Knowledge

Celtic Array

Source 📝

340:. The National Grid expects to construct a 400 kV substation adjacent to the onshore Celtic Array wind farm substation, and to make the connection to the mainland electrical gridon the Wylfa Pentir overhead line. The wind farm at stage 2 was expected to consist of between 146 and 440 (15 MW to 4 MW) wind turbines, with up to 8 HVAC offshore substations plus potentially up to 4 HVDC offshore substations; the use of HVDC was not a preferred option. The wind farm would potentially have had up to 4 offshore accommodation platforms for servicing. 1064: 242:
roughly between the southwestern and southeastern development zones; additional Liverpool to Dublin shipping skirted close to the southern edge of the zone, as well as crossing the southeastern zone. To reduce collision risk an additional shipping buffer zone was recommended at the southern and southwestern edges of the southeastern development zone (Rhiannon). Considerations of the main shipping routes were a major factor in forming shapes of the development zones.
1050: 1078: 335:
By the stage 2 consultation (March 2014) the wind farm power export cables, landfall and national grid connection had been narrowed from 16 export cables with potential landfall and grid connection sites along the west English and north Welsh coasts, to 12 export cables making landfall at 4 sites in
241:
Significant shipping routes crossed the wind farm zone at several points, including: Liverpool to Belfast shipping crosses the zone roughly between the south-eastern and north-eastern development areas; shipping mainly tankers to the Mersey ports via the pilot station at Point Lynas cross the zone
167:
to develop the zone; a "zone appraisal report" published in 2012 split the area into 3 development zones, with large scale gaps between, primarily to prevent disruption to shipping; the three development zones were estimated to have a total capacity of between 2.9 and 5.4 GW. In 2012 a planning
808: 260:
In July 2014 plans for the wind farm were terminated by Centrica and Dong, due to the foundation requirements being beyond what was currently financially viable. One factor was the differing ground conditions (sand/rock) which would have required different foundation types, increasing costs.
222:
The site was split into three zones: a north-east zone of 359 km (139 sq mi) with 1 to 2 GW estimated capacity; a south-west zone of 255 km (98 sq mi) with 0.5 to 0.8 GW; and a south-eastern zone of 617 km (238 sq mi) with 1.4 to 2.6 GW.
817: 210:
was awarded the license to develop the Irish Sea round 3 zone; the zone had a total area of 2,200 km (850 sq mi) with an estimated potential of 4.2 GW through wind power generation. In March 2012 Centrica and
524:"Consideration of shipping traffic and adverse weather routes emerged as a key issue safe passage of navigation was one of the main reasons driving the shape and location of the Potential Development Areas" 750: 962: 792: 184: 203:
designated several areas of potential development, and began a competitive tender process to allocate the sites to developers. Zone development agreements were made in December 2009.
984: 858: 253:. In late 2012 the wind farm plan application for the northeast block was delayed based on concerns on its impact on shipping to the Isle of Man (such as that affecting the 684: 382: 329:
The wind farm site had a maximum area of 497 km (192 sq mi) with water depths of 36 to 83 m (118 to 272 ft) with a tidal range of up to 8.5m.
902: 271: 759: 1106: 973: 880: 948: 924: 800: 356: 1121: 1116: 537: 1101: 995: 567: 246: 869: 668: 254: 391: 59: 721: 913: 323: 226:
The sea bed of the wind farm zone consisted of sand/gravel, or glacial material including sand/gravel and boulders in
891: 837: 238:. Bedrock was located at between sea bed level and 100m below sea bed, with deeper levels at the west of the zone. 954: 326:
connection at Anglesey. The initial scoping report supposed wind turbines with between 5 MW and 15 MW capacity.
935: 1083: 187:
instigated studies to identify offshore wind sites for around 25 GW of generating capacity; the study, the
175:
In July 2014 the developers terminated plans for the wind farm due to unviable turbine foundation costs.
1055: 365: 310:
An initial scoping report was submitted in 2012; the proposed wind farm was on a site ~19 km from
245:
The south-east zone was the first to be taken forward, with a planning scoping report submitted to the
1031: 1021: 1011: 1063: 199:" phase of UK offshore development was announced, subsequently the OESEA plan was adopted, and the 192: 596: 408: 191:(OESEA1, 2009) identified up to 33 GW of potential offshore wind power within English and Welsh 702: 549: 426:
Centrica and DONG Energy establish joint venture to co-develop Round 3 Irish Sea wind farm zone
1111: 685:"Stage 1 consultation for Rhiannon Wind Farm, an offshore wind farm proposal in the Irish Sea" 424: 196: 145: 575: 384:
Round 3 Offshore Wind Site Selection at National and Project Levels - Non-Technical Summary
332:
Public consultation began in late 2012, the second consultation phase began in March 2014.
1069: 1095: 810:
Rhiannon Wind Farm Limited - Environmental Impact Assessment Offshore Scoping Report
656:
Rhiannon Wind Farm Limited - Environmental Impact Assessment Offshore Scoping Report
644:
Rhiannon Wind Farm Limited - Environmental Impact Assessment Offshore Scoping Report
632:
Rhiannon Wind Farm Limited - Environmental Impact Assessment Offshore Scoping Report
231: 200: 1077: 315: 212: 164: 153: 106: 614: 1045: 287: 273: 74: 61: 227: 219:, the Irish Sea wind farm development subsidiary, at a cost of £40 million. 149: 118: 47: 195:
at sea bed depth of less than 60 m (200 ft); In June 2008 the "
163:
for development in 2012, and in 2012 Centrica formed a joint venture with
130: 722:"Plans for Europe's largest off-shore wind farm due to be unveiled today" 337: 311: 207: 160: 102: 843: 319: 215:
formed a joint venture to develop the wind farm zone, acquiring 50% of
336:
North Anglesey connected by an underground cable to a substation at
473:
Environmental Impact Assessment Offshore Scoping Report (July 2012)
235: 358:
Supporting Information Relating to the Announcement of Round 3
322:, with a capacity of up to 2.2 GW; initial planning assumed a 168:
application for the southeastern zone was submitted, as the
410:
Centrica awarded Round Three offshore wind development zone
778:
5.3 (Box 5.1); 5.14-5.15 (Table 5.1); 5.47-5.50; 5.62-5.63
615:"Irish Sea windfarm proposals lodged with planning agency" 839:
Irish Sea Zone: Zonal Appraisal and Planning (ZAP) Report
185:
Department for Business, Enterprise and Regulatory Reform
752:
Rhiannon Wind Farm Connection - Strategic Options Report
550:"Celtic Array delay Irish Sea wind farm extension plans" 963:"3. Site Selection & Consideration of Alternatives" 597:"Celtic Array Rhiannon wind farm off Anglesey scrapped" 758:, 18 March 2014, 3. pp.10-13; 9. p.50, archived from 738:
3. Site Selection & Consideration of Alternatives
230:(mud/sand); below the sea bed surface strata include 953:, Centrica / DONG Energy, March 2014, archived from 703:"Isle of Man residents consulted on wind farm plans" 390:, The Crown Estate, pp. 1–2, 11, archived from 816:, Centrica / DONG Energy, July 2012, archived from 634:(July 2012) pp.1, 3, 5; fig.1.1, p.7; fig.3.3, p.17 117: 112: 98: 90: 53: 43: 29: 20: 1033:Celtic Array North East Potential Development Area 1023:Celtic Array South West Potential Development Area 189:Offshore Energy Strategic Environmental Assessment 535:5. Identification of Potential Development Areas 992:Stage 2 Preliminary Environmental Information 970:Stage 2 Preliminary Environmental Information 950:Stage 2 Preliminary Environmental Information 793:"Rhiannon Wind Farm (Round 3 Irish Sea Zone)" 8: 469:Rhiannon Wind Farm (Round 3 Irish Sea Zone) 217:Centrica Energy Renewable Investments Ltd. 17: 859:"6. ZAP Engineering Studies and Envelope" 673:, North Wales Daily Post, 29 October 2012 413:(Press release), Centrica, 8 January 2010 429:(Press release), Centrica, 21 March 2012 172:, with an estimated capacity of 2.2 GW. 464: 462: 460: 452:6. ZAP Engineering studies and envelope 348: 670:Rhiannon Wind Farm consultation starts 471:(Infrastructure Planning Commission). 7: 1107:Offshore wind farms in the Irish Sea 797:infrastructure.planningportal.gov.uk 568:"Centrica, Dong ditch R3 Irish Sea" 658:(July 2012) 4.4, p.18; 4.14, p.21; 364:, The Crown Estate, archived from 247:Infrastructure Planning Commission 159:The wind farm zone was awarded to 14: 1076: 1062: 1048: 925:"21. Conclusions and Next Steps" 842:, Centrica, 2012, archived from 720:Devine, Darren (31 March 2014), 255:Isle of Man Steam Packet Company 655: 643: 631: 472: 1122:Wind farms in Northern Ireland 574:, 31 July 2014, archived from 507: 498:14.4.4-14.4.7 Figs.14.9-14.29 495: 440:21. Conclusions and Next Steps 439: 1: 994:, vol. 1, archived from 972:, vol. 1, archived from 903:"14. Shipping and Navigation" 146:UK round 3 offshore wind farm 775: 534: 519: 483: 451: 1117:Ørsted (company) wind farms 1102:Round 3 offshore wind farms 737: 508:14. Shipping and Navigation 496:14. Shipping and Navigation 299:Rhiannon offshore wind farm 1138: 538:5.3.3-5.4.3; Figs.5.8-5.12 486:7.4.1-7.4.2; Figs.7.1, 7.2 468: 881:"7. Geology and Sediment" 689:www.nwcoastalforum.org.uk 127: 25: 985:"5. Project Description" 932:Rhiannon ZAP report 2012 910:Rhiannon ZAP report 2012 888:Rhiannon ZAP report 2012 866:Rhiannon ZAP report 2012 1084:Renewable energy portal 484:7. Geology and Sediment 314:, ~34 km from the 179:History and development 776:5. Project Description 1056:United Kingdom portal 726:www.walesonline.co.uk 646:(July 2012) 4.9, p.20 318:and ~60 km from 707:BBC News Isle of Man 183:In late 2007 the UK 510:14.15.1 Figs.14.52 283: /  71: /  1013:Rhiannon Wind Farm 941:on 20 January 2013 897:on 20 January 2013 875:on 20 January 2013 556:, 19 December 2012 265:Rhiannon wind farm 251:Rhiannon Wind Farm 193:territorial waters 170:Rhiannon Wind Farm 152:south east of the 765:on 3 January 2015 691:, 6 November 2012 520:Executive Summary 138: 137: 1129: 1086: 1081: 1080: 1072: 1067: 1066: 1058: 1053: 1052: 1051: 1037: 1027: 1017: 1002: 1001:on 29 April 2014 1000: 989: 980: 979:on 29 April 2014 978: 967: 958: 957:on 29 April 2014 942: 940: 934:, archived from 929: 920: 919:on 29 April 2014 918: 912:, archived from 907: 898: 896: 890:, archived from 885: 876: 874: 868:, archived from 863: 854: 853: 851: 846:on 29 April 2014 831: 830: 828: 823:on 29 April 2014 822: 815: 804: 803:on 29 April 2014 799:, archived from 779: 773: 767: 766: 764: 757: 747: 741: 735: 729: 728: 717: 711: 710: 699: 693: 692: 681: 675: 674: 665: 659: 653: 647: 641: 635: 629: 623: 622: 611: 605: 604: 593: 587: 586: 585: 583: 578:on 3 August 2014 564: 558: 557: 546: 540: 532: 526: 522:p.vii, Figs.6,7 517: 511: 505: 499: 493: 487: 481: 475: 466: 455: 449: 443: 437: 431: 430: 421: 415: 414: 405: 399: 398: 397:on 29 April 2014 396: 389: 379: 373: 372: 371:on 29 April 2014 370: 363: 353: 307: 306: 304: 303: 302: 300: 295: 294: 289: 288:53.675°N 4.238°W 284: 281: 280: 279: 276: 206:In January 2010 131:edit on Wikidata 86: 85: 83: 82: 81: 76: 75:53.771°N 4.411°W 72: 69: 68: 67: 64: 18: 1137: 1136: 1132: 1131: 1130: 1128: 1127: 1126: 1092: 1091: 1090: 1089: 1082: 1075: 1068: 1061: 1054: 1049: 1047: 1042: 1030: 1020: 1010: 998: 987: 983: 976: 965: 961: 947: 938: 927: 923: 916: 905: 901: 894: 883: 879: 872: 861: 857: 849: 847: 836: 826: 824: 820: 813: 807: 791: 787: 782: 774: 770: 762: 755: 749: 748: 744: 736: 732: 719: 718: 714: 709:, 26 March 2014 701: 700: 696: 683: 682: 678: 667: 666: 662: 654: 650: 642: 638: 630: 626: 613: 612: 608: 595: 594: 590: 581: 579: 566: 565: 561: 548: 547: 543: 533: 529: 518: 514: 506: 502: 494: 490: 482: 478: 467: 458: 450: 446: 438: 434: 423: 422: 418: 407: 406: 402: 394: 387: 381: 380: 376: 368: 361: 355: 354: 350: 346: 298: 296: 292: 290: 286: 285: 282: 277: 274: 272: 270: 269: 267: 249:in 2012 as the 181: 144:was a proposed 134: 113:Wind farm 79: 77: 73: 70: 65: 62: 60: 58: 57: 39: 12: 11: 5: 1135: 1133: 1125: 1124: 1119: 1114: 1109: 1104: 1094: 1093: 1088: 1087: 1073: 1070:Weather portal 1059: 1044: 1043: 1041: 1040: 1039: 1038: 1028: 1018: 1005: 1004: 1003: 981: 945: 944: 943: 921: 899: 877: 834: 833: 832: 788: 786: 783: 781: 780: 768: 742: 730: 712: 694: 676: 660: 648: 636: 624: 621:, 14 July 2012 619:BBC News Wales 606: 603:, 31 July 2014 588: 559: 541: 527: 512: 500: 488: 476: 456: 454:6.3; Table 6.1 444: 432: 416: 400: 374: 347: 345: 342: 293:53.675; -4.238 266: 263: 180: 177: 136: 135: 128: 125: 124: 121: 115: 114: 110: 109: 100: 96: 95: 92: 88: 87: 80:53.771; -4.411 55: 51: 50: 45: 41: 40: 38: 37: 36:United Kingdom 33: 31: 27: 26: 23: 22: 13: 10: 9: 6: 4: 3: 2: 1134: 1123: 1120: 1118: 1115: 1113: 1110: 1108: 1105: 1103: 1100: 1099: 1097: 1085: 1079: 1074: 1071: 1065: 1060: 1057: 1046: 1036:, 4C Offshore 1035: 1034: 1029: 1026:, 4C Offshore 1025: 1024: 1019: 1016:, 4C Offshore 1015: 1014: 1009: 1008: 1006: 997: 993: 986: 982: 975: 971: 964: 960: 959: 956: 952: 951: 946: 937: 933: 926: 922: 915: 911: 904: 900: 893: 889: 882: 878: 871: 867: 860: 856: 855: 845: 841: 840: 835: 819: 812: 811: 806: 805: 802: 798: 794: 790: 789: 784: 777: 772: 769: 761: 754: 753: 746: 743: 739: 734: 731: 727: 723: 716: 713: 708: 704: 698: 695: 690: 686: 680: 677: 672: 671: 664: 661: 657: 652: 649: 645: 640: 637: 633: 628: 625: 620: 616: 610: 607: 602: 601:www.bbc.co.uk 598: 592: 589: 577: 573: 569: 563: 560: 555: 551: 545: 542: 539: 536: 531: 528: 525: 521: 516: 513: 509: 504: 501: 497: 492: 489: 485: 480: 477: 474: 470: 465: 463: 461: 457: 453: 448: 445: 441: 436: 433: 428: 427: 420: 417: 412: 411: 404: 401: 393: 386: 385: 378: 375: 367: 360: 359: 352: 349: 343: 341: 339: 333: 330: 327: 325: 324:National grid 321: 317: 313: 308: 305: 264: 262: 258: 256: 252: 248: 243: 239: 237: 233: 232:boulder clays 229: 224: 220: 218: 214: 209: 204: 202: 198: 194: 190: 186: 178: 176: 173: 171: 166: 162: 157: 155: 151: 147: 143: 132: 126: 122: 120: 116: 111: 108: 104: 101: 97: 93: 89: 84: 56: 52: 49: 46: 42: 35: 34: 32: 28: 24: 19: 16: 1032: 1022: 1012: 1007:4C Offshore 996:the original 991: 974:the original 969: 955:the original 949: 936:the original 931: 914:the original 909: 892:the original 887: 870:the original 865: 848:, retrieved 844:the original 838: 825:, retrieved 818:the original 809: 801:the original 796: 771: 760:the original 751: 745: 733: 725: 715: 706: 697: 688: 679: 669: 663: 651: 639: 627: 618: 609: 600: 591: 580:, retrieved 576:the original 571: 562: 553: 544: 530: 523: 515: 503: 491: 479: 447: 435: 425: 419: 409: 403: 392:the original 383: 377: 366:the original 357: 351: 334: 331: 328: 309: 268: 259: 250: 244: 240: 225: 221: 216: 205: 201:Crown Estate 188: 182: 174: 169: 158: 142:Celtic Array 141: 139: 21:Celtic Array 15: 316:Isle of Man 291: / 213:DONG Energy 165:DONG Energy 154:Isle of Man 107:DONG Energy 78: / 54:Coordinates 1096:Categories 572:renews.biz 344:References 297: ( 275:53°40′30″N 63:53°46′16″N 740:3.42-3.63 278:4°14′17″W 228:Diamicton 150:Irish Sea 94:Cancelled 66:4°24′40″W 48:Irish Sea 1112:Centrica 850:28 April 827:28 April 554:BBC News 338:Rhosgoch 312:Anglesey 208:Centrica 161:Centrica 123:Offshore 103:Centrica 99:Owner(s) 44:Location 785:Sources 582:31 July 320:Cumbria 197:Round 3 148:in the 30:Country 91:Status 999:(PDF) 988:(PDF) 977:(PDF) 966:(PDF) 939:(PDF) 928:(PDF) 917:(PDF) 906:(PDF) 895:(PDF) 884:(PDF) 873:(PDF) 862:(PDF) 821:(PDF) 814:(PDF) 763:(PDF) 756:(PDF) 395:(PDF) 388:(PDF) 369:(PDF) 362:(PDF) 236:tills 129:[ 852:2014 829:2014 584:2014 442:21.2 234:and 140:The 119:Type 257:). 1098:: 990:, 968:, 930:, 908:, 886:, 864:, 795:, 724:, 705:, 687:, 617:, 599:, 570:, 552:, 459:^ 156:. 105:, 301:) 133:]

Index

Irish Sea
53°46′16″N 4°24′40″W / 53.771°N 4.411°W / 53.771; -4.411
Centrica
DONG Energy
Type
edit on Wikidata
UK round 3 offshore wind farm
Irish Sea
Isle of Man
Centrica
DONG Energy
Department for Business, Enterprise and Regulatory Reform
territorial waters
Round 3
Crown Estate
Centrica
DONG Energy
Diamicton
boulder clays
tills
Infrastructure Planning Commission
Isle of Man Steam Packet Company
53°40′30″N 4°14′17″W / 53.675°N 4.238°W / 53.675; -4.238 (Rhiannon offshore wind farm)
Anglesey
Isle of Man
Cumbria
National grid
Rhosgoch
Supporting Information Relating to the Announcement of Round 3
the original

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.