is located in the south tower of the new complex. It replaced a previous bus terminal located on the site where the north tower will be built. Unknown is the fate of the former CP Express & Transport Building dock door and limestone facade, which was incorporated into the previous GO bus
535:
of Toronto. Ivanhoe Cambridge bought 81 Bay Street (formerly 45 Bay Street) in 2007 and later acquired additional land and air rights over the rail corridor. In September 2014, Ivanhoe agreed with Metrolinx to build the new GO Bus Terminal at 81 Bay Street.
539:
CIBC was announced as the anchor tenant of the south tower (81 Bay Street) in April 2017, with construction beginning in June 2017. The south tower was scheduled to open in 2020 but was delayed until summer 2021. The
772: 1171: 475: 403:. The north tower is scheduled for completion in 2024. The base of the towers will be a four-storey podium housing retail space, including a flagship CIBC retail bank branch. 764: 1156: 678: 568:
has moved into a 132,000 square feet (12,300 m) facility for its Canadian headquarters at 81 Bay Street from 1950 Meadowvale Boulevard in Mississauga. The
1166: 1136: 1151: 595: 1141: 487: 126: 1051: 1131: 1025: 972: 463: 648: 516: 314: 243: 894: 555: 318: 741: 946: 1146: 451: 399:
The 50 storey north tower (141 Bay Street) will be built on the site of the former GO Transit bus terminal, located behind the
30: 1078: 997: 821: 439: 1161: 920: 794: 1111: 119: 407: 686: 569: 541: 361: 330: 503: 524: 558:
is the primary tenant of the complex with 1,750,000 square feet (163,000 m) or 60% of the leasable space.
400: 356:
The 49 storey south tower (81 Bay Street) was completed first, built on the site of a parking lot opposite the
410:, with varied topography: slopes and hills, horticulture, gardens, shade groves, balconies, and vista areas. 353:
The 2,900,000 square feet (270,000 m) complex will consist of two towers to be completed in two phases.
871: 559: 377: 342: 617: 1002: 512: 322: 310: 237: 294: 77: 618:"Construction kicks off on Bay Street mega-development, set to include towers, bus terminal, park" 532: 427: 418: 221: 1106: 321:(CIBC), consolidating approximately 15,000 staff from several CIBC-tenanted buildings in the 385: 373: 357: 562:
will occupy approximately 85,000 square feet (7,900 m) for its Canadian headquarters.
846: 381: 368:
and inter-city bus services, replacing the former terminal on Bay Street. A pedestrian
326: 765:"Sugar Wharf development's first phase to put 8,000 residents on Toronto's waterfront" 406:
At fourth floor level will be a one-acre, publicly accessible park, elevated over the
1125: 528: 414: 215: 590: 742:"Ivanhoé Cambridge and Hines Break Ground on CIBC SQUARE's Second Tower in Toronto" 653: 345:. The complex will also include a one-acre park elevated over the rail corridor. 389: 798: 365: 338: 306: 88: 141: 128: 1037: 565: 520: 334: 1083: 622: 256: 973:"CIBC SQUARE South Tower Welcomes Tenants as North Tower Work Advances" 302: 298: 102: 98: 369: 290: 112: 872:"Ivanhoé Cambridge and Hines acquire 141 Bay Street from Metrolinx" 596: 502: 1116: 1052:"Microsoft Canada announces new headquarters in downtown Toronto" 384:
walkway system further south below the railway corridor - to the
393: 895:"New GO Bus Terminal Slated for Massive 45-141 Bay Development" 317:. It serves as the new global operational headquarters for the 1101: 947:"Bay Park Centre Unveiled as 'CIBC Square' at Ground Breaking" 711: 269: 822:"Renderings Reveal Details for CIBC Square's Elevated Park" 1079:"Microsoft Canada Moves to the Heart of Downtown Toronto" 527:
parking lot), and designed by British architectural firm
341:
and other inter-city bus services, connected directly to
1117:
TABLE Fare + Social (food hall on the 4th level) website
413:
The overall complex was designed by British architects
1026:"The Boston Consulting Group to move into CIBC Square" 679:"New Union Station Bus Terminal (USBT) at CIBC SQUARE" 507:
South tower (81 Bay) under construction in March 2019.
1172:
Buildings and structures under construction in Canada
921:"CIBC Announced as Anchor Tenant for Bay Park Centre" 642: 640: 547:
Construction on the north tower began in March 2021.
998:"New Union Station Bus Terminal to Officially Open" 262: 252: 230: 208: 203: 195: 190: 182: 165: 157: 118: 108: 94: 83: 73: 65: 57: 52: 44: 23: 874:(Press release). Ivanhoé Cambridge. April 12, 2017 744:(Press release). Ivanhoé Cambridge. March 31, 2021 649:"CIBC to move head offices to new Bay Park Centre" 611: 609: 309:south of Front Street, is a joint development of 388:complex and ultimately to the under-development 285:(known during early stages of development as 8: 20: 673: 671: 325:, including its existing headquarters at 481:TABLE Fare + Social Food Hall at Level 4 582: 423: 795:"Bay Park Centre Park & Amenities" 493:Bridge access artwork by Nicolas Baier 1157:Skyscraper office buildings in Canada 1077:Peesker, Kevin (September 11, 2018). 763:Kalinowski, Tess (January 11, 2018). 7: 893:Matanis, Marc (September 30, 2014). 736: 734: 732: 706: 704: 1167:Hines Interests Limited Partnership 1137:Buildings and structures in Toronto 945:Novakovic, Stefan (June 21, 2017). 797:. Ivanhoé Cambridge. Archived from 775:from the original on April 13, 2019 616:McGillivray, Kate (June 21, 2017). 511:The development is being co-led by 1152:Canadian Imperial Bank of Commerce 319:Canadian Imperial Bank of Commerce 305:, Canada. The complex, located on 14: 1142:Modernist architecture in Canada 1112:CIBC Square on Ivanhoe Cambridge 486: 474: 462: 450: 438: 426: 329:. The complex also includes the 29: 971:Landau, Jack (August 6, 2021). 919:Landau, Jack (April 12, 2017). 820:Landau, Jack (August 3, 2018). 647:Wright, Lisa (April 12, 2017). 164: 1028:(Press release). July 25, 2017 1: 457:Level 4 cafe and common area 1132:Bank headquarters in Canada 1188: 570:Union Station Bus Terminal 542:Union Station Bus Terminal 362:Union Station Bus Terminal 360:. This tower includes the 331:Union Station Bus Terminal 544:opened in December 2020. 525:Toronto Parking Authority 519:using land acquired from 469:Rooftop garden at Level 4 372:links the complex to the 333:constructed on behalf of 267: 40: 28: 1102:Official project website 401:Dominion Public Building 560:Boston Consulting Group 523:(as well as city-owned 204:Design and construction 35:CIBC Square, March 2021 1147:Skyscrapers in Toronto 508: 1003:Government of Ontario 506: 186:241.3 m (South tower) 175:2024 (141 Bay Street) 142:43.64417°N 79.37750°W 1107:CIBC Square on Hines 1058:. September 11, 2018 801:on December 10, 2017 689:on November 16, 2020 396:lands farther east. 323:Greater Toronto Area 172:2021 (81 Bay Street) 166:Estimated completion 147:43.64417; -79.37750 138: /  74:Architectural style 53:General information 1006:. December 4, 2020 533:Adamson Associates 509: 419:Adamson Associates 222:Adamson Associates 61:Under construction 16:Toronto skyscraper 1162:Ivanhoé Cambridge 1056:TheCanadianTechie 599:Skyscraper Center 513:Ivanhoé Cambridge 311:Ivanhoé Cambridge 297:neighbourhood of 280: 279: 238:Ivanhoé Cambridge 209:Architecture firm 191:Technical details 1179: 1089: 1088: 1074: 1068: 1067: 1065: 1063: 1048: 1042: 1041: 1035: 1033: 1022: 1016: 1015: 1013: 1011: 994: 988: 987: 985: 983: 968: 962: 961: 959: 957: 942: 936: 935: 933: 931: 916: 910: 909: 907: 905: 890: 884: 883: 881: 879: 868: 862: 861: 859: 857: 843: 837: 836: 834: 832: 817: 811: 810: 808: 806: 791: 785: 784: 782: 780: 760: 754: 753: 751: 749: 738: 727: 726: 724: 722: 708: 699: 698: 696: 694: 685:. Archived from 675: 666: 665: 663: 661: 644: 635: 634: 632: 630: 613: 604: 603: 598: 587: 566:Microsoft Canada 490: 478: 466: 454: 442: 433:CIBC Square Logo 430: 408:railway corridor 386:One Yonge Street 380:, expanding the 374:Scotiabank Arena 358:Scotiabank Arena 276: 273: 271: 153: 152: 150: 149: 148: 143: 139: 136: 135: 134: 131: 33: 21: 1187: 1186: 1182: 1181: 1180: 1178: 1177: 1176: 1122: 1121: 1098: 1093: 1092: 1076: 1075: 1071: 1061: 1059: 1050: 1049: 1045: 1038:Canada Newswire 1031: 1029: 1024: 1023: 1019: 1009: 1007: 996: 995: 991: 981: 979: 970: 969: 965: 955: 953: 951:urbantoronto.ca 944: 943: 939: 929: 927: 925:urbantoronto.ca 918: 917: 913: 903: 901: 899:urbantoronto.ca 892: 891: 887: 877: 875: 870: 869: 865: 855: 853: 845: 844: 840: 830: 828: 819: 818: 814: 804: 802: 793: 792: 788: 778: 776: 762: 761: 757: 747: 745: 740: 739: 730: 720: 718: 710: 709: 702: 692: 690: 677: 676: 669: 659: 657: 646: 645: 638: 628: 626: 615: 614: 607: 589: 588: 584: 579: 553: 501: 494: 491: 482: 479: 470: 467: 458: 455: 446: 443: 434: 431: 392:project on the 351: 293:complex in the 287:Bay Park Centre 268: 253:Main contractor 248: 226: 178: 146: 144: 140: 137: 132: 129: 127: 125: 124: 48:Bay Park Centre 36: 17: 12: 11: 5: 1185: 1183: 1175: 1174: 1169: 1164: 1159: 1154: 1149: 1144: 1139: 1134: 1124: 1123: 1120: 1119: 1114: 1109: 1104: 1097: 1096:External links 1094: 1091: 1090: 1069: 1043: 1017: 989: 963: 937: 911: 885: 863: 838: 812: 786: 755: 728: 700: 667: 636: 605: 581: 580: 578: 575: 552: 549: 500: 497: 496: 495: 492: 485: 483: 480: 473: 471: 468: 461: 459: 456: 449: 447: 444: 437: 435: 432: 425: 350: 347: 327:Commerce Court 278: 277: 265: 264: 260: 259: 254: 250: 249: 247: 246: 241: 234: 232: 228: 227: 225: 224: 219: 212: 210: 206: 205: 201: 200: 197: 193: 192: 188: 187: 184: 180: 179: 177: 176: 173: 169: 167: 163: 162: 159: 158:Groundbreaking 155: 154: 122: 116: 115: 110: 106: 105: 96: 92: 91: 85: 81: 80: 75: 71: 70: 69:Office complex 67: 63: 62: 59: 55: 54: 50: 49: 46: 42: 41: 38: 37: 34: 26: 25: 15: 13: 10: 9: 6: 4: 3: 2: 1184: 1173: 1170: 1168: 1165: 1163: 1160: 1158: 1155: 1153: 1150: 1148: 1145: 1143: 1140: 1138: 1135: 1133: 1130: 1129: 1127: 1118: 1115: 1113: 1110: 1108: 1105: 1103: 1100: 1099: 1095: 1086: 1085: 1080: 1073: 1070: 1062:September 11, 1057: 1053: 1047: 1044: 1039: 1027: 1021: 1018: 1005: 1004: 999: 993: 990: 978: 977:Urban Toronto 974: 967: 964: 952: 948: 941: 938: 926: 922: 915: 912: 900: 896: 889: 886: 878:September 12, 873: 867: 864: 852: 851:Urban Toronto 848: 847:"CIBC Square" 842: 839: 827: 826:Urban Toronto 823: 816: 813: 800: 796: 790: 787: 774: 770: 766: 759: 756: 743: 737: 735: 733: 729: 717: 713: 707: 705: 701: 688: 684: 680: 674: 672: 668: 656: 655: 650: 643: 641: 637: 625: 624: 619: 612: 610: 606: 601: 600: 592: 591:"CIBC Square" 586: 583: 576: 574: 571: 567: 563: 561: 557: 550: 548: 545: 543: 537: 534: 530: 529:WilkinsonEyre 526: 522: 518: 514: 505: 498: 489: 484: 477: 472: 465: 460: 453: 448: 441: 436: 429: 424: 422: 420: 416: 415:WilkinsonEyre 411: 409: 404: 402: 397: 395: 391: 387: 383: 379: 378:Union Station 375: 371: 367: 364:for regional 363: 359: 354: 348: 346: 344: 343:Union Station 340: 336: 332: 328: 324: 320: 316: 312: 308: 304: 300: 296: 292: 288: 284: 275: 266: 261: 258: 255: 251: 245: 242: 239: 236: 235: 233: 229: 223: 220: 217: 216:WilkinsonEyre 214: 213: 211: 207: 202: 198: 194: 189: 185: 181: 174: 171: 170: 168: 161:June 21, 2017 160: 156: 151: 123: 121: 117: 114: 111: 107: 104: 100: 97: 93: 90: 87:81 & 141 86: 82: 79: 76: 72: 68: 64: 60: 56: 51: 47: 43: 39: 32: 27: 22: 19: 1082: 1072: 1060:. Retrieved 1055: 1046: 1036:– via 1032:November 11, 1030:. Retrieved 1020: 1008:. Retrieved 1001: 992: 982:November 11, 980:. Retrieved 976: 966: 954:. Retrieved 950: 940: 928:. Retrieved 924: 914: 902:. Retrieved 898: 888: 876:. Retrieved 866: 854:. Retrieved 850: 841: 831:November 11, 829:. Retrieved 825: 815: 803:. Retrieved 799:the original 789: 777:. Retrieved 769:Toronto Star 768: 758: 746:. Retrieved 721:November 11, 719:. Retrieved 715: 693:November 11, 691:. Retrieved 687:the original 682: 658:. Retrieved 654:Toronto Star 652: 627:. Retrieved 621: 594: 585: 564: 554: 546: 538: 510: 445:Office Lobby 421:of Toronto. 412: 405: 398: 355: 352: 286: 282: 281: 95:Town or city 45:Former names 18: 1010:December 6, 716:CIBC Square 551:Key tenants 390:Sugar Wharf 283:CIBC Square 272:.cibcsquare 196:Floor count 145: / 120:Coordinates 24:CIBC Square 1126:Categories 956:August 15, 930:August 15, 904:August 15, 712:"The Park" 683:GO Transit 577:References 573:terminal. 366:GO Transit 339:GO Transit 307:Bay Street 295:South Core 133:79°22′39″W 130:43°38′39″N 89:Bay Street 856:March 12, 805:April 12, 779:April 13, 748:April 20, 660:April 12, 521:Metrolinx 370:skybridge 335:Metrolinx 231:Developer 78:Modernist 1084:LinkedIn 773:Archived 629:June 24, 623:CBC News 289:) is an 257:EllisDon 499:History 303:Ontario 299:Toronto 263:Website 109:Country 103:Ontario 99:Toronto 84:Address 417:, and 349:Design 291:office 183:Height 113:Canada 58:Status 597:CTBUH 517:Hines 315:Hines 244:Hines 1064:2018 1034:2021 1012:2020 984:2021 958:2023 932:2023 906:2023 880:2018 858:2019 833:2021 807:2017 781:2019 750:2021 723:2021 695:2021 662:2017 631:2017 556:CIBC 531:and 515:and 394:LCBO 382:PATH 376:and 337:for 313:and 274:.com 66:Type 270:www 1128:: 1081:. 1054:. 1000:. 975:. 949:. 923:. 897:. 849:. 824:. 771:. 767:. 731:^ 714:. 703:^ 681:. 670:^ 651:. 639:^ 620:. 608:^ 593:. 301:, 199:50 101:, 1087:. 1066:. 1040:. 1014:. 986:. 960:. 934:. 908:. 882:. 860:. 835:. 809:. 783:. 752:. 725:. 697:. 664:. 633:. 602:. 240:; 218:;

Index


Modernist
Bay Street
Toronto
Ontario
Canada
Coordinates
43°38′39″N 79°22′39″W / 43.64417°N 79.37750°W / 43.64417; -79.37750
WilkinsonEyre
Adamson Associates
Ivanhoé Cambridge
Hines
EllisDon
www.cibcsquare.com
office
South Core
Toronto
Ontario
Bay Street
Ivanhoé Cambridge
Hines
Canadian Imperial Bank of Commerce
Greater Toronto Area
Commerce Court
Union Station Bus Terminal
Metrolinx
GO Transit
Union Station
Scotiabank Arena
Union Station Bus Terminal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.