29: 702: 688: 563:
emissions remains high, in spite of moderate investments in filtering technology. Since 2001, NOx emissions of the Amyntaio power plant even significantly increased, reaching 2.5 kg/MWh in 2008, the highest value of all power plants in Greece. This is explained by the low and further decreasing
583:
directive 2001/80 has been approved, the environmental permits of Amyntaio were renewed in 2008. With its lifetime being limited to 2023, the Amyntaio power plant however remains excluded from compliance with the stricter emission limits set by the EU directive 2010/75. Subsequently, neither the
462:
In 2013, the Greek government included the Amyntaio power plant in a list of assets which PPC was required to spin-off to a subsidiary. This subsidiary was set to be turned into a new competing electricity company following its privatization. Following large scale protests and limited corporate
512:
Originally constructed in 2005, the district heating network is currently being expanded by a planned 50% to cover a larger share of the three villages' heating requirements. Accordingly, the equipment is being upgraded to allow for thermal loads up to 34
446:
The power plant's first unit has been in operation since January 1987 with the second unit following in August 1987. Its lifespan is limited by the remaining exploitable deposits in the Amyntaio mine. As PPC requested article 33
894: 1149: 943: 28: 900: 394: 1159: 1144: 493: 433: 200: 1041:
José Antonio Rodriguez Martin; et al. (September 2014). "Local deposition of mercury in topsoils around coal-fired power plants: is it always true?".
543:
In spite of investments in heat cogeneration, overall efficiency of the power station remains relatively low, significantly contributing to the country's
791: 1164: 607: 951: 77: 851: 830: 1015: 1003: 974: 1043: 809: 715: 382: 248: 739: 1012:
Proceedings of the 12 International Conference on Environmental Science and Technology, 8–10 September 2011 in Rhodes, Greece
765: 1073: 858: 837: 552: 343: 145: 1095: 327: 947: 589: 926: 611: 297: 523:
The Amyntaio district heating project is the third project of its kind in Greece following similar projects in
386: 159: 592:
to reduce particle emissions is planned for this power plant, though preliminary studies have been completed.
452: 405: 367: 1004:"Investigating the long-term environmental performance of the Greek electricity sector on the basis of SO 872: 416: 320: 300: 125: 331: 813: 371: 195: 1102: 922: 670: 252: 556: 335: 263: 1154: 792:"Dirty Great Machines – Bucket Wheel Excavator | Technology Documentary | Reel Truth. Science" 573: 308: 65: 1048: 975:"Detailed examination of Greek lignite thermal power stations on the basis of NOx emissions" 720: 585: 420: 488: 743: 568:
of the low-quality lignite of the Amyntaio coal mine, which however has been found low in
532: 424: 413: 378: 256: 244: 1066: 1019: 978: 601: 580: 565: 544: 456: 428: 363: 289: 1138: 707: 693: 548: 502: 409: 531:. It has become a model project in transnational cooperation with the neighbouring 499: 209: 354:
The power station was constructed between 1983 and 1986 by a consortium of French
769: 509:
operates an extensive network connecting 1250 public and residential buildings.
455:
plants, excluding them from compliance with stricter emission limits set by the
1052: 683: 528: 476: 92: 79: 701: 315:. Build and commissioned in the mid 1980s, the power station is fuelled by 944:"Know-how transfer for district heating applications in Bitola and Novaci" 480: 459:
directive 2010/75, they are expected to be shut down by the end of 2023.
377:
It consists of two units with a generation capacity of 300 MW each.
304: 61: 275: 927:"Expansion of district heating network infrastructure of Amyntaio area" 484: 467:-led government however announced it would call off the privatization. 401: 339: 316: 177: 569: 524: 464: 390: 359: 355: 312: 51: 873:"Syriza MP reiterates party plan to end 'Little PPC' as first move" 505:. Connecting to the power stations steam pipelines, the municipal 393:. The plant's 200 metres (660 ft) tall chimney is one of the 1067:"Corporate Social Responsibility and Sustainability Report 2013" 514: 560: 342:. Both the power plant and the adjacent mine are owned by the 579:
After a pollutant emissions reduction plan as required by
326:
Today it is one of six power plants in an area called the
1126: 475:
The power station is equipped to make productive use of
1127:
District Heating Municipal Company of Amyntaio (ΔΕΤΕΠΑ)
463:
interest in entering the Greek lignite market, the new
1150:
Buildings and structures in Florina (regional unit)
262: 219: 208: 191: 183: 173: 168: 152: 141: 124: 116: 108: 71: 57: 47: 39: 21: 1047:. Vol. 21, no. 17. pp. 10205–14. 8: 1044:Environmental Science and Pollution Research 973:M. Emmanouilidis; et al. (July 2012). 18: 599: 1160:Energy infrastructure completed in 1987 731: 1002:G.C. Spyropoulos; et al. (2011). 438:, some 50 km south of the plant. 7: 1145:Coal-fired power stations in Greece 507:District Heating Company of Amyndeo 977:. pp. 966–975. Archived from 899:. 22 February 2013. Archived from 896:ΠΑΡΟΥΣΙΑΣΗ ΤΗΛΕΘΕΡΜΑΝΣΗΣ ΑΜΥΝΤΑΙΟΥ 768:. 24 November 2010. Archived from 588:technology nor the replacement of 16:Coal-fired power station in Greece 14: 950:Macedonia–Greece. Archived from 810:Ministry of Development (Greece) 766:"Lignite-Fired Plants in Greece" 716:List of power stations in Greece 700: 686: 328:Western Macedonia Lignite Center 169:Thermal power station 27: 479:, supplying the nearby town of 423:is transported from the nearby 553:respirable suspended particles 471:Cogeneration of Heat and Power 1: 1165:1987 establishments in Greece 1096:"Verified Emissions for 2014" 547:emissions. At the same time, 451:status for its Amyntaio and 395:tallest structures in Greece 334:and constitutes the largest 590:electrostatic precipitators 449:Limited lifetime derogation 404:fuel is dug out by several 1181: 1076:. October 2014. p. 55 948:IPA Cross-Border Programme 814:"Energy Outlook of Greece" 608:EU Emission Trading Scheme 330:, which is located in the 187:660 m (2,165 ft) 1053:10.1007/s11356-014-2873-0 668: 293: 272: 228: 224: 35: 26: 1074:Public Power Corporation 895: 859:Public Power Corporation 838:Public Power Corporation 344:Public Power Corporation 241:Make and model 160:Public Power Corporation 146:Public Power Corporation 861:. 2014. p. 105 ff. 406:bucket-wheel excavators 389:are supplied by French 264:Nameplate capacity 117:Construction began 740:"Amyntaio Power Plant" 286:Amyntaio Power Station 233:Units operational 22:Amyntaio Power Station 381:are built by Russian 220:Power generation 93:40.61889°N 21.68389°E 852:"Annual Report 2013" 840:. 2014. p. 180. 831:"Annual Report 2013" 483:and the villages of 368:Zarubezhenergoproekt 126:Commission date 1103:European Commission 923:European Commission 671:European Commission 619: 606:as verified by the 427:and the artificial 408:and transported by 192:Cooling source 184:Site elevation 89: /  600: 584:implementation of 557:soil acidification 417:Amyntaio coal mine 412:from the adjacent 356:Alsthom-Atlantique 338:in Greece and the 321:Amyntaio coal mine 319:from the adjacent 98:40.61889; 21.68389 875:. 27 January 2015 812:(February 2009). 677: 676: 309:Western Macedonia 283: 282: 174:Primary fuel 66:Western Macedonia 1172: 1131: 1115: 1114: 1112: 1110: 1100: 1092: 1086: 1085: 1083: 1081: 1071: 1063: 1057: 1056: 1038: 1032: 1031: 1029: 1027: 1018:. Archived from 999: 993: 992: 990: 989: 983: 970: 964: 963: 961: 959: 940: 934: 933: 931: 919: 913: 912: 910: 908: 891: 885: 884: 882: 880: 869: 863: 862: 856: 848: 842: 841: 835: 827: 821: 820: 818: 806: 800: 799: 796:Insidexploration 788: 782: 781: 779: 777: 762: 756: 755: 753: 751: 742:. Archived from 736: 721:Energy in Greece 710: 705: 704: 696: 691: 690: 689: 620: 586:desulphurisation 497: 437: 379:Turbo generators 364:Energomachexport 360:Stein Industries 332:Ptolemaida Basin 295: 276:edit on Wikidata 204: 137: 135: 104: 103: 101: 100: 99: 94: 90: 87: 86: 85: 82: 31: 19: 1180: 1179: 1175: 1174: 1173: 1171: 1170: 1169: 1135: 1134: 1129: 1123: 1118: 1108: 1106: 1098: 1094: 1093: 1089: 1079: 1077: 1069: 1065: 1064: 1060: 1040: 1039: 1035: 1025: 1023: 1022:on 2 April 2015 1007: 1001: 1000: 996: 987: 985: 981: 972: 971: 967: 957: 955: 954:on 2 April 2015 942: 941: 937: 929: 921: 920: 916: 906: 904: 903:on 2 April 2015 897: 893: 892: 888: 878: 876: 871: 870: 866: 854: 850: 849: 845: 833: 829: 828: 824: 816: 808: 807: 803: 798:. 7 April 2019. 790: 789: 785: 775: 773: 772:on 18 July 2009 764: 763: 759: 749: 747: 738: 737: 733: 729: 706: 699: 692: 687: 685: 682: 615: 605: 598: 566:calorific value 541: 533:North Macedonia 518: 491: 473: 444: 431: 425:Lake Vegoritida 391:Stein Industrie 352: 279: 257:Stein Industrie 245:Turbo generator 236:2 x 300 MW 198: 164: 133: 131: 97: 95: 91: 88: 83: 80: 78: 76: 75: 17: 12: 11: 5: 1178: 1176: 1168: 1167: 1162: 1157: 1152: 1147: 1137: 1136: 1133: 1132: 1122: 1121:External links 1119: 1117: 1116: 1105:. 1 April 2015 1087: 1058: 1033: 1005: 994: 965: 935: 914: 886: 864: 843: 822: 801: 783: 757: 730: 728: 725: 724: 723: 718: 712: 711: 697: 681: 678: 675: 674: 666: 665: 662: 659: 656: 653: 650: 647: 643: 642: 639: 636: 633: 630: 627: 624: 613: 602:Greenhouse gas 597: 594: 545:carbon dioxide 540: 537: 516: 472: 469: 443: 440: 429:Lake Polyfytos 410:belt conveyors 387:Sulzer boilers 351: 348: 296:) is a 600 MW 281: 280: 273: 270: 269: 266: 260: 259: 242: 238: 237: 234: 230: 229: 226: 225: 222: 221: 217: 216: 213: 206: 205: 196:Polyfytos Lake 193: 189: 188: 185: 181: 180: 175: 171: 170: 166: 165: 163: 162: 156: 154: 150: 149: 143: 139: 138: 128: 122: 121: 118: 114: 113: 110: 106: 105: 73: 69: 68: 59: 55: 54: 49: 45: 44: 41: 37: 36: 33: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 1177: 1166: 1163: 1161: 1158: 1156: 1153: 1151: 1148: 1146: 1143: 1142: 1140: 1128: 1125: 1124: 1120: 1104: 1097: 1091: 1088: 1075: 1068: 1062: 1059: 1054: 1050: 1046: 1045: 1037: 1034: 1021: 1017: 1013: 1009: 998: 995: 984:on 2015-04-02 980: 976: 969: 966: 953: 949: 945: 939: 936: 928: 924: 918: 915: 902: 898: 890: 887: 874: 868: 865: 860: 853: 847: 844: 839: 832: 826: 823: 819:. p. 14. 815: 811: 805: 802: 797: 793: 787: 784: 771: 767: 761: 758: 746:on 2013-01-07 745: 741: 735: 732: 726: 722: 719: 717: 714: 713: 709: 708:Energy portal 703: 698: 695: 694:Greece portal 684: 679: 672: 667: 663: 660: 657: 654: 651: 648: 645: 644: 640: 637: 634: 631: 628: 625: 622: 621: 617: 609: 603: 596:Emission data 595: 593: 591: 587: 582: 577: 575: 571: 567: 562: 558: 554: 550: 549:air pollution 546: 538: 536: 534: 530: 526: 521: 519: 510: 508: 504: 503:district heat 501: 495: 490: 486: 482: 478: 470: 468: 466: 460: 458: 454: 450: 441: 439: 435: 430: 426: 422: 418: 415: 411: 407: 403: 398: 396: 392: 388: 384: 380: 375: 373: 369: 365: 361: 357: 349: 347: 345: 341: 337: 333: 329: 324: 322: 318: 314: 310: 306: 302: 301:power station 299: 294:ΑΗΣ Αμυνταίου 291: 287: 277: 271: 267: 265: 261: 258: 254: 253:Sulzer boiler 250: 246: 243: 240: 239: 235: 232: 231: 227: 223: 218: 214: 211: 207: 202: 197: 194: 190: 186: 182: 179: 176: 172: 167: 161: 158: 157: 155: 151: 147: 144: 140: 129: 127: 123: 119: 115: 111: 107: 102: 74: 70: 67: 63: 60: 56: 53: 50: 46: 43:ΑΗΣ Αμυνταίου 42: 40:Official name 38: 34: 30: 25: 20: 1107:. Retrieved 1090: 1078:. Retrieved 1061: 1042: 1036: 1024:. Retrieved 1020:the original 1011: 997: 986:. Retrieved 979:the original 968: 956:. Retrieved 952:the original 938: 917: 905:. Retrieved 901:the original 889: 877:. Retrieved 867: 846: 825: 804: 795: 786: 774:. Retrieved 770:the original 760: 748:. Retrieved 744:the original 734: 578: 542: 522: 511: 506: 500:co-generated 474: 461: 448: 445: 399: 376: 353: 350:Construction 325: 285: 284: 210:Cogeneration 539:Environment 492: [ 432: [ 199: [ 153:Operator(s) 112:Operational 96: / 72:Coordinates 1139:Categories 1130:(in Greek) 1008:emissions" 988:2015-04-02 727:References 664:4,095,373 529:Ptolemaida 477:waste heat 370:and Greek 362:, Russian 298:coal-fired 661:4,197,293 658:5,016,496 655:5,056,625 652:4,609,479 649:4,396,383 646:5,256,992 604:emissions 442:Operation 421:Feedwater 336:coalfield 84:21°41′2″E 81:40°37′8″N 1155:Amyntaio 925:(2012). 680:See also 481:Amyntaio 414:open-pit 385:, while 305:Amyntaio 142:Owner(s) 62:Amyntaio 58:Location 1109:2 April 1080:1 April 1026:1 April 958:1 April 907:1 April 879:1 April 776:1 April 750:1 April 673:, 2015 574:mercury 485:Filotas 402:lignite 346:(PPC). 340:Balkans 317:lignite 178:Lignite 132: ( 48:Country 669:Data: 570:sulfur 525:Kozani 465:Syriza 453:Kardia 372:Biokat 313:Greece 268:600 MW 109:Status 52:Greece 1099:(XLS) 1070:(PDF) 1016:CERTH 982:(PDF) 930:(PDF) 855:(PDF) 834:(PDF) 817:(PDF) 641:2014 498:with 496:] 489:Levea 436:] 303:near 290:Greek 274:[ 203:] 148:(PPC) 1111:2015 1082:2015 1028:2015 960:2015 909:2014 881:2015 778:2015 752:2015 638:2013 635:2012 632:2011 629:2010 626:2009 623:2008 610:(in 572:and 555:and 527:and 487:and 400:The 366:and 358:and 134:1987 130:1987 120:1983 1049:doi 612:tCO 561:NOx 559:by 551:by 383:LMZ 307:in 255:by 249:LMZ 247:by 215:Yes 1141:: 1101:. 1072:. 1014:. 1010:. 946:. 857:. 836:. 794:. 618:) 581:EU 576:. 535:. 520:. 517:th 515:MW 494:el 457:EU 434:el 419:. 397:. 374:. 323:. 311:, 292:: 251:; 201:el 64:, 1113:. 1084:. 1055:. 1051:: 1030:. 1006:2 991:. 962:. 932:. 911:. 883:. 780:. 754:. 616:e 614:2 288:( 278:] 212:? 136:)

Index


Greece
Amyntaio
Western Macedonia
40°37′8″N 21°41′2″E / 40.61889°N 21.68389°E / 40.61889; 21.68389
Commission date
Public Power Corporation
Public Power Corporation
Lignite
Polyfytos Lake
el
Cogeneration
Turbo generator
LMZ
Sulzer boiler
Stein Industrie
Nameplate capacity
edit on Wikidata
Greek
coal-fired
power station
Amyntaio
Western Macedonia
Greece
lignite
Amyntaio coal mine
Western Macedonia Lignite Center
Ptolemaida Basin
coalfield
Balkans

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.