1076:
504:
490:
285:
and
Congress leader. However, the project went into limbo as the following state governments failed to follow it. In 2007, Manmohan Singh's government finally put a stamp of approval on it. The joint venture agreement was signed on 6 November 2007 and the company was incorporated on 22 November 2007.
294:
The railways need the plant because of the demands of a globalising economy and mega projects of the
Railways such as the planned Dedicated Freight Corridors across the country. The electricity from this plant will be utilized by Indian Railways for running
611:
581:
707:
335:, approved the railways' proposal for using direct power supply from Central generating agencies from the 15 per cent unallocated central share of power. Railways are saving about Rs. 50
270:, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar.
641:
1213:
339:
per annum due to implementation of these schemes for using direct power supply from NTPC/Central generating agencies. EPC is being undertaken by public sector major
767:
659:
619:
589:
735:
277:
and veteran leader
Satyendra Narain Singh conceived the proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to
537:
918:
1188:
559:
399:
The beneficiaries for the power generated from NTPC are Indian
Railways (90%) and Bihar State (10%). PPA has been signed with both of the beneficiaries.
939:
352:
332:
1030:
71:
721:
1208:
959:
913:
883:
863:
833:
828:
818:
517:
1020:
1015:
878:
838:
1198:
1193:
984:
964:
903:
893:
823:
1112:
923:
858:
848:
843:
760:
383:). Coal requirement for the project is 5 MTPA. The coal linkage of 5 MTPA has been accorded from Pachra & Pachra south block,
853:
808:
803:
340:
1138:
1005:
898:
798:
974:
873:
753:
1051:
1025:
949:
908:
888:
1000:
979:
954:
545:
388:
267:
55:
384:
567:
1203:
202:
282:
274:
286:
Commercial generation started from Unit-1 and 2 (2X250MW) of
Bharatiya Rail Bijli Company Limited in 2016.
1061:
328:
372:
119:
251:
136:
17:
296:
255:
140:
664:
209:
1075:
380:
693:
1046:
868:
247:
132:
708:"BHEL commissions 250 MW thermal plant in Bihar and other Top Corporate News of the day"
324:
679:
1182:
1153:
1143:
509:
1107:
1102:
776:
495:
360:
356:
312:
278:
153:
612:"PM DR Manmohan Singh Approves NTPC Project in Bihar Promised by Then CM SN Sinha"
1163:
316:
308:
1133:
1128:
1097:
1010:
813:
485:
376:
243:
351:
The project site is situated on a state highway which is 25 km south of
86:
73:
1158:
503:
304:
263:
224:
1148:
259:
215:
359:, 9 km from ‘Nabinagar Road’ Railway Station and 100 km from
320:
745:
736:"BHEL Commissions Third 250-MW Unit at Nabinagar Power Plant in Bihar"
1056:
969:
336:
300:
59:
171:
749:
642:"First unit of NTPC-Rail JV synchronised at Bihar's Nabinagar"
660:"Aurangabad power plant unit to be commissioned in September"
391:
which is approximately 215 km from the project site.
722:"NTPC commissions 250 MW unit of Bhartiya Rail Bijlee Co"
38:
Location of the
Nabinagar (4X250MW) Thermal Power Station
327:
in the eastern and western regions of the country. The
1121:
1090:
1083:
1039:
993:
932:
791:
784:
582:"S N Sinha's brainchild NTPC project gets approval"
208:
177:
167:
162:
146:
128:
118:
110:
102:
65:
51:
43:
31:
375:which is allocated from the upper stream of the
761:
8:
331:has, in view of the high tariff charged by
1087:
788:
768:
754:
746:
28:
940:Indira Gandhi Super Thermal Power Project
406:
371:Water requirement for the project is 60
1214:Energy infrastructure completed in 2016
529:
648:. Press Trust of India. 20 March 2016.
960:Nabinagar Super Thermal Power Project
518:Nabinagar Super Thermal Power Project
7:
240:Bhartiya Rail Bijlee Company Limited
18:Bhartiya Rail Bijlee Company Limited
985:Patratu Super Thermal Power Project
965:Patratu Super Thermal Power Project
1189:Coal-fired power stations in Bihar
25:
1074:
502:
488:
163:Thermal power station
945:Nabinagar Thermal Power Project
538:"High drama in power-plant row"
236:Nabinagar Thermal Power Station
32:Nabinagar Thermal Power Station
1:
124:3 out of 4 units commissioned
1209:2016 establishments in Bihar
975:Vallur Thermal Power Project
560:"Protest stalls power plant"
950:Kanti Thermal Power Station
1230:
1199:Railway companies of India
1194:Aurangabad district, Bihar
980:Meja Thermal Power Station
680:"Press Information Bureau"
389:Central Coalfields Limited
268:Aurangabad district, Bihar
1072:
694:"Nabinagar Thermal Power"
385:North Karanpura Coalfield
221:
186:
182:
36:
333:State Electricity Boards
199:Make and model
646:Business Standard India
618:. India. Archived from
588:. India. Archived from
283:Prime Minister of India
275:Chief Minister of Bihar
262:thermal power plant at
258:. It installs a 4X 250
210:Nameplate capacity
111:Construction began
564:www.telegraphindia.com
542:www.telegraphindia.com
329:Union Cabinet of India
191:Units operational
416:Date of Commissioning
373:cubic feet per second
178:Power generation
252:Ministry of Railways
137:Ministry of Railways
120:Commission date
570:on 7 December 2017.
548:on 7 December 2017.
256:Government of India
141:Government of India
83: /
56:Aurangabad district
665:The Times of India
403:Installed capacity
290:Need for the plant
242:is a wholly owned
238:Project (NTPS) of
194:under construction
1176:
1175:
1172:
1171:
1113:Tapovan Vishnugad
1070:
1069:
479:
478:
381:Indrapuri Barrage
232:
231:
168:Primary fuel
16:(Redirected from
1221:
1088:
1078:
789:
770:
763:
756:
747:
740:
739:
732:
726:
725:
718:
712:
711:
704:
698:
697:
690:
684:
683:
676:
670:
669:
656:
650:
649:
638:
632:
631:
629:
627:
608:
602:
601:
599:
597:
578:
572:
571:
566:. Archived from
556:
550:
549:
544:. Archived from
534:
512:
507:
506:
498:
493:
492:
491:
413:Capacity (In MW)
407:
225:edit on Wikidata
98:
97:
95:
94:
93:
88:
84:
81:
80:
79:
76:
29:
21:
1229:
1228:
1224:
1223:
1222:
1220:
1219:
1218:
1204:Son River basin
1179:
1178:
1177:
1168:
1117:
1079:
1066:
1035:
989:
928:
864:North Karanpura
780:
774:
744:
743:
734:
733:
729:
720:
719:
715:
706:
705:
701:
692:
691:
687:
678:
677:
673:
658:
657:
653:
640:
639:
635:
625:
623:
616:Hindustan Times
610:
609:
605:
595:
593:
586:Hindustan Times
580:
579:
575:
558:
557:
553:
536:
535:
531:
526:
508:
501:
494:
489:
487:
484:
405:
397:
369:
349:
297:electric trains
292:
248:Indian Railways
228:
158:
133:Indian Railways
91:
89:
87:24.70°N 84.08°E
85:
82:
77:
74:
72:
70:
69:
39:
23:
22:
15:
12:
11:
5:
1227:
1225:
1217:
1216:
1211:
1206:
1201:
1196:
1191:
1181:
1180:
1174:
1173:
1170:
1169:
1167:
1166:
1161:
1156:
1151:
1146:
1141:
1136:
1131:
1125:
1123:
1119:
1118:
1116:
1115:
1110:
1105:
1100:
1094:
1092:
1085:
1081:
1080:
1073:
1071:
1068:
1067:
1065:
1064:
1059:
1054:
1049:
1043:
1041:
1037:
1036:
1034:
1033:
1028:
1023:
1021:Jhanor-Gandhar
1018:
1013:
1008:
1003:
997:
995:
991:
990:
988:
987:
982:
977:
972:
967:
962:
957:
952:
947:
942:
936:
934:
930:
929:
927:
926:
921:
916:
911:
906:
904:Talcher Kaniha
901:
896:
891:
886:
881:
876:
871:
866:
861:
856:
851:
846:
841:
836:
831:
826:
821:
816:
811:
806:
801:
795:
793:
786:
782:
781:
779:power stations
775:
773:
772:
765:
758:
750:
742:
741:
727:
713:
699:
685:
671:
651:
633:
622:on 5 June 2011
603:
592:on 5 June 2011
573:
551:
528:
527:
525:
522:
521:
520:
514:
513:
499:
483:
480:
477:
476:
473:
470:
467:
463:
462:
459:
456:
453:
449:
448:
447:Commissioned
445:
442:
439:
435:
434:
431:
428:
425:
421:
420:
417:
414:
411:
404:
401:
396:
393:
368:
365:
348:
345:
325:Madhya Pradesh
291:
288:
230:
229:
222:
219:
218:
212:
206:
205:
200:
196:
195:
192:
188:
187:
184:
183:
180:
179:
175:
174:
169:
165:
164:
160:
159:
157:
156:
150:
148:
144:
143:
130:
126:
125:
122:
116:
115:
112:
108:
107:
104:
100:
99:
67:
63:
62:
53:
49:
48:
45:
41:
40:
37:
34:
33:
24:
14:
13:
10:
9:
6:
4:
3:
2:
1226:
1215:
1212:
1210:
1207:
1205:
1202:
1200:
1197:
1195:
1192:
1190:
1187:
1186:
1184:
1165:
1162:
1160:
1157:
1155:
1152:
1150:
1147:
1145:
1142:
1140:
1137:
1135:
1132:
1130:
1127:
1126:
1124:
1120:
1114:
1111:
1109:
1106:
1104:
1101:
1099:
1096:
1095:
1093:
1089:
1086:
1082:
1077:
1063:
1060:
1058:
1055:
1053:
1050:
1048:
1045:
1044:
1042:
1038:
1032:
1029:
1027:
1024:
1022:
1019:
1017:
1014:
1012:
1009:
1007:
1004:
1002:
999:
998:
996:
992:
986:
983:
981:
978:
976:
973:
971:
968:
966:
963:
961:
958:
956:
953:
951:
948:
946:
943:
941:
938:
937:
935:
931:
925:
922:
920:
917:
915:
912:
910:
907:
905:
902:
900:
897:
895:
892:
890:
887:
885:
882:
880:
877:
875:
872:
870:
867:
865:
862:
860:
857:
855:
852:
850:
847:
845:
842:
840:
837:
835:
832:
830:
827:
825:
822:
820:
817:
815:
812:
810:
807:
805:
802:
800:
797:
796:
794:
790:
787:
783:
778:
771:
766:
764:
759:
757:
752:
751:
748:
737:
731:
728:
723:
717:
714:
709:
703:
700:
695:
689:
686:
681:
675:
672:
667:
666:
661:
655:
652:
647:
643:
637:
634:
621:
617:
613:
607:
604:
591:
587:
583:
577:
574:
569:
565:
561:
555:
552:
547:
543:
539:
533:
530:
523:
519:
516:
515:
511:
510:Energy portal
505:
500:
497:
486:
481:
475:Commissioned
474:
472:2021 December
471:
468:
465:
464:
461:Commissioned
460:
458:2019 February
457:
454:
451:
450:
446:
443:
440:
437:
436:
433:Commissioned
432:
429:
426:
423:
422:
418:
415:
412:
409:
408:
402:
400:
395:Beneficiaries
394:
392:
390:
386:
382:
378:
374:
366:
364:
362:
358:
354:
346:
344:
342:
338:
334:
330:
326:
322:
318:
314:
310:
306:
302:
298:
289:
287:
284:
280:
276:
273:In 1989, the
271:
269:
265:
261:
257:
253:
249:
245:
241:
237:
226:
220:
217:
213:
211:
207:
204:
201:
198:
197:
193:
190:
189:
185:
181:
176:
173:
170:
166:
161:
155:
152:
151:
149:
145:
142:
138:
134:
131:
127:
123:
121:
117:
113:
109:
105:
101:
96:
68:
64:
61:
57:
54:
50:
46:
42:
35:
30:
27:
19:
1103:Lata Tapovan
944:
730:
716:
702:
688:
674:
663:
654:
645:
636:
624:. Retrieved
620:the original
615:
606:
594:. Retrieved
590:the original
585:
576:
568:the original
563:
554:
546:the original
541:
532:
496:India portal
398:
370:
361:Gaya Airport
350:
313:Chhattisgarh
293:
279:Rajiv Gandhi
272:
239:
235:
233:
154:NTPC Limited
92:24.70; 84.08
26:
924:Vindhyachal
626:23 February
596:23 February
317:Maharashtra
309:West Bengal
147:Operator(s)
106:Operational
90: /
66:Coordinates
1183:Categories
1031:Kayamkulam
933:Coal (JVs)
869:Ramagundam
809:Bongaigaon
792:Coal (own)
524:References
444:2017 April
430:2016 March
377:Sone River
244:subsidiary
1154:Ranganadi
1144:Koteshwar
1040:Gas (JVs)
1016:Faridabad
994:Gas (own)
914:Telangana
884:Singrauli
834:Kahalgaon
829:Gadarwara
819:Darlipali
305:Jharkhand
264:Nabinagar
1047:Agartala
919:Unchahar
879:Simhadri
839:Khargone
482:See also
347:Location
129:Owner(s)
52:Location
1164:Tuirial
1062:Tripura
1006:Auraiya
899:Talcher
894:Solapur
824:Farakka
799:Barauni
785:Thermal
419:status
321:Gujarat
246:of the
78:84°05′E
75:24°42′N
44:Country
1139:Kopili
1134:Kameng
1129:Doyang
1108:Rammam
1098:Koldam
874:Rihand
367:Inputs
281:, the
214:1,000
103:Status
1159:Tehri
1084:Hydel
1057:RGPPL
1052:Assam
1026:Kawas
1011:Dadri
970:NSPCL
909:Tanda
889:Sipat
859:Mauda
849:Kudgi
844:Korba
814:Dadri
357:Barun
355:from
337:crore
301:Bihar
223:[
60:Bihar
47:India
1149:Pare
1001:Anta
955:Meja
854:Lara
804:Barh
777:NTPC
628:2007
598:2007
410:Unit
353:NH-2
341:BHEL
323:and
234:The
203:BHEL
172:Coal
114:2012
1122:JVs
1091:Own
469:250
455:250
441:250
427:250
387:of
299:in
266:in
1185::
662:.
644:.
614:.
584:.
562:.
540:.
363:.
343:.
319:,
315:,
311:,
307:,
303:,
260:MW
254:,
250:,
216:MW
139:,
135:,
58:,
769:e
762:t
755:v
738:.
724:.
710:.
696:.
682:.
668:.
630:.
600:.
466:4
452:3
438:2
424:1
379:(
227:]
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.