: 172: 167: 161: 160: 150: 149: 148:Highway system 145: 144: 141: 140: 135: 131: 130: 125: 121: 120: 116: 115: 112: 111: 101: 97: 96: 91: 87: 86: 82: 81: 78: 74: 73: 70: 66: 65: 61:Maintained by 58: 57: 53: 52: 49: 41: 40: 33: 32: 24: 15: 13: 10: 9: 6: 4: 3: 2: 1543: 1532: 1529: 1527: 1526:Lantau Island 1524: 1522: 1519: 1517: 1514: 1513: 1511: 1500: 1499: 1493: 1491: 1487: 1482: 1478: 1476: 1475: 1469: 1468: 1457: 1454: 1450: 1447: 1445: 1442: 1440: 1437: 1436: 1435: 1432: 1427: 1424: 1422: 1419: 1415: 1412: 1410: 1407: 1405: 1402: 1400: 1397: 1395: 1392: 1390: 1387: 1385: 1382: 1380: 1377: 1375: 1372: 1371: 1370: 1367: 1366: 1364: 1362: 1358: 1354: 1347: 1342: 1340: 1335: 1333: 1328: 1327: 1324: 1320: 1317: 1285: 1280: 1276: 1275: 1271: 1255: 1249: 1246: 1241: 1237: 1230: 1227: 1219: 1213: 1210: 1205: 1198: 1195: 1187: 1184: 1176: 1173: 1168: 1161: 1158: 1153: 1146: 1143: 1130: 1126: 1120: 1118: 1114: 1109: 1108: 1100: 1097: 1092: 1088: 1084: 1080: 1073: 1071: 1069: 1067: 1065: 1061: 1048: 1044: 1038: 1036: 1032: 1026: 1024: 1022: 1016: 1014: 1010: 1006: 1002: 998: 990: 988: 986: 981: 979: 975: 967: 957: 949: 948: 943: 939: 930: 928: 924: 920: 916: 912: 908: 906: 904: 901: 898: 896: 893: 892: 889: 887: 883: 879: 875: 871: 868: 865: 862: 860: 857: 855: 851: 848: 842: 840: 836: 832: 829: 826: 824: 821: 820: 817: 814: 811: 808: 805: 804: 801: 797: 791: 789: 785: 781: 777: 774: 771: 769: 766: 764: 760: 754: 752: 748: 744: 741: 738: 735: 734: 728: 726: 722: 719: 717: 714: 713: 709: 707: 705: 703: 700: 698: 694: 690: 687: 683: 679: 676: 674: 672: 669: 667: 664: 662: 658: 652:Destinations 635: 630: 618: 615:November 2021 608: 604: 599: 594: 585: 584: 578: 576: 574: 568: 565: 563: 558: 551: 549: 546: 544: 540: 537: 533: 528: 524: 520: 516: 510: 505: 501: 494:2008 flooding 493: 491: 489: 485: 481: 473: 471: 469: 464: 462: 458: 457:Leighton Asia 454: 450: 446: 442: 433: 431: 429: 424: 416: 411: 409: 407: 403: 399: 395: 391: 387: 383: 379: 375: 371: 366: 364: 360: 356: 355:Lantau Island 352: 348: 344: 340: 332: 324: 316: 307: 295: 293: 289: 281: 279: 275: 272: 268: 260: 258: 254: 251: 247: 239: 237: 233: 230: 226: 221: 217: 209: 207: 203: 195: 193: 189: 185: 180: 171: 168: 166: 163: 162: 159: 158: 154: 153: 151: 146: 142: 139: 136: 132: 129: 126: 122: 117: 113: 109: 105: 102: 100:East end 98: 95: 92: 90:West end 88: 83: 79: 75: 71: 67: 64: 59: 54: 47: 42: 39: 34: 28: 22: 19: 1497: 1496: 1479: 1472: 1455: 1289: 1258:. Retrieved 1248: 1239: 1229: 1212: 1203: 1197: 1186: 1175: 1169:. p. 4. 1166: 1160: 1151: 1145: 1133:. Retrieved 1128: 1110:. p. 5. 1105: 1099: 1085:(6): 16–34. 1082: 1078: 1051:. Retrieved 1046: 1017: 994: 982: 971: 953:   938:Route 8 678:Airport Road 666:Chek Lap Kok 612: 597: 579:Interchanges 569: 566: 562:David Wilson 559: 555: 547: 527:Chek Lap Kok 500:service road 497: 477: 465: 445:Downer Group 437: 420: 404:to meet the 374:Chek Lap Kok 370:Airport Road 367: 338: 337: 257:Romanization 236:Hanyu Pinyin 155: 94:Chek Lap Kok 80:1997–present 18: 1474:Lantau Link 1434:Lantau Link 1311: / 1299:113°59′33″E 1260:19 February 1240:Lantau News 1135:19 February 1053:19 February 915:Lantau Link 609:if you can. 532:Lantau Link 507: [ 484:Penny's Bay 453:China State 406:Lantau Link 398:Ta Shui Wan 363:speed limit 1510:Categories 1296:22°18′51″N 1027:References 997:Tai Ho Wan 940:continues 763:Siu Ho Wan 697:Tung Chung 573:Tai Ho Wan 519:Tung Chung 417:Background 349:, linking 343:expressway 1091:1751-7672 927:Hong Kong 886:Sunny Bay 854:Tsuen Wan 640:Location 637:District 138:Hong Kong 1013:Tuen Mun 919:Tsing Yi 917: – 880: – 833: – 780:Tuen Mun 778: – 680: – 461:Hochtief 292:Jyutping 119:Location 36:Part of 1361:Route 8 968:Traffic 923:Kowloon 682:Airport 661:Islands 412:History 388:of the 347:Route 8 124:Country 77:Existed 38:Route 8 1429:  1089:  835:Zhuhai 784:Zhuhai 655:Notes 552:Design 441:Tai Ho 341:is an 212:北大屿山公路 198:北大嶼山公路 165:Routes 106:(near 104:Lantau 69:Length 1221:(PDF) 899:12.9 863:11.3 859:Yam O 839:Macao 788:Macao 649:Exit 511:] 250:Hakka 128:China 108:Yam O 1262:2018 1137:2018 1087:ISSN 1055:2018 972:The 822:5.4 806:4.8 798:and 767:3.4 736:1.6 715:0.6 701:0.4 670:0.0 541:and 459:and 400:and 384:and 353:and 1083:126 827:5A 772:6A 742:6B 720:6C 643:km 536:MTR 525:at 372:on 1512:: 1238:. 1127:. 1116:^ 1081:. 1063:^ 1045:. 1034:^ 925:, 921:, 884:, 869:5 837:, 812:6 786:, 782:, 749:, 517:, 509:zh 502:, 490:. 463:. 455:, 430:. 1345:e 1338:t 1331:v 1264:. 1242:. 1139:. 1093:. 1057:. 617:) 613:( 110:)

Index

Route 8 shield}}
Route 8

Highways Department
Chek Lap Kok
Lantau
Yam O
China
Hong Kong
Transport in Hong Kong
Routes
Roads and Streets
Traditional Chinese
Simplified Chinese
Standard Mandarin
Hanyu Pinyin
Hakka
Romanization
Yue: Cantonese
Yale Romanization
Jyutping



expressway
Route 8
Hong Kong International Airport
Lantau Island
hard shoulders
speed limit

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.