On 21 July 1866 three notable businessmen of Bapaume conctracted with their municipality for constructing a railway to connect Bapaume to the French railway system. The businessmen were Messrs. Edouard Arrachart, owner of a chemical plant; Edouard Grardel, textiles manufacturer; and banker Florimond
262:
and distilleries. The state had given a subsidy of 125,000 francs for the Achiet–Marcoing railway. Others, mainly manufacturers, subsidized it for 376,253 francs. In a primarily agricultural and sugar area, the secondary lines allowed a spectacular development of the cultivation of sugar beet and
254:
The section from Achiet to Bapaume served the general interests of the town. In the 1880s it had a traffic of 70-80 cars a day. Most of them to or from destinations further away than Achiet. This explains the standard gauge. However, the rail was light, so trains could not travel at more than
270:
In the 1880s none of the local industries had its own branch, which would of course allow direct use of railway cars instead of using them via transloading with wagons and carts. Later, the line had several branches to serve important local industries, like Sucrerie Lejosne in
352:
The station at Bapaume also had the repair shop of the railway company. It also did repairs for the line from Boisleux to Marquion, and that from Vélu to Saint-Quentin.
221:
Parel. The contract was called a concession. The municipality subsidized the line and in exchange the company would offer service on certain conditions, fare price etc.
184:
was a secondary line of standard gauge railway in Hauts-de-France. The first section opened in 1871. The last section of the line was closed down in 1999.
579: 574: 589: 584: 370: 206: 516: 205:
date back to the early 1860s. However, in these plans the section was part of a larger plan to improve the connections of the
358: 310: 66: 228:
agreed with the plans. On 30 May 1868 the construction of the railway was declared to be in public interest.
342: 136: 258:
The section from Bapaume to Marcoing had been primarily constructed in the interests of the local
259: 267:. This had to do with the very high cost of transporting heavy cargo like sugar beet by road. 302: 198: 84: 28: 338: 171: 568: 318: 225: 70: 555: 544: 534: 334: 239: 143: 306: 272: 346: 89: 546:
Chemin de fer d'Achiet a Noyon par Bapaume, Péronne et Ham, Avant-Projet
330: 326: 314: 202: 539:, vol. XXXXI, Imprimerie imperiale, Paris, 1868, pp. 737–753 322: 287:
Compagnie Générale de chemin de fer d'Intérêt Local (CGL) 1930-1961
214: 210: 376:
The railway station of Beugny in April 2017. Part is now a house.
557:
Les chemins de fer a faible trafic en France: lignes secondaires
264: 245:
1878: Havrincourt - Marcoing 8 km closed down 1969
142: 132: 124: 119: 111: 103: 98: 77: 61: 53: 45: 40: 21: 399: 397: 395: 393: 391: 235:1871: Achiet - Bapaume 7 km, closed down 1999 293:GIE Exploitation Ferroviaire de Bapaume 1969-1999 284:Chemin de fer d’Achiet à Bapaume (A.B.) 1871-1930 560:, Librairie Polytechnique, Baudry et Cie, Paris 290:Régie départementale du Pas-de-Calais 1961-1969 364:Former railway station of Bapaume in May 2014. 8: 415: 209:by making a more direct connection between 35:It ends at Marcoing, just south of Cambrai. 217:to the south. This plan was not executed. 33:The line starts in the center of the map. 439: 427: 499: 487: 475: 463: 451: 387: 354: 536:Bulletin des lois de l'empire français 18: 7: 403: 549:, Imprimerie imperiale, Paris, 1863 275:and the Gagny factory in Bapaume. 14: 580:Standard gauge railways in France 231:The line was opened in sections: 57:GIE Expl. Ferr. de Bapaume - 1999 575:Railway lines in Hauts-de-France 369: 357: 27: 207:Nord-Pas de Calais Mining Basin 224:In August 1867 the department 1: 197:The plans for a railway from 590:Railway lines opened in 1999 585:Railway lines opened in 1871 521:FACS Patrimoine Ferroviaire 242:18 km closed down 1969 606: 182:Achiet to Marcoing Railway 22:Achiet to Marcoing Railway 16:Railway in Hauts-de-France 26: 311:Biefvillers-lès-Bapaume 128:33 km (21 mi) 554:Sampité, A. (1888), 517:"Pas de Calais (62)" 260:beet sugar factories 416:Avant-Projet 1863 178: 177: 597: 561: 550: 540: 530: 528: 527: 503: 497: 491: 485: 479: 473: 467: 461: 455: 449: 443: 437: 431: 425: 419: 413: 407: 401: 373: 361: 321:(km 12), halte; 238:1877: Bapaume - 174: 168: 166: 165: 161: 158: 150: 133:Number of tracks 31: 19: 605: 604: 600: 599: 598: 596: 595: 594: 565: 564: 553: 543: 533: 525: 523: 515: 512: 507: 506: 498: 494: 486: 482: 474: 470: 462: 458: 450: 446: 438: 434: 426: 422: 414: 410: 402: 389: 384: 377: 374: 365: 362: 313:(km 5), arrêt; 309:(km 3), arrêt; 303:Achiet-le-Grand 300: 281: 252: 199:Achiet-le-Grand 195: 190: 170: 163: 159: 156: 154: 153:4 ft  152: 148: 94: 85:Achiet-le-Grand 36: 34: 17: 12: 11: 5: 603: 601: 593: 592: 587: 582: 577: 567: 566: 563: 562: 551: 541: 531: 511: 508: 505: 504: 492: 480: 468: 456: 444: 442:, p. 737. 432: 430:, p. 739. 420: 408: 386: 385: 383: 380: 379: 378: 375: 368: 366: 363: 356: 299: 296: 295: 294: 291: 288: 285: 280: 277: 255:45 km/h. 251: 248: 247: 246: 243: 236: 194: 191: 189: 186: 176: 175: 172:standard gauge 146: 140: 139: 134: 130: 129: 126: 122: 121: 117: 116: 113: 109: 108: 105: 101: 100: 96: 95: 93: 92: 87: 81: 79: 75: 74: 63: 59: 58: 55: 51: 50: 47: 43: 42: 38: 37: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 602: 591: 588: 586: 583: 581: 578: 576: 573: 572: 570: 559: 558: 552: 548: 547: 542: 538: 537: 532: 522: 518: 514: 513: 509: 502:, p. 49. 501: 496: 493: 490:, p. 45. 489: 484: 481: 478:, p. 44. 477: 472: 469: 466:, p. 46. 465: 460: 457: 454:, p. 43. 453: 448: 445: 441: 440:Bulletin 1868 436: 433: 429: 428:Bulletin 1868 424: 421: 417: 412: 409: 405: 400: 398: 396: 394: 392: 388: 381: 372: 367: 360: 355: 353: 350: 348: 344: 340: 336: 332: 328: 324: 320: 316: 312: 308: 304: 297: 292: 289: 286: 283: 282: 278: 276: 274: 268: 266: 261: 256: 249: 244: 241: 237: 234: 233: 232: 229: 227: 226:Pas-de-Calais 222: 218: 216: 213:/ Achiet and 212: 208: 204: 200: 192: 187: 185: 183: 173: 149:1,435 mm 147: 145: 141: 138: 135: 131: 127: 123: 118: 114: 110: 106: 102: 97: 91: 88: 86: 83: 82: 80: 76: 72: 71:Pas-de-Calais 68: 64: 60: 56: 52: 48: 44: 39: 30: 25: 20: 556: 545: 535: 524:. Retrieved 520: 500:Sampité 1888 495: 488:Sampité 1888 483: 476:Sampité 1888 471: 464:Sampité 1888 459: 452:Sampité 1888 447: 435: 423: 418:, p. 4. 411: 351: 301: 269: 257: 253: 250:Significance 230: 223: 219: 196: 181: 179: 137:Single track 339:Flesquières 335:Havrincourt 240:Havrincourt 144:Track gauge 125:Line length 569:Categories 526:2023-06-24 382:References 319:Frémicourt 193:Foundation 404:FACS 2023 349:(km 33). 345:(km 28); 343:Ribécourt 337:(km 25); 333:(km 21); 329:(km 17); 325:(km 14); 307:Bihucourt 279:Operators 273:Bihucourt 120:Technical 115:1969-1999 107:1871-1878 347:Marcoing 317:(km 7); 305:(km 0); 298:Stations 167: in 90:Marcoing 65:France ( 41:Overview 510:Sources 331:Hermies 315:Bapaume 203:Bapaume 188:History 162:⁄ 99:History 78:Termini 49:Defunct 323:Beugny 112:Closed 104:Opened 62:Locale 46:Status 215:Noyon 211:Arras 54:Owner 327:Vélu 265:flax 180:The 67:Nord 201:to 571:: 519:. 390:^ 341:- 169:) 69:, 529:. 406:. 164:2 160:1 157:+ 155:8 151:( 73:)

Index


Nord
Pas-de-Calais
Achiet-le-Grand
Marcoing
Single track
Track gauge
standard gauge
Achiet-le-Grand
Bapaume
Nord-Pas de Calais Mining Basin
Arras
Noyon
Pas-de-Calais
Havrincourt
beet sugar factories
flax
Bihucourt
Achiet-le-Grand
Bihucourt
Biefvillers-lès-Bapaume
Bapaume
Frémicourt
Beugny
Vélu
Hermies
Havrincourt
Flesquières
Ribécourt
Marcoing

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.