Both the EU Court of Justice and the UN Human Rights Council have said that the consent of representatives of the people of Western Sahara is required for a project like this. This requirement does not seem to have been met. The issue was raised in a question to the EU parliament. The response was that the EU would respond to questions about exploitation of natural resources by pointing out the unresolved legal status of Western Sahara.
153: 123: 52: 273:
The village of Aftissat was established in 2005 as part of a development program of the Ministry of Agriculture and Fisheries, aimed at establishing fishermen's villages and equipped ports along the Moroccan coast, in order to strengthen the marine fishing sector and revive traditional fishing. It is
321:
announced that EEM had selected it to supply 40 onshore wind turbines to power a 200MW extension to the Aftissat onshore wind farm. The Cypress turbines will be moderated at 5.0MW, and will have rotors with a 158 metres (518 ft) diameter. The project was expected to come into operation in 2023.
302:. It has 56 Siemens wind turbines with nominal power of 3.6MW, and delivers 201.6MW, or 1,000GWh per year. Windhoist was responsible for erecting the turbines. The project cost was estimated as $ 391 million. The project included construction of the 250 kilometres (160 mi) 400kV power line from 313:
Commercial operations began in October 2018. The wind farm delivers energy over the national VHV/HV network to large industrial consumers. Customers mentioned in a December 2016 statement by Nareva included LafargeHolcim Maroc, OCP, Ciments du Maroc, Sonasid, Managem, la Snep and Air Liquide Maroc.
290:
Avtisat has one fish market, 30 stores for fish trading and 204 stores for sailors, as well as a box store and an engine repair workshop. The village has 635 boats for traditional fishing.
105: 569: 830: 694: 44: 619: 585: 140: 73: 687: 835: 737: 802: 680: 170: 808: 554: 517: 307: 258: 602: 253:
of the Western Sahara. The village is on National Road No. 1, in the section that links the cities of
500: 790: 318: 298:
The Astissat wind farm was built by Energie Eolienne du Maroc (EEM), a wholly-owned subsidiary of
550: 165: 703: 571:
GE Renewable Energy and Nareva to build 200 MW Aftissat onshore wind farm extension in Morocco
250: 180: 339: 261:, 63 km southwest of Boujdour and 286 km northeast of Dakhla. It belongs to the 226: 534: 246: 234: 110: 824: 784: 752: 653: 279: 275: 796: 556:
E-000152/2018 Answer given by Vice-President Mogherini on behalf of the Commission
322:
Following the expansion the Aftissat wind farm would be the largest in Morocco.
274:
one of four fishing villages in the Boujdour province, the others being Lacraa,
88: 75: 372: 370: 727: 713: 387: 385: 303: 254: 265:
commune in the Boujdour province of the Laayoune-Sakia El Hamra region.
762: 757: 262: 158: 128: 455: 453: 299: 672: 586:"Morocco: GE wins contract to expand Aftissat wind farm by 200 MW" 420: 404: 402: 400: 637: 676: 361: 620:"Provinces du Sud Le programme villages de pêche bien avancé" 539:(in French), Rotaume de Maric Haut-Commissariat au Plan, 2015 471: 376: 432: 391: 639:
UK company building wind park in occupied Western Sahara
459: 536:
Annuaire Statistique Regional Laayoune - Sakia el Hamra
771: 745: 720: 408: 338:GE Renewable Energy is a Paris-based subsidiary of 237:. It is the location of a large onshore wind farm. 212: 204: 199: 191: 186: 176: 164: 146: 116: 104: 21: 444: 518:"Aftissat wind farm in Morocco set for expansion" 642:, Western Sahara Resource Watch, 30 October 2017 310:, which is further south, to the Moroccan grid. 688: 483: 8: 306:to Aftissat. This is a stage in connecting 695: 681: 673: 18: 574:, GE Renewable Energy, 30 September 2021 354: 331: 198: 185: 103: 68: 37: 603:"Node: Aftissat أفتيسات (7786015037)" 421:Aftissat Wind Farm, Morocco Windhoist 211: 203: 190: 175: 163: 145: 115: 7: 362:Node: Aftissat أفتيسات (7786015037) 230: 195:13.46 km (5.2 sq mi) 831:Populated places in Western Sahara 14: 736: 516:Anita Anyango (5 October 2021), 472:GE Renewable Energy and Nareva.. 151: 141:Sahrawi Arab Democratic Republic 133: 121: 51: 50: 43: 377:Provinces du Sud Le programme.. 233:) is a fishing village in the 1: 433:UK company building wind park 392:Annuaire Statistique Regional 286:Facilities and infrastructure 106:Non-self-governing territory 502:Aftissat Wind Farm, Morocco 460:Morocco: GE wins contract.. 852: 734: 710: 69: 38: 31: 16:Village in Western Sahara 809:Zaouiat Ahmed Ben Yaddas 626:(3472), 23 February 2011 25: 803:Côte Aftissate-Boujdour 655:Wind farm of Aftissat 1 445:Federica Mogherini 2018 409:Wind farm of Aftissat 1 171:Laâyoune-Sakia El Hamra 342:of the United States. 216:6.8/km (18/sq mi) 836:Wind farms in Morocco 781:(village, wind farm) 590:Africa Energy Portal 213: • Density 791:Boujdour Lighthouse 319:GE Renewable Energy 245:Aftissat is on the 89:25.6146°N 14.6830°W 85: /  551:Federica Mogherini 484:Anita Anyango 2021 317:In September 2021 278:(اكطً الغازي) and 205: • Total 192: • Total 159:Kingdom of Morocco 129:Kingdom of Morocco 818: 817: 704:Boujdour Province 251:Boujdour Province 220: 219: 181:Boujdour Province 94:25.6146; -14.6830 843: 811:(religious site) 740: 697: 690: 683: 674: 665: 664: 663: 649: 648: 647: 633: 632: 631: 615: 614: 613: 598: 597: 596: 581: 580: 579: 565: 564: 563: 553:(5 April 2018), 546: 545: 544: 530: 529: 528: 512: 511: 510: 487: 481: 475: 469: 463: 457: 448: 442: 436: 430: 424: 418: 412: 406: 395: 389: 380: 374: 365: 359: 343: 340:General Electric 336: 282:(مٌناء بوجدور). 232: 157: 155: 154: 139: 137: 136: 127: 125: 124: 100: 99: 97: 96: 95: 90: 86: 83: 82: 81: 78: 54: 53: 47: 19: 851: 850: 846: 845: 844: 842: 841: 840: 821: 820: 819: 814: 772:Other locations 767: 741: 732: 716: 706: 701: 670: 668: 661: 659: 652: 645: 643: 636: 629: 627: 618: 611: 609: 601: 594: 592: 584: 577: 575: 568: 561: 559: 549: 542: 540: 533: 526: 524: 515: 508: 506: 499: 495: 490: 482: 478: 470: 466: 458: 451: 443: 439: 431: 427: 419: 415: 407: 398: 390: 383: 375: 368: 360: 356: 352: 347: 346: 337: 333: 328: 296: 288: 271: 243: 152: 150: 134: 132: 131: 122: 120: 93: 91: 87: 84: 79: 76: 74: 72: 71: 65: 64: 63: 62: 61: 60: 59: 55: 34: 27: 24: 17: 12: 11: 5: 849: 847: 839: 838: 833: 823: 822: 816: 815: 813: 812: 806: 800: 794: 788: 782: 775: 773: 769: 768: 766: 765: 760: 755: 749: 747: 746:Rural communes 743: 742: 735: 733: 731: 730: 724: 722: 721:Municipalities 718: 717: 711: 708: 707: 702: 700: 699: 692: 685: 677: 667: 666: 650: 634: 616: 599: 582: 566: 547: 531: 513: 496: 494: 491: 489: 488: 476: 464: 449: 437: 425: 413: 396: 381: 366: 353: 351: 348: 345: 344: 330: 329: 327: 324: 295: 292: 287: 284: 270: 267: 242: 239: 235:Western Sahara 218: 217: 214: 210: 209: 206: 202: 201: 197: 196: 193: 189: 188: 184: 183: 178: 174: 173: 168: 162: 161: 148: 144: 143: 118: 114: 113: 111:Western Sahara 108: 102: 101: 67: 66: 57: 56: 49: 48: 42: 41: 40: 39: 36: 35: 32: 29: 28: 22: 15: 13: 10: 9: 6: 4: 3: 2: 848: 837: 834: 832: 829: 828: 826: 810: 807: 805:(Ramsar site) 804: 801: 798: 795: 792: 789: 786: 785:Agti el Ghazi 783: 780: 777: 776: 774: 770: 764: 761: 759: 756: 754: 753:Guelta Zemmur 751: 750: 748: 744: 739: 729: 726: 725: 723: 719: 715: 709: 705: 698: 693: 691: 686: 684: 679: 678: 675: 671: 657: 656: 651: 641: 640: 635: 625: 621: 617: 608: 607:OpenStreetMap 604: 600: 591: 587: 583: 573: 572: 567: 558: 557: 552: 548: 538: 537: 532: 523: 519: 514: 504: 503: 498: 497: 492: 485: 480: 477: 473: 468: 465: 461: 456: 454: 450: 446: 441: 438: 434: 429: 426: 422: 417: 414: 410: 405: 403: 401: 397: 394:, p. 92. 393: 388: 386: 382: 378: 373: 371: 367: 363: 358: 355: 349: 341: 335: 332: 325: 323: 320: 315: 311: 309: 305: 301: 293: 291: 285: 283: 281: 280:Port Boujdour 277: 276:Agti el Ghazi 268: 266: 264: 260: 256: 252: 248: 240: 238: 236: 228: 224: 215: 207: 194: 182: 179: 172: 169: 167: 160: 149: 147:Controlled by 142: 130: 119: 112: 109: 107: 98: 70:Coordinates: 46: 30: 20: 797:Cape Bojador 793:(lighthouse) 778: 669: 660:, retrieved 654: 644:, retrieved 638: 628:, retrieved 624:L'Économiste 623: 610:, retrieved 606: 593:, retrieved 589: 576:, retrieved 570: 560:, retrieved 555: 541:, retrieved 535: 525:, retrieved 522:Pumps Africa 521: 507:, retrieved 501: 479: 467: 440: 428: 416: 357: 334: 316: 312: 297: 289: 272: 244: 222: 221: 505:, Windhoist 92: / 825:Categories 662:2021-10-21 646:2021-10-21 630:2021-10-22 612:2021-10-21 595:2021-10-21 578:2021-10-21 562:2021-10-21 543:2021-10-22 527:2021-10-21 509:2021-10-21 200:Population 117:Claimed by 80:14°40′59″W 77:25°36′53″N 787:(village) 712:Capital: 350:Citations 294:Wind farm 249:coast in 779:Aftissat 728:Boujdour 714:Boujdour 658:, NAREVA 304:Laayoune 255:Boujdour 247:Atlantic 241:Location 223:Aftissat 177:Province 58:Aftissat 23:Aftissat 763:Lemseid 758:Jraifia 493:Sources 269:Origins 263:Jraifia 231:أفتيسات 33:Village 26:أفتيسات 799:(cape) 308:Dakhla 300:Nareva 259:Dakhla 227:Arabic 166:Region 156:  138:  126:  326:Notes 257:and 187:Area 827:: 622:, 605:, 588:, 520:, 452:^ 399:^ 384:^ 369:^ 229:: 208:92 696:e 689:t 682:v 486:. 474:. 462:. 447:. 435:. 423:. 411:. 379:. 364:. 225:(

Index

Aftissat is located in Western Sahara
25°36′53″N 14°40′59″W / 25.6146°N 14.6830°W / 25.6146; -14.6830
Non-self-governing territory
Western Sahara
Kingdom of Morocco
Sahrawi Arab Democratic Republic
Kingdom of Morocco
Region
Laâyoune-Sakia El Hamra
Boujdour Province
Arabic
Western Sahara
Atlantic
Boujdour Province
Boujdour
Dakhla
Jraifia
Agti el Ghazi
Port Boujdour
Nareva
Laayoune
Dakhla
GE Renewable Energy
General Electric
Node: Aftissat أفتيسات (7786015037)


Provinces du Sud Le programme..

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.