516:. Hrvatske autoceste, operator of the motorway, defended the price as a result of unfavorable, silty ground along the route requiring large quantities of backfill and transportation of the backfill material. Furthermore, Hrvatske autoceste rejected the claims of cost per kilometer of the A11 and the A1. The company which operates both of the motorways claimed that the average price of the A1 motorway was 7.1 million euro per kilometer and that the average cost per kilometer of the A11 stands at 11.3 million euro, further citing high transport cost of the backfill material caused by remote location of the closest quarry which is approximately 100 kilometres (62 miles) away. Construction of the A11 motorway was also criticized as an example of interference of politics in road construction, where construction sites are perceived as generally serving as 487:
planning documents. In turn, the county accused the government of insufficient project funding and that accusations levied by the central government were intended to disguise lack of money. This situation led to announcements made in 2008, that the motorway would be built from the direction of Sisak, however that was not immediately feasible as land was not purchased and construction design had to be adjusted. Even so, the works were announced to start north of Sisak at the beginning of 2009. The plan to start construction in 2009 from Sisak were confirmed in July 2008, when Hrvatske autoceste denied rumors that the route may be shortened to the northern outskirts of Sisak, instead of
2338: 1067: 927: 977: 310: 504:, a viaduct and an underpass. Total cost of the section was reported to be 657 million kuna (88.8 million euro). At the opening ceremony, it was announced that the entire route between Zagreb and MoŔćenica shall be completed by 2011. In May 2009, new construction contracts were made for the BuÅ”evec–Sisak section of the route, only to be cancelled in September of the same year. The cancellation was attributed to change of funding sources and models, and new contracts were announced for November 2009. 410: 81: 25: 1093: 1046: 1037: 1000: 908: 881: 137: 50: 813: 118: 694: 673: 2333: 2474: 1153: 270:
continued to hinder progress of development of the route, and in 2010 construction works were restarted. The A11 motorway construction was criticized as too expensive in comparison to other Croatian motorways and as a site of political promotion and bickering. In November 2015, the A11 was first connected to the national motorway network at the JakuŔevec interchange, which serves as its connection to the
1139: 2260: 56: 72: 2486: 733: 1009: 952: 822: 392:
An automatic traffic monitoring and guidance system is in place along the motorway. It consists of measuring, control and signaling devices located in zones where driving conditions may vary, such as at interchanges, viaducts, bridges and zones where fog and strong wind are known to occur. The system
574:
In the Lekenik–Sisak section, preparatory works first commenced in 2011, entailing relocation of utilities along the planned motorway route. In May 2012, Hrvatske autoceste proposed cancellation of construction works south of Lekenik. Later the plans were restored, but the total investment in
714:
The section of the A11 between Velika Gorica jug and JakuŔevec interchanges, which was completed in November 2015, is expected to start carrying a substantially increased volume of traffic compared to the existing A11 route because it is expected to take over a significant portion of the D30 state
269:
The A11 motorway tender procedures and construction works were initiated in 2006. After several delays attributed to planning and land ownership issues, as well as funding and lack of political support, the first section of the A11 was opened in 2009, just 9 kilometres (5.6 miles) long. The delays
486:
The first indication of delays came in March 2007, when the national government started trading accusations with authorities of the Zagreb County. The government accused the county authorities of willfully slowing down the project as the county failed to adopt required amendments of their spatial
550:
The 11-kilometre (6.8 mi) JakuÅ”evec–Velika Gorica jug section of the A11 spans Zagreb suburban area and its completion was repeatedly delayed due to changes of legislation, land acquisition and funding issues. In November 2015, that section of the motorway was opened, connecting the
547:. Value of the contract works is 645 million kuna (87.1 million euro), including VAT. The subsection was opened for traffic in April 2015, and the cost was 700 million kuna (about 95 million euro), excluding VAT, and was to date the most expensive motorway ever built by Croatian Motorways Ltd. 462:
interchange and the Velika Gorica jug exit. At the time, the cost of the section was estimated at 770 million kuna (104 million euro) and the construction works were scheduled to be completed by June 15, 2007. On April 4, commencement of the works between the Velika Gorica jug interchange and
507:
Since the opening of the first A11 motorway section, the project was criticized by political opposition parties as excessively expensive, citing estimated cost of 14.8 million euro per kilometer and comparing it to cost of somewhat more than 4 million euro per kilometer cost of the
495:
located immediately to the south of Sisak. By August 2008, the planning of a tunnel under Zagreb shunting yard was abandoned in favor of a viaduct extending to the north of the planned JakuŔevec interchange. Construction of the latter started shortly afterwards, but stalled.
523:
In April 2010, the entire A11 motorway route between Zagreb bypass and Sisak, at the time with the planned length of 47.9-kilometre (29.8 mi), was planned to be completed within two and a half years, at a cost of 5.1 billion kuna (689 million euro).
458:), and the extension to Lekenik was valued at 586 million kuna (79.1 million euro). In February and March 2006, Government of Croatia performed tender procedure for the 8.3-kilometre (5.2 mi) northernmost section of the A11 spanning the 1576: 445:
Buzin interchange approximately 2.5 kilometres (1.6 miles) to the west. The plans refer to the moved interchange as Sveta Klara interchange. That scheme planned completion of the motorway to the south of Velika Gorica by 2007, to
2093: 333:. The designed motorway route is of regional importance as it is planned to gradually take over traffic from state road network in the area, especially the D30 which carries a significant commuter traffic volume between 440:
developed a preliminary study of the route, proposing to connect the A11 to Zagreb at the Zagreb bypass and the Sarajevska Road, requiring a tunnel below Zagreb railway shunting yard. The plan also required moving the
499:
On May 9, 2009, the first section of the A11 motorway was completed and opened to traffic, spanning Velika Gorica and BuŔevec exits. The section is 9 kilometres (5.6 miles) long, and contains 6 bridges, 4 flyovers, 2
593:
When completed, the A11 shall be tolled between Velika Gorica jug exit and Sisak, unlike the sections between Velika Gorica jug and JakuŔevec interchanges which shall remain toll free as a part of the Zagreb bypass.
551:
JakuÅ”evec and Velika Gorica jug interchanges, at a total cost of 1.645 billion kuna (222.2 million euro). The section contains some of the most significant structures on the route, a 743-metre (2,438 ft)
265:
exit, as of the planned 42-kilometre (26 mi) route, 30 km (19 mi) are completed. The motorway is planned as a north–south transportation corridor for commuter traffic between the cities.
353:
exits respectively. The D30 and the D31 have a shared intersection in Velika Gorica itself, providing an alternative route to the motorway section. Legally designated termini of the A11 motorway are the
1743: 428:
in Motorway development plan for the 2005–2008 period. The route defined at the time fully complied with county development plans, except in a 4-kilometre (2.5 mi) segment south of the
2124: 1584: 531:
section commenced in April 2010, when completion of the section was announced for 2011. The section required construction of two bridges, six flyovers, four culverts, Lekenik toll plaza and
1689: 1988: 1773: 2097: 1882: 1663: 1950: 1607: 567:
The future access road to the A11 from the direction of Zagreb via the Sarajevska street and onto the JakuŔevec interchange will require a large overpass to span the width of the
1408: 2044: 1495: 397:
to communicate changing driving conditions, possible restrictions and other information to motorway users. The A11 motorway mainly runs through a plain, south of
1747: 715:
road traffic. The D30 state road, parallel to the JakuÅ”evec–Velika Gorica jug section of the A11 carries estimated AADT of 31,458 vehicles, measured at
719:
north of Velika Gorica. The Kurilovec counting site south of Velika Gorica, located near the Velika Gorica jug interchange, carries AADT of 4,721 vehicles.
2337: 2236: 1846: 1688:[Hrvatske autoceste denies: Dalmatina is not three times more expensive than the Zagreb-Sisak motorway] (in Croatian). Nacional. April 9, 2010. 1330: 2136: 1998: 1685: 1914: 1769: 1280: 2074:[Construction of JakuŔevec-KuŔanec section starts in October (taken from the Večernji list)] (in Croatian). Independent Road-workers Union 64: 2161: 1382: 532: 1659: 1221: 1824: 1290: 1962: 1746:[Prime minister tours Zagreb-Sisak motorway construction site] (in Croatian). Government of Croatia. April 6, 2010. Archived from 1712: 1637: 1464: 1827:[Motorway construction flourishes again ahead of elections even though the plans are 'unstable'] (in Croatian). Poslovni dnevnik 1615: 450:
by 2008 and later on to Sisak. At the time the cost of the first section between Velika Gorica and BuŔevec was estimated at 328 million
1557:[A new southern entrance to Zagreb, comprising two interchanges, is under construction] (in Croatian). Nova TV. August 11, 2008 2096:[Zagreb-Sisak motorway BuŔevec-Lekenik section works resumed] (in Croatian). Hrvatske autoceste. April 6, 2010. Archived from 1662:[Kalmeta's budget: Zagreb-Sisak motorway three times more expensive than Dalmatina] (in Croatian). Nacional. April 9, 2010. 1874: 1525: 483:, at a price of 202 million kuna (27.3 million euro) without VAT, and the works were scheduled to be completed by June 15, 2007. 1795: 1772:[Kosor: 'Motorway construction to prevent failure of civil engineering sector'] (in Croatian). Nacional. April 6, 2010. 621:
sites on the A11 motorway route were located at the Mraclin mainline toll site and at the BuŔevec exit. Both sites recorded the
2229: 2193: 1441: 1418: 2489: 1579:[Prime minister ceremonially opens Zagreb-Sisak motorway section between Velika Gorica and BuŔevec] (in Croatian). 1554: 559:
Canal. The JakuÅ”evec ā€“ Velika Gorica section is part of a system of roads constructed to bypass the city of Velika Gorica.
2511: 345:. As of January 2016, 30 kilometres (19 miles) of the route are open to traffic, connecting the D31 and the D30 roads at 2477: 1166: 1066: 926: 626: 622: 613:
Traffic is regularly counted and reported by Hrvatske autoceste, operator of the motorway, and results are published by
1503: 605:
River, and a 710-metre (2,330 ft) viaduct north of the JakuÅ”evec interchange, across the Zagreb shunting yard.
2021: 1190: 2222: 1355: 2022:"Autocesta Zagreb-Sisak bit će gotova već 2023. godine: Natječaj za 11 nedostajućih kilometara do kraja veljače" 1640:[Zagreb-Sisak motorway three times more expensive than Dalmatina!] (in Croatian). Nova TV. April 9, 2010 1322: 597:
Ultimately, when completed the A11 is planned to have eight interchanges, as well as a 270-metre (890 ft)
2332: 1253: 464: 517: 967: 378: 181: 2259: 413:
Velika Gorica jug interchange and the A11 route (bottom) approaching the A3 motorway (left) as it passes
1925: 1921: 1580: 1296: 579: 425: 394: 386: 1358:[Lively construction spring] (in Croatian). Radio Velika Gorica. April 16, 2009. Archived from 582:
announced that project will be over in 2023. Construction of 11 km motorway will cost 300.000.000
2171: 1171: 1016: 848: 385:
mainline toll plaza, after which point it is tolled at the BuŔevec and Lekenik exits, which comprise
350: 234: 144: 1385:[From Sisak to Zagreb through a tunnel under Zagreb shunting yard after all] (in Croatian). 309: 2457: 2451: 2445: 2438: 2432: 2427: 2245: 1231: 544: 286: 210: 540: 472: 2421: 2414: 2407: 2401: 2396: 2391: 2045:"ZavrÅ”ava se zadnja dionica dugo iŔčekivane autoceste A11: Od Siska do Zagreba za samo 20 minuta" 1991:[Hrvatske autoceste cancelling projects worth 9.5 billion kuna, ordered by Ivo Sanader]. 1958: 1717: 1577:"Predsjednik Vlade svečano otvorio dionicu autoceste Zagreb-Sisak između Velike Gorice i BuÅ”evca" 1444:[Zagreb-Sisak motorway construction works start tomorrow] (in Croatian). Poslovni dnevnik 1096: 1049: 1040: 1003: 911: 884: 825: 437: 326: 322: 140: 1528:[Construction of the Zagreb-Sisak motorway starts in the spring of 2009] (in Croatian). 301:, while the remainder is toll-free, like the rest of the Zagreb and Velika Gorica bypass roads. 293:. As of January 2016, there are five exits along the route, and one rest area. The motorway is 2385: 2378: 2371: 2364: 2357: 1610:[Construction contracts cancelled: Has the recession taken the Sisak motorway away?]. 1529: 1472: 1326: 1286: 568: 501: 226: 555:
Viaduct that spans a railway and a road, and a 322-metre (1,056 ft) bridge crossing the
1851: 1800: 1386: 290: 80: 746: 571:
marshalling station located there, and as of 2015 preparatory investments were being made.
2072:"Gradnja dionice od JakuŔevca do KuŔanca počinje u listopadu (preuzeto iz Večenjeg lista)" 432:, which required changes of the spatial planning documents of the City of Zagreb and the 374: 2162:"Regulation on motorway markings, chainage, interchange/exit/rest area numbers and names" 488: 1886: 2166: 2132: 1226: 1144: 794: 693: 672: 614: 513: 414: 409: 282: 177: 24: 49: 2505: 2317: 2071: 1993: 1413: 959: 900: 873: 861: 835: 618: 583: 451: 433: 429: 359: 346: 338: 330: 298: 254: 246: 191: 173: 125: 1989:"HAC odustaje od projekata vrijednih 9,5 milijardi kuna koje je naredio Ivo Sanader" 2312: 2307: 2302: 2297: 2292: 2287: 2282: 2277: 2272: 1158: 831: 816: 716: 578:
The plans for finishing this motorway has been restored on the start of 2021, when
509: 442: 370: 271: 121: 2197: 1075:
Under construction connection to Sisak toll plaza; Opening planned in March 2025.
1030: 806: 459: 401:
River, requiring no major structures except for the exit interchanges themselves.
355: 242: 1847:"Otvorena nova dionica JakuÅ”evec ā€“ Velika Gorica sa spojem na autocestu za Sisak" 1953:[Plans for preparatory measures and activities for 2011 tourist season] 1686:"Demantij iz HAC-a: 'Dalmatina nije tri puta skuplja od autoceste Zagreb-Sisak'" 1467:[Croatian Democratic Union: Picula slows down construction of the A11]. 1259: 598: 575:
the section remained relatively small, in 2015 only 623,000 kuna (84,189 euro).
552: 536: 476: 1770:"Kosor: 'Gradnjom autocesta spriječit ćemo da graditeljstvo padne na koljena'" 1134: 945: 377:
in each direction along its entire length. The Velika Gorica interchange is a
1715:[Government spends 2 billion kuna for bridges and roads to meadows]. 556: 294: 55: 71: 1660:"Kalmetin proračun: Autocesta Zagreb ā€“ Sisak triput skuplja od Dalmatine" 1411:[Zagreb-Sisak motorway: Six tenders to build the first section]. 1055: 492: 1608:"Raskidaju se ugovori o gradnji: Je li kriza pojela autocestu do Siska?" 1498:[Zagreb-Sisak motorway shall be built from direction of Sisak]. 1194: 2249: 2127:[Traffic counting on the roadways of Croatia in 2015 - digest] 2094:"Nastavak radova na autocesti Zagreb-Sisak na dionici BuÅ”evec ā€“Lekenik" 1383:"Iz Siska u Zagreb ipak tunelom ispod zagrebačkoga ranžirnog kolodvora" 993: 528: 480: 468: 447: 382: 318: 262: 238: 163: 2214: 1359: 740:
This article contains a bulleted list or table of intersections which
274:. As of 2016, the motorway does not have a scheduled completion date. 2196:[Motorways] (in Croatian). Hrvatske autoceste. Archived from 527:
Construction works on the 11.2-kilometre (7.0 mi) BuÅ”evec–
334: 250: 1325:[Two motorways for revival of Velika Gorica] (in Croatian). 1825:"Pred izbore opet buja gradnja autocesta iako su planovi 'klimavi'" 63: 1713:"Država utroŔila 2 milijarde kn za mostove i ceste prema ledinama" 1102: 1086: 467:
was announced. The contract was won by a joint venture comprising
421: 408: 363: 342: 308: 258: 1951:"Planovi pripremnih mjera i aktivnosti za turističku sezonu 2011" 1744:"Predsjednica Vlade obiŔla gradiliŔte na autocesti Zagreb-Sisak" 602: 587: 455: 398: 278: 2218: 726: 1409:"Autocesta Zagreb-Sisak: Šest ponuda za gradnju prve dionice" 2125:"Brojanje prometa na cestama Republike Hrvatske godine 2015" 1110:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
742:
should be presented in a properly formatted junction table.
634: 535:
rest area. The construction works contract was awarded to
317:
The A11 motorway is an incomplete northā€“south motorway in
1796:"Autocesta Zagreb ā€“ Lekenik isplatit će se za 183 godine" 1738: 1736: 1549: 1547: 1526:"Gradnja autoceste Zagreb-Sisak počinje u proljeće 2009" 424:
motorway was defined as a priority traffic route by the
1638:"Autocesta Zagreb-Sisak tri puta skuplja od Dalmatine!" 1496:"Autocesta Zagreb - Sisak gradit će se iz smjera Siska" 750: 381:. The A11 route is not tolled from JakuÅ”evec up to the 1915:"Plan građenja i održavanja autocesta za 2015. godinu" 1230:(in Croatian) (94/2014). July 31, 2014. Archived from 1224:[Decision on categorisation of public roads]. 1350: 1348: 1442:"Sutra otvaranje radova na autocesti Zagreb - Sisak" 2345: 2265: 201: 187: 169: 159: 154: 131: 112: 107: 96: 91: 21: 1555:"Gradi se novi južni ulaz u Zagreb s dva čvoriÅ”ta" 1216: 1214: 1212: 590:) and will be over in 2 years from start of work. 241:, 30 kilometres (19 miles) long. It connects the 1909: 1907: 297:on the sections south of Velika Gorica using a 1285:. Hrvatske autoceste. 2007. pp. 130ā€“133. 1082: 1064: 1026: 663: 658: 653: 648: 643: 34: 2230: 2170:(in Croatian). April 24, 2003. Archived from 1883:Ministry of Sea, Transport and Infrastructure 1019:; As of November 2015, the southern terminus 749:for information on how to create one. Please 289:. Both intersections of the A11 motorway are 8: 2119: 2117: 2115: 1071: 2237: 2223: 2215: 1191:"Overview of motorways and semi-motorways" 285:in each driving direction separated by a 1885:. May 8, 2007. p. 2. Archived from 1323:"Dva autoputa za preporod Velike Gorice" 769: 631: 1182: 18: 1222:"Odluka o razvrstavanju javnih cesta" 7: 2485: 1961:. September 17, 2010. Archived from 1711:Gordan Zubčić (February 14, 2011). 1381:Mirjana SoÅ”ić (February 17, 2006). 627:average summer daily traffic (ASDT) 623:annual average daily traffic (AADT) 2070:Iva Puljić-Å ego (August 8, 2007). 2043:Bohutinski, Josip (8 March 2021). 1440:Dalibor Klobučar (April 4, 2006). 369:The A11 motorway has at least two 14: 1776:from the original on 12 June 2012 1692:from the original on 6 April 2012 1666:from the original on 12 June 2012 1606:Mate PiÅ”kor (September 4, 2009). 1333:from the original on 12 June 2012 1105:; Opening planned in March 2025. 1101:Under construction connection to 1054:Planned connection to Žažina and 520:sites during election campaigns. 261:, but currently reaches only the 102:42 km (26.1 mi) planned 2484: 2473: 2472: 2336: 2331: 2258: 1463:Tomislav Kukec (March 7, 2007). 1151: 1137: 1091: 1065: 1044: 1035: 1007: 998: 975: 950: 925: 906: 879: 820: 811: 731: 692: 671: 135: 116: 79: 70: 62: 54: 48: 23: 1100: 1090: 1085: 1079: 1074: 1061: 1053: 1034: 1029: 1023: 1877:[Kosnica interchange] 1855:(in Croatian). 3 November 2015 1823:Ivan Pandžić (March 7, 2011). 1465:"HDZ: Picula koči gradnju A11" 1321:Dean Sinovčić (3 April 2006). 958:Connection to BuÅ”evec and the 1: 1997:(in Croatian). Archived from 1987:KreÅ”imir Žabec (1 May 2012). 1614:(in Croatian). Archived from 1583:. May 9, 2009. Archived from 1502:(in Croatian). Archived from 1494:Mate PiÅ”kor (April 8, 2008). 1471:(in Croatian). Archived from 1417:(in Croatian). Archived from 855:Connection to Odra and Mlaka 313:Velika Gorica jug interchange 277:The motorway consists of two 2135:. April 2016. Archived from 1804:(in Croatian). 23 April 2015 1407:M. PiÅ”kor (March 24, 2006). 1356:"Živo graditeljsko proljeće" 1167:International E-road network 989: 974: 941: 924: 896: 889:Connection to Velika Gorica 869: 844: 802: 705: 702: 684: 681: 100:30 km (19 mi) 1924:. p. 9. Archived from 916:Connection to Velika Gorica 2528: 1015:Connection to Lekenik and 637:A11 traffic volume details 2467: 2329: 2256: 1109: 981: 966: 931: 859: 792: 787: 784: 781: 778: 775: 772: 206: 197: 150: 47: 42: 33: 2020:HINA (4 February 2021). 1116:     43:Autocesta Zagreb - Sisak 1255:Overview map of the A11 518:ribbon-cutting ceremony 1193:. HUKA. Archived from 417: 395:variable traffic signs 379:cloverleaf interchange 314: 230: 182:Sisak-Moslavina County 35: 1581:Government of Croatia 426:Government of Croatia 412: 329:state roads south of 312: 2512:Motorways in Croatia 1172:Transport in Croatia 982:PeŔćenica rest area 751:improve this article 563:Further construction 387:trumpet interchanges 211:Highways in Croatia 1892:on October 25, 2014 1618:on October 22, 2012 1506:on October 22, 2012 1475:on October 22, 2012 1421:on October 22, 2012 932:Mraclin toll plaza 679:2031 Mraclin - jug 358:interchange on the 287:central reservation 245:interchange of the 233:) is an incomplete 16:Motorway in Croatia 2174:on October 4, 2011 1959:Hrvatske autoceste 1922:Croatian Motorways 1718:Slobodna Dalmacija 1282:Croatian Motorways 830:Connection to the 502:wildlife crossings 465:HraŔće Turopoljsko 438:Hrvatske autoceste 418: 315: 249:, to the south of 68:under construction 2499: 2498: 2100:on March 28, 2012 1968:on March 28, 2012 1750:on March 23, 2012 1587:on March 23, 2012 1362:on March 29, 2012 1292:978-953-7491-09-3 1128: 1127: 1072:Sisak toll plaza 1017:Poljana Lekenička 768: 767: 712: 711: 569:Croatian Railways 420:The Zagreb– 351:Poljana Lekenička 305:Route description 219: 218: 145:Poljana Lekenička 92:Route information 2519: 2490:Commons category 2488: 2487: 2476: 2475: 2340: 2335: 2262: 2239: 2232: 2225: 2216: 2210: 2209: 2207: 2205: 2190: 2184: 2183: 2181: 2179: 2158: 2152: 2151: 2149: 2147: 2141: 2130: 2121: 2110: 2109: 2107: 2105: 2090: 2084: 2083: 2081: 2079: 2067: 2061: 2060: 2058: 2056: 2040: 2034: 2033: 2031: 2029: 2017: 2011: 2010: 2008: 2006: 2001:on 2 August 2012 1984: 1978: 1977: 1975: 1973: 1967: 1956: 1947: 1941: 1940: 1938: 1936: 1930: 1919: 1911: 1902: 1901: 1899: 1897: 1891: 1880: 1871: 1865: 1864: 1862: 1860: 1843: 1837: 1836: 1834: 1832: 1820: 1814: 1813: 1811: 1809: 1792: 1786: 1785: 1783: 1781: 1766: 1760: 1759: 1757: 1755: 1740: 1731: 1730: 1728: 1726: 1708: 1702: 1701: 1699: 1697: 1682: 1676: 1675: 1673: 1671: 1656: 1650: 1649: 1647: 1645: 1634: 1628: 1627: 1625: 1623: 1603: 1597: 1596: 1594: 1592: 1573: 1567: 1566: 1564: 1562: 1551: 1542: 1541: 1539: 1537: 1522: 1516: 1515: 1513: 1511: 1491: 1485: 1484: 1482: 1480: 1460: 1454: 1453: 1451: 1449: 1437: 1431: 1430: 1428: 1426: 1404: 1398: 1397: 1395: 1393: 1387:Poslovni dnevnik 1378: 1372: 1371: 1369: 1367: 1352: 1343: 1342: 1340: 1338: 1318: 1312: 1311: 1309: 1307: 1301: 1295:. Archived from 1277: 1271: 1270: 1268: 1266: 1250: 1244: 1243: 1241: 1239: 1234:on March 4, 2016 1218: 1207: 1206: 1204: 1202: 1197:on July 15, 2011 1187: 1161: 1156: 1155: 1154: 1147: 1142: 1141: 1140: 1121: 1117: 1095: 1094: 1069: 1048: 1047: 1039: 1038: 1011: 1010: 1002: 1001: 979: 978: 954: 953: 929: 910: 909: 883: 882: 864: 824: 823: 815: 814: 797: 770: 763: 760: 754: 735: 734: 727: 696: 675: 632: 139: 138: 120: 119: 83: 74: 66: 58: 52: 38: 27: 19: 2527: 2526: 2522: 2521: 2520: 2518: 2517: 2516: 2502: 2501: 2500: 2495: 2463: 2341: 2327: 2263: 2252: 2243: 2213: 2203: 2201: 2192: 2191: 2187: 2177: 2175: 2160: 2159: 2155: 2145: 2143: 2139: 2128: 2123: 2122: 2113: 2103: 2101: 2092: 2091: 2087: 2077: 2075: 2069: 2068: 2064: 2054: 2052: 2051:. Večernji list 2042: 2041: 2037: 2027: 2025: 2019: 2018: 2014: 2004: 2002: 1986: 1985: 1981: 1971: 1969: 1965: 1957:(in Croatian). 1954: 1949: 1948: 1944: 1934: 1932: 1928: 1920:(in Croatian). 1917: 1913: 1912: 1905: 1895: 1893: 1889: 1881:(in Croatian). 1878: 1873: 1872: 1868: 1858: 1856: 1845: 1844: 1840: 1830: 1828: 1822: 1821: 1817: 1807: 1805: 1794: 1793: 1789: 1779: 1777: 1768: 1767: 1763: 1753: 1751: 1742: 1741: 1734: 1724: 1722: 1710: 1709: 1705: 1695: 1693: 1684: 1683: 1679: 1669: 1667: 1658: 1657: 1653: 1643: 1641: 1636: 1635: 1631: 1621: 1619: 1605: 1604: 1600: 1590: 1588: 1575: 1574: 1570: 1560: 1558: 1553: 1552: 1545: 1535: 1533: 1532:. July 25, 2008 1524: 1523: 1519: 1509: 1507: 1493: 1492: 1488: 1478: 1476: 1462: 1461: 1457: 1447: 1445: 1439: 1438: 1434: 1424: 1422: 1406: 1405: 1401: 1391: 1389: 1380: 1379: 1375: 1365: 1363: 1354: 1353: 1346: 1336: 1334: 1320: 1319: 1315: 1305: 1303: 1299: 1293: 1279: 1278: 1274: 1264: 1262: 1252: 1251: 1247: 1237: 1235: 1220: 1219: 1210: 1200: 1198: 1189: 1188: 1184: 1180: 1157: 1152: 1150: 1143: 1138: 1136: 1133: 1124: 1119: 1115: 1111: 1092: 1045: 1043: 1036: 1008: 1006: 999: 976: 968:Sisak-Moslavina 962: 951: 917: 907: 880: 876:sjever (north) 860: 821: 819: 812: 793: 764: 758: 755: 745:Please consult 744: 736: 732: 725: 639: 617:. In 2015, the 611: 565: 407: 307: 291:grade separated 257:and onwards to 136: 117: 108:Major junctions 103: 87: 85:other motorways 78: 28: 17: 12: 11: 5: 2525: 2523: 2515: 2514: 2504: 2503: 2497: 2496: 2494: 2493: 2481: 2468: 2465: 2464: 2462: 2461: 2454: 2449: 2442: 2435: 2430: 2425: 2418: 2411: 2404: 2399: 2394: 2389: 2382: 2375: 2368: 2361: 2353: 2351: 2343: 2342: 2330: 2328: 2326: 2325: 2320: 2315: 2310: 2305: 2300: 2295: 2290: 2285: 2280: 2275: 2269: 2267: 2264: 2257: 2254: 2253: 2244: 2242: 2241: 2234: 2227: 2219: 2212: 2211: 2185: 2167:Narodne novine 2153: 2133:Hrvatske ceste 2111: 2085: 2062: 2035: 2012: 1979: 1942: 1903: 1875:"Čvor Kosnica" 1866: 1838: 1815: 1787: 1761: 1732: 1703: 1677: 1651: 1629: 1598: 1568: 1543: 1517: 1486: 1455: 1432: 1399: 1373: 1344: 1313: 1291: 1272: 1245: 1227:Narodne novine 1208: 1181: 1179: 1176: 1175: 1174: 1169: 1163: 1162: 1148: 1145:Croatia portal 1132: 1129: 1126: 1125: 1123: 1122: 1112: 1107: 1106: 1099: 1089: 1084: 1081: 1077: 1076: 1073: 1070: 1063: 1059: 1058: 1052: 1033: 1028: 1025: 1021: 1020: 1013: 996: 991: 988: 984: 983: 980: 973: 970: 964: 963: 960:D30 state road 956: 948: 943: 940: 936: 935: 933: 930: 923: 919: 918: 914: 904: 898: 895: 891: 890: 887: 877: 871: 868: 865: 857: 856: 853: 851: 846: 843: 839: 838: 828: 809: 804: 801: 798: 795:City of Zagreb 790: 789: 786: 783: 780: 777: 774: 766: 765: 747:this guideline 739: 737: 730: 724: 721: 710: 709: 707: 704: 701: 698: 689: 688: 686: 683: 680: 677: 668: 667: 662: 657: 652: 647: 641: 640: 635: 615:Hrvatske ceste 610: 609:Traffic volume 607: 564: 561: 454:(44.3 million 415:Zagreb Airport 406: 403: 375:emergency lane 306: 303: 283:emergency lane 217: 216: 215: 214: 204: 203: 202:Highway system 199: 198: 195: 194: 189: 185: 184: 178:City of Zagreb 171: 167: 166: 161: 157: 156: 152: 151: 148: 147: 133: 132:South end 129: 128: 114: 113:North end 110: 109: 105: 104: 101: 98: 94: 93: 89: 88: 53: 45: 44: 40: 39: 31: 30: 22: 15: 13: 10: 9: 6: 4: 3: 2: 2524: 2513: 2510: 2509: 2507: 2492: 2491: 2482: 2480: 2479: 2470: 2469: 2466: 2460: 2459: 2455: 2453: 2450: 2448: 2447: 2443: 2441: 2440: 2436: 2434: 2431: 2429: 2426: 2424: 2423: 2419: 2417: 2416: 2412: 2410: 2409: 2405: 2403: 2400: 2398: 2395: 2393: 2390: 2388: 2387: 2383: 2381: 2380: 2376: 2374: 2373: 2369: 2367: 2366: 2362: 2360: 2359: 2355: 2354: 2352: 2349: 2346:Expressways ( 2344: 2339: 2334: 2324: 2321: 2319: 2316: 2314: 2311: 2309: 2306: 2304: 2301: 2299: 2296: 2294: 2291: 2289: 2286: 2284: 2281: 2279: 2276: 2274: 2271: 2270: 2268: 2261: 2255: 2251: 2247: 2240: 2235: 2233: 2228: 2226: 2221: 2220: 2217: 2204:September 19, 2200:on 2011-09-24 2199: 2195: 2189: 2186: 2173: 2169: 2168: 2163: 2157: 2154: 2142:on 2016-07-01 2138: 2134: 2126: 2120: 2118: 2116: 2112: 2104:September 19, 2099: 2095: 2089: 2086: 2078:September 19, 2073: 2066: 2063: 2050: 2046: 2039: 2036: 2023: 2016: 2013: 2000: 1996: 1995: 1994:Jutarnji list 1990: 1983: 1980: 1972:September 19, 1964: 1960: 1952: 1946: 1943: 1931:on 2015-03-16 1927: 1923: 1916: 1910: 1908: 1904: 1888: 1884: 1876: 1870: 1867: 1854: 1853: 1852:Večernji list 1848: 1842: 1839: 1831:September 19, 1826: 1819: 1816: 1803: 1802: 1801:Večernji list 1797: 1791: 1788: 1775: 1771: 1765: 1762: 1754:September 19, 1749: 1745: 1739: 1737: 1733: 1725:September 19, 1721:(in Croatian) 1720: 1719: 1714: 1707: 1704: 1691: 1687: 1681: 1678: 1665: 1661: 1655: 1652: 1644:September 19, 1639: 1633: 1630: 1622:September 19, 1617: 1613: 1612:Jutarnji list 1609: 1602: 1599: 1591:September 19, 1586: 1582: 1578: 1572: 1569: 1561:September 19, 1556: 1550: 1548: 1544: 1536:September 19, 1531: 1527: 1521: 1518: 1510:September 19, 1505: 1501: 1500:Jutarnji list 1497: 1490: 1487: 1479:September 19, 1474: 1470: 1469:Jutarnji list 1466: 1459: 1456: 1448:September 19, 1443: 1436: 1433: 1425:September 19, 1420: 1416: 1415: 1414:Jutarnji list 1410: 1403: 1400: 1392:September 19, 1388: 1384: 1377: 1374: 1366:September 19, 1361: 1357: 1351: 1349: 1345: 1332: 1328: 1324: 1317: 1314: 1302:on 2011-02-18 1298: 1294: 1288: 1284: 1283: 1276: 1273: 1261: 1257: 1256: 1249: 1246: 1233: 1229: 1228: 1223: 1217: 1215: 1213: 1209: 1196: 1192: 1186: 1183: 1177: 1173: 1170: 1168: 1165: 1164: 1160: 1149: 1146: 1135: 1130: 1114: 1113: 1108: 1104: 1098: 1088: 1078: 1068: 1060: 1057: 1051: 1042: 1032: 1022: 1018: 1014: 1005: 997: 995: 992: 986: 985: 971: 969: 965: 961: 957: 949: 947: 944: 938: 937: 934: 928: 921: 920: 915: 913: 905: 902: 901:Velika Gorica 899: 893: 892: 888: 886: 878: 875: 874:Velika Gorica 872: 866: 863: 862:Zagreb County 858: 854: 852: 850: 847: 841: 840: 837: 836:Zagreb bypass 833: 829: 827: 818: 810: 808: 805: 799: 796: 791: 771: 762: 759:November 2021 752: 748: 743: 738: 729: 728: 722: 720: 718: 708: 700:2047 BuÅ”evec 699: 695: 691: 690: 687: 678: 674: 670: 669: 666: 661: 656: 651: 650:Counting site 646: 642: 638: 633: 630: 628: 624: 620: 619:traffic count 616: 608: 606: 604: 601:spanning the 600: 595: 591: 589: 585: 584:Croatian kuna 581: 576: 572: 570: 562: 560: 558: 554: 548: 546: 545:Osijek Koteks 542: 538: 534: 530: 525: 521: 519: 515: 511: 505: 503: 497: 494: 490: 484: 482: 478: 474: 470: 466: 461: 457: 453: 449: 444: 439: 435: 434:Zagreb County 431: 430:Zagreb bypass 427: 423: 416: 411: 404: 402: 400: 396: 390: 388: 384: 380: 376: 372: 371:traffic lanes 367: 365: 361: 360:Zagreb bypass 357: 352: 348: 347:Velika Gorica 344: 340: 339:Velika Gorica 336: 332: 331:Velika Gorica 328: 324: 320: 311: 304: 302: 300: 299:ticket system 296: 292: 288: 284: 280: 279:traffic lanes 275: 273: 267: 264: 260: 256: 255:Velika Gorica 252: 248: 247:Zagreb bypass 244: 240: 236: 232: 231:Autocesta A11 228: 224: 213: 212: 208: 207: 205: 200: 196: 193: 192:Velika Gorica 190: 186: 183: 179: 175: 174:Zagreb County 172: 168: 165: 162: 158: 153: 149: 146: 142: 134: 130: 127: 126:Velika Gorica 123: 115: 111: 106: 99: 95: 90: 86: 82: 77: 73: 69: 65: 61: 57: 51: 46: 41: 37: 36:Autocesta A11 32: 26: 20: 2483: 2471: 2456: 2444: 2437: 2420: 2413: 2406: 2384: 2377: 2370: 2363: 2356: 2347: 2322: 2202:. Retrieved 2198:the original 2188: 2176:. Retrieved 2172:the original 2165: 2156: 2144:. Retrieved 2137:the original 2102:. Retrieved 2098:the original 2088: 2076:. Retrieved 2065: 2053:. Retrieved 2048: 2038: 2026:. Retrieved 2015: 2003:. Retrieved 1999:the original 1992: 1982: 1970:. Retrieved 1963:the original 1945: 1933:. Retrieved 1926:the original 1894:. Retrieved 1887:the original 1869: 1857:. Retrieved 1850: 1841: 1829:. Retrieved 1818: 1806:. Retrieved 1799: 1790: 1778:. Retrieved 1764: 1752:. Retrieved 1748:the original 1723:. Retrieved 1716: 1706: 1694:. Retrieved 1680: 1668:. Retrieved 1654: 1642:. Retrieved 1632: 1620:. Retrieved 1616:the original 1611: 1601: 1589:. Retrieved 1585:the original 1571: 1559:. Retrieved 1534:. Retrieved 1520: 1508:. Retrieved 1504:the original 1499: 1489: 1477:. Retrieved 1473:the original 1468: 1458: 1446:. Retrieved 1435: 1423:. Retrieved 1419:the original 1412: 1402: 1390:. Retrieved 1376: 1364:. Retrieved 1360:the original 1335:. Retrieved 1316: 1306:September 5, 1304:. Retrieved 1297:the original 1281: 1275: 1265:February 12, 1263:. Retrieved 1254: 1248: 1236:. Retrieved 1232:the original 1225: 1201:September 8, 1199:. Retrieved 1195:the original 1185: 1159:Roads portal 1118:   903:jug (south) 849:Veliko Polje 785:Destination 756: 741: 717:Velika Mlaka 713: 664: 659: 654: 649: 644: 636: 612: 596: 592: 586:(40.000.000 577: 573: 566: 549: 541:Hidroelektra 526: 522: 506: 498: 485: 473:Hidroelektra 419: 391: 368: 316: 276: 268: 223:A11 motorway 222: 220: 209: 188:Major cities 84: 75: 67: 59: 29:A11 motorway 2194:"Autoceste" 2049:večernji.hr 2024:. Novi List 1260:Google Maps 832:A3 motorway 753:if you can. 599:arch bridge 537:Konstruktor 510:A1 motorway 477:Konstruktor 443:A3 motorway 321:, spanning 272:A3 motorway 1896:October 2, 580:government 491:suburb of 2266:Motorways 807:JakuÅ”evec 723:Exit list 557:Sava-Odra 533:PeŔčenica 489:MoŔćenica 460:JakuÅ”evec 356:JakuÅ”evec 243:JakuÅ”evec 2506:Category 2478:Category 2246:Highways 2178:July 24, 2146:June 12, 1774:Archived 1690:Archived 1664:Archived 1331:Archived 1327:Nacional 1238:June 25, 1131:See also 1120:Unopened 1056:Petrinja 834:and the 625:and the 493:Petrinja 235:motorway 227:Croatian 170:Counties 155:Location 2348:partial 2250:Croatia 1935:12 June 1859:12 June 1808:12 June 1780:17 June 1696:17 June 1670:17 June 1530:Nova TV 1337:17 June 1258:(Map). 1178:Sources 994:Lekenik 946:BuÅ”evec 773:County 529:Lekenik 481:Strabag 469:Viadukt 448:Lekenik 405:History 383:Mraclin 373:and an 319:Croatia 281:and an 263:Lekenik 239:Croatia 164:Croatia 160:Country 76:planned 2055:22 May 2028:22 May 1289:  1031:Žažina 1012:Ž3230 955:Ž3116 788:Notes 706:1,480 703:1,784 685:1,636 682:1,985 335:Zagreb 295:tolled 251:Zagreb 97:Length 60:in use 2140:(PDF) 2129:(PDF) 2005:8 May 1966:(PDF) 1955:(PDF) 1929:(PDF) 1918:(PDF) 1890:(PDF) 1879:(PDF) 1300:(PDF) 1103:Sisak 1087:Sisak 1080:41.9 1062:38.8 1024:35.2 987:29.4 972:23.8 939:18.1 922:12.1 782:Name 779:Exit 665:Notes 588:Euros 514:Split 422:Sisak 393:uses 364:Sisak 343:Sisak 259:Sisak 253:, to 143:near 124:near 2458:D528 2452:D522 2446:D510 2439:D425 2433:D424 2428:D220 2206:2011 2180:2010 2148:2016 2106:2011 2080:2011 2057:2021 2030:2021 2007:2012 1974:2011 1937:2016 1898:2010 1861:2016 1833:2011 1810:2016 1782:2016 1756:2011 1727:2011 1698:2016 1672:2016 1646:2011 1624:2011 1593:2011 1563:2011 1538:2011 1512:2011 1481:2011 1450:2011 1427:2011 1394:2011 1368:2011 1339:2016 1308:2010 1287:ISBN 1267:2018 1240:2016 1203:2010 894:8.7 867:2.3 842:1.0 800:0.0 697:A11 676:A11 660:ASDT 655:AADT 645:Road 603:Kupa 553:Odra 543:and 479:and 456:euro 452:kuna 399:Sava 362:and 349:and 341:and 325:and 221:The 2422:D76 2415:D33 2408:D30 2402:D14 2397:D12 2392:D10 2323:A11 2318:A10 2248:of 1097:D36 1050:D36 1041:D30 1004:D30 912:D31 885:D30 826:E70 776:km 512:to 327:D31 323:D30 237:in 141:D30 2508:: 2386:D8 2379:D6 2372:D3 2365:D2 2358:D1 2313:A9 2308:A8 2303:A7 2298:A6 2293:A5 2288:A4 2283:A3 2278:A2 2273:A1 2164:. 2131:. 2114:^ 2047:. 1906:^ 1849:. 1798:. 1735:^ 1546:^ 1347:^ 1329:. 1211:^ 1083:8 1027:7 990:6 942:5 897:4 870:3 845:2 817:A3 803:1 629:. 539:, 475:, 471:, 436:. 389:. 366:. 337:, 229:: 180:, 176:, 122:A3 2350:) 2238:e 2231:t 2224:v 2208:. 2182:. 2150:. 2108:. 2082:. 2059:. 2032:. 2009:. 1976:. 1939:. 1900:. 1863:. 1835:. 1812:. 1784:. 1758:. 1729:. 1700:. 1674:. 1648:. 1626:. 1595:. 1565:. 1540:. 1514:. 1483:. 1452:. 1429:. 1396:. 1370:. 1341:. 1310:. 1269:. 1242:. 1205:. 761:) 757:( 225:(

Index

A11 motorway shield

Map key - green
Map key - red
Map key - violet
Map key - blue
A3
Velika Gorica
D30
Poljana Lekenička
Croatia
Zagreb County
City of Zagreb
Sisak-Moslavina County
Velika Gorica
Highways in Croatia
Croatian
motorway
Croatia
JakuŔevec
Zagreb bypass
Zagreb
Velika Gorica
Sisak