844:
running through the city of Rijeka itself, necessitated development of a high capacity bypass road to further the development and relieve congestion on the city streets. This was first officially formulated in spatial planning documents in 1974, and construction started in 1977. The first, 8.3-kilometre (5.2 mi) section was completed in July 1988, between Diračje and Orehovica interchange, executed as a two-lane expressway with grade separated intersections. The 4.0-kilometre (2.5 mi) Diračje–Matulji and Matulji–JuÅ”ići sections, completed in 1990 and 1991 respectively, were built as four-lane expressways without emergency lanes. Those completed the western arm of Rijeka bypass, but traffic proceeding east from Orehovica interchange to
865:(2.3 mi) to Jurdani, and in 2005, another 11-kilometre (6.8 mi) section was completed between Jurdani and the Slovenian border. The two new sections were the first ones built as a six-lane motorway. In May 2006, the motorway extended 6.35 kilometres (3.95 mi) east to Sveti Kuzam, forming the eastern arm of Rijeka bypass, relieving that part of the city from the transit traffic. Finally, after the Rijeka–Zagreb motorway was completed in 2008, work on the remaining single-carriageway section of the route intensified. In December 2009, the Diračje–Orehovica section was upgraded to six-lane motorway, thus bringing the entire route between Rupa border crossing and Sveti Kuzam interchange to a uniform standard. 730: 783: 3771: 1340: 1471: 1355: 1244: 1103: 836: 624: 1254: 150: 85: 27: 1793: 1755: 1658: 1547: 1494: 236: 1694: 208: 1833: 1608: 1433: 1407: 1378: 1311: 228: 195: 181: 167: 54: 3766: 3907: 1916: 880:, and a number of motorway access roads. At the same time, the concession period was extended to 32 years and 11 months, starting on the date of the original concession contract. Therefore, the concession, in its present form, will expire on May 28, 2031. Construction costs incurred after 2007, when Autocesta Rijeka – Zagreb took over the motorway development, were estimated at 105 million euros. 1902: 3693: 506: 60: 76: 3919: 114: 108: 1524: 1442: 2221: 1136:. The rest area operators are not permitted to sub-lease the fuel operations, but they are also penalized if some facilities required by the lease contract are not operating. All of the A7 motorway rest areas, are accessible from both traffic directions of the motorway. The rest areas normally operate 24 hours a day, seven days a week. 1703: 1626: 1617: 1261: 798:. A significant number of interchanges present along Rijeka bypass the 18-kilometre (11 mi) A7 section between Matulji and Sveti Kuzam which consists of seven interchanges (including the Orehovica interchange with the A6 motorway), thus yielding an average distance of only 3 kilometres (1.9 mi) between them. 996:
Substantial differences observed between AADT and ASDT numbers are usually attributed to the fact that the motorway carries significant tourist traffic to Istria and Kvarner Gulf area. The seasonal increase in traffic volume ranges from 10% on the south of OŔtrovica interchange to 120% as measured on
864:
In the 2000s, as the first stage of the A6 motorway construction spanning between Zagreb and Rijeka neared completion, construction of a proper motorway along the A7 route started. In 2004, when the first stage of Rijeka–Zagreb motorway was completed, the A7 route was extended by 3.7 kilometres
1119:
but no restaurants or accommodations; and D-type rest areas offer parking spaces only, with possibly some picnic tables, benches, and restrooms. Even though the rest areas found along the A7 motorway follow this ranking system, the Vrata Jadrana rest area is a C-type rest area and the Rupa rest area
821:
canyon, is also noteworthy because its design and construction conditions are different from normal since it spans a protected water supply zone. The bridge consists of two parallel structures, and the first one to be completed was the northern span in 1984. The southern span was the last structure
461:
Plans for the motorway were officially formulated in 1974 and the construction was started in 1977. The first 8.3-kilometre (5.2 mi) sections were completed as a two-lane expressway with grade-separated intersections, in 1988 and 1990, comprising the western arm of Rijeka bypass. As the first
947:
junction to the Novi Vinodolski junction, will be 6.5-kilometre (4.0 mi) long and its route will be built on the route of the left lane of the future highway. The route of the bypass passes through extremely demanding terrain, which is why a large number of facilities will be built on it, of
768:
As of December 2010, Autocesta Rijeka–Zagreb collects toll on a single section of the motorway, between Rupa and Jurdani interchanges, close to the northern terminus of the motorway. Unlike those sections further south, which are used as bypass road of the city of Rijeka, therefore carrying
691:
An automatic traffic monitoring and guidance system is in place along the motorway. It consists of measuring, control, and signaling devices, located in zones where driving conditions may varyā€”at interchanges, near viaducts, beside bridges, in tunnels, and in zones where fog and strong winds are
843:
Development of the city of Rijeka and the surrounding region (particularly in relation to the development of Port of Rijeka), associated transit transport of cargo, tourism and associated passenger traffic to the northern Adriatic resorts, rugged coastal topography, and the existing road routes
948:
which the 843-metre (2,766 ft) long Zagori tunnel and the Ričina viaduct across the Vinodol valley, 1,057-metre (3,468 ft) long, stand out. The works, according to the contract, should be completed within three years. The 600 million kuna construction contract was signed between
1110:
As of November 2010, there are only two rest areas operating along the A7 motorway. Applicable legislation provides for four types of rest areas designated as types A through D: A-type rest areas comprise a full range of amenities including a filling station, a restaurant, and a hotel or
712:
only 40 metres (130 ft) away from the route. The noise pollution was addressed by building a noise barrier 352 metres (1,155 ft) long which largely encloses that motorway section like a tunnel. Curved overhead sections of the noise barrier are covered with 2,300 square metres
980:
Traffic is regularly counted by means of a traffic census at Rupa mainline toll plaza as well as at two other sections of the motorway which are not tolled. The traffic volume is reported by Autocesta Rijeka – Zagreb, the operator of the motorway, and are published by
912:
The section was initially planned to be opened as an expressway by 2009, but those plans were delayed indefinitely. In 2012, the Croatian government announced that no funds would be made available in near future for construction of A7 south of KrižiŔće.
773:
32,400) collected during a single, peak season, weekend in July. Even though motorway traffic volume and thus toll revenue, decreased slightly elsewhere in the country, this particular tolled section reported virtually no change in income by 2010.
699:
The A7 motorway runs through hills, rugged coastal terrain, and urban areas, requiring a substantial number of bridges, viaducts, and tunnels along the route. Particular attention to the environment is also required since the route is situated in
985:. The traffic is heaviest along the western arm of Rijeka bypass as the section serves the city and acts as a link between the A8 and the A6 motorways while carrying regular A7 traffic. That part of the A7 motorway carries a 20,100-vehicle 631:
As of 2014, the motorway spans 42.4 kilometres (26.3 mi) between the Rupa border crossing to Slovenia and KrižiŔće where southbound A7 traffic currently ends at a roundabout connecting to the state roads D8 and D102. It connects to
972:-Kikovica-Kraljevica route. Similarly, a new interchange of the A8 and A7 motorways is planned near JuÅ”ići. However, these long-term plans, even though they are well documented in government studies, still have no funding approved. 3333: 608:, while the latter is planned to encompass the growth of the Port of Rijeka's cargo handling capacity, improved railroad links and a new Rijeka bypass motorway linking the A7, via a number of new interchanges, to the 921: 1131:
The primary motorway operator, Autocesta Rijeka–Zagreb, leases the rest areas to various operators through public tenders. As of November 2010, both rest areas found along the A7 motorway are operated by
493:. This section is no longer part of any short-term plans, as no funding until 2012 is currently scheduled for the section. Further long-term plans specify an outer Rijeka bypass and a new interchange with the 3241: 3355: 3536: 3267: 2626: 2343: 3214:[Decision on amendments and additions to decision on founding of Autocesta Rijeka - Zagreb joint stock company and award of concession to develop and maintain Rijeka - Zagreb motorway]. 708:. Noise pollution was assessed as especially severe in the Rastočine neighborhood of Rijeka, where residential buildings are particularly close to the motorway route, most notably a 26-story 462:
stage of the A6 motorway construction spanning between Zagreb and Rijeka neared completion in the 2000s, construction of a proper motorway along the A7 route started. In December 2009, the
3325: 3389: 3044: 1962: 876:
was granted expansion of the concession previously awarded. The new concession contract included development and maintenance of the A7 motorway north of KrižiŔće interchange,
3184:[Decision on founding of Rijeka - Zagreb Motorway joint stock company and granting of concession regulating construction and management of Rijeka - Zagreb motorway]. 3212:"Odluka o izmjenama i dopunama odluke o osnivanju dioničkog druÅ”tva Autocesta Rijeka - Zagreb d.d. i dodjeli koncesije za građenje i gospodarenje autocestom Rijeka - Zagreb" 769:
substantial suburban and commuter traffic, the tolled section carries almost exclusively transit traffic. The Rupa toll plaza, located on the section reported 240,975 kuna (
3609: 3949: 757:, and major credit and debit cards. A number of prepaid toll collection systems are also used, including various types of smart cards issued by the motorway operator and 2397: 957: 2371: 3446: 952:
and a contractor, a consortium consisting of the Slovenian company Kolektor CPG and the Italian ICM SPA. The decision to build the Novi bypass was made by the
3420: 790:
As the A7 motorway route runs through rugged terrain, it utilizes a substantial number of major structures—bridges, viaducts, tunnels, underpasses,
485:. The two sections are scheduled to be completed by 2012. Current long-term plans for developing the A7 motorway define its ultimate southern terminus in 3770: 3669: 2815: 1180:
Facilities found at Brgud (previously Rupa) rest area are a filling station selling petrol, diesel fuel, and LPG, a cafƩ, a restaurant, and restrooms.
470:
section was upgraded to a six-lane motorway, bringing the entire route between Rupa border crossing and Sveti Kuzam interchange to a uniform standard.
3381: 3120: 2067: 668:
in each driving direction along its entire length, except in tunnels where there are emergency bays rather than lanes. All existing interchanges are
3152: 2543: 2121: 931:
In January 2024, the tender for two segments of the A7, 17.5 kilometres between KrižiŔće - Selce, began. This also includes the Crikvenica bypass.
68: 3182:"Odluka o osnivanju dioničkog druÅ”tva Autocesta Rijeka - Zagreb d.d. i dodjeli koncesije za građenje i gospodarenje autocestom Rijeka - Zagreb" 3181: 2372:"Transport : launch of the Italy-Turkey pan-European Corridor through Albania, Bulgaria, Former Yugoslav Republic of Macedonia and Greece" 3211: 2553: 2461:"Pravilnik o označavanju autocesta, njihove stacionaže, brojeva izlaza i prometnih čvoriÅ”ta te naziva izlaza, prometnih čvoriÅ”ta i odmoriÅ”ta" 2135: 2085: 2249:"European Agreement on main international traffic arteries (AGR) (with annexes and list of roads). Concluded at Geneva on 15 November 1975" 765:
system which is shared by most motorways in Croatia and provides drivers with discounted toll rates for dedicated lanes at toll plazas.
2868: 3003: 2966: 2588: 997:
the Rupa–Matulji section. The central part of the motorway exhibits summer-season traffic volume increase of approximately 50%.
3509: 742: 455: 3296: 680:
and restaurants. As of October 2010, the motorway has 10 interchanges, providing access to a number of towns and cities and to the
3613: 729: 2781: 1194:
Facilities found at Vrata Jadrana rest area are a filling station selling petrol, diesel fuel, and LPG, a cafƩ, and restrooms.
3662: 2652: 2409: 893:
Long-term plans of development of the A7 motorway, published in the 2000s, involved an extension of the southern terminus at
446:, tunnels, and other structures were required as the route traverses rugged terrain. As of 2010, there are ten exits and two 419:. The importance of the motorway as a transit route will be further increased upon completion of a proposed expansion of the 2280: 2248: 873: 685: 3922: 2897: 3944: 2320: 704:, which is particularly susceptible to water pollution, and the urbanized areas requiring special attention to be paid to 1854: 906: 605: 553:. The sections south of Orehovica interchange are a part of the E65, while the remaining sections are a part of the E61. 3910: 2405: 1929: 1234: 1164: 990: 986: 542: 273: 2706:[Electronic toll collection available on HAC, ARZ and BINA Istra motorways] (in Croatian). HUKA. Archived from 3457: 3040: 822:
completed on the present A7 motorway route, and it was opened to traffic in 2009, 25 years after the original span.
592:. The genuine importance of the motorway as a transit route will be demonstrated upon completion of the A7 route to 473:
Two new sections of the A7 motorway are currently under construction, extending the route eastward into vicinity of
3326:"Autocesta KrižiŔće - Žuta Lokva trebala bi biti gotova u punom profilu najkasnije do 2030., doznajemo sve detalje" 3097: 762: 3424: 2166: 3655: 3358:[Contract worth HRK 600 million signed: ā€˜Novljan bypass is an overture for the motorway to Žuta Lokvaā€™]. 2682: 696:
used to communicate changing driving conditions, possible restrictions, and other information to motorway users.
813:
exits, and the 588-metre (1,929 ft) Vežica Viaduct built on Orehovica–Draga section of the motorway.
2811: 2807: 2703: 2316: 2312: 3765: 2840:
Zlatko Šavor; Igor Gukov; Jelena Bleiziffer; Gordna Hrelja; Ivan Kalafatić; Marin Franetović (July 24, 2009).
2678: 3356:"Potpisan ugovor vrijedan 600 milijuna kuna: 'Novljanska obilaznica uvertira je za autocestu do Žute Lokve'" 1121: 1115:; B-type rest areas have no lodging; C-type rest areas are very common and include a filling station and a 956:, and the financing of the project was provided in cooperation with the Croatian Postal Bank (HPB) and the 3423:[Interdependency of transport and tourism in Croatia] (in Croatian). geografija.hr. Archived from 3394: 3130: 2655:[Solar electric power plant on Rijeka bypass] (in Croatian). Lider. March 25, 2009. Archived from 2089: 782: 681: 617: 385: 3692: 3612:[Highway Sv.Kuzam - KrižiŔće opened] (in Croatian). novilist.hr. 23 December 2013. Archived from 2276: 1723:
road; As this is the easternmost interchange completed on A7 motorway, it also serves as a connection to
3160: 2559: 2192: 2141: 1601: 953: 802: 801:
The longest structures on the A7 motorway are the 858-metre (2,815 ft) Trsat Tunnel located on the
693: 669: 538: 381: 202: 2841: 968:
Further long-term plans specify a wider and longer outer Rijeka bypass which is planned on the Jurdani-
928:
that the road was planned for completion by 2030 or before, and that the bidding process had started.
2400:[Execution of Rijeka transport node as a precondition of economic development of the county] 1934: 1387: 676:
along the motorway, providing various types of services ranging from parking spaces and restrooms to
530: 338: 3189: 2517: 1588: 905:, a distance of approximately 56km. This will also go toward completion of Croatia's section of the 814: 616:
motorways. The project is, among other goals, aiming to increase traffic along the Croatian part of
3890: 3884: 3878: 3871: 3865: 3860: 3678: 3637: 3219: 2463:[Regulation on motorway markings, chainage, interchange/exit/rest area numbers and names]. 1966: 1796: 1758: 1737:
The southern terminus of the European route E65 concurrency; The southern terminus of the motorway
1661: 1550: 1497: 1445: 435: 314: 239: 3071: 3854: 3847: 3840: 3834: 3829: 3824: 3100:[Full-section Rijeka bypass finally opens] (in Croatian). Metro Portal. December 22, 2009 2127: 1871: 1706: 1697: 1637: 1629: 1620: 1400: 1290: 1287: 1264: 1125: 949: 925: 869: 791: 561: 557: 550: 546: 467: 416: 412: 389: 366: 211: 113: 107: 835: 648:. Future development of the motorway will include southward extensions of the motorway towards 3818: 3811: 3804: 3797: 3790: 2549: 2131: 2081: 1671: 1410: 1381: 1314: 396: 330: 231: 170: 1786: 1772: 894: 243: 1816: 1573: 1517: 1278: 917: 810: 701: 660:, and ultimately Žuta Lokva interchange on the A1 motorway. The A7 motorway consists of two 439: 3015: 2978: 2785: 2600: 3584: 3562: 2460: 2041: 2016: 1989: 1636:
The southern terminus of the European route E61 concurrency; The northern terminus of the
1320: 940: 705: 677: 653: 354: 3513: 3487: 2729: 809:
section, the 595-metre (1,952 ft) Å kurinje II Tunnel situated between Å kurinje and
623: 438:. There are no emergency lanes in the tunnels. All intersections of the A7 motorway are 3453: 2465: 2375: 2255: 1971: 1907: 1850: 1712: 1560: 1084: 1062: 982: 944: 665: 645: 601: 431: 420: 291: 2909: 2434: 2346:[Four business zones for 40 million tons of cargo handled by Port of Rijeka]. 26: 3938: 3755: 3750: 3125: 2873: 2488: 1826: 1304: 902: 750: 718: 593: 526: 486: 427: 350: 174: 3642: 2591:[Rijeka bypass and the southern carriageway of Orehovica - Diračje section] 1676:
The access road from Draga to the port in Brajdica is also considered a part of A7.
1450:
Also a connection a number of cities and towns via the A8 motorway (E751) including
362: 53: 3745: 3740: 3730: 3725: 3720: 3715: 3710: 3705: 2762:[Toll income lower than last year's] (in Croatian). Limun.hr. July 14, 2008 2398:"Realizacija prometnog čvora Rijeka kao pretpostavka gospodarskog razvoja županije" 1921: 1842: 1836: 1720: 1611: 1436: 1080: 1058: 898: 817:, a 210-metre (690 ft) inclined strut reinforced concrete bridge spanning the 661: 613: 609: 597: 589: 581: 577: 534: 494: 490: 408: 198: 184: 2656: 556:
The motorway is of major importance to Croatia in terms of its development of the
2287: 1811:
The access road from KrižiŔće to the Krk Bridge is also considered a part of A7.
2281:"Adriatic-Ionian Transport Corridor on the territory of the Republic of Croatia" 2227: 1687: 1540: 969: 806: 714: 604:
and Rijeka transport node. The former is planned as a part of completion of the
454:, but a single section is tolled using an open toll system with pricing tied to 215: 1323:
border crossing; That route extends into Slovenia as route 7 and further on to
1897: 1806: 1724: 1487: 1102: 877: 849: 818: 649: 482: 478: 474: 463: 295: 3301: 3272: 3043:[Full cross-section of Rijeka-Zagreb motorway opens] (in Croatian). 2348: 1282: 738: 709: 673: 637: 573: 451: 447: 373: 1802: 1667: 3048: 2759: 839:
Orehovica interchange, the most significant interchange of the A7 motorway
3006:[35 years long story: Rijeka and Zagreb connected by a motorway] 1716: 1274: 1270: 522: 358: 3390:
Ministry of Sea, Transport and Infrastructure of the Republic of Croatia
2170: 415:
on the cities and towns it connects, and because of its contribution to
411:
regions. The motorway is nationally significant because of its positive
3682: 2871:[Rijeka bypass opens after more than 20 years of expectation]. 2869:"Otvorena riječka zaobilaznica, cesta koja se čekala viŔe od 20 godina" 2844:[Rječina Bridge on the southern carriageway of Rijeka bypass]. 1768: 1459: 1455: 1426: 1371: 1324: 1116: 795: 786:
Rječina Bridge, prior to construction of the parallel structure in 2009
746: 565: 529:
border crossing. The A7 motorway currently connects to the rest of the
514: 443: 400: 377: 369: 342: 263: 188: 3647: 564:, as it represents the shortest and the most convenient route between 513:
The A7 motorway is an important north–south motorway in western
1846: 1651: 1556: 1503: 1451: 641: 633: 585: 518: 404: 346: 287: 283: 3299:[Broken SDP's promise; Žuta Lokva as a red slap to Rijeka]. 2707: 505: 584:
area and to the Port of Rijeka, but it is also true for resorts in
2935: 2455: 2453: 2451: 1328: 1112: 1101: 834: 781: 728: 622: 569: 504: 2898:"NaÅ”a ideja je bila izgraditi ono Å”to samo zvali 'hrvatski križ'" 2900:[Our idea was to build what we called 'Croatian cross'] 2315:[Expansion of Port of Rijeka facilities] (in Croatian). 1764: 1748: 1728: 853: 754: 657: 3651: 2969:[Expansion of Rijeka-Zagreb motorway to full motorway] 2589:"Riječka obilaznica i južni kolnik dionice Orehovica - Diračje" 3447:"Traffic counting on the roadways of Croatia in 2009 - digest" 2344:"Četiri poslovne zone za 40 milijuna tona tereta riječke luke" 1732: 1175: 1133: 872:
normally develops motorways in Croatia, as of September 2007,
845: 770: 3610:"U 12 sati otvoren puni profil dionice Sv. Kuzam - KrižiŔće" 3297:"PrekrÅ”eno obećanje SDP-a; Žuta Lokva crvena pljuska Rijeci" 1861:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
1199:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
3539:[INA "spills" 500 thousand euro in Gorski Kotar]. 3014:(in Croatian) (2). HUKA: 1. September 2004. Archived from 3004:"Priča duga 35 godina: Rijeka i Zagreb spojeni autocestom" 2286:. Regional Economic Forum Southeast Europe. Archived from 2116: 2114: 2112: 2110: 2036: 2034: 1002: 922:
Minister of Maritime Affairs, Transport and Infrastructure
2934:
Klara Bačić Čapalija; Ratimir Šarar (November 10, 2007).
2582: 2580: 745:
using an open toll system in place between the Rupa and
733:
Sveti Kuzam interchange, the southern terminus of the A7
365:
transportation corridor in Croatia, and it is a part of
3270:[No funds for KrižiŔće - Žuta Lokva motorway]. 1963:
Ministry of Sea, Transport and Infrastructure (Croatia)
717:
with annual electricity production capacity of 248,000
517:, connecting the nation's largest port and the city of 3510:"Basic types and offer of roadside service facilities" 2938:[Rijeka Bypass - construction and completion] 1969:[Decision on categorization of public roads]. 1120:
is a B-type facility. The filling stations also offer
580:. This particularly applies to tourist resorts in the 450:
situated along the route. Most of the motorway is not
349:, to the Croatian motorway network, as well as to the 3098:"Napokon otvorena riječka obilaznica u punom profilu" 2967:"Gradnja do punog profila na autocesti Rijeka-Zagreb" 2835: 2833: 2810:[ARZ loses 8.6 million kuna] (in Croatian). 2512: 2510: 636:
as it forms Rijeka bypass, the A8 expressway of the
3778: 3698: 2842:"Most Rječina na južnom kolniku riječke obilaznice" 640:and the A6 which represents motorway connection to 305: 279: 269: 259: 254: 222: 159: 144: 139: 124: 95: 23: 16:
A 42.4-kilometre-long (26.3 mi) motorway in Croatia
2629:[The bypass closed on Sunday once again]. 2193:"Map of border crossings and customs office areas" 1984: 1982: 1957: 1955: 1953: 1951: 1949: 1415:Connection to Trinajstići; Opened in October 2023 3153:"ARZ takes over Rijeka transport node management" 3123:[Kalmeta: Bypass as a motorway by 2010]. 3074:[Rijeka-Zagreb-Budapest corridor opens]. 3070:Tomislav Grdić; Damir Herceg (October 23, 2008). 2200:Customs Administration of the Republic of Croatia 3537:"Ina "prosula" 500 tisuća eura u Gorskom kotaru" 3482: 3480: 3478: 3393:(in Croatian). December 10, 2007. Archived from 3188:(in Croatian). December 11, 1997. Archived from 958:Croatian Bank for Reconstruction and Development 2061: 2059: 2011: 2009: 2007: 3268:"Nula kuna za autocestu KrižiŔće ā€“ Žuta Lokva" 3159:(in Croatian). August 30, 2007. Archived from 2548:. Hrvatske autoceste. 2007. pp. 130ā€“133. 1823: 1782: 1744: 1683: 1597: 1569: 1026: 1021: 1016: 1011: 856:still had to switch to the streets of Rijeka. 627:Noise protection barrier at the A7 near Rijeka 380:–Rijeka. The A7 motorway route south of 36: 3663: 3218:(in Croatian). August 8, 2007. Archived from 3045:Ministry of Sea, Transport and Infrastructure 3041:"Otvoren puni profil autoceste Rijeka-Zagreb" 8: 3421:"Međuovisnost prometa i turizma u Hrvatskoj" 2936:"Riječka obilaznica ā€“ izgradnja i dovrÅ”etak" 403:and, indirectly, to numerous resorts in the 3604: 3602: 3382:"Major transport infrastructure, pp. 37-38" 2066:Crnjak, Mario; Puž, Goran (November 2007). 916:However, in June 2023, it was announced by 889:Completion of KrižiŔće - Žuta Lokva section 345:. It connects the nation's largest port in 3670: 3656: 3648: 3072:"Otvoren koridor Rijeka-Zagreb-BudimpeÅ”ta" 2653:"Solarna elektrana na riječkoj obilaznici" 2167:"Overview of motorways and semi-motorways" 1293:and the northern terminus of the motorway 434:in each driving direction, separated by a 337:) is a 42.4-kilometre-long (26.3 mi) 134:Total 103.5 km (64.3 mi) planned 3950:Transport in Primorje-Gorski Kotar County 3638:Autocesta Rijeka–Zagreb web cameras 3121:"Kalmeta: Puni profil obilaznice do 2010" 1587: 1210: 1138: 999: 2313:"ProÅ”irenje lučkih kapaciteta u Rijeci" 1945: 1735:(via the D8), until the A7 is extended. 1043:Between Rupa and Jurdani interchanges. 737:Only one section of the A7 motorway is 692:known to occur. The system consists of 620:, which connects to the A7 near Rijeka. 2760:"Prihodi od cestarina manji nego lani" 2740:(in Croatian) (19). HUKA: 8. July 2010 2627:"Obilaznica u nedjelju opet zatvorena" 2123:Croatian Motorways (pp. 367–378) 2080:. Hrvatske autoceste. pp. 27ā€“28. 395:The A7 motorway runs near a number of 20: 3354:Glavan, Marinko (14 September 2021). 1967:"Odluka o razvrstavanju javnih cesta" 954:Government of the Republic of Croatia 749:interchanges. The toll is payable in 7: 3918: 3512:. Hrvatske autoceste. Archived from 2784:. Hrvatske autoceste. Archived from 1087:junctions. AADT figure estimated by 3488:"Rest areas - types and facilities" 3419:Jelena Lončar (December 14, 2007). 3244:[Žuta Lokva is forgotten]. 2965:Branko Nadilo (December 20, 2006). 2408:. September 2, 2003. Archived from 1634:Connection to the A6 motorway (E65) 991:average summer daily traffic (ASDT) 987:annual average daily traffic (AADT) 3047:. October 22, 2008. Archived from 14: 2867:Luka Benčić (December 22, 2009). 2625:Darko Pajić (November 12, 2009). 2491:[National report (2007)] 2444:(in Croatian). February 10, 2010. 2319:. October 3, 2010. Archived from 2069:Kapitalna prometna infrastruktura 1674:and the Port of Rijeka (Brajdica) 1106:The A7 at Vrata Jadrana rest area 743:vehicle classification in Croatia 130:Length includes two access roads. 3917: 3906: 3905: 3769: 3764: 3691: 2524:(in Croatian). December 14, 2004 2074:Capital transport infrastructure 2042:"section: Orehovica-Sveti Kuzam" 1914: 1900: 1831: 1791: 1753: 1701: 1692: 1656: 1624: 1615: 1606: 1545: 1522: 1492: 1469: 1440: 1431: 1405: 1376: 1353: 1338: 1309: 1259: 1252: 1242: 763:electronic toll collection (ETC) 234: 226: 206: 193: 179: 165: 148: 128:42.4 km (26.3 mi) 112: 106: 83: 74: 66: 58: 52: 25: 3587:. Autocesta Rijeka–Zagreb 3565:. Autocesta Rijeka–Zagreb 3490:. Autocesta Rijeka–Zagreb 3336:from the original on 2023-06-02 3295:Tihana Tomičić (3 April 2012). 2896:Tihomir PonoÅ” (June 27, 2004). 2808:"ARZ izgubio 8,6 milijuna kuna" 2044:. Autocesta Rijeka–Zagreb 2019:. Autocesta Rijeka–Zagreb 1992:. Autocesta Rijeka–Zagreb 1840: 1830: 1825: 1820: 1800: 1790: 1785: 1779: 1762: 1752: 1747: 1741: 1710: 1691: 1686: 1680: 1633: 1605: 1600: 1594: 1579: 1577: 1572: 1567: 1268: 1251: 1248: 1241: 1238: 1142:List of A7 motorway rest areas 874:Autocesta Rijeka – Zagreb 686:Autocesta Rijeka – Zagreb 361:. The motorway forms part of a 3248:(in Croatian). August 14, 2009 2814:. June 5, 2010. Archived from 684:. The motorway is operated by 606:Adriatic–Ionian motorway 600:and proposed expansion of the 1: 3456:. May 1, 2010. Archived from 3276:(in Croatian). March 12, 2010 3129:(in Croatian). Archived from 3119:Iva Balen (August 30, 2007). 2977:(in Croatian). Archived from 2908:(in Croatian). Archived from 2683:Autocesta Rijeka–Zagreb 2599:(in Croatian). Archived from 2489:"Nacionalno izvijeŔće (2007)" 2435:"A7 motorway development map" 1580:Planned connection to Kozala 1286:The northern terminus of the 509:Draga interchange near Rijeka 426:The motorway consists of two 3585:"Rest areas - Vrata Jadrana" 3535:Darko Pajić (June 4, 2010). 2520:[Public Roads Act]. 2406:Primorje-Gorski Kotar County 2342:Darko Pajić (July 3, 2010). 2202:(in Croatian). March 6, 2008 1930:International E-road network 1647: 1536: 1513: 1483: 1468: 1422: 1396: 1367: 1352: 1300: 1075: 1072: 1053: 1050: 1039: 1036: 897:to the interchange with the 713:(25,000 sq ft) of 543:International E-road network 541:. The motorway is a part of 3324:Pajić, Darko (2023-06-01). 2732:[Statistical data] 2587:Branko Nadilo (July 2008). 682:Croatian state road network 423:and Rijeka transport node. 384:, where it also intersects 3966: 2469:(in Croatian). May 6, 2003 1775:; Opened in December 2013 1386:Connection to Jurdani and 1273:. The road continues into 1235:Primorje-Gorski Kotar 1233: 1165:Primorje-Gorski Kotar 489:at the interchange of the 132:Route partially completed. 3900: 3762: 3689: 3242:"Žuta Lokva zaboravljena" 2782:"Toll payment conditions" 1860: 1809:; Opened in December 2013 1502:Connection to Rijeka and 1475: 1359: 1344: 1228: 1225: 1222: 1219: 1216: 1213: 1198: 1163: 1141: 1005:A7 traffic volume details 531:Croatian motorway network 310: 301: 250: 120: 104: 100: 51: 44: 35: 2812:Croatian Radiotelevision 2518:"Zakon o javnim cestama" 2317:Croatian Radiotelevision 2017:"section: Rijeka bypass" 1975:(in Croatian) (66/2013). 1879:     1867:     1855:Adriaticā€“Ionian motorway 1853:); Planned as a part of 1476:Vrata Jadrana rest area 1269:Rupa border crossing to 907:Adriaticā€“Ionian motorway 618:Pan-European corridor Vb 386:Pan-European corridor Vb 1990:"section: Rupa-Matulji" 989:, and a 31,700-vehicle 399:and provides access to 155:at Rupa border crossing 2223:Overview map of the A7 2169:. HUKA. Archived from 1454:via Kvarnerska Cesta, 1107: 935:Novi Vinodolski bypass 840: 787: 734: 694:variable traffic signs 628: 510: 456:vehicle classification 334: 37: 1817:Lika-Senj County 1319:Connection to D8 and 1249:Rupa border crossing 1105: 1070:2810 Katarina Tunnel 1034:2818 Rupa toll plaza 838: 803:Orehovica interchange 785: 732: 626: 539:Orehovica interchange 508: 382:Orehovica interchange 274:Primorje-Gorski Kotar 203:Orehovica interchange 3945:Motorways in Croatia 2730:"Statistički podaci" 2704:"Statistički podaci" 2679:"Tolls - price list" 2293:on December 29, 2009 1935:Transport in Croatia 670:trumpet interchanges 525:road network at the 442:. Numerous bridges, 357:border crossings to 315:Highways in Croatia 3563:"Rest areas - Rupa" 2378:. September 9, 2002 1277:as route 6 towards 1188:Vrata Jadrana 1048:2807 Rijeka bypass 596:interchange of the 576:, Slovenia and the 436:central reservation 161:Major intersections 3400:on October 4, 2011 3051:on October 4, 2011 2659:on October 2, 2011 2545:Croatian Motorways 2128:Hrvatske autoceste 2095:on October 4, 2011 1638:European route E65 1288:European route E61 1126:convenience stores 1124:and include small 1108: 950:Hrvatske Autocesta 870:Hrvatske autoceste 841: 788: 778:Notable structures 735: 629: 560:, most notably in 558:economy of Croatia 511: 417:tourism in Croatia 390:European route E65 367:European route E61 72:under construction 3932: 3931: 2555:978-953-7491-09-3 2279:(November 2006). 2137:978-953-7491-09-3 2086:978-953-7491-02-2 1891: 1890: 1845:(Connection with 1841:Interchange with 1204: 1203: 1095: 1094: 964:New Rijeka bypass 588:, served via the 501:Route description 323: 322: 153:Slovenian route 6 96:Route information 3957: 3923:Commons category 3921: 3920: 3909: 3908: 3773: 3768: 3695: 3672: 3665: 3658: 3649: 3626: 3625: 3623: 3621: 3616:on 29 March 2014 3606: 3597: 3596: 3594: 3592: 3581: 3575: 3574: 3572: 3570: 3559: 3553: 3552: 3550: 3548: 3532: 3526: 3525: 3523: 3521: 3506: 3500: 3499: 3497: 3495: 3484: 3473: 3472: 3470: 3468: 3463:on July 21, 2011 3462: 3451: 3443: 3437: 3436: 3434: 3432: 3416: 3410: 3409: 3407: 3405: 3399: 3386: 3378: 3372: 3371: 3369: 3367: 3351: 3345: 3344: 3342: 3341: 3321: 3315: 3314: 3312: 3310: 3292: 3286: 3285: 3283: 3281: 3264: 3258: 3257: 3255: 3253: 3238: 3232: 3231: 3229: 3227: 3222:on March 3, 2016 3208: 3202: 3201: 3199: 3197: 3192:on April 2, 2015 3178: 3172: 3171: 3169: 3168: 3149: 3143: 3142: 3140: 3138: 3116: 3110: 3109: 3107: 3105: 3094: 3088: 3087: 3085: 3083: 3067: 3061: 3060: 3058: 3056: 3037: 3031: 3030: 3028: 3026: 3021:on March 3, 2021 3020: 3009: 3000: 2994: 2993: 2991: 2989: 2984:on July 18, 2011 2983: 2972: 2962: 2956: 2955: 2953: 2951: 2941: 2931: 2925: 2924: 2922: 2920: 2915:on July 16, 2007 2914: 2903: 2893: 2887: 2886: 2884: 2882: 2864: 2858: 2857: 2855: 2853: 2837: 2828: 2827: 2825: 2823: 2804: 2798: 2797: 2795: 2793: 2778: 2772: 2771: 2769: 2767: 2756: 2750: 2749: 2747: 2745: 2735: 2726: 2720: 2719: 2717: 2715: 2710:on July 21, 2011 2700: 2694: 2693: 2691: 2689: 2675: 2669: 2668: 2666: 2664: 2649: 2643: 2642: 2640: 2638: 2622: 2616: 2615: 2613: 2611: 2605: 2594: 2584: 2575: 2574: 2572: 2570: 2564: 2558:. Archived from 2540: 2534: 2533: 2531: 2529: 2514: 2505: 2504: 2502: 2500: 2494: 2485: 2479: 2478: 2476: 2474: 2457: 2446: 2445: 2439: 2431: 2425: 2424: 2422: 2420: 2415:on June 13, 2011 2414: 2403: 2394: 2388: 2387: 2385: 2383: 2368: 2362: 2361: 2359: 2357: 2339: 2333: 2332: 2330: 2328: 2309: 2303: 2302: 2300: 2298: 2292: 2285: 2273: 2267: 2266: 2264: 2262: 2253: 2245: 2239: 2238: 2236: 2234: 2218: 2212: 2211: 2209: 2207: 2197: 2189: 2183: 2182: 2180: 2178: 2173:on July 15, 2011 2163: 2157: 2156: 2154: 2152: 2146: 2140:. Archived from 2118: 2105: 2104: 2102: 2100: 2094: 2088:. Archived from 2079: 2063: 2054: 2053: 2051: 2049: 2038: 2029: 2028: 2026: 2024: 2013: 2002: 2001: 1999: 1997: 1986: 1977: 1976: 1965:(May 10, 2013). 1959: 1924: 1919: 1918: 1917: 1910: 1905: 1904: 1903: 1884: 1880: 1875: 1868: 1835: 1834: 1795: 1794: 1757: 1756: 1705: 1704: 1696: 1695: 1660: 1659: 1628: 1627: 1619: 1618: 1610: 1609: 1549: 1548: 1526: 1525: 1496: 1495: 1473: 1472: 1444: 1443: 1435: 1434: 1409: 1408: 1380: 1379: 1360:Brgud rest area 1357: 1356: 1345:Rupa toll plaza 1342: 1341: 1313: 1312: 1279:Ilirska Bistrica 1263: 1262: 1256: 1255: 1246: 1245: 1211: 1139: 1000: 702:karst topography 678:filling stations 672:. There are two 401:Učka Nature Park 238: 237: 230: 229: 210: 209: 197: 196: 183: 182: 169: 168: 162: 152: 151: 116: 110: 87: 86: 78: 77: 70: 69: 62: 61: 56: 40: 29: 21: 3965: 3964: 3960: 3959: 3958: 3956: 3955: 3954: 3935: 3934: 3933: 3928: 3896: 3774: 3760: 3696: 3685: 3676: 3643:Exit list of A7 3634: 3629: 3619: 3617: 3608: 3607: 3600: 3590: 3588: 3583: 3582: 3578: 3568: 3566: 3561: 3560: 3556: 3546: 3544: 3534: 3533: 3529: 3519: 3517: 3508: 3507: 3503: 3493: 3491: 3486: 3485: 3476: 3466: 3464: 3460: 3449: 3445: 3444: 3440: 3430: 3428: 3427:on June 9, 2011 3418: 3417: 3413: 3403: 3401: 3397: 3384: 3380: 3379: 3375: 3365: 3363: 3353: 3352: 3348: 3339: 3337: 3323: 3322: 3318: 3308: 3306: 3294: 3293: 3289: 3279: 3277: 3266: 3265: 3261: 3251: 3249: 3240: 3239: 3235: 3225: 3223: 3210: 3209: 3205: 3195: 3193: 3180: 3179: 3175: 3166: 3164: 3151: 3150: 3146: 3136: 3134: 3118: 3117: 3113: 3103: 3101: 3096: 3095: 3091: 3081: 3079: 3069: 3068: 3064: 3054: 3052: 3039: 3038: 3034: 3024: 3022: 3018: 3007: 3002: 3001: 2997: 2987: 2985: 2981: 2970: 2964: 2963: 2959: 2949: 2947: 2939: 2933: 2932: 2928: 2918: 2916: 2912: 2901: 2895: 2894: 2890: 2880: 2878: 2866: 2865: 2861: 2851: 2849: 2839: 2838: 2831: 2821: 2819: 2806: 2805: 2801: 2791: 2789: 2780: 2779: 2775: 2765: 2763: 2758: 2757: 2753: 2743: 2741: 2733: 2728: 2727: 2723: 2713: 2711: 2702: 2701: 2697: 2687: 2685: 2677: 2676: 2672: 2662: 2660: 2651: 2650: 2646: 2636: 2634: 2624: 2623: 2619: 2609: 2607: 2603: 2592: 2586: 2585: 2578: 2568: 2566: 2562: 2556: 2542: 2541: 2537: 2527: 2525: 2516: 2515: 2508: 2498: 2496: 2492: 2487: 2486: 2482: 2472: 2470: 2459: 2458: 2449: 2437: 2433: 2432: 2428: 2418: 2416: 2412: 2404:(in Croatian). 2401: 2396: 2395: 2391: 2381: 2379: 2370: 2369: 2365: 2355: 2353: 2341: 2340: 2336: 2326: 2324: 2311: 2310: 2306: 2296: 2294: 2290: 2283: 2275: 2274: 2270: 2260: 2258: 2251: 2247: 2246: 2242: 2232: 2230: 2220: 2219: 2215: 2205: 2203: 2195: 2191: 2190: 2186: 2176: 2174: 2165: 2164: 2160: 2150: 2148: 2144: 2138: 2120: 2119: 2108: 2098: 2096: 2092: 2077: 2065: 2064: 2057: 2047: 2045: 2040: 2039: 2032: 2022: 2020: 2015: 2014: 2005: 1995: 1993: 1988: 1987: 1980: 1961: 1960: 1947: 1943: 1920: 1915: 1913: 1906: 1901: 1899: 1896: 1887: 1882: 1878: 1870: 1866: 1862: 1832: 1810: 1792: 1754: 1736: 1702: 1700: 1693: 1675: 1657: 1635: 1625: 1623: 1616: 1614: 1607: 1546: 1523: 1493: 1470: 1441: 1439: 1432: 1406: 1377: 1354: 1339: 1310: 1285: 1260: 1258: 1253: 1243: 1209: 1200: 1100: 1007: 978: 966: 941:Novi Vinodolski 937: 891: 886: 862: 860:Modern motorway 833: 828: 780: 727: 706:noise pollution 654:Novi Vinodolski 503: 440:grade separated 413:economic impact 397:Croatian cities 388:, is a part of 235: 227: 207: 205: 194: 192: 180: 178: 166: 160: 154: 149: 140:Major junctions 135: 133: 131: 91: 89:other motorways 84: 82: 75: 67: 59: 30: 17: 12: 11: 5: 3963: 3961: 3953: 3952: 3947: 3937: 3936: 3930: 3929: 3927: 3926: 3914: 3901: 3898: 3897: 3895: 3894: 3887: 3882: 3875: 3868: 3863: 3858: 3851: 3844: 3837: 3832: 3827: 3822: 3815: 3808: 3801: 3794: 3786: 3784: 3776: 3775: 3763: 3761: 3759: 3758: 3753: 3748: 3743: 3738: 3733: 3728: 3723: 3718: 3713: 3708: 3702: 3700: 3697: 3690: 3687: 3686: 3677: 3675: 3674: 3667: 3660: 3652: 3646: 3645: 3640: 3633: 3632:External links 3630: 3628: 3627: 3598: 3576: 3554: 3527: 3501: 3474: 3454:Hrvatske ceste 3438: 3411: 3373: 3346: 3316: 3287: 3259: 3233: 3216:Narodne Novine 3203: 3186:Narodne Novine 3173: 3144: 3111: 3089: 3062: 3032: 2995: 2957: 2926: 2888: 2859: 2829: 2799: 2773: 2751: 2721: 2695: 2670: 2644: 2617: 2576: 2554: 2535: 2522:Narodne Novine 2506: 2480: 2466:Narodne novine 2447: 2426: 2389: 2376:European Union 2363: 2334: 2323:on May 3, 2010 2304: 2268: 2256:United Nations 2240: 2213: 2184: 2158: 2136: 2106: 2055: 2030: 2003: 1978: 1972:Narodne novine 1944: 1942: 1939: 1938: 1937: 1932: 1926: 1925: 1911: 1908:Croatia portal 1895: 1892: 1889: 1888: 1886: 1885: 1876: 1863: 1858: 1857: 1839: 1829: 1824: 1822: 1819: 1813: 1812: 1799: 1789: 1784: 1781: 1777: 1776: 1761: 1751: 1746: 1743: 1739: 1738: 1731:and island of 1711:Connection to 1709: 1690: 1685: 1682: 1678: 1677: 1666:Connection to 1664: 1654: 1649: 1646: 1642: 1641: 1632: 1604: 1599: 1596: 1592: 1591: 1589:Rječina Bridge 1586: 1582: 1581: 1578: 1576: 1571: 1568: 1565: 1564: 1561:Port of Rijeka 1555:Connection to 1553: 1543: 1538: 1535: 1531: 1530: 1528: 1520: 1515: 1512: 1508: 1507: 1500: 1490: 1485: 1482: 1478: 1477: 1474: 1467: 1463: 1462: 1448: 1429: 1424: 1421: 1417: 1416: 1413: 1403: 1398: 1395: 1391: 1390: 1384: 1374: 1369: 1366: 1362: 1361: 1358: 1351: 1347: 1346: 1343: 1336: 1332: 1331: 1317: 1307: 1302: 1299: 1295: 1294: 1267: 1250: 1247: 1240: 1237: 1231: 1230: 1227: 1224: 1221: 1218: 1215: 1208: 1205: 1202: 1201: 1196: 1195: 1192: 1189: 1186: 1182: 1181: 1178: 1173: 1170: 1167: 1161: 1160: 1157: 1154: 1151: 1148: 1144: 1143: 1099: 1096: 1093: 1092: 1089:Hrvatske Ceste 1077: 1074: 1071: 1067: 1066: 1055: 1052: 1049: 1045: 1044: 1041: 1038: 1035: 1031: 1030: 1025: 1020: 1015: 1009: 1008: 1003: 983:Hrvatske ceste 977: 976:Traffic volume 974: 965: 962: 939:The bypass of 936: 933: 890: 887: 885: 882: 861: 858: 832: 829: 827: 824: 815:Rječina Bridge 779: 776: 726: 723: 666:emergency lane 602:Port of Rijeka 502: 499: 432:emergency lane 421:Port of Rijeka 321: 320: 319: 318: 308: 307: 306:Highway system 303: 302: 299: 298: 281: 277: 276: 271: 267: 266: 261: 257: 256: 252: 251: 248: 247: 224: 220: 219: 163: 157: 156: 146: 142: 141: 137: 136: 129: 126: 122: 121: 118: 117: 102: 101: 98: 97: 93: 92: 57: 49: 48: 42: 41: 33: 32: 24: 15: 13: 10: 9: 6: 4: 3: 2: 3962: 3951: 3948: 3946: 3943: 3942: 3940: 3925: 3924: 3915: 3913: 3912: 3903: 3902: 3899: 3893: 3892: 3888: 3886: 3883: 3881: 3880: 3876: 3874: 3873: 3869: 3867: 3864: 3862: 3859: 3857: 3856: 3852: 3850: 3849: 3845: 3843: 3842: 3838: 3836: 3833: 3831: 3828: 3826: 3823: 3821: 3820: 3816: 3814: 3813: 3809: 3807: 3806: 3802: 3800: 3799: 3795: 3793: 3792: 3788: 3787: 3785: 3782: 3779:Expressways ( 3777: 3772: 3767: 3757: 3754: 3752: 3749: 3747: 3744: 3742: 3739: 3737: 3734: 3732: 3729: 3727: 3724: 3722: 3719: 3717: 3714: 3712: 3709: 3707: 3704: 3703: 3701: 3694: 3688: 3684: 3680: 3673: 3668: 3666: 3661: 3659: 3654: 3653: 3650: 3644: 3641: 3639: 3636: 3635: 3631: 3615: 3611: 3605: 3603: 3599: 3586: 3580: 3577: 3564: 3558: 3555: 3547:September 26, 3543:(in Croatian) 3542: 3538: 3531: 3528: 3516:on 2011-07-13 3515: 3511: 3505: 3502: 3489: 3483: 3481: 3479: 3475: 3459: 3455: 3448: 3442: 3439: 3426: 3422: 3415: 3412: 3396: 3392: 3391: 3383: 3377: 3374: 3362:(in Croatian) 3361: 3357: 3350: 3347: 3335: 3331: 3327: 3320: 3317: 3305:(in Croatian) 3304: 3303: 3298: 3291: 3288: 3275: 3274: 3269: 3263: 3260: 3247: 3243: 3237: 3234: 3221: 3217: 3213: 3207: 3204: 3191: 3187: 3183: 3177: 3174: 3163:on 2011-10-02 3162: 3158: 3154: 3148: 3145: 3133:on 2010-05-16 3132: 3128: 3127: 3126:Jutarnji list 3122: 3115: 3112: 3099: 3093: 3090: 3078:(in Croatian) 3077: 3073: 3066: 3063: 3050: 3046: 3042: 3036: 3033: 3017: 3013: 3005: 2999: 2996: 2980: 2976: 2968: 2961: 2958: 2946:(in Croatian) 2945: 2937: 2930: 2927: 2911: 2907: 2899: 2892: 2889: 2877:(in Croatian) 2876: 2875: 2874:Jutarnji list 2870: 2863: 2860: 2848:(in Croatian) 2847: 2843: 2836: 2834: 2830: 2818:on 2010-05-03 2817: 2813: 2809: 2803: 2800: 2788:on 2011-07-18 2787: 2783: 2777: 2774: 2761: 2755: 2752: 2739: 2731: 2725: 2722: 2709: 2705: 2699: 2696: 2684: 2680: 2674: 2671: 2658: 2654: 2648: 2645: 2633:(in Croatian) 2632: 2628: 2621: 2618: 2606:on 2011-07-18 2602: 2598: 2590: 2583: 2581: 2577: 2565:on 2011-02-18 2561: 2557: 2551: 2547: 2546: 2539: 2536: 2523: 2519: 2513: 2511: 2507: 2490: 2484: 2481: 2468: 2467: 2462: 2456: 2454: 2452: 2448: 2443: 2436: 2430: 2427: 2411: 2407: 2399: 2393: 2390: 2377: 2373: 2367: 2364: 2352:(in Croatian) 2351: 2350: 2345: 2338: 2335: 2322: 2318: 2314: 2308: 2305: 2289: 2282: 2278: 2277:Radimir Čačić 2272: 2269: 2257: 2250: 2244: 2241: 2233:September 17, 2229: 2225: 2224: 2217: 2214: 2201: 2194: 2188: 2185: 2172: 2168: 2162: 2159: 2147:on 2011-02-18 2143: 2139: 2133: 2129: 2125: 2124: 2117: 2115: 2113: 2111: 2107: 2091: 2087: 2083: 2075: 2071: 2070: 2062: 2060: 2056: 2043: 2037: 2035: 2031: 2018: 2012: 2010: 2008: 2004: 1991: 1985: 1983: 1979: 1974: 1973: 1968: 1964: 1958: 1956: 1954: 1952: 1950: 1946: 1940: 1936: 1933: 1931: 1928: 1927: 1923: 1912: 1909: 1898: 1893: 1877: 1873: 1865: 1864: 1859: 1856: 1852: 1848: 1844: 1838: 1828: 1818: 1815: 1814: 1808: 1804: 1798: 1788: 1778: 1774: 1770: 1766: 1760: 1750: 1740: 1734: 1730: 1726: 1722: 1718: 1714: 1708: 1699: 1689: 1679: 1673: 1669: 1665: 1663: 1655: 1653: 1650: 1644: 1643: 1639: 1631: 1622: 1613: 1603: 1593: 1590: 1584: 1583: 1575: 1566: 1562: 1558: 1554: 1552: 1544: 1542: 1539: 1533: 1532: 1529: 1521: 1519: 1516: 1510: 1509: 1505: 1501: 1499: 1491: 1489: 1486: 1480: 1479: 1465: 1464: 1461: 1457: 1453: 1449: 1447: 1438: 1430: 1428: 1425: 1419: 1418: 1414: 1412: 1404: 1402: 1399: 1393: 1392: 1389: 1385: 1383: 1375: 1373: 1370: 1364: 1363: 1349: 1348: 1337: 1334: 1333: 1330: 1326: 1322: 1318: 1316: 1308: 1306: 1303: 1297: 1296: 1292: 1289: 1284: 1280: 1276: 1272: 1266: 1236: 1232: 1212: 1206: 1197: 1193: 1190: 1187: 1184: 1183: 1179: 1177: 1174: 1171: 1168: 1166: 1162: 1158: 1155: 1152: 1149: 1146: 1145: 1140: 1137: 1135: 1129: 1127: 1123: 1118: 1114: 1104: 1097: 1090: 1086: 1082: 1078: 1069: 1068: 1064: 1060: 1056: 1047: 1046: 1042: 1033: 1032: 1029: 1024: 1019: 1014: 1013:Counting site 1010: 1006: 1001: 998: 994: 992: 988: 984: 975: 973: 971: 963: 961: 959: 955: 951: 946: 942: 934: 932: 929: 927: 923: 919: 918:Oleg Butković 914: 910: 908: 904: 900: 896: 888: 883: 881: 879: 875: 871: 866: 859: 857: 855: 851: 847: 837: 831:Rijeka bypass 830: 825: 823: 820: 819:Rječina River 816: 812: 808: 804: 799: 797: 793: 784: 777: 775: 772: 766: 764: 760: 756: 752: 751:Croatian kuna 748: 744: 741:based on the 740: 731: 724: 722: 720: 716: 711: 707: 703: 697: 695: 689: 687: 683: 679: 675: 671: 667: 663: 662:traffic lanes 659: 655: 651: 647: 643: 639: 635: 625: 621: 619: 615: 611: 607: 603: 599: 595: 591: 590:A8 expressway 587: 583: 579: 575: 571: 567: 563: 559: 554: 552: 548: 544: 540: 536: 532: 528: 524: 520: 516: 507: 500: 498: 496: 492: 488: 484: 480: 476: 471: 469: 465: 459: 457: 453: 449: 445: 441: 437: 433: 429: 428:traffic lanes 424: 422: 418: 414: 410: 406: 402: 398: 393: 391: 387: 383: 379: 375: 371: 368: 364: 360: 356: 352: 348: 344: 340: 336: 332: 328: 317: 316: 312: 311: 309: 304: 300: 297: 293: 289: 285: 282: 278: 275: 272: 268: 265: 262: 258: 253: 249: 245: 241: 233: 225: 221: 217: 213: 204: 200: 190: 186: 176: 172: 164: 158: 147: 143: 138: 127: 123: 119: 115: 109: 103: 99: 94: 90: 81: 73: 65: 55: 50: 47: 43: 39: 34: 28: 22: 19: 3916: 3904: 3889: 3877: 3870: 3853: 3846: 3839: 3817: 3810: 3803: 3796: 3789: 3780: 3735: 3618:. Retrieved 3614:the original 3591:November 26, 3589:. Retrieved 3579: 3569:November 26, 3567:. Retrieved 3557: 3545:. Retrieved 3540: 3530: 3518:. Retrieved 3514:the original 3504: 3494:September 7, 3492:. Retrieved 3467:September 6, 3465:. Retrieved 3458:the original 3441: 3431:September 6, 3429:. Retrieved 3425:the original 3414: 3402:. Retrieved 3395:the original 3388: 3376: 3364:. Retrieved 3359: 3349: 3338:. Retrieved 3329: 3319: 3307:. Retrieved 3300: 3290: 3280:December 24, 3278:. Retrieved 3271: 3262: 3252:December 24, 3250:. Retrieved 3245: 3236: 3226:November 25, 3224:. Retrieved 3220:the original 3215: 3206: 3196:September 6, 3194:. Retrieved 3190:the original 3185: 3176: 3165:. Retrieved 3161:the original 3156: 3147: 3137:November 25, 3135:. Retrieved 3131:the original 3124: 3114: 3104:December 24, 3102:. Retrieved 3092: 3080:. Retrieved 3075: 3065: 3053:. Retrieved 3049:the original 3035: 3023:. Retrieved 3016:the original 3011: 2998: 2986:. Retrieved 2979:the original 2974: 2960: 2950:November 24, 2948:. Retrieved 2943: 2929: 2917:. Retrieved 2910:the original 2905: 2891: 2881:November 30, 2879:. Retrieved 2872: 2862: 2852:November 30, 2850:. Retrieved 2845: 2822:December 25, 2820:. Retrieved 2816:the original 2802: 2790:. Retrieved 2786:the original 2776: 2766:December 25, 2764:. Retrieved 2754: 2744:September 6, 2742:. Retrieved 2737: 2724: 2712:. Retrieved 2708:the original 2698: 2686:. Retrieved 2673: 2663:December 24, 2661:. Retrieved 2657:the original 2647: 2637:December 24, 2635:. Retrieved 2630: 2620: 2610:November 25, 2608:. Retrieved 2601:the original 2596: 2569:September 5, 2567:. Retrieved 2560:the original 2544: 2538: 2528:September 6, 2526:. Retrieved 2521: 2499:November 22, 2497:. Retrieved 2483: 2473:September 6, 2471:. Retrieved 2464: 2441: 2429: 2417:. Retrieved 2410:the original 2392: 2382:September 6, 2380:. Retrieved 2366: 2356:December 24, 2354:. Retrieved 2347: 2337: 2325:. Retrieved 2321:the original 2307: 2297:September 8, 2295:. Retrieved 2288:the original 2271: 2259:. Retrieved 2243: 2231:. Retrieved 2222: 2216: 2204:. Retrieved 2199: 2187: 2177:September 8, 2175:. Retrieved 2171:the original 2161: 2149:. Retrieved 2142:the original 2122: 2097:. Retrieved 2090:the original 2073: 2068: 2048:December 24, 2046:. Retrieved 2021:. Retrieved 1996:December 24, 1994:. Retrieved 1970: 1922:Roads portal 1881:   1869:   1640:concurrency 1506:and Diračje 1226:Destination 1130: 1109: 1088: 1027: 1022: 1017: 1012: 1004: 995: 979: 967: 938: 930: 915: 911: 892: 868:Even though 867: 863: 842: 800: 789: 767: 758: 736: 715:solar panels 698: 690: 630: 582:Kvarner Gulf 578:Adriatic Sea 555: 512: 497:expressway. 472: 460: 425: 409:Kvarner Gulf 394: 363:longitudinal 335:Autocesta A7 326: 324: 313: 280:Major cities 88: 79: 71: 63: 45: 38:Autocesta A7 18: 3157:Lider Press 3012:HUKA Bilten 2738:HUKA Bilten 2688:October 10, 2228:Google Maps 2206:October 13, 2099:October 11, 2023:December 5, 1872:Concurrency 1688:Sveti Kuzam 1401:Trinajstići 1291:concurrency 1065:junctions. 943:, from the 899:A1 motorway 598:A1 motorway 535:A6 motorway 491:A1 motorway 327:A7 motorway 246:interchange 218:interchange 216:Sveti Kuzam 191:interchange 177:interchange 31:A7 motorway 3939:Categories 3366:13 October 3340:2023-06-14 3167:2010-06-07 3082:October 7, 3055:October 7, 3025:October 7, 2988:October 7, 2975:Građevinar 2944:Građevinar 2919:October 7, 2846:Građevinar 2714:August 28, 2597:Građevinar 2419:October 8, 2327:October 8, 2151:October 7, 1941:References 1827:Žuta Lokva 1801:Access to 1763:Access to 1725:Crikvenica 1156:Operators 1098:Rest areas 903:Žuta Lokva 878:Krk Bridge 850:Crikvenica 846:Krk Island 761:—an 674:rest areas 650:Crikvenica 594:Žuta Lokva 487:Žuta Lokva 483:Krk Bridge 479:Crikvenica 475:Kraljevica 448:rest areas 296:Kraljevica 3699:Motorways 3620:26 August 3541:Novi list 3360:Novi List 3330:Novi list 3302:Novi list 3273:Novi list 3246:Novi list 2631:Novi list 2349:Novi list 1602:Orehovica 1283:Ljubljana 1207:Exit list 710:high-rise 638:Istrian Y 574:Ljubljana 523:Slovenian 468:Orehovica 374:Ljubljana 3911:Category 3679:Highways 3520:July 29, 3334:Archived 2792:July 29, 2261:July 29, 2130:. 2007. 1894:See also 1883:Unopened 1874:terminus 1787:KrižiŔće 1773:KrižiŔće 1719:and the 1672:Brajdica 1559:and the 1541:Å kurinje 1518:Rujevica 1275:Slovenia 1271:Slovenia 1122:LPG fuel 1079:Between 1057:Between 993:figure. 970:Marčelji 960:(HBOR). 895:KrižiŔće 811:Rujevica 807:Å kurinje 796:culverts 792:flyovers 533:via the 444:viaducts 359:Slovenia 339:motorway 331:Croatian 270:Counties 255:Location 244:KrižiŔće 105:Part of 46:Primorka 3781:partial 3683:Croatia 3404:June 7, 3076:Vjesnik 2906:Vjesnik 2226:(Map). 1807:OmiÅ”alj 1769:Hreljin 1563:(west) 1488:Diračje 1460:Matulji 1456:Opatija 1372:Jurdani 1325:Trieste 1214:County 1147:County 1076:17,211 1073:15,700 1054:31,700 1051:20,100 1040:14,634 826:History 805:– 747:Jurdani 664:and an 566:Trieste 562:tourism 545:routes 521:to the 515:Croatia 466:– 464:Diračje 430:and an 378:Trieste 376:– 372:– 370:Villach 343:Croatia 264:Croatia 260:Country 189:Matulji 80:planned 3309:10 May 2552:  2495:. HUKA 2134:  2084:  2076:] 1847:Zagreb 1803:Å mrika 1668:Vežica 1574:Kozala 1557:Rijeka 1527:Ž5025 1504:Kastav 1452:Rijeka 1388:JuÅ”ići 1321:Pasjak 1229:Notes 1172:Brgud 1159:Notes 1037:6,653 924:) and 884:Future 852:, and 794:, and 739:tolled 642:Zagreb 634:Rijeka 586:Istria 519:Rijeka 481:, and 452:tolled 405:Istria 355:Pasjak 347:Rijeka 288:Rijeka 284:Kastav 125:Length 64:in use 3461:(PDF) 3450:(PDF) 3398:(PDF) 3385:(PDF) 3019:(PDF) 3008:(PDF) 2982:(PDF) 2971:(PDF) 2940:(PDF) 2913:(PDF) 2902:(PDF) 2734:(PDF) 2604:(PDF) 2593:(PDF) 2563:(PDF) 2493:(PDF) 2438:(PDF) 2413:(PDF) 2402:(PDF) 2291:(PDF) 2284:(PDF) 2252:(PDF) 2196:(PDF) 2145:(PDF) 2093:(PDF) 2078:(PDF) 2072:[ 1851:Split 1821:99.0 1780:43.7 1742:39.7 1717:Čavle 1713:Bakar 1681:34.4 1652:Draga 1645:31.0 1595:28.5 1585:27.3 1534:23.9 1511:23.1 1481:20.0 1466:18.0 1420:16.4 1394:15.0 1365:11.4 1329:Italy 1223:Name 1220:Exit 1185:18.0 1153:Name 1113:motel 1028:Notes 945:Selce 755:euros 646:Split 570:Italy 292:Bakar 3891:D528 3885:D522 3879:D510 3872:D425 3866:D424 3861:D220 3622:2014 3593:2010 3571:2010 3549:2010 3522:2011 3496:2010 3469:2010 3433:2010 3406:2010 3368:2021 3311:2012 3282:2010 3254:2010 3228:2010 3198:2010 3139:2010 3106:2010 3084:2010 3057:2010 3027:2010 2990:2010 2952:2010 2921:2010 2883:2010 2854:2010 2824:2010 2794:2011 2768:2010 2746:2010 2716:2010 2690:2010 2665:2010 2639:2010 2612:2010 2571:2010 2550:ISBN 2530:2010 2501:2010 2475:2010 2442:HUKA 2421:2010 2384:2010 2358:2010 2329:2010 2299:2010 2263:2011 2235:2010 2208:2010 2179:2010 2153:2010 2132:ISBN 2101:2010 2082:ISBN 2050:2010 2025:2010 1998:2010 1805:and 1797:D102 1771:and 1765:Meja 1759:D501 1749:Meja 1729:Senj 1662:D404 1551:D403 1498:D304 1458:and 1446:E751 1427:Učka 1350:5.5 1335:4.0 1305:Rupa 1298:1.9 1281:and 1239:0.0 1191:OMV 1169:5.5 1117:cafĆ© 1085:D403 1083:and 1063:D304 1061:and 1023:ASDT 1018:AADT 854:Senj 725:Toll 658:Senj 644:and 612:and 549:and 527:Rupa 407:and 353:and 351:Rupa 325:The 240:D102 175:Rupa 145:From 3855:D76 3848:D33 3841:D30 3835:D14 3830:D12 3825:D10 3756:A11 3751:A10 3681:of 1783:14 1745:13 1733:Krk 1707:E65 1698:D40 1684:12 1648:11 1630:E65 1621:E61 1598:10 1265:E61 1217:km 1176:OMV 1150:km 1134:OMV 926:HAC 901:at 759:ENC 719:kWh 572:or 551:E61 547:E65 537:in 341:in 242:in 214:in 212:D40 201:in 187:in 173:in 3941:: 3819:D8 3812:D6 3805:D3 3798:D2 3791:D1 3746:A9 3741:A8 3736:A7 3731:A6 3726:A5 3721:A4 3716:A3 3711:A2 3706:A1 3601:^ 3477:^ 3452:. 3387:. 3332:. 3328:. 3155:. 3010:. 2973:. 2942:. 2904:. 2832:^ 2736:. 2681:. 2595:. 2579:^ 2509:^ 2450:^ 2440:. 2374:. 2254:. 2198:. 2126:. 2109:^ 2058:^ 2033:^ 2006:^ 1981:^ 1948:^ 1849:, 1843:A1 1837:A1 1767:, 1727:, 1721:D8 1715:, 1670:, 1612:A6 1570:9 1537:8 1514:7 1484:6 1437:A8 1423:5 1411:D8 1397:4 1382:D8 1368:3 1327:, 1315:D8 1301:1 1128:. 1091:. 1081:A6 1059:A8 909:. 848:, 753:, 721:. 688:. 656:, 652:, 614:A8 610:A6 568:, 495:A8 477:, 458:. 392:. 333:: 294:, 290:, 286:, 232:D8 223:To 199:A6 185:A8 171:D8 111:, 3783:) 3671:e 3664:t 3657:v 3624:. 3595:. 3573:. 3551:. 3524:. 3498:. 3471:. 3435:. 3408:. 3370:. 3343:. 3313:. 3284:. 3256:. 3230:. 3200:. 3170:. 3141:. 3108:. 3086:. 3059:. 3029:. 2992:. 2954:. 2923:. 2885:. 2856:. 2826:. 2796:. 2770:. 2748:. 2718:. 2692:. 2667:. 2641:. 2614:. 2573:. 2532:. 2503:. 2477:. 2423:. 2386:. 2360:. 2331:. 2301:. 2265:. 2237:. 2210:. 2181:. 2155:. 2103:. 2052:. 2027:. 2000:. 1257:6 920:( 771:ā‚¬ 329:(

Index

A7 motorway shield

European route E61
European route E65
D8
Rupa
A8
Matulji
A6
Orehovica interchange
D40
Sveti Kuzam
D8
D102
KrižiŔće
Croatia
Primorje-Gorski Kotar
Kastav
Rijeka
Bakar
Kraljevica
Highways in Croatia
Croatian
motorway
Croatia
Rijeka
Rupa
Pasjak
Slovenia
longitudinal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

ā†‘