156: 337:. A fourth turbine was added in 2020, then in January 2023 two further turbines were added, making it the largest number of turbines in a tidal-stream array. These turbines were connected by a subsea hub and a single export cable, whereas the previous turbines all had individual cables to shore. However, the three oldest turbines were removed just months later at the end of the EnFAIT project leaving the array at just 0.3 MW. By December 2020 the array had generated 469 MWh through more that 14,000 hours of operation. 397:. The scheme was expected to comprise 15 of Nova's 100 kW M100 turbines, starting with an initial phase of five turbines. As with previous turbines, these would be mounted on gravity foundations on the seabed. The turbines were expected to be manufactured in Canada, with the first one commissioned by 2021, however this did not happen. The project secured C$ 4 million in funding from the Clean Growth Program. 91:, based in Leith, Edinburgh. They deployed their first 30 kW turbine in 2014. Since then, they have developed and tested a 100 kW seabed mounded two-bladed horizontal-axis tidal stream turbine, and plan to scale this up in future. Up to six of these turbines have been deployed simultaneously in the 340:
All of the turbines were two-bladed horizontal-axis machines, which sat on the seabed on gravity foundations. The first three were Nova M100 turbines which incorporated a gearbox. Nova simplified the design for the later M100-D by incorporating a direct-drive mechanism, reportedly cutting the cost by
332:
The first 100 kW tidal turbine was connected in August 2016, followed by another two similar turbines later that year. The original plan was for an array of five turbines, but in 2018 an amended license was awarded to install six turbines. This including re-configuring the array as part of the
168:
In April 2014, Nova installed a 30 kW turbine in the Bluemull Sound, in partnership with the North Yell Development Council, making it the "world's first community-owned tidal power generator". This was connected to the local electricity grid by a 1 km subsea cable; helping power an ice
372:. Due to the flow of the river, the tidal resource in the estuary had faster ebb currents than flood currents. The RE50 turbine did not yaw, and was therefore deployed facing into the ebb current minimising the impact of tower shadow and maximising power generation. 492:
tidal test site, claiming this would be the largest number of turbines installed in a tidal stream array. These would each be 250 kW, scaled up from the existing 100 kW turbines used at Bluemull Sound.
316:
After deploying the Nova 30, the company developed plans for an array of five turbines in the Bluemull Sound, to the northeast of Cullivoe Harbour. The company was awarded £1.9m in grants and loans from
504: 1156: 1494: 180:
The Nova 30 turbine was a three-bladed horizontal axis machine, mounted on a gravity foundation that sat on the seabed. It was fabricated by Renfrew based Steel Engineering.
1242: 425:
and other partners from 2017–2022. However, Nova announced in Feb 2023 that it was mothballing the project, citing issues with the grid connect and lack of revenue support.
606: 630: 1091: 1130: 1106: 656: 421:
of the project, was to include five 100 kW turbines. Baseline environmental surveys for seabirds and marine mammals were carried out by
958: 906: 98:
They have also announced plans to install turbines in France, Canada and Wales. In November 2023, the company announced it had been awarded
1434: 228: 1410: 856: 555: 405:
Nova secured £1.2m from the Welsh Government in 2020 to develop a 0.5 MW tidal stream array, to be located in the waters between
1459: 581: 528: 353: 326: 341:
a third. The six turbines deployed at the site were all given female names: Ailsa, Betty, Charlotte, Eunice, Grace and Hali Hope.
155: 1294: 1009: 418: 436:, North Wales. The first deployments were initially stated for 2023/24, but there have been no further announcements on this. 1499: 680: 325:
based green energy company ELSA, part of the IDETA Group. In 2021, the company received a further £6.4m investment from the
1062: 507:
in allocation round 6, to supply a total of 6 MW of electricity at £172/MWh for their SEASTAR and OCEANSTAR projects.
489: 103: 933: 806: 880: 184: 432:-based Sabella to each develop 6 MW of a 12 MW berth at the Morlais tidal stream project off the coast of 1270:"Nova Scotia project receives $ 4M from federal government to produce clean tidal energy - Halifax | Globalnews.ca" 753: 1036: 778: 386: 141: 1269: 1181: 497: 149: 137: 173:
harbour and up to 30 local homes. The turbine was decommissioned in 2016. The project was supported by the
1367: 294: 113:
solutions, with a system tested at Leith Docks in 2023. In June 2024, Nova announced a joint venture with
1391: 445: 433: 268: 368:
Estuary, their first turbine installed outwith Scotland. This was supported by the Horizon 2020 funded
1196: 1489: 145: 125: 318: 174: 1342: 1213: 830: 457: 348:
batteries alongside the array in 2018, to help even out the variation in power over the six-hour
1318: 356:
at Cullivoe Harbour in March 2021, claiming this was the world's first "tidal powered" charger.
422: 410: 453: 807:"Case study: Nova Innovation - Shetland Tidal Array | Scotland's Marine Assessment 2020" 704: 607:"Floating solar farm in Edinburgh port could be model for solving world's energy needs" 485: 449: 99: 92: 1483: 1411:"Nova Innovation announce project to produce Scotch whisky distilled by tidal power" 496:
The company is looking to raise £20m in investment, and is considering plans for an
1092:
EnFAIT T1-3 Operations Report: Performance and Progress of the Shetland Tidal Array
984:"Nova Innovation leads flagship €20 million European tidal energy project – EnFAIT" 983: 681:"NOVA INNOVATION LTD filing history - Find and update company information - GOV.UK" 456:
for "song of the sea", and the project would help power the famous distilleries on
390: 345: 121: 556:"Scottish company wins EU backing to build one of the world's biggest tidal farms" 907:"Ocean Energy - Nova Innovation and ELSA secure funding for Shetland tidal array" 1107:"Tidal-plus-Tesla: The Scottish energy project providing 'baseload' tidal power" 469: 394: 283: 110: 88: 406: 369: 334: 243: 230: 473: 414: 306: 114: 48: 117:
called AquaGen365, to design, build, and install floating solar platforms.
124:'s launch in June 2023 of a Scottish-based publicly owned energy company " 170: 152:, in Electrical Engineering and Power Systems Engineering respectively. 429: 365: 322: 1131:"Electric vehicle charger powered by tidal energy switches on in Yell" 782: 476:. The project investigated a 7 MW array in the Larantuka Strait. 364:
Between March and April 2023, Nova tested a 50 kW turbine in the
448:
granted Nova an option agreement to develop a 3 MW array in the
728: 582:"Nova Innovation deploys Scotland's 'first' floating solar project" 529:"Nova Innovation secures €20M from EU for 4MW tidal energy project" 911:
Renewable Energy Magazine, at the heart of clean energy journalism
857:"Shetland Tidal Turbine On Display At National Museum of Scotland" 428:
Joint plans were announced in January 2022 by Nova Innovation and
154: 1295:"Wales funds Nova Innovation's 'blue energy island' tidal scheme" 631:"Keir Starmer pledges to launch green energy company in Scotland" 472:
in 2021 to conduct a feasibility study into building an array in
349: 183:
In March 2024, one of the turbine blades went on display at the
76: 488:
funding to develop a 4 MW array with 16 turbines at the
102:
funding to develop a 4 MW array with 16 turbines at the
1460:"Contracts for Difference (CfD) Allocation Round 6: results" 484:
In November 2023, the company announced it had been awarded
1010:"Nova Innovation adds 4th turbine to Shetland tidal array" 705:"Simon Forrest | Offshore Energy & Storage Symposium" 657:"Labour vows to go green and increase UK energy security" 959:"World first for Shetlands in tidal power breakthrough" 1157:"Scottish tidal firm deploys its first unit in France" 159:
Nova 30kW turbine blade at National Museum of Scotland
1199:(Report). ELEMENT Project (published 12 April 2024). 1184:(Report). ELEMENT Project (published 12 April 2024). 468:
Looking further afield, Nova was awarded £200k from
128:". This was held in their turbine factory in Leith. 109:
Nova have also diversified into developing floating
1063:"Nova looking to decommission older tidal turbines" 292: 282: 277: 267: 259: 222: 214: 206: 197: 72: 55: 32: 24: 1214:"Nova Innovation to develop tidal array in Canada" 685:find-and-update.company-information.service.gov.uk 389:to develop a 1.5 MW array in Petite Passage, 934:"Nova to raise £20m, eyes IPO in next two years" 1435:"Nova Innovation to conduct study in Indonesia" 1368:"Nova and Sabella secure 12MW Welsh tidal site" 881:"£1.85m for tidal turbines off Scottish coast" 831:"Shetland tidal turbine will be 'world first'" 777:North Yell Development Council (2015-08-05). 8: 19: 1495:Tidal power companies of the United Kingdom 1037:"Shetland Tidal Array becomes world leader" 503:In September 2024, Nova was awarded three 440:Proposed Òran na Mara Tidal Energy Project 194: 18: 385:In 2019, Nova was awarded a license from 360:Turbine in Étel Estuary, Brittany, France 321:, and they raised a further £1.85m from 1343:"Nova pulls out of Welsh tidal project" 1241:Natural Resources Canada (2020-08-28). 754:"World first with Yell tidal generator" 516: 177:Community and Renewable Energy Scheme. 16:Scottish tidal stream turbine developer 464:Feasibility study for Indonesian array 381:Proposed array in Bay of Fundy, Canada 136:Nova Innovation was set up in 2009 by 1264: 1262: 1236: 1234: 1208: 1206: 1085: 1083: 1031: 1029: 1003: 1001: 999: 928: 926: 801: 799: 7: 550: 548: 522: 520: 1197:D10.2 In-Sea Estuary Testing Report 14: 1182:D10.1 Site Decommissioning Report 327:Scottish National Investment Bank 905:Viaintermedia.com (2014-06-17). 1392:"Whisky from beneath the waves" 419:environmental impact assessment 1293:Garanovic, Amir (2020-11-12). 1008:Garanovic, Amir (2020-10-16). 855:Anstiss, Graham (2024-03-01). 779:"Bluemull Sound Tidal Project" 527:Garanovic, Amir (2023-11-29). 401:Proposed developments in Wales 278:Tidal power station 1: 1105:Topalov, Milan (2018-10-31). 752:Johnson, Peter (2014-05-23). 580:Heynes, George (2023-11-10). 417:were appointed to conduct an 1180:Evenno, Tara (31 May 2023). 1155:Dykes, Andrew (2023-03-20). 1090:Wills, Tom (December 2020). 655:Hakimian, Rob (2023-06-19). 605:Reid, Scott (27 June 2024). 1247:natural-resources.canada.ca 452:. The name Òran na Mara is 185:National Museum of Scotland 87:is a Scottish developer of 77:https://novainnovation.com/ 1516: 352:. They later installed an 1195:Walker, C (29 May 2023). 729:"About — Nova Innovation" 303: 202: 144:Gary Connor. Both have a 505:Contracts for Difference 387:Natural Resources Canada 354:electric vehicle charger 498:initial public offering 150:University of Edinburgh 95:, Shetland since 2016. 1319:"Marine Data Exchange" 299:3 × 100 kW Nova M100-D 288:Tidal stream generator 244:60.699889°N 0.982806°W 160: 62:Dr David Simon Forrest 38:; 15 years ago 1500:Tidal power in Canada 1396:Crown Estate Scotland 709:www.oses.eng.ed.ac.uk 446:Crown Estate Scotland 434:Holy Island, Anglesey 158: 89:tidal stream turbines 1323:Marine Data Exchange 490:EMEC Fall of Warness 269:Commission date 249:60.699889; -0.982806 198:Shetland Tidal Array 191:Shetland Tidal Array 126:Great British Energy 104:EMEC Fall of Warness 1415:Marine Energy Wales 319:Scottish Enterprise 240: /  175:Scottish Government 120:The company hosted 85:Nova Innovation Ltd 21: 20:Nova Innovation Ltd 1409:Jay (2021-02-03). 1243:"Nova Tidal Array" 758:The Shetland Times 661:New Civil Engineer 586:Solar Power Portal 444:In February 2021, 344:Nova incorporated 293:Type of  161: 140:Simon Forrest and 1349:. 8 February 2023 1043:. 31 January 2023 861:Green Energy News 423:Bangor University 314: 313: 106:tidal test site. 82: 81: 1507: 1474: 1473: 1471: 1470: 1456: 1450: 1449: 1447: 1446: 1431: 1425: 1424: 1422: 1421: 1406: 1400: 1399: 1388: 1382: 1381: 1379: 1378: 1364: 1358: 1357: 1355: 1354: 1339: 1333: 1332: 1330: 1329: 1315: 1309: 1308: 1306: 1305: 1290: 1284: 1283: 1281: 1280: 1266: 1257: 1256: 1254: 1253: 1238: 1229: 1228: 1226: 1225: 1210: 1201: 1200: 1192: 1186: 1185: 1177: 1171: 1170: 1168: 1167: 1152: 1146: 1145: 1143: 1142: 1127: 1121: 1120: 1118: 1117: 1102: 1096: 1095: 1087: 1078: 1077: 1075: 1074: 1059: 1053: 1052: 1050: 1048: 1033: 1024: 1023: 1021: 1020: 1005: 994: 993: 991: 990: 980: 974: 973: 971: 969: 955: 949: 948: 946: 945: 930: 921: 920: 918: 917: 902: 896: 895: 893: 892: 877: 871: 870: 868: 867: 852: 846: 845: 843: 842: 827: 821: 820: 818: 817: 803: 794: 793: 791: 790: 781:. Archived from 774: 768: 767: 765: 764: 749: 743: 742: 740: 739: 725: 719: 718: 716: 715: 701: 695: 694: 692: 691: 677: 671: 670: 668: 667: 652: 646: 645: 643: 642: 635:Holyrood Website 627: 621: 620: 618: 617: 602: 596: 595: 593: 592: 577: 571: 570: 568: 567: 552: 543: 542: 540: 539: 524: 307:edit on Wikidata 255: 254: 252: 251: 250: 245: 241: 238: 237: 236: 233: 195: 46: 44: 39: 36:May 1, 2009 22: 1515: 1514: 1510: 1509: 1508: 1506: 1505: 1504: 1480: 1479: 1478: 1477: 1468: 1466: 1458: 1457: 1453: 1444: 1442: 1433: 1432: 1428: 1419: 1417: 1408: 1407: 1403: 1390: 1389: 1385: 1376: 1374: 1366: 1365: 1361: 1352: 1350: 1341: 1340: 1336: 1327: 1325: 1317: 1316: 1312: 1303: 1301: 1299:Offshore Energy 1292: 1291: 1287: 1278: 1276: 1268: 1267: 1260: 1251: 1249: 1240: 1239: 1232: 1223: 1221: 1212: 1211: 1204: 1194: 1193: 1189: 1179: 1178: 1174: 1165: 1163: 1154: 1153: 1149: 1140: 1138: 1129: 1128: 1124: 1115: 1113: 1104: 1103: 1099: 1089: 1088: 1081: 1072: 1070: 1061: 1060: 1056: 1046: 1044: 1035: 1034: 1027: 1018: 1016: 1014:Offshore Energy 1007: 1006: 997: 988: 986: 982: 981: 977: 967: 965: 957: 956: 952: 943: 941: 932: 931: 924: 915: 913: 904: 903: 899: 890: 888: 879: 878: 874: 865: 863: 854: 853: 849: 840: 838: 829: 828: 824: 815: 813: 811:marine.gov.scot 805: 804: 797: 788: 786: 776: 775: 771: 762: 760: 751: 750: 746: 737: 735: 733:Nova Innovation 727: 726: 722: 713: 711: 703: 702: 698: 689: 687: 679: 678: 674: 665: 663: 654: 653: 649: 640: 638: 629: 628: 624: 615: 613: 604: 603: 599: 590: 588: 579: 578: 574: 565: 563: 554: 553: 546: 537: 535: 533:Offshore Energy 526: 525: 518: 513: 482: 480:SEASTAR Project 466: 442: 403: 383: 378: 376:Future projects 370:ELEMENT project 362: 310: 248: 246: 242: 239: 234: 231: 229: 227: 226: 193: 166: 164:Nova 30 turbine 134: 68: 42: 40: 37: 17: 12: 11: 5: 1513: 1511: 1503: 1502: 1497: 1492: 1482: 1481: 1476: 1475: 1451: 1426: 1401: 1383: 1359: 1334: 1310: 1285: 1258: 1230: 1202: 1187: 1172: 1147: 1122: 1097: 1079: 1054: 1025: 995: 975: 950: 938:Daily Business 922: 897: 872: 847: 822: 795: 769: 744: 720: 696: 672: 647: 622: 597: 572: 544: 515: 514: 512: 509: 486:Horizon Europe 481: 478: 465: 462: 450:Sound of Islay 441: 438: 411:Llŷn Peninsula 402: 399: 382: 379: 377: 374: 361: 358: 335:EnFAIT project 312: 311: 304: 301: 300: 297: 290: 289: 286: 280: 279: 275: 274: 271: 265: 264: 261: 257: 256: 224: 220: 219: 218:Shetland Isles 216: 212: 211: 208: 204: 203: 200: 199: 192: 189: 165: 162: 133: 130: 100:Horizon Europe 93:Bluemull Sound 80: 79: 74: 70: 69: 67: 66: 65:Dr Gary Connor 63: 59: 57: 53: 52: 34: 30: 29: 26: 15: 13: 10: 9: 6: 4: 3: 2: 1512: 1501: 1498: 1496: 1493: 1491: 1488: 1487: 1485: 1465: 1461: 1455: 1452: 1440: 1439:Energy Global 1436: 1430: 1427: 1416: 1412: 1405: 1402: 1398:. 2021-02-03. 1397: 1393: 1387: 1384: 1373: 1369: 1363: 1360: 1348: 1344: 1338: 1335: 1324: 1320: 1314: 1311: 1300: 1296: 1289: 1286: 1275: 1271: 1265: 1263: 1259: 1248: 1244: 1237: 1235: 1231: 1219: 1215: 1209: 1207: 1203: 1198: 1191: 1188: 1183: 1176: 1173: 1162: 1158: 1151: 1148: 1136: 1135:Shetland News 1132: 1126: 1123: 1112: 1108: 1101: 1098: 1093: 1086: 1084: 1080: 1068: 1067:Shetland News 1064: 1058: 1055: 1042: 1038: 1032: 1030: 1026: 1015: 1011: 1004: 1002: 1000: 996: 985: 979: 976: 964: 960: 954: 951: 939: 935: 929: 927: 923: 912: 908: 901: 898: 886: 882: 876: 873: 862: 858: 851: 848: 836: 832: 826: 823: 812: 808: 802: 800: 796: 785:on 2015-08-05 784: 780: 773: 770: 759: 755: 748: 745: 734: 730: 724: 721: 710: 706: 700: 697: 686: 682: 676: 673: 662: 658: 651: 648: 636: 632: 626: 623: 612: 608: 601: 598: 587: 583: 576: 573: 561: 557: 551: 549: 545: 534: 530: 523: 521: 517: 510: 508: 506: 501: 499: 494: 491: 487: 479: 477: 475: 471: 463: 461: 459: 455: 451: 447: 439: 437: 435: 431: 426: 424: 420: 416: 412: 408: 400: 398: 396: 392: 388: 380: 375: 373: 371: 367: 359: 357: 355: 351: 347: 342: 338: 336: 333:Horizon 2020 330: 328: 324: 320: 308: 302: 298: 296: 291: 287: 285: 281: 276: 272: 270: 266: 262: 258: 253: 225: 221: 217: 213: 209: 205: 201: 196: 190: 188: 186: 181: 178: 176: 172: 163: 157: 153: 151: 147: 143: 139: 131: 129: 127: 123: 118: 116: 112: 107: 105: 101: 96: 94: 90: 86: 78: 75: 71: 64: 61: 60: 58: 54: 50: 35: 31: 27: 23: 1467:. Retrieved 1463: 1454: 1443:. Retrieved 1441:. 2021-12-01 1438: 1429: 1418:. Retrieved 1414: 1404: 1395: 1386: 1375:. Retrieved 1371: 1362: 1351:. Retrieved 1346: 1337: 1326:. Retrieved 1322: 1313: 1302:. Retrieved 1298: 1288: 1277:. Retrieved 1273: 1250:. Retrieved 1246: 1222:. Retrieved 1220:. 2019-12-12 1217: 1190: 1175: 1164:. Retrieved 1161:Energy Voice 1160: 1150: 1139:. Retrieved 1137:. 2021-03-22 1134: 1125: 1114:. Retrieved 1111:Current News 1110: 1100: 1071:. Retrieved 1069:. 2023-02-28 1066: 1057: 1045:. Retrieved 1040: 1017:. Retrieved 1013: 987:. Retrieved 978: 966:. Retrieved 963:the Guardian 962: 953: 942:. Retrieved 940:. 2023-06-20 937: 914:. Retrieved 910: 900: 889:. Retrieved 887:. 2014-06-15 884: 875: 864:. Retrieved 860: 850: 839:. Retrieved 837:. 2012-08-23 834: 825: 814:. Retrieved 810: 787:. Retrieved 783:the original 772: 761:. Retrieved 757: 747: 736:. Retrieved 732: 723: 712:. Retrieved 708: 699: 688:. Retrieved 684: 675: 664:. Retrieved 660: 650: 639:. Retrieved 637:. 2023-06-19 634: 625: 614:. Retrieved 611:The Scotsman 610: 600: 589:. Retrieved 585: 575: 564:. Retrieved 562:. 2023-11-29 559: 536:. Retrieved 532: 502: 495: 483: 467: 443: 427: 404: 391:Bay of Fundy 384: 363: 343: 339: 331: 315: 232:60°41′59.6″N 182: 179: 167: 135: 122:Keir Starmer 119: 108: 97: 84: 83: 28:Tidal energy 1490:Tidal power 1274:Global News 1047:25 November 968:8 September 500:in future. 470:Innovate UK 395:Nova Scotia 350:tidal cycle 263:Operational 247: / 235:0°58′58.1″W 223:Coordinates 111:solar power 1484:Categories 1469:2024-09-03 1445:2023-12-16 1420:2023-12-16 1377:2023-11-28 1372:reNEWS.biz 1353:2023-12-10 1347:ReNews.biz 1328:2023-12-10 1304:2023-12-10 1279:2023-12-10 1252:2023-12-10 1224:2023-12-10 1166:2023-12-10 1141:2023-12-10 1116:2023-12-10 1073:2023-11-25 1019:2023-12-09 989:2023-12-09 944:2023-12-16 916:2023-12-10 891:2023-12-10 885:The Herald 866:2024-04-06 841:2023-12-09 816:2023-12-09 789:2023-12-09 763:2023-12-09 738:2023-12-21 714:2023-12-21 690:2023-12-21 666:2023-12-16 641:2023-12-16 616:2024-06-09 591:2023-12-09 566:2023-12-02 560:The Herald 538:2023-12-02 511:References 407:Ynys Enlli 43:2009-05-01 1094:(Report). 474:Indonesia 169:house at 148:from the 49:Edinburgh 1218:BBC News 835:BBC News 409:and the 215:Location 210:Scotland 171:Cullivoe 25:Industry 430:Quimper 323:Belgium 207:Country 132:History 73:Website 56:Founder 41: ( 33:Founded 1464:GOV.UK 1041:ReNEWS 454:Gaelic 260:Status 458:Islay 346:Tesla 305:[ 1049:2023 970:2016 366:Étel 284:Type 273:2016 51:, UK 415:RSK 295:TSG 146:PhD 142:CTO 138:CEO 115:RSK 47:in 1486:: 1462:. 1437:. 1413:. 1394:. 1370:. 1345:. 1321:. 1297:. 1272:. 1261:^ 1245:. 1233:^ 1216:. 1205:^ 1159:. 1133:. 1109:. 1082:^ 1065:. 1039:. 1028:^ 1012:. 998:^ 961:. 936:. 925:^ 909:. 883:. 859:. 833:. 809:. 798:^ 756:. 731:. 707:. 683:. 659:. 633:. 609:. 584:. 558:. 547:^ 531:. 519:^ 460:. 413:. 393:, 329:. 187:. 1472:. 1448:. 1423:. 1380:. 1356:. 1331:. 1307:. 1282:. 1255:. 1227:. 1169:. 1144:. 1119:. 1076:. 1051:. 1022:. 992:. 972:. 947:. 919:. 894:. 869:. 844:. 819:. 792:. 766:. 741:. 717:. 693:. 669:. 644:. 619:. 594:. 569:. 541:. 309:] 45:)

Index

Edinburgh
https://novainnovation.com/
tidal stream turbines
Bluemull Sound
Horizon Europe
EMEC Fall of Warness
solar power
RSK
Keir Starmer
Great British Energy
CEO
CTO
PhD
University of Edinburgh
A blue turbine blade about 2m high, mounted vertically with a metal adaptor bolting it to a plinth, in an exhibition gallery of the National Museum of Scotland
Cullivoe
Scottish Government
National Museum of Scotland
60°41′59.6″N 0°58′58.1″W / 60.699889°N 0.982806°W / 60.699889; -0.982806
Commission date
Type
TSG
edit on Wikidata
Scottish Enterprise
Belgium
Scottish National Investment Bank
EnFAIT project
Tesla
tidal cycle
electric vehicle charger

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.