22:
156:. Both directions of motorway traffic are directed onto the westbound carriageway contraflow at a speed limit of 50 mph. The eastbound carriageway will then be closed and used for HGV queuing in two lanes (the hard shoulder and 3rd lane) with the other two lanes reserved for emergency vehicles, maintenance vehicles and amenities. This would be marked out with cones and subjected to a 30 mph speed limit. Due to the contraflow setup, non-HGV traffic cannot join the M20 eastbound at Junction 8.
140:(HGVs) queuing for the Port of Dover. At this stage, Dover TAP is activated and all HGVs using the Port must use the A20 from Folkestone, queuing in the left hand lane. The road will be reduced to 40 mph and all other traffic will use the right hand lane. HGVs will be released in intervals at Western Heights Roundabout to the west of Dover, in order to avoid clogging up the only main road through the town.
205:
Operation Brock would have to be activated again in the following months due to the uncertainty of Brexit. The westbound carriageway has stayed at 50 mph. This has decreased safety to motorists travelling on the M20 whether
Operation Brock is in force or not, as if they breakdown they are in a live lane and there are no warnings to other traffic like there are on
112:
and altering the carriageway of the M20 between
Junctions 8 and 9. On the westbound carriageway of the M20, the hard shoulder was converted to a running lane, giving that carriageway a total of four lanes, all remarked with white lines. A steel barrier now separates these lanes, providing two in each
204:
The contraflow has been the height of issues however. As
Operation Brock was not used due to Brexit being delayed, the decision was made to partially revert the M20 back to its original state. This was done by reopening the eastbound carriageway fully, and keeping the steel barrier in the event that
200:
In
January 2019, a rehearsal for part of Operation Brock was carried out, using the former Manston Airport as a lorry park. It was criticised for being unrepresentative of the actual situation that would occur in reality. On the first day of the test, only 89 of the planned 150 lorries turned up for
242:
28 January 2022 – Work, expected to take approximately 1 year, begins to move the barriers stored position from the hard shoulder to the central reservation. During this period lanes are closed in both directions on parts of the motorway between J8 and J9 but the contraflow is not normally used.
92:
coupled with the more recent Dover
Traffic Assessment Project (TAP), which meters or halts lorries but not other traffic on the A20 before they may enter the town. However, with the possibility of a higher administrative overhead at the Port of Dover
250:
incident as a precaution against disruption at Dover. Between 25 March and 6 April the coastbound M20 is completely closed with increasing frequency between J8 and J9, with the coastbound contraflow being used for HGV traffic management.
260:
6 June 2022 - Operation Brock is deactivated. Lane closures and speed limits are still in force between
Junctions 8 and 9 to resume the previous works to move the barrier storage location.
192:
Phase 4 only affects HGVs for the
Channel Tunnel. The M26 is now closed entirely and HGVs are parked on both carriageways until space at the contraflow on the M20 becomes available.
108:
request that "£30m has been allocated to cover the design, build and initial operation of the scheme for up to six months." The works included strengthening the carriageways of the
217:
May 2018 – Highways
England designed and built a temporary traffic management system that would implement a contraflow system using a rigid steel barrier separating traffic flows.
209:. In the first few weeks of the contraflow being in force, many accidents happened on the stretch, and with no hard shoulder emergency vehicles found it hard to get to the scene.
164:
Phase 3 separates the HGVs for the Port of Dover and
Channel Tunnel. All HGVs for the Channel Tunnel use the contraflow on the M20, whereas HGVs for the Port of Dover head to
696:
321:
88:
since the late 1990s. When the ferries and/or shuttle trains were not running to schedule, lorries bound for the continent were parked on the motorway, under
295:
233:
80:
dual carriageway making up the last few miles to Dover. Effectively the motorway has carried nearly all cross channel traffic to and from the
406:
223:
January 2020 – The barrier is removed and works begin in designing a moveable barrier that can be implemented and removed at short notice.
753:
805:
354:
704:
671:
779:
465:
232:
21 December 2020 – Barrier is moved into place and
Operation Brock activated due to the French Border being closed as a result of
853:
105:
858:
543:
257:
14 April 2022 – Operation Brock is scaled back, reopening M20 J10a to J11 and the coastbound contraflow to normal traffic.
379:
21:
727:
169:
619:
247:
594:
863:
645:
491:
254:
6 April 2022 – "Operation Brock Zero" is activated, extending the complete closure of the coastbound M20 to J11.
149:
728:"Operation Brock in force on M20 at Maidstone and Ashford as P&O Ferries expected to cause freight delays"
517:
672:"Operation Brock M20 barrier between Ashford and Maidstone to move from hard shoulder to central reservation"
229:
11 December 2020 – Testing of the moveable barrier was carried out in preparation for 27/28 December 2020.
269:
116:
Operation Brock was scheduled to be ready for activation no later than the date of the UK's exit from the
97:
and an increase in freight traffic, protocols needed to be strengthened and Operation Brock was formed.
180:(advertised routes by Highways England). HGVs will queue here until space is made available on the
137:
49:
780:"Operation Brock contraflow back in force tonight as Junction 10a and 11 on M20 reopen coastbound"
77:
37:
806:"M20 50mph limit remains despite deactivation of Operation Brock between Maidstone and Ashford"
128:
There are four phases of Operation Brock, each trying to cope with more traffic than the last.
414:
329:
48:
during cross-Channel traffic problems. It was originally developed for use in the event of a
152:
between Junctions 8 and 9 on the M20 and now applies to HGVs for both the Port of Dover and
120:, 31 January 2020. Road marking reworkings began on or around the night of 26 October 2019.
101:
274:
165:
89:
45:
492:"Operation Brock has been in place for two days on the M20 and it's already a disaster"
206:
153:
117:
85:
847:
81:
568:
439:
184:, where the TAP256 will control HGVs in the same way the Dover TAP does on the A20.
109:
69:
65:
26:
239:
25 April 2021 – Contraflow is removed and barrier is moved back to the shoulder.
838:
833:
544:"The M20 closures planned this week as new Op Brock barrier set to be installed"
322:"No-deal Brexit could trigger 14 days of road chaos, Highways England reveals"
73:
418:
333:
236:. It was initially planned to move the barrier into place on 27/28 December.
181:
177:
173:
94:
296:"NAO warns 'considerable' infrastructure work needed at UK border"
246:
25 March 2022 – Operation Brock contraflow is activated after the
754:"M20 closed between Maidstone and Hythe as Brock Zero brought in"
466:"Operation Brock – work to remove M20 contraflow starts tonight"
355:"Kent roads ready for Brexit as hauliers gear up for 31 October"
41:
646:"Full closure of M20 planned to remove Operation Brock barrier"
16:
Traffic management system to mitigate the effects of Brexit
569:"Operation Brock M20 barrier test as Brexit date looms"
407:"No-deal Brexit rehearsal in Kent 'a waste of time'"
29:
near Hollingbourne within the Operation Brock area.
620:"Post-Christmas work to activate Operation Brock"
100:Work began in May 2018 on this scheme managed by
595:"Operation Brock to be deployed in Kent tonight"
226:September 2020 – Zipper barrier is installed.
8:
104:and in September 2018 they revealed in a
440:"Post-Brexit lorry park trial under way"
380:"Airport site used for post-Brexit test"
220:26 October 2019 – Barrier is installed.
20:
286:
542:MacDougall, Lauren (30 August 2020).
320:O'Carroll, Lisa (28 September 2018).
7:
644:MacDougall, Lauren (20 April 2021).
490:Chessum, Victoria (26 March 2019).
405:O'Carroll, Lisa (7 January 2019).
14:
834:Highways England: Operation Brock
136:The initial phase only concerns
778:Castle, Liane (14 April 2022).
726:Dixon, Rachel (22 March 2022).
703:. 21 March 2022. Archived from
670:Wright, Dan (13 January 2022).
516:Pyman, Tom (31 January 2020).
44:, England, used to supplement
1:
839:Roads.org.uk: Operation Brock
697:"Operation Brock is in place"
54:Brexit Operations across Kent
52:and the name is derived from
294:Clark, Jess (20 July 2018).
248:P&O sacking of 800 staff
804:Austin, Ben (6 June 2022).
880:
752:Jee, Alex (6 April 2022).
518:"Brock removal completed"
148:Phase 2 encompasses the
76:, with a section of the
854:Consequences of Brexit
270:Operation Yellowhammer
106:Freedom of Information
30:
859:Disaster preparedness
24:
138:heavy goods vehicles
575:. 12 December 2020
300:New Civil Engineer
38:traffic management
31:
864:Transport in Kent
68:runs between the
871:
821:
820:
818:
816:
801:
795:
794:
792:
790:
775:
769:
768:
766:
764:
749:
743:
742:
740:
738:
723:
717:
716:
714:
712:
707:on 21 March 2022
701:Highways England
693:
687:
686:
684:
682:
667:
661:
660:
658:
656:
641:
635:
634:
632:
630:
616:
610:
609:
607:
605:
591:
585:
584:
582:
580:
565:
559:
558:
556:
554:
539:
533:
532:
530:
528:
513:
507:
506:
504:
502:
487:
481:
480:
478:
476:
462:
456:
455:
453:
451:
446:. 7 January 2019
436:
430:
429:
427:
425:
402:
396:
395:
393:
391:
386:. 7 January 2019
376:
370:
369:
367:
365:
351:
345:
344:
342:
340:
317:
311:
310:
308:
306:
291:
102:Highways England
879:
878:
874:
873:
872:
870:
869:
868:
844:
843:
830:
825:
824:
814:
812:
803:
802:
798:
788:
786:
777:
776:
772:
762:
760:
751:
750:
746:
736:
734:
725:
724:
720:
710:
708:
695:
694:
690:
680:
678:
669:
668:
664:
654:
652:
643:
642:
638:
628:
626:
618:
617:
613:
603:
601:
593:
592:
588:
578:
576:
567:
566:
562:
552:
550:
541:
540:
536:
526:
524:
515:
514:
510:
500:
498:
489:
488:
484:
474:
472:
464:
463:
459:
449:
447:
438:
437:
433:
423:
421:
404:
403:
399:
389:
387:
378:
377:
373:
363:
361:
353:
352:
348:
338:
336:
319:
318:
314:
304:
302:
293:
292:
288:
283:
275:Operation Stack
266:
215:
207:Smart motorways
201:the rehearsal.
198:
190:
166:Manston Airport
162:
146:
134:
126:
90:Operation Stack
62:
46:Operation Stack
34:Operation Brock
17:
12:
11:
5:
877:
875:
867:
866:
861:
856:
846:
845:
842:
841:
836:
829:
828:External links
826:
823:
822:
796:
770:
744:
718:
688:
662:
636:
611:
586:
560:
534:
508:
482:
457:
431:
397:
371:
346:
312:
285:
284:
282:
279:
278:
277:
272:
265:
262:
214:
211:
197:
194:
189:
186:
161:
158:
154:Channel Tunnel
145:
142:
133:
130:
125:
122:
118:European Union
86:Channel Tunnel
61:
58:
50:no-deal Brexit
15:
13:
10:
9:
6:
4:
3:
2:
876:
865:
862:
860:
857:
855:
852:
851:
849:
840:
837:
835:
832:
831:
827:
811:
807:
800:
797:
785:
781:
774:
771:
759:
755:
748:
745:
733:
729:
722:
719:
706:
702:
698:
692:
689:
677:
673:
666:
663:
651:
647:
640:
637:
625:
621:
615:
612:
600:
596:
590:
587:
574:
570:
564:
561:
549:
545:
538:
535:
523:
519:
512:
509:
497:
493:
486:
483:
471:
467:
461:
458:
445:
441:
435:
432:
420:
416:
412:
408:
401:
398:
385:
381:
375:
372:
360:
356:
350:
347:
335:
331:
327:
323:
316:
313:
301:
297:
290:
287:
280:
276:
273:
271:
268:
267:
263:
261:
258:
255:
252:
249:
244:
240:
237:
235:
230:
227:
224:
221:
218:
212:
210:
208:
202:
195:
193:
187:
185:
183:
179:
175:
171:
167:
159:
157:
155:
151:
143:
141:
139:
131:
129:
123:
121:
119:
114:
111:
107:
103:
98:
96:
91:
87:
83:
82:Port of Dover
79:
75:
71:
67:
59:
57:
55:
51:
47:
43:
39:
35:
28:
23:
19:
813:. Retrieved
809:
799:
787:. Retrieved
783:
773:
761:. Retrieved
757:
747:
735:. Retrieved
731:
721:
709:. Retrieved
705:the original
700:
691:
679:. Retrieved
675:
665:
653:. Retrieved
649:
639:
627:. Retrieved
623:
614:
602:. Retrieved
598:
589:
577:. Retrieved
572:
563:
551:. Retrieved
547:
537:
525:. Retrieved
521:
511:
499:. Retrieved
495:
485:
473:. Retrieved
469:
460:
448:. Retrieved
443:
434:
422:. Retrieved
411:The Guardian
410:
400:
388:. Retrieved
383:
374:
362:. Retrieved
358:
349:
337:. Retrieved
326:The Guardian
325:
315:
303:. Retrieved
299:
289:
259:
256:
253:
245:
241:
238:
231:
228:
225:
222:
219:
216:
203:
199:
191:
163:
147:
135:
127:
115:
99:
63:
53:
33:
32:
18:
810:Kent Online
784:Kent Online
758:Kent Online
676:Kent Online
629:27 December
604:21 December
579:21 December
553:21 December
527:21 December
522:Kent Online
496:Kent Online
384:Kent Online
234:Coronavirus
113:direction.
848:Categories
364:17 October
281:References
150:contraflow
74:Folkestone
60:Background
40:system in
450:7 January
424:7 January
419:0261-3077
390:7 January
334:0261-3077
789:17 April
737:28 March
732:KentLive
711:28 March
681:28 March
655:23 April
650:KentLive
573:BBC News
548:KentLive
475:15 April
444:BBC News
339:10 April
305:10 April
264:See also
196:Problems
168:via the
84:and the
763:9 April
213:History
188:Phase 4
160:Phase 3
144:Phase 2
132:Phase 1
36:is the
815:6 June
624:GOV.UK
599:GOV.UK
501:16 May
470:GOV.UK
417:
359:GOV.UK
332:
124:Phases
95:Brexit
93:post-
817:2022
791:2022
765:2022
739:2022
713:2022
683:2022
657:2021
631:2020
606:2020
581:2020
555:2020
529:2020
503:2019
477:2019
452:2019
426:2019
415:ISSN
392:2019
366:2019
341:2023
330:ISSN
307:2023
182:A256
178:A299
176:and
174:A249
72:and
64:The
42:Kent
25:The
110:M26
78:A20
70:M25
66:M20
27:M20
850::
808:.
782:.
756:.
730:.
699:.
674:.
648:.
622:.
597:.
571:.
546:.
520:.
494:.
468:.
442:.
413:.
409:.
382:.
357:.
328:.
324:.
298:.
172:,
170:M2
56:.
819:.
793:.
767:.
741:.
715:.
685:.
659:.
633:.
608:.
583:.
557:.
531:.
505:.
479:.
454:.
428:.
394:.
368:.
343:.
309:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.