420:
684:
653:
627:
35:
133:
799:
230:
478:
in 2000 caused traffic congestion in the town, officials from
Ashland, Southborough, and Westborough asked that their three stations open within a 90-day span to avoid overwhelming any one town with traffic. The three stations, which together cost $ 14.2 million, were originally scheduled to open on
479:
December 31, 2001. However, they were delayed by several factors, including a debate on whether to build full-length high-level platforms. Those were ruled out because they interfere with freight traffic; instead, smaller "mini-high" platforms plus long low platforms were built.
494:, officials later agreed to the MBTA's plans for a 700-space lot. The new station was built to the west of the town center, where land was available for large parking lots. The downtown station still stands, and is currently used as a doctor's office.
825:
489:
opened on June 22, 2002, followed by
Ashland on August 24. Construction of the station cost $ 7.4 million. Although the town originally insisted on no more than 450 parking spaces in an attempt to limit traffic on
830:
497:
A $ 2.5 million renovation including restoration of the footbridge and resurfacing of the platforms took place in 2023. The station was temporarily closed on August 26 from to
December 23, 2023.
431:(later Ashland, after the town separated from Hopkinton in 1846) was in use by 1838. Improvements to the station were made around 1846. Passenger service to the old
456:
835:
67:
233:
229:
452:
444:
248:
697:
448:
136:
747:
598:
527:
763:
803:
321:
777:
840:
482:
432:
243:
436:
329:
440:
400:
306:
256:
557:
491:
463:
419:
404:
683:
652:
626:
396:
55:
403:. It has a long driveway leading from the south parking lot to the intersection of West Union Street (
34:
701:
486:
724:
716:
573:
407:) and Voyagers Lane. Like the other stations on the line west of Framingham, Ashland serves as a
392:
339:
316:
263:
743:
594:
672:
658:
641:
615:
700:(Press release). Massachusetts Bay Transportation Authority. August 27, 2002. Archived from
475:
520:
542:
471:
462:
In 1994, service to
Worcester was restored as mitigation for delays with reopening the
102:
819:
781:
467:
408:
344:
268:
113:
466:. Service initially ran nonstop from Framingham to Worcester, but intermediate
780:. Massachusetts Bay Transportation Authority. December 1, 2023. Archived from
82:
69:
810:
766:(Press release). Massachusetts Bay Transportation Authority. July 31, 2023.
798:
673:"New stations popular with commuters: Town's rail stop will open Aug. 24"
740:
A Field Guide to
Southern New England Railroad Depots and Freight Houses
459:
only. Service to
Worcester ended entirely in 1975, but resumed in 1994.
764:"Ashland Station to Receive $ 2.5 Million in Repairs and Improvements"
418:
470:
stops were added later as mitigation for delays in reopening the
826:
MBTA Commuter Rail stations in
Middlesex County, Massachusetts
575:
Report of the
Directors of the Boston and Worcester Railroad
578:. Boston and Worcester Railroad. June 1, 1846. p. 10.
435:–built downtown station ended on April 24, 1960, when
305:
227:
831:
Railway stations in the United States opened in 2002
589:Humphrey, Thomas J. & Clark, Norton D. (1985).
371:
215:
199:
190:
182:
177:
169:
164:
156:
148:
143:
127:
119:
108:
98:
61:
49:
44:
21:
423:The previous downtown station photographed in 2016
717:"Parking scarcity makes commuting by train tough"
593:. Boston Street Railway Association. p. 24.
521:"Changes to Transit Service in the MBTA district"
648:. pp. 148, 150 – via Newspapers.com.
616:"They'll wait for the stations a little longer"
541:Central Transportation Planning Staff (2019).
545:. Massachusetts Bay Transportation Authority.
16:Railway station in Ashland, Massachusetts, US
8:
591:Boston's Commuter Rail: The First 150 Years
514:
512:
510:
368:
299:
288:
221:
33:
18:
679:. p. 111 – via Newspapers.com.
310:
302:
237:
224:
622:. p. 28 – via Newspapers.com.
506:
671:Saltzman, Jonathan (August 11, 2002).
132:
7:
836:2002 establishments in Massachusetts
640:Saltzman, Jonathan (June 16, 2002).
559:The Boston Almanac for the Year 1838
778:"Alerts: Framingham/Worcester Line"
742:. Branch Line Press. p. 125.
614:Flanagan, Ted (October 16, 2001).
14:
528:Boston Street Railway Association
797:
715:Gregg, John (November 1, 1998).
698:"MBTA Opens New Ashland Station"
682:
651:
625:
411:station with 678 parking spots.
228:
131:
53:Pleasant Street near High Street
203:931 (weekday average boardings)
1:
39:Ashland station in March 2022
727:– via Newspapers.com.
642:"Hear that whistle blowin'"
543:"2018 Commuter Rail Counts"
433:Shepley, Rutan and Coolidge
857:
437:Boston and Albany Railroad
330:Boston and Albany Railroad
257:Framingham/Worcester Line
738:Roy, John H. Jr. (2007).
401:Framingham/Worcester Line
378:
367:
363:
359:
307:New York Central Railroad
287:
283:
279:
220:
211:
207:
195:
32:
556:Dickinson, S.N. (1838).
474:. After the opening of
152:678 spaces ($ 4.00 fee)
841:Ashland, Massachusetts
804:Ashland station (MBTA)
424:
397:Ashland, Massachusetts
56:Ashland, Massachusetts
806:at Wikimedia Commons
784:on December 13, 2023.
422:
704:on October 11, 2002.
443:was cut to stops at
723:. pp. West 1,
519:Belcher, Jonathan.
83:42.2616°N 71.4826°W
79: /
45:General information
425:
393:MBTA Commuter Rail
311:Following station
303:Preceding station
238:Following station
225:Preceding station
802:Media related to
386:
385:
382:
381:
355:
354:
351:
350:
275:
274:
165:Other information
88:42.2616; -71.4826
848:
801:
786:
785:
774:
768:
767:
760:
754:
753:
735:
729:
728:
721:The Boston Globe
712:
706:
705:
694:
688:
687:
686:
680:
668:
662:
656:
655:
649:
637:
631:
630:
629:
623:
611:
605:
604:
586:
580:
579:
570:
564:
563:
553:
547:
546:
538:
532:
531:
525:
516:
464:Old Colony Lines
439:service west of
399:. It serves the
369:
300:
289:
232:
222:
135:
134:
94:
93:
91:
90:
89:
84:
80:
77:
76:
75:
72:
37:
19:
856:
855:
851:
850:
849:
847:
846:
845:
816:
815:
795:
790:
789:
776:
775:
771:
762:
761:
757:
750:
737:
736:
732:
714:
713:
709:
696:
695:
691:
681:
670:
669:
665:
650:
639:
638:
634:
624:
613:
612:
608:
601:
588:
587:
583:
572:
571:
567:
555:
554:
550:
540:
539:
535:
523:
518:
517:
508:
503:
417:
389:Ashland station
374:
347:
334:
324:
294:
293:Former services
271:
251:
186:August 24, 2002
87:
85:
81:
78:
73:
70:
68:
66:
65:
54:
40:
28:
27:
26:
17:
12:
11:
5:
854:
852:
844:
843:
838:
833:
828:
818:
817:
814:
813:
811:MBTA – Ashland
794:
793:External links
791:
788:
787:
769:
755:
748:
730:
707:
689:
663:
632:
606:
599:
581:
565:
548:
533:
505:
504:
502:
499:
472:Greenbush Line
416:
413:
384:
383:
380:
379:
376:
375:
372:
365:
364:
361:
360:
357:
356:
353:
352:
349:
348:
342:
337:
335:
332:
327:
325:
319:
313:
312:
309:
304:
296:
295:
292:
285:
284:
281:
280:
277:
276:
273:
272:
266:
261:
259:
254:
252:
246:
240:
239:
236:
226:
218:
217:
213:
212:
209:
208:
205:
204:
201:
197:
196:
193:
192:
188:
187:
184:
180:
179:
175:
174:
171:
167:
166:
162:
161:
158:
154:
153:
150:
146:
145:
141:
140:
129:
125:
124:
121:
117:
116:
114:side platforms
110:
106:
105:
103:Worcester Line
100:
96:
95:
63:
59:
58:
51:
47:
46:
42:
41:
38:
30:
29:
24:
23:
22:
15:
13:
10:
9:
6:
4:
3:
2:
853:
842:
839:
837:
834:
832:
829:
827:
824:
823:
821:
812:
809:
808:
807:
805:
800:
792:
783:
779:
773:
770:
765:
759:
756:
751:
749:9780942147087
745:
741:
734:
731:
726:
722:
718:
711:
708:
703:
699:
693:
690:
685:
678:
674:
667:
664:
660:
654:
647:
643:
636:
633:
628:
621:
617:
610:
607:
602:
600:9780685412947
596:
592:
585:
582:
577:
576:
569:
566:
562:. p. 49.
561:
560:
552:
549:
544:
537:
534:
529:
522:
515:
513:
511:
507:
500:
498:
495:
493:
488:
484:
480:
477:
473:
469:
468:park and ride
465:
460:
458:
454:
450:
446:
442:
438:
434:
430:
427:A station at
421:
414:
412:
410:
409:park-and-ride
406:
402:
398:
394:
390:
377:
370:
366:
362:
358:
346:
341:
338:
336:
331:
328:
326:
323:
318:
315:
314:
308:
301:
298:
297:
291:
290:
286:
282:
278:
270:
269:South Station
265:
262:
260:
258:
255:
253:
250:
245:
242:
241:
235:
231:
223:
219:
214:
210:
206:
202:
198:
194:
189:
185:
181:
176:
172:
168:
163:
159:
155:
151:
147:
142:
138:
130:
126:
122:
118:
115:
111:
107:
104:
101:
97:
92:
64:
60:
57:
52:
48:
43:
36:
31:
20:
796:
782:the original
772:
758:
739:
733:
720:
710:
702:the original
692:
677:Boston Globe
676:
666:
646:Boston Globe
645:
635:
620:Boston Globe
619:
609:
590:
584:
574:
568:
558:
551:
536:
496:
483:Southborough
481:
461:
428:
426:
388:
387:
244:Southborough
144:Construction
659:second page
487:Westborough
453:Springfield
395:station in
128:Connections
86: /
62:Coordinates
820:Categories
501:References
457:Pittsfield
441:Framingham
429:Unionville
340:Framingham
317:Cordaville
264:Framingham
191:Passengers
157:Accessible
74:71°28′57″W
71:42°15′42″N
492:Route 135
445:Worcester
405:Route 135
333:Main Line
249:Worcester
170:Fare zone
109:Platforms
373:Location
216:Services
50:Location
476:Grafton
415:History
343:toward
320:toward
267:toward
247:toward
178:History
149:Parking
99:Line(s)
25:Ashland
746:
597:
455:, and
449:Palmer
391:is an
345:Boston
322:Albany
183:Opened
120:Tracks
524:(PDF)
137:MWRTA
744:ISBN
595:ISBN
485:and
234:MBTA
200:2018
160:Yes
139:: 5
822::
725:11
719:.
675:.
644:.
618:.
526:.
509:^
451:,
447:,
112:2
752:.
661:)
657:(
603:.
530:.
173:6
123:2
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.