35:
430:
hydrocarbons per day, and 11.3 million standard cubic metres of gas per day. There is a single production train with four stages of separation with the first stage operating at a pressure of 103. Electricity generation was powered by three 24 MW Rolls-Royce/GEC ERB-124C gas turbines. The topside accommodation was for 240 people. There were 21 topside modules and the topsides weight was 33,000 tonnes.
434:
million standard cubic metres of gas per day. There is a single production train with three stages of separation with the first stage operating at a pressure of 102 bar. Electric power is provided from Brae A and Brae B by subsea cable. The topside accommodation was for 160 people. The topsides weight was 18,500 tonnes. Fabrication details are shown in the table.
42:
433:
The topsides for East Brae were designed by
Matthew Hall Engineering which was awarded the contract in October 1988. Initially there were facilities for 13 oil wells, and four gas injection wells and 13 spare slots. The production capacity was 120,000 barrels of liquid hydrocarbon per day, and 17.6
214:
The Fields are operated by TAQA Bratani and are located in UKCS block 16/7a. Three accumulations total about 70 million tonnes of oil liquids and a further 22 cubic kilometres of gas. The main platforms currently produce from underlying reserves, with regular infill drilling to identify and exploit
413:
The topsides for Brae Alpha (Brae South) were designed by
Matthew Hall Engineering which was awarded the contract in August 1979. Initially there were facilities for 19 oil production wells, 14 water injection wells, two gas injection wells and 11 spare slots. The production capacity was 100,000
429:
The topsides for Brae Bravo (Brae North) were designed by
Matthew Hall Engineering which was awarded the contract in October 1983. Initially there were facilities for 12 oil production wells, three gas injection wells and 19 spare slots. The production capacity was 75,000 barrels of liquid
422:(NGL) per day and 4.25 million standard cubic metres of gas per day. There are two production trains each with three stages of separation with the first stage operating at the exceptionally high initial pressure, for that time, of 248
219:
fields in the area produce through facilities on the platforms, extending their viability into the future. Gas is exported to St Fergus, Scotland via the SAGE pipeline system and oil is exported via the
Forties system.
426:. Electricity generation was powered by four 25 MW Rolls-Royce SK-30 gas turbines. The topside accommodation was for 240 people. There were 14 topside modules and the topsides weight was 31,000 tonnes.
672:
834:
719:
34:
692:
211:
word for hillside. The field was discovered in 1974 by well 16/7-1 drilled by a semi-submersible rig Odin Drill for operator Pan Ocean.
667:
854:
739:
159:
100:
824:
869:
849:
785:
864:
829:
419:
859:
724:
Rift-Related Coarse-Grained
Submarine Fan Reservoirs; the Brae Play, South Viking Graben, North Sea
781:
735:
696:
727:
216:
208:
843:
415:
720:"The Discovery and Development of the Brae Area Fields, U.K. South Viking Graben"
423:
155:
731:
115:
102:
228:
The hydrocarbon reservoirs in the Brae field have the following properties.
204:
72:
201:
151:
147:
61:
811:
Matthew Hall
Engineering publicity brochure n.d. but c. 1990
143:
762:. Ledbury: Oilfield Publications Limited. pp. 69–81.
215:
undrained pockets in the Brae stratigraphy. A number of
630:14 producers, 14 water injection, 2 gas injection
182:
170:
165:
139:
131:
94:
86:
78:
68:
57:
23:
673:Energy use and conservation in the United Kingdom
402:682 billion cubic feet; 22 billion cubic metres
8:
20:
776:Department of Trade and Industry (1994).
499:
436:
230:
684:
758:Oilfield Publications Limited (1985).
534:Drilling, production, accommodation
531:Drilling, production, accommodation
488:Trafalgar House Offshore Fabricators
41:
7:
807:
805:
803:
801:
799:
797:
771:
769:
753:
751:
668:Energy policy of the United Kingdom
376:204 million bbl; 21 million tonnes
373:65 million bbl; 9.0 million tonnes
370:267 million bbl; 40 million tonnes
418:of oil per day, 12,000 barrels of
14:
693:"Northern/Central North Sea Map"
232:Brae field reservoir properties
40:
33:
633:12 production; 3 gas injection
501:Brae platforms key facts
438:Brae platforms – construction
1:
780:. London: HMSO. p. 140.
760:The North Sea Platform Guide
342:Pressure & temperature
886:
394:Recoverable reserves, gas
381:Recoverable reserves, NGL
367:Recoverable reserves, oil
49:Location of Brae oil field
207:. The name comes from a
28:
855:Engie oil and gas fields
732:10.1306/13652181M1153810
446:Fabrication contractor
397:155 billion cubic feet
350:7,000 psi, 240 °F
345:7,200 psi, 240 °F
870:Oil fields of Scotland
545:58°47’32”N 01°20’51”E
542:58°41’33”N 01°16’54”E
355:Bubble point pressure
267:12,000-13,500 ft
850:BP oil and gas fields
718:Pye, Malcolm (2018).
254:Upper Jurassic sands
176:1976 (Central sector)
865:North Sea oil fields
726:. pp. 155–162.
830:DTI Brown Book 2001
502:
474:McDermott Scotland
460:McDermott Scotland
439:
420:Natural Gas Liquids
384:33 million bbl NGL
233:
183:Start of production
178:1977 (South sector)
174:1975 (North sector)
112: /
500:
452:Installation date
437:
409:Topside facilities
231:
16:Scottish oil field
825:DECC Fields Index
778:The Energy Report
659:
658:
649:Production start
498:
497:
406:
405:
194:
193:
877:
812:
809:
792:
791:
773:
764:
763:
755:
746:
745:
715:
709:
708:
706:
704:
695:. Archived from
689:
594:Topsides weight
503:
440:
234:
224:Field reservoirs
127:
126:
124:
123:
122:
117:
113:
110:
109:
108:
105:
87:Offshore/onshore
64:, United Kingdom
44:
43:
37:
21:
885:
884:
880:
879:
878:
876:
875:
874:
840:
839:
821:
816:
815:
810:
795:
788:
775:
774:
767:
757:
756:
749:
742:
717:
716:
712:
702:
700:
699:on 4 April 2009
691:
690:
686:
681:
664:
411:
329:Carbon dioxide
272:12,000 ft
259:Upper Jurassic
226:
189:
187:
177:
175:
120:
118:
114:
111:
106:
103:
101:
99:
98:
53:
52:
51:
50:
47:
46:
45:
17:
12:
11:
5:
883:
881:
873:
872:
867:
862:
857:
852:
842:
841:
838:
837:
832:
827:
820:
819:External links
817:
814:
813:
793:
786:
765:
747:
740:
710:
683:
682:
680:
677:
676:
675:
670:
663:
660:
657:
656:
653:
650:
646:
645:
642:
639:
635:
634:
631:
628:
627:Wells planned
624:
623:
620:
617:
613:
612:
609:
606:
605:Accommodation
602:
601:
598:
597:32,000 tonnes
595:
591:
590:
587:
584:
580:
579:
576:
573:
569:
568:
567:22,000 tonnes
565:
564:18,600 tonnes
562:
561:Jacket weight
558:
557:
554:
551:
547:
546:
543:
540:
536:
535:
532:
529:
525:
524:
521:
518:
514:
513:
510:
507:
496:
495:
492:
489:
486:
482:
481:
478:
475:
472:
468:
467:
464:
461:
458:
454:
453:
450:
447:
444:
410:
407:
404:
403:
400:
398:
395:
391:
390:
388:
387:6 million bbl
385:
382:
378:
377:
374:
371:
368:
364:
363:
361:
359:
356:
352:
351:
348:
346:
343:
339:
338:
335:
333:
330:
326:
325:
324:5,000 scf/bbl
322:
320:
319:1,400 scf/bbl
317:
316:Gas Oil Ratio
313:
312:
310:
307:
304:
300:
299:
296:
293:
290:
286:
285:
283:
281:
280:1,500 ft
278:
274:
273:
270:
268:
265:
261:
260:
257:
255:
252:
248:
247:
244:
241:
238:
225:
222:
217:subsea tieback
209:Scots language
192:
191:
190:1989 (Central)
184:
180:
179:
172:
168:
167:
163:
162:
141:
137:
136:
133:
129:
128:
96:
92:
91:
88:
84:
83:
80:
79:Location/block
76:
75:
70:
66:
65:
59:
55:
54:
48:
39:
38:
32:
31:
30:
29:
26:
25:
24:Brae oil field
15:
13:
10:
9:
6:
4:
3:
2:
882:
871:
868:
866:
863:
861:
858:
856:
853:
851:
848:
847:
845:
836:
833:
831:
828:
826:
823:
822:
818:
808:
806:
804:
802:
800:
798:
794:
789:
783:
779:
772:
770:
766:
761:
754:
752:
748:
743:
741:9780891813958
737:
733:
729:
725:
721:
714:
711:
698:
694:
688:
685:
678:
674:
671:
669:
666:
665:
661:
654:
651:
648:
647:
643:
640:
638:Installation
637:
636:
632:
629:
626:
625:
621:
618:
615:
614:
610:
607:
604:
603:
600:40,000 tones
599:
596:
593:
592:
588:
585:
582:
581:
577:
574:
571:
570:
566:
563:
560:
559:
555:
552:
549:
548:
544:
541:
538:
537:
533:
530:
527:
526:
523:Steel jacket
522:
520:Steel jacket
519:
516:
515:
511:
508:
505:
504:
493:
490:
487:
484:
483:
479:
476:
473:
470:
469:
465:
462:
459:
456:
455:
451:
448:
445:
443:Installation
442:
441:
435:
431:
427:
425:
421:
417:
408:
401:
399:
396:
393:
392:
389:
386:
383:
380:
379:
375:
372:
369:
366:
365:
362:
360:
357:
354:
353:
349:
347:
344:
341:
340:
336:
334:
331:
328:
327:
323:
321:
318:
315:
314:
311:
308:
305:
302:
301:
297:
294:
291:
288:
287:
284:
282:
279:
276:
275:
271:
269:
266:
263:
262:
258:
256:
253:
250:
249:
245:
243:Brae Central
242:
239:
236:
235:
229:
223:
221:
218:
212:
210:
206:
203:
199:
185:
181:
173:
169:
166:Field history
164:
161:
157:
153:
149:
145:
142:
138:
134:
130:
125:
97:
93:
89:
85:
81:
77:
74:
71:
67:
63:
60:
56:
36:
27:
22:
19:
860:Marathon Oil
835:Marathon Oil
777:
759:
723:
713:
701:. Retrieved
697:the original
687:
550:Water depth
539:Coordinates
432:
428:
412:
309:0.64 %
306:0.64 %
289:API gravity
227:
213:
197:
195:
188:1988 (North)
186:1983 (South)
116:58.7°N 1.3°E
18:
616:Well slots
512:Brae Bravo
509:Brae Alpha
471:Brae Bravo
466:April 1982
457:Brae Alpha
277:Oil column
246:Brae North
240:Brae South
119: /
95:Coordinates
844:Categories
787:0115153802
679:References
652:July 1983
641:June 1982
485:Brae East
480:June 1987
477:Ardersier
463:Ardersier
358:3,688 psi
332:Up to 35%
298:47° (NGL)
251:Reservoir
198:Brae field
156:Nippon Oil
528:Function
506:Platform
494:May 1993
337:8 %
205:oil field
171:Discovery
121:58.7; 1.3
73:North Sea
703:8 August
662:See also
202:Scottish
152:GDF Suez
148:Centrica
140:Partners
132:Operator
90:offshore
62:Scotland
556:99.5 m
491:Methil
416:barrels
303:Sulfur
104:58°42′N
58:Country
784:
738:
583:Piles
553:112 m
264:Depth
237:Field
107:1°18′E
69:Region
655:1988
644:1987
572:Legs
517:Type
449:Site
200:is a
82:16/7a
782:ISBN
736:ISBN
705:2009
611:240
608:240
295:33°
292:37°
196:The
160:TAQA
135:TAQA
728:doi
622:34
619:46
589:36
586:36
424:bar
846::
796:^
768:^
750:^
734:.
722:.
578:8
575:8
158:,
154:,
150:,
146:,
144:BP
790:.
744:.
730::
707:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.