in 2000 caused traffic congestion in the town, officials from Ashland, Southborough, and Westborough asked that their three stations open within a 90-day span to avoid overwhelming any one town with traffic. The three stations, which together cost $ 14.2 million, were originally scheduled to open on
479:
December 31, 2001. However, they were delayed by several factors, including a debate on whether to build full-length high-level platforms. Those were ruled out because they interfere with freight traffic; instead, smaller "mini-high" platforms plus long low platforms were built.
494:, officials later agreed to the MBTA's plans for a 700-space lot. The new station was built to the west of the town center, where land was available for large parking lots. The downtown station still stands, and is currently used as a doctor's office. 825: 489:
opened on June 22, 2002, followed by Ashland on August 24. Construction of the station cost $ 7.4 million. Although the town originally insisted on no more than 450 parking spaces in an attempt to limit traffic on
830: 497:
A $ 2.5 million renovation including restoration of the footbridge and resurfacing of the platforms took place in 2023. The station was temporarily closed on August 26 from to December 23, 2023.
431:(later Ashland, after the town separated from Hopkinton in 1846) was in use by 1838. Improvements to the station were made around 1846. Passenger service to the old 456: 835: 67: 233: 229: 452: 444: 248: 697: 448: 136: 747: 598: 527: 763: 803: 321: 777: 840: 482: 432: 243: 436: 329: 440: 400: 306: 256: 557: 491: 463: 419: 404: 683: 652: 626: 396: 55: 403:. It has a long driveway leading from the south parking lot to the intersection of West Union Street ( 34: 701: 486: 724: 716: 573: 407:) and Voyagers Lane. Like the other stations on the line west of Framingham, Ashland serves as a 392: 339: 316: 263: 743: 594: 672: 658: 641: 615: 700:(Press release). Massachusetts Bay Transportation Authority. August 27, 2002. Archived from 475: 520: 542: 471: 462:
In 1994, service to Worcester was restored as mitigation for delays with reopening the
102: 819: 781: 467: 408: 344: 268: 113: 466:. Service initially ran nonstop from Framingham to Worcester, but intermediate 780:. Massachusetts Bay Transportation Authority. December 1, 2023. Archived from 82: 69: 810: 766:(Press release). Massachusetts Bay Transportation Authority. July 31, 2023. 798: 673:"New stations popular with commuters: Town's rail stop will open Aug. 24" 740:
A Field Guide to Southern New England Railroad Depots and Freight Houses
459:
only. Service to Worcester ended entirely in 1975, but resumed in 1994.
764:"Ashland Station to Receive $ 2.5 Million in Repairs and Improvements" 418: 470:
stops were added later as mitigation for delays in reopening the
826:
MBTA Commuter Rail stations in Middlesex County, Massachusetts
575:
Report of the Directors of the Boston and Worcester Railroad
578:. Boston and Worcester Railroad. June 1, 1846. p. 10. 435:–built downtown station ended on April 24, 1960, when 305: 227: 831:
Railway stations in the United States opened in 2002
589:Humphrey, Thomas J. & Clark, Norton D. (1985). 371: 215: 199: 190: 182: 177: 169: 164: 156: 148: 143: 127: 119: 108: 98: 61: 49: 44: 21: 423:The previous downtown station photographed in 2016 717:"Parking scarcity makes commuting by train tough" 593:. Boston Street Railway Association. p. 24. 521:"Changes to Transit Service in the MBTA district" 648:. pp. 148, 150 – via Newspapers.com. 616:"They'll wait for the stations a little longer" 541:Central Transportation Planning Staff (2019). 545:. Massachusetts Bay Transportation Authority. 16:Railway station in Ashland, Massachusetts, US 8: 591:Boston's Commuter Rail: The First 150 Years 514: 512: 510: 368: 299: 288: 221: 33: 18: 679:. p. 111 – via Newspapers.com. 310: 302: 237: 224: 622:. p. 28 – via Newspapers.com. 506: 671:Saltzman, Jonathan (August 11, 2002). 132: 7: 836:2002 establishments in Massachusetts 640:Saltzman, Jonathan (June 16, 2002). 559:The Boston Almanac for the Year 1838 778:"Alerts: Framingham/Worcester Line" 742:. Branch Line Press. p. 125. 614:Flanagan, Ted (October 16, 2001). 14: 528:Boston Street Railway Association 797: 715:Gregg, John (November 1, 1998). 698:"MBTA Opens New Ashland Station" 682: 651: 625: 411:station with 678 parking spots. 228: 131: 53:Pleasant Street near High Street 203:931 (weekday average boardings) 1: 39:Ashland station in March 2022 727:– via Newspapers.com. 642:"Hear that whistle blowin'" 543:"2018 Commuter Rail Counts" 433:Shepley, Rutan and Coolidge 857: 437:Boston and Albany Railroad 330:Boston and Albany Railroad 257:Framingham/​Worcester Line 738:Roy, John H. Jr. (2007). 401:Framingham/Worcester Line 378: 367: 363: 359: 307:New York Central Railroad 287: 283: 279: 220: 211: 207: 195: 32: 556:Dickinson, S.N. (1838). 474:. After the opening of 152:678 spaces ($ 4.00 fee) 841:Ashland, Massachusetts 804:Ashland station (MBTA) 424: 397:Ashland, Massachusetts 56:Ashland, Massachusetts 806:at Wikimedia Commons 784:on December 13, 2023. 422: 704:on October 11, 2002. 443:was cut to stops at 723:. pp. West 1, 519:Belcher, Jonathan. 83:42.2616°N 71.4826°W 79: /  45:General information 425: 393:MBTA Commuter Rail 311:Following station 303:Preceding station 238:Following station 225:Preceding station 802:Media related to 386: 385: 382: 381: 355: 354: 351: 350: 275: 274: 165:Other information 88:42.2616; -71.4826 848: 801: 786: 785: 774: 768: 767: 760: 754: 753: 735: 729: 728: 721:The Boston Globe 712: 706: 705: 694: 688: 687: 686: 680: 668: 662: 656: 655: 649: 637: 631: 630: 629: 623: 611: 605: 604: 586: 580: 579: 570: 564: 563: 553: 547: 546: 538: 532: 531: 525: 516: 464:Old Colony Lines 439:service west of 399:. It serves the 369: 300: 289: 232: 222: 135: 134: 94: 93: 91: 90: 89: 84: 80: 77: 76: 75: 72: 37: 19: 856: 855: 851: 850: 849: 847: 846: 845: 816: 815: 795: 790: 789: 776: 775: 771: 762: 761: 757: 750: 737: 736: 732: 714: 713: 709: 696: 695: 691: 681: 670: 669: 665: 650: 639: 638: 634: 624: 613: 612: 608: 601: 588: 587: 583: 572: 571: 567: 555: 554: 550: 540: 539: 535: 523: 518: 517: 508: 503: 417: 389:Ashland station 374: 347: 334: 324: 294: 293:Former services 271: 251: 186:August 24, 2002 87: 85: 81: 78: 73: 70: 68: 66: 65: 54: 40: 28: 27: 26: 17: 12: 11: 5: 854: 852: 844: 843: 838: 833: 828: 818: 817: 814: 813: 811:MBTA – Ashland 794: 793:External links 791: 788: 787: 769: 755: 748: 730: 707: 689: 663: 632: 606: 599: 581: 565: 548: 533: 505: 504: 502: 499: 472:Greenbush Line 416: 413: 384: 383: 380: 379: 376: 375: 372: 365: 364: 361: 360: 357: 356: 353: 352: 349: 348: 342: 337: 335: 332: 327: 325: 319: 313: 312: 309: 304: 296: 295: 292: 285: 284: 281: 280: 277: 276: 273: 272: 266: 261: 259: 254: 252: 246: 240: 239: 236: 226: 218: 217: 213: 212: 209: 208: 205: 204: 201: 197: 196: 193: 192: 188: 187: 184: 180: 179: 175: 174: 171: 167: 166: 162: 161: 158: 154: 153: 150: 146: 145: 141: 140: 129: 125: 124: 121: 117: 116: 114:side platforms 110: 106: 105: 103:Worcester Line 100: 96: 95: 63: 59: 58: 51: 47: 46: 42: 41: 38: 30: 29: 24: 23: 22: 15: 13: 10: 9: 6: 4: 3: 2: 853: 842: 839: 837: 834: 832: 829: 827: 824: 823: 821: 812: 809: 808: 807: 805: 800: 792: 783: 779: 773: 770: 765: 759: 756: 751: 749:9780942147087 745: 741: 734: 731: 726: 722: 718: 711: 708: 703: 699: 693: 690: 685: 678: 674: 667: 664: 660: 654: 647: 643: 636: 633: 628: 621: 617: 610: 607: 602: 600:9780685412947 596: 592: 585: 582: 577: 576: 569: 566: 562:. p. 49. 561: 560: 552: 549: 544: 537: 534: 529: 522: 515: 513: 511: 507: 500: 498: 495: 493: 488: 484: 480: 477: 473: 469: 468:park and ride 465: 460: 458: 454: 450: 446: 442: 438: 434: 430: 427:A station at 421: 414: 412: 410: 409:park-and-ride 406: 402: 398: 394: 390: 377: 370: 366: 362: 358: 346: 341: 338: 336: 331: 328: 326: 323: 318: 315: 314: 308: 301: 298: 297: 291: 290: 286: 282: 278: 270: 269:South Station 265: 262: 260: 258: 255: 253: 250: 245: 242: 241: 235: 231: 223: 219: 214: 210: 206: 202: 198: 194: 189: 185: 181: 176: 172: 168: 163: 159: 155: 151: 147: 142: 138: 130: 126: 122: 118: 115: 111: 107: 104: 101: 97: 92: 64: 60: 57: 52: 48: 43: 36: 31: 20: 796: 782:the original 772: 758: 739: 733: 720: 710: 702:the original 692: 677:Boston Globe 676: 666: 646:Boston Globe 645: 635: 620:Boston Globe 619: 609: 590: 584: 574: 568: 558: 551: 536: 496: 483:Southborough 481: 461: 428: 426: 388: 387: 244:Southborough 144:Construction 659:second page 487:Westborough 453:Springfield 395:station in 128:Connections 86: / 62:Coordinates 820:Categories 501:References 457:Pittsfield 441:Framingham 429:Unionville 340:Framingham 317:Cordaville 264:Framingham 191:Passengers 157:Accessible 74:71°28′57″W 71:42°15′42″N 492:Route 135 445:Worcester 405:Route 135 333:Main Line 249:Worcester 170:Fare zone 109:Platforms 373:Location 216:Services 50:Location 476:Grafton 415:History 343:toward 320:toward 267:toward 247:toward 178:History 149:Parking 99:Line(s) 25:Ashland 746:  597:  455:, and 449:Palmer 391:is an 345:Boston 322:Albany 183:Opened 120:Tracks 524:(PDF) 137:MWRTA 744:ISBN 595:ISBN 485:and 234:MBTA 200:2018 160:Yes 139:: 5 822:: 725:11 719:. 675:. 644:. 618:. 526:. 509:^ 451:, 447:, 112:2 752:. 661:) 657:( 603:. 530:. 173:6 123:2

Index


Ashland, Massachusetts
42°15′42″N 71°28′57″W / 42.2616°N 71.4826°W / 42.2616; -71.4826
Worcester Line
side platforms
MWRTA

MBTA
Southborough
Worcester
Framingham/​Worcester Line
Framingham
South Station
New York Central Railroad
Cordaville
Albany
Boston and Albany Railroad
Framingham
Boston
MBTA Commuter Rail
Ashland, Massachusetts
Framingham/Worcester Line
Route 135
park-and-ride

Shepley, Rutan and Coolidge
Boston and Albany Railroad
Framingham
Worcester
Palmer

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.