Knowledge (XXG)

Chashma Nuclear Power Complex

Source 📝

1840: 741: 755: 1895: 769: 527:
In 1990, the discussion over the funding of nuclear power plant was again held with France, which the French government agreed upon supplying a nuclear power reactor but later decided against it due to financial funding. In 1992, Pakistan eventually signed an agreement with China and construction of
456:
With growing demands of energy that was recognized in November 2006, the IAEA approved an agreement with Pakistan for new nuclear power plants to be built in the country with Chinese assistance when its Board of Governors of unanimously approved the safeguards agreement for any future Nuclear Power
603:
reactor with nominal difference of generating a gross electrical capacity of 325 MWe with a net output of about 300 MW. The reactor was designed and built in Pakistan with local industry's participation. Pakistani administration eventually financed the commercial nuclear power plant for industrial
567:
reactor with PAEC scientists and engineers designed in China with their nation's standards and regulations. It is the first Chinese export of a nuclear power plant. The reactor has a thermal capacity of 999 MW and a gross electrical capacity of 325 MW, with a net output of about 300 MW. Since its
722:
Since 2000, the Chashma Nuclear Power Plant offers training programs and certification in engineering and health physics. Its training centre is known as "CHASNUPP Centre of Nuclear Training" (or CHASCENT) offers a one-year postgraduate training program in engineering and a one-year post-diploma
684:
On July 14, 2023, Prime Minister of Pakistan Shahbaz Sharif performed the groundbreaking ceremony of the 1,200 MW Chashma Nuclear Power Plant Unit 5 (C-5). This significant project is expected to be completed within a span of seven to eight years, with an estimated cost of approximately $ 4.8
580:(PNRA) refrained the PAEC to start working on the second unit right away because the agency wanted to monitor the nuclear reactor for its safety and performances for at least 3-years— first year and half for nominal power and rest of the time at full power as this is the most critical phase. 519:
In 1986, Pakistan eventually entered in understanding with China when it signed an agreement on peaceful usage of commercial nuclear power technology. In 1989, China announced to sell of the reactor but the nuclear power plant did not operationalise due the PAEC scientists and engineers, who
713:
is an energy contractor that manages the on site operations of the nuclear power plant on behalf of Nuclear Regulatory Authority. The Pakistan Atomic Energy Commission has the responsibility of running the overall operations of the nuclear power plant including computerized machinery, plant
520:
eventually designed the reactor based on CNP-300 in China, and had to conduct several lengthy testing and pass PAEC required regulation phases, since China did not have the experience to sustain such a large and highly complex project— the experience Pakistan learned from running the
535:
overseeing the grid connections of the power plant. In 2004, the China National Nuclear Corporation was awarded contract for building a second unit based on the first reactor, followed by contracting for two more reactors in 2011.
498:, which would bring the nuclear power plant under International Atomic Energy Agency's watch. The French government agreed on this proposal and eventually signed a safeguard agreement with Bhutto administration on 18 March 1976. 482: 572:
of electricity as of 2019. The first reactor unit went on critical phase on 2 May 2000 and joined the nation's electricity grid system on 12 June 2000; it commenced its official operations on 14 September 2000.
648:
is also a CNP-300 type and is a 315-MW two-loop pressurized reactor with a gross capacity of 340 MW. Construction of the fourth reactor started on 18 December 2011 and it went critical on 15 March 2017. The
620:
On 28 April 2009, a general engineering and design contract for third and fourth units were signed with Shanghai Nuclear Engineering Research and Design Institute at the cost of US$ 2.37 Bn. Construction of
583:
In May 2004, the Nuclear Regulatory Authority allowed the Pakistan Atomic Energy Commission to sign the contract with the China National Nuclear Corporation (CNNC) to start the work on the second reactor,
2227: 2212: 726:
The simulator is used for providing training to the nuclear power plant operators. Apart from training nuclear plant operators the centre offers various engineering programs at diploma and degree levels.
1993: 604:
usage and reportedly contracted Chinese National Nuclear Corp. for overseeing the second unit to be installed, which was officially inaugurated on 10 May 2011 by former Prime Minister
501:
Despite the IAEA safeguard agreement and Zia administration's asking of CEA to fulfill the Chashma contract, France eventually halted the funding and ejected from the project in 1978.
2232: 512:
1.2 Bn funding from the Zia administration to lessen the dependence on energy infrastructure depended on Saudi oil aid and oil imports from UAE. In 1984–85, Pakistan reached out to
494:', conducted in 1974. In February 1976, French government began to show increased concern over the export of technology and Bhutto administration eventually suggested to sign a 1983: 1825: 661:
In March 2013, Pakistan and China agreed to build a fifth unit at the Chashma nuclear power plant site, eventually signing an agreement on 27 November 2017. It will be a
723:
training program in health physics. The facility is equipped with a full-scope training simulator, laboratories, a library, a physical models house, and an auditorium.
2217: 2013: 2008: 1156:"Agreement with China on Power Plant: "Safeguarded" By IAEA," PTV Television Network (Islamabad), 12 August 1992; Proliferation Issues, 20 August 1992, Pg. 16 2074: 2207: 1633: 244: 2018: 437:, the nuclear power plant is generating energy for industrial usage with four nuclear reactors with one being in construction phase in cooperation with 981:, a memorial speech delivered at the Memorial Reference held in the memory of Munir Ahmed in Islamabad, 28 April 2007, access date: 18 August 2020. 951:, a memorial speech delivered at the Memorial Reference held in the memory of Munir Ahmed in Islamabad, 28 April 2007, access date: 18 August 2020. 76: 2153: 1818: 1803: 2197: 1763:
Amer Manzoor, Mahmood Shah, and Zahid Salman, "Simulators; Training Methodology for Chashma," Nuclear Engineering International, 20 August 2002.
1089: 2137: 1909: 710: 2202: 2086: 1914: 1099: 843: 799: 706: 577: 2237: 830: 490:
Negotiations over the supply of commercial nuclear power plant became controversial and further complicated after India's nuclear test, '
2108: 1860: 281: 1408: 1811: 809: 702: 666: 532: 442: 285: 1015: 2080: 794: 694: 670: 609: 466: 236: 1879: 516:
over the funding of the project which the Russians were receptive of the offer but decided against participating in the project.
1798: 592:
design. The construction of the second unit start on 27 December 2005 and achieved its critical phase on 21 February 2011. The
2166: 1678: 1664: 1380: 477:
as its potential site. In 1974, Bhutto administration entered in negotiation over the supply of the nuclear power plant with
2003: 1952: 1867: 1785: 1646: 1568: 804: 1872: 1608: 1459: 714:
stimulators, and manufacturing of fuel bundles, producing fuel cycle, manufacturing tools, and employing of computers.
2058: 1998: 1855: 919: 521: 508:, and Pakistan begin the construction of the nuclear power plant in 1982–83. This 900 MW nuclear power plant received 961: 866: 629:
joined the nation's electricity grid system on 15 October 2016 and commenced its operations on 6 December 2016. The
596:
joined the nation's electricity grid system on 13 March 2011 and commenced its official operations on 17 May 2011.
1988: 974: 944: 545: 2103: 1834: 784: 774: 634: 556: 1543: 1490: 2126: 2044: 1515: 453:
in 1973 but the site was completed with China's joining the project, and later providing the reactor in 1993.
449:
which also provide funding for the site expansion. Planning of the Chashma Nuclear Power Plant took place with
481:, presenting the initial design by the Pakistan Atomic Energy Commission, and signed a contract with France's 487:(CEA) to provide funding of the nuclear power plant and a separate plutonium production facility in Khushab. 2171: 1964: 2176: 1385: 789: 653:
was connected to nation's grid system on 25 June 2017, and commenced its operations on 19 September 2017.
528:
the nuclear power plant site begin in 1993 with China and Pakistan financing US$ 900 Mn for this project.
1040: 531:
In 2000, the Chashma Nuclear Power Plant became operational when it joined the nation's grid system with
167: 1679:"IAEA helps streamline Pakistan's nuclear power programme : Nuclear Policies - World Nuclear News" 1138:"Pakistan: Details on Bhutto-Mitterrand News Conference," Islamabad Domestic Service, 21 February 1990 638: 560: 509: 605: 411: 2132: 1418: 353: 1328: 1246: 1166: 2066: 2039: 1658: 1413: 1095: 839: 568:
commissioning in 2000, the reactor has been kept at 90.3% capacity factor, generating 2,335.5
415: 56: 1115: 678: 474: 470: 423: 64: 1772:
Pakistan Atomic Energy Commission, "Chasnupp Centre for Nuclear Training," www.paec.gov/pk.
746: 698: 495: 446: 365: 1224: 2222: 1790: 1007: 491: 893: 2191: 760: 569: 465:
Planning and design phase of the Chashma Nuclear Power Plant began in 1973–75 by the
1441: 1583:"Pakistan's fourth nuclear power plant, built with China's assistance, goes online" 513: 674: 662: 338: 295: 2034: 736: 1705:"China to expedite delivery of N-plants: Indigenous capability being pursued" 625:
begin on 28 May 2011 and it went on its critical phase on 1 August 2016. The
91: 78: 1300: 1200: 1182: 754: 1739: 923: 1894: 1704: 1839: 427: 419: 60: 46: 600: 564: 333: 673:
had signed a cooperation agreement for the construction of a 1,200 MW
1799:
State Nuclear Power Technology Corporation (parent company of SNERDI)
478: 450: 1740:"CHASNUPP Center for Nuclear Training (CHASCENT) | Facilities | NTI" 1582: 1275: 504:
In 1980, Pakistan discussed funding of the nuclear power plant with
392: 1354: 505: 438: 383: 612:
of US$ 860 Mn, with Chinese banks loaning the nation US$ 350 Mn.
1001: 999: 997: 995: 993: 991: 989: 987: 1807: 1647:"Pakistan Expanding Nuclear Plant With New Hualong One Reactor" 1718: 1634:
China ‘to build third Hualong One nuclear reactor’ in Pakistan
1569:"Pakistan's Chashma 4 connected to grid - World Nuclear News" 1065:
Chashma Nuclear Power Plant to become operational in 1980-90.
1035: 1033: 1609:"China's CNNC to build Unit 5 of Chashma NPP in Pakistan" 2228:
Nuclear power stations with reactors under construction
2213:
Nuclear power stations using pressurized water reactors
1516:"Pakistan's Chashma 3 inaugurated - World Nuclear News" 1409:"China to build 2,200 MW N-power facility for Pakistan" 894:"Sino-Pak Nuclear Engagement -I: The Big 'Deal' | IPCS" 1225:
https://www.uxc.com/smr/uxc_SMRDetail.aspx?key=CNP-300
832:
China-Pakistan Relations : Implications for India
677:
nuclear reactor at the Chashma nuclear power plant in
693:
The Chashma Nuclear Power Plant site is owned by the
2014:
Nuclear Institute for Agriculture and Biology (NIAB)
1147:
May Fail," Nucleonics Week, 29 November 1990, Pg. 11
1088:
Rajagopalan, Rajesh; Mishra, Atul (12 August 2015).
2146: 2119: 2096: 2065: 2053: 2027: 1976: 1929: 1902: 1848: 379: 374: 364: 352: 301: 291: 277: 269: 259: 254: 232: 224: 210: 166: 115: 107: 70: 52: 42: 32: 23: 1613:Power Technology | Energy News and Market Analysis 867:"Contract for Chashma nuclear plant unit-2 signed" 1045:. Information Division, Embassy of Pakistan. 1982 555:The first reactor unit, C1, is a 300-MW two-loop 1269: 1267: 2019:Nuclear Institute for Food and Agriculture NIFA 1786:Groundbreaking of Chasnupp-2 Pakistan on Friday 563:(LEU) fuel. Its design is based on the Chinese 2233:Nuclear power stations using CPR-1000 reactors 1460:"Chasnupp-3 Connected to the Grid in Pakistan" 1381:"PM inaugurates 330MW Chashma-2 N-power plant" 838:. New Delhi: Vij Books India Private Limited. 1819: 1120:. Pakistan, Ministry of Foreign Affairs. 2005 1008:"Remembering Unsung Heroes: Munir Ahmed Khan" 920:"Pakistan gets IAEA approval for new N-plant" 8: 2075:National Electric Power Regulatory Authority 1077:Chashma Nuclear Power Plant Approved by NEC. 641:(LEU) fuel with a gross capacity of 340 MW. 1984:Institute of Nuclear Science and Technology 457:Plants that Pakistan will be constructing. 1826: 1812: 1804: 20: 1538: 1536: 1485: 1483: 1481: 1323: 1321: 1241: 1239: 1237: 1235: 1233: 1091:Nuclear South Asia: Keywords and Concepts 900:. Institute of Peace and Conflict Studies 2218:Energy infrastructure completed in 2000 962:"Pakistan gets approval for nuke plant" 821: 588:, which would be modeled as similar to 441:. The energy site is covered under the 2138:World Association of Nuclear Operators 1910:Multan Heavy Water Production Facility 1656: 1440:InpaperMagazine, From (18 July 2011). 2087:Pakistan Nuclear Regulatory Authority 1922:Radioactive Waste Management Facility 1915:Islamabad Uranium Conversion Facility 800:Pakistan Nuclear Regulatory Authority 578:Pakistan Nuclear Regulatory Authority 7: 1464:World Nuclear Industry Status Report 1442:"Expanding nuclear power generation" 1355:"Chashma plant second phase delayed" 1018:from the original on 18 January 2005 2109:Nuclear power programme in Pakistan 1861:Pakistan Nuclear Power Fuel Complex 979:Munir Ahmad Khan Memorial Reference 949:Munir Ahmad Khan Memorial Reference 2208:Nuclear power stations in Pakistan 1171:. Embassy of Pakistan. March 1995. 810:China National Nuclear Corporation 703:International Atomic Energy Agency 667:China National Nuclear Corporation 576:After the first reactor unit, the 533:China National Nuclear Corporation 443:International Atomic Energy Agency 14: 2081:Pakistan Atomic Energy Commission 1703:ul Haque, Ihtasham (9 May 2008). 1645:Proctor, Darrell (20 June 2023). 1274:Newspaper, the (17 August 2016). 795:Pakistan Atomic Energy Commission 695:Pakistan Atomic Energy Commission 671:Pakistan Atomic Energy Commission 484:Commissariat à l'énergie atomique 467:Pakistan Atomic Energy Commission 237:Pakistan Atomic Energy Commission 1893: 1880:Pakistan Atomic Research Reactor 1838: 1227:Info on CNP-300 at Ux Consulting 767: 753: 739: 711:China-Pakistan Power Plant Corp. 255:Nuclear power station 1329:"Chashma Nuclear Power Plant 2" 1301:"CHASNUPP-2 | Facilities | NTI" 1247:"Chashma Nuclear Power Plant 1" 1201:"CHASNUPP-1 | Facilities | NTI" 1183:"CHASNUPP-2 | Facilities | NTI" 599:The second unit, C2, is also a 273:Pressurized Water Reactor (PWR) 199:C4: 19 September 2017 172:C1: 14 September 2000 16:Nuclear power plant in Pakistan 2009:Institute of Power Engineering 1994:Centre for High Energy Physics 1417:. 27 July 2013. Archived from 1014:. Islamabad: Defense Journal. 637:(PWR), using between 2.4—3.0% 559:(PWR), using between 2.4—3.0% 146:C4: 18 December 2011 128:C2: 27 December 2005 1: 2004:Centre for Earthquake Studies 1930:Facilities under construction 1868:Karachi Nuclear Power Complex 1856:Chashma Nuclear Power Complex 1006:Shabbir, Usman (5 May 2004). 805:China Atomic Energy Authority 435:Chashma Nuclear Power Complex 282:Pakistan Nuclear Fuel Complex 218:C3 & C4: US$ 2.37 billion 190:C3: 6 December 2016 37:Chashma Nuclear Power Complex 1873:Kundian Nuclear Fuel Complex 707:Nuclear Regulatory Authority 345:Units under const. 286:China National Nuclear Corp. 249:(Site and energy management) 2238:Nawaz Sharif administration 1999:National Centre for Physics 829:Chandra, Dr Suresh (2016). 697:(PAEC) and is subjected to 608:. The Pakistani government 522:Karachi Nuclear Power Plant 469:(PAEC), with its chairman, 404:Chashma Nuclear Power Plant 384:Chashma Nuclear Power Plant 137:C3: 28 April 2011 119:C1: 1 August 1993 24:Chashma Nuclear Power Plant 2254: 1989:Khan Research Laboratories 1919:Gadwal Enrichment Facility 1891: 1663:: CS1 maint: url-status ( 1520:www.world-nuclear-news.org 546:Nuclear reactor technology 543: 245:China–Pakistan Power Corp. 214:C1: US$ 900 million (1993) 155:C5: 14 July 2023 2198:France–Pakistan relations 2162: 2104:Energy policy of Pakistan 1835:Nuclear power in Pakistan 785:Nuclear power in Pakistan 775:Nuclear technology portal 699:safeguards and monitoring 635:pressurized water reactor 557:pressurized water reactor 447:monitoring and safeguards 389: 310: 306: 181:C2: 17 May 2011 28: 2203:China–Pakistan relations 2127:Pakistan Nuclear Society 1544:"PRIS - Reactor Details" 1491:"PRIS - Reactor Details" 1117:Foreign Affairs Pakistan 1094:. New Delhi: Routledge. 410:) is a large commercial 329:Make and model 354:Nameplate capacity 116:Construction began 1683:world-nuclear-news.org 1386:The News International 1012:www.defencejournal.com 790:Nuclear power in China 718:Training opportunities 681:province in Pakistan. 358:1,330 MW (operational) 315:Units operational 228:Government of Pakistan 211:Construction cost 1977:National laboratories 1793:Federal Bureau Report 1333:www.world-nuclear.org 1251:www.world-nuclear.org 633:is a 315-MW two-loop 302:Power generation 278:Reactor supplier 92:32.39028°N 71.46250°E 705:and enforced by the 689:Corporate management 639:low-enriched uranium 561:low-enriched uranium 433:Officially known as 366:Capacity factor 241:(Reactor management) 220:C5: US$ 3.48 billion 168:Commission date 964:. 25 November 2006. 701:provided under the 606:Yousaf Raza Gillani 496:safeguard agreement 412:nuclear power plant 375:External links 292:Cooling source 216:C2: US$ 860 million 88: /  2167:Electricity sector 2154:Nuclear Technology 2133:CANDU Owners Group 1615:. 24 November 2017 1589:. 28 December 2016 1466:. 11 November 2016 540:Reactor technology 360:2,530 MW (planned) 97:32.39028; 71.46250 2185: 2184: 1414:Pakistan Observer 1361:. 9 November 2003 1101:978-1-317-32476-8 892:Kulkarni, Tanvi. 845:978-93-86019-94-3 400: 399: 270:Reactor type 2245: 2054:Fuel extractions 1967: 1955: 1943: 1897: 1843: 1842: 1828: 1821: 1814: 1805: 1773: 1770: 1764: 1761: 1755: 1754: 1752: 1750: 1736: 1730: 1729: 1727: 1725: 1715: 1709: 1708: 1700: 1694: 1693: 1691: 1689: 1675: 1669: 1668: 1662: 1654: 1642: 1636: 1631: 1625: 1624: 1622: 1620: 1605: 1599: 1598: 1596: 1594: 1579: 1573: 1572: 1565: 1559: 1558: 1556: 1554: 1540: 1531: 1530: 1528: 1526: 1512: 1506: 1505: 1503: 1501: 1487: 1476: 1475: 1473: 1471: 1456: 1450: 1449: 1437: 1431: 1430: 1428: 1426: 1405: 1399: 1398: 1396: 1394: 1377: 1371: 1370: 1368: 1366: 1351: 1345: 1344: 1342: 1340: 1325: 1316: 1315: 1313: 1311: 1297: 1291: 1290: 1288: 1286: 1271: 1262: 1261: 1259: 1257: 1243: 1228: 1222: 1216: 1215: 1213: 1211: 1197: 1191: 1190: 1179: 1173: 1172: 1163: 1157: 1154: 1148: 1145: 1139: 1136: 1130: 1129: 1127: 1125: 1112: 1106: 1105: 1085: 1079: 1075:Staff reporter, 1073: 1067: 1063:Staff reporter, 1061: 1055: 1054: 1052: 1050: 1042:Pakistan Affairs 1037: 1028: 1027: 1025: 1023: 1003: 982: 972: 966: 965: 958: 952: 942: 936: 935: 933: 931: 922:. Archived from 916: 910: 909: 907: 905: 889: 883: 882: 880: 878: 863: 857: 856: 854: 852: 837: 826: 777: 772: 771: 770: 763: 758: 757: 749: 744: 743: 742: 610:provided finance 473:, selecting the 471:Munir Ahmad Khan 393:edit on Wikidata 370:90.3% (lifetime) 250: 242: 206: 204: 197: 195: 188: 186: 179: 177: 162: 160: 153: 151: 144: 142: 135: 133: 126: 124: 103: 102: 100: 99: 98: 93: 89: 86: 85: 84: 81: 21: 2253: 2252: 2248: 2247: 2246: 2244: 2243: 2242: 2188: 2187: 2186: 2181: 2158: 2142: 2115: 2092: 2061: 2059:Fuel extraction 2049: 2023: 1972: 1963: 1951: 1939: 1925: 1898: 1889: 1844: 1837: 1832: 1782: 1777: 1776: 1771: 1767: 1762: 1758: 1748: 1746: 1738: 1737: 1733: 1723: 1721: 1719:"PAEC CHASCENT" 1717: 1716: 1712: 1702: 1701: 1697: 1687: 1685: 1677: 1676: 1672: 1655: 1644: 1643: 1639: 1632: 1628: 1618: 1616: 1607: 1606: 1602: 1592: 1590: 1581: 1580: 1576: 1567: 1566: 1562: 1552: 1550: 1542: 1541: 1534: 1524: 1522: 1514: 1513: 1509: 1499: 1497: 1489: 1488: 1479: 1469: 1467: 1458: 1457: 1453: 1439: 1438: 1434: 1424: 1422: 1421:on 15 June 2015 1407: 1406: 1402: 1392: 1390: 1379: 1378: 1374: 1364: 1362: 1353: 1352: 1348: 1338: 1336: 1327: 1326: 1319: 1309: 1307: 1299: 1298: 1294: 1284: 1282: 1276:"PNRA response" 1273: 1272: 1265: 1255: 1253: 1245: 1244: 1231: 1223: 1219: 1209: 1207: 1199: 1198: 1194: 1181: 1180: 1176: 1165: 1164: 1160: 1155: 1151: 1146: 1142: 1137: 1133: 1123: 1121: 1114: 1113: 1109: 1102: 1087: 1086: 1082: 1074: 1070: 1062: 1058: 1048: 1046: 1039: 1038: 1031: 1021: 1019: 1005: 1004: 985: 973: 969: 960: 959: 955: 943: 939: 929: 927: 926:on 27 July 2011 918: 917: 913: 903: 901: 891: 890: 886: 876: 874: 865: 864: 860: 850: 848: 846: 835: 828: 827: 823: 818: 781: 780: 773: 768: 766: 759: 752: 747:Pakistan portal 745: 740: 738: 733: 720: 691: 659: 618: 553: 548: 542: 463: 396: 359: 336: 323: 321: 319: 284: 264: 263:4 (operational) 248: 247: 243: 240: 239: 219: 217: 215: 202: 200: 198: 193: 191: 189: 184: 182: 180: 175: 173: 158: 156: 154: 149: 147: 145: 140: 138: 136: 131: 129: 127: 122: 120: 96: 94: 90: 87: 82: 79: 77: 75: 74: 17: 12: 11: 5: 2251: 2249: 2241: 2240: 2235: 2230: 2225: 2220: 2215: 2210: 2205: 2200: 2190: 2189: 2183: 2182: 2180: 2179: 2174: 2169: 2163: 2160: 2159: 2157: 2156: 2150: 2148: 2144: 2143: 2141: 2140: 2135: 2130: 2123: 2121: 2117: 2116: 2114: 2113: 2112: 2111: 2100: 2098: 2094: 2093: 2091: 2090: 2084: 2078: 2071: 2069: 2063: 2062: 2057: 2055: 2051: 2050: 2048: 2047: 2045:Paradise Point 2042: 2037: 2031: 2029: 2025: 2024: 2022: 2021: 2016: 2011: 2006: 2001: 1996: 1991: 1986: 1980: 1978: 1974: 1973: 1971: 1970: 1969: 1968: 1958: 1957: 1956: 1946: 1945: 1944: 1933: 1931: 1927: 1926: 1924: 1923: 1920: 1917: 1912: 1906: 1904: 1900: 1899: 1892: 1890: 1888: 1887: 1886: 1885: 1877: 1876: 1875: 1865: 1864: 1863: 1852: 1850: 1846: 1845: 1833: 1831: 1830: 1823: 1816: 1808: 1802: 1801: 1796: 1791:Pakistan Times 1781: 1780:External links 1778: 1775: 1774: 1765: 1756: 1731: 1710: 1695: 1670: 1651:POWER Magazine 1637: 1626: 1600: 1574: 1560: 1532: 1507: 1477: 1451: 1432: 1400: 1372: 1346: 1317: 1292: 1263: 1229: 1217: 1192: 1174: 1158: 1149: 1140: 1131: 1107: 1100: 1080: 1068: 1056: 1029: 983: 975:Mahmood, S. B. 967: 953: 945:Mahmood, S. B. 937: 911: 884: 858: 844: 820: 819: 817: 814: 813: 812: 807: 802: 797: 792: 787: 779: 778: 764: 750: 735: 734: 732: 729: 719: 716: 690: 687: 658: 655: 617: 614: 552: 549: 544:Main article: 541: 538: 492:Smiling Buddha 462: 459: 398: 397: 390: 387: 386: 381: 377: 376: 372: 371: 368: 362: 361: 356: 350: 349: 346: 342: 341: 330: 326: 325: 316: 312: 311: 308: 307: 304: 303: 299: 298: 293: 289: 288: 279: 275: 274: 271: 267: 266: 261: 257: 256: 252: 251: 234: 230: 229: 226: 222: 221: 212: 208: 207: 170: 164: 163: 117: 113: 112: 109: 105: 104: 72: 68: 67: 54: 50: 49: 44: 40: 39: 34: 30: 29: 26: 25: 15: 13: 10: 9: 6: 4: 3: 2: 2250: 2239: 2236: 2234: 2231: 2229: 2226: 2224: 2221: 2219: 2216: 2214: 2211: 2209: 2206: 2204: 2201: 2199: 2196: 2195: 2193: 2178: 2175: 2173: 2170: 2168: 2165: 2164: 2161: 2155: 2152: 2151: 2149: 2145: 2139: 2136: 2134: 2131: 2128: 2125: 2124: 2122: 2120:Organizations 2118: 2110: 2107: 2106: 2105: 2102: 2101: 2099: 2097:Public policy 2095: 2088: 2085: 2082: 2079: 2076: 2073: 2072: 2070: 2068: 2064: 2060: 2056: 2052: 2046: 2043: 2041: 2038: 2036: 2033: 2032: 2030: 2026: 2020: 2017: 2015: 2012: 2010: 2007: 2005: 2002: 2000: 1997: 1995: 1992: 1990: 1987: 1985: 1982: 1981: 1979: 1975: 1966: 1962: 1961: 1959: 1954: 1950: 1949: 1947: 1942: 1938: 1937: 1935: 1934: 1932: 1928: 1921: 1918: 1916: 1913: 1911: 1908: 1907: 1905: 1901: 1896: 1884:Research-only 1883: 1882: 1881: 1878: 1874: 1871: 1870: 1869: 1866: 1862: 1859: 1858: 1857: 1854: 1853: 1851: 1847: 1841: 1836: 1829: 1824: 1822: 1817: 1815: 1810: 1809: 1806: 1800: 1797: 1794: 1792: 1787: 1784: 1783: 1779: 1769: 1766: 1760: 1757: 1745: 1741: 1735: 1732: 1720: 1714: 1711: 1706: 1699: 1696: 1684: 1680: 1674: 1671: 1666: 1660: 1652: 1648: 1641: 1638: 1635: 1630: 1627: 1614: 1610: 1604: 1601: 1588: 1584: 1578: 1575: 1570: 1564: 1561: 1549: 1548:pris.iaea.org 1545: 1539: 1537: 1533: 1521: 1517: 1511: 1508: 1496: 1495:pris.iaea.org 1492: 1486: 1484: 1482: 1478: 1465: 1461: 1455: 1452: 1447: 1443: 1436: 1433: 1420: 1416: 1415: 1410: 1404: 1401: 1389:. 13 May 2011 1388: 1387: 1382: 1376: 1373: 1360: 1356: 1350: 1347: 1334: 1330: 1324: 1322: 1318: 1306: 1302: 1296: 1293: 1281: 1277: 1270: 1268: 1264: 1252: 1248: 1242: 1240: 1238: 1236: 1234: 1230: 1226: 1221: 1218: 1206: 1202: 1196: 1193: 1188: 1184: 1178: 1175: 1170: 1169: 1168:Pakistan News 1162: 1159: 1153: 1150: 1144: 1141: 1135: 1132: 1119: 1118: 1111: 1108: 1103: 1097: 1093: 1092: 1084: 1081: 1078: 1072: 1069: 1066: 1060: 1057: 1044: 1043: 1036: 1034: 1030: 1017: 1013: 1009: 1002: 1000: 998: 996: 994: 992: 990: 988: 984: 980: 976: 971: 968: 963: 957: 954: 950: 946: 941: 938: 925: 921: 915: 912: 899: 895: 888: 885: 872: 868: 862: 859: 847: 841: 836:(googlebooks) 834: 833: 825: 822: 815: 811: 808: 806: 803: 801: 798: 796: 793: 791: 788: 786: 783: 782: 776: 765: 762: 761:Energy portal 756: 751: 748: 737: 730: 728: 724: 717: 715: 712: 708: 704: 700: 696: 688: 686: 682: 680: 676: 672: 668: 664: 656: 654: 652: 647: 642: 640: 636: 632: 628: 624: 615: 613: 611: 607: 602: 597: 595: 591: 587: 581: 579: 574: 571: 566: 562: 558: 550: 547: 539: 537: 534: 529: 525: 523: 517: 515: 511: 507: 502: 499: 497: 493: 488: 486: 485: 480: 476: 472: 468: 460: 458: 454: 452: 448: 444: 440: 436: 431: 429: 425: 421: 417: 413: 409: 405: 394: 388: 385: 382: 378: 373: 369: 367: 363: 357: 355: 351: 347: 344: 343: 340: 335: 331: 328: 327: 317: 314: 313: 309: 305: 300: 297: 294: 290: 287: 283: 280: 276: 272: 268: 262: 258: 253: 246: 238: 235: 231: 227: 223: 213: 209: 171: 169: 165: 118: 114: 110: 106: 101: 73: 69: 66: 62: 58: 55: 51: 48: 45: 41: 38: 35: 33:Official name 31: 27: 22: 19: 2028:Reservations 1940: 1849:Power plants 1789: 1768: 1759: 1747:. Retrieved 1743: 1734: 1722:. Retrieved 1713: 1698: 1686:. Retrieved 1682: 1673: 1650: 1640: 1629: 1617:. Retrieved 1612: 1603: 1591:. Retrieved 1586: 1577: 1563: 1551:. Retrieved 1547: 1523:. Retrieved 1519: 1510: 1498:. Retrieved 1494: 1468:. Retrieved 1463: 1454: 1445: 1435: 1423:. Retrieved 1419:the original 1412: 1403: 1391:. Retrieved 1384: 1375: 1363:. Retrieved 1358: 1349: 1337:. Retrieved 1332: 1308:. Retrieved 1304: 1295: 1283:. Retrieved 1279: 1254:. Retrieved 1250: 1220: 1208:. Retrieved 1204: 1195: 1186: 1177: 1167: 1161: 1152: 1143: 1134: 1122:. Retrieved 1116: 1110: 1090: 1083: 1076: 1071: 1064: 1059: 1047:. Retrieved 1041: 1020:. Retrieved 1011: 978: 970: 956: 948: 940: 928:. Retrieved 924:the original 914: 902:. Retrieved 898:www.ipcs.org 897: 887: 875:. Retrieved 873:. 5 May 2004 870: 861: 849:. Retrieved 831: 824: 725: 721: 692: 683: 660: 650: 645: 643: 631:CHASNUPP-III 630: 627:CHASNUPP-III 626: 623:CHASNUPP-III 622: 619: 598: 593: 589: 585: 582: 575: 554: 530: 526: 518: 514:Soviet Union 503: 500: 489: 483: 475:Chashma Lake 464: 455: 434: 432: 407: 403: 401: 36: 18: 2172:Solar power 1744:www.nti.org 1305:www.nti.org 1205:www.nti.org 1187:www.nti.org 675:Hualong One 663:Hualong One 651:CHASNUPP-IV 646:CHASNUPP-IV 594:CHASNUPP-II 586:CHASNUPP-II 414:located at 348:C5: 1200 MW 339:Hualong One 296:Indus River 265:1 (planned) 233:Operator(s) 111:Operational 95: / 71:Coordinates 2192:Categories 2177:Wind power 2035:Baghalchur 1960:Khushab-5 1903:Facilities 1425:15 October 930:1 February 816:References 590:CHASNUPP-I 324:C4: 340 MW 322:C3: 340 MW 320:C2: 325 MW 318:C1: 325 MW 203:2017-09-19 194:2016-12-06 185:2011-05-17 176:2000-09-14 159:2023-07-14 150:2011-12-18 141:2011-04-28 132:2005-12-27 123:1993-08-01 83:71°27′45″E 80:32°23′25″N 1749:20 August 1724:20 August 1688:20 August 1619:19 August 1593:19 August 1553:19 August 1525:19 August 1500:19 August 1470:19 August 1393:29 August 1365:19 August 1339:19 August 1310:19 August 1285:19 August 1256:19 August 1210:19 August 1124:19 August 1049:19 August 1022:19 August 904:19 August 877:14 August 851:19 August 685:billion. 665:reactor. 616:C3 and C4 551:C1 and C2 2147:See also 2067:Agencies 1941:CHASNUPP 1659:cite web 1587:DAWN.COM 1446:DAWN.COM 1359:DAWN.COM 1280:DAWN.COM 1016:Archived 871:DAWN.COM 731:See also 669:and the 428:Pakistan 420:Mianwali 408:CHASNUPP 260:Reactors 225:Owner(s) 61:Mianwali 53:Location 47:Pakistan 2077:(NEPRA) 2040:Chashma 1707:. Dawn. 601:CNP-300 565:CNP-300 461:History 445:(IAEA) 416:Chashma 380:Website 334:CNP-300 332:C1-C4: 201: ( 192: ( 183: ( 174: ( 157: ( 148: ( 139: ( 130: ( 121: ( 57:Chashma 43:Country 2089:(PNRA) 2083:(PAEC) 1953:KANUPP 1098:  842:  709:. The 679:Punjab 479:France 451:France 424:Punjab 108:Status 65:Punjab 2223:Domes 2129:(PNS) 1335:. WNO 506:China 439:China 391:[ 1751:2020 1726:2020 1690:2020 1665:link 1621:2020 1595:2020 1555:2020 1527:2020 1502:2020 1472:2020 1427:2016 1395:2013 1367:2020 1341:2020 1312:2020 1287:2020 1258:2020 1212:2020 1126:2020 1096:ISBN 1051:2020 1024:2020 932:2010 906:2020 879:2020 853:2020 840:ISBN 644:The 570:GW-h 510:US$ 406:(or 402:The 337:C5: 1965:KNC 1948:K4 1936:C5 418:in 2194:: 1788:, 1742:. 1681:. 1661:}} 1657:{{ 1649:. 1611:. 1585:. 1546:. 1535:^ 1518:. 1493:. 1480:^ 1462:. 1444:. 1411:. 1383:. 1357:. 1331:. 1320:^ 1303:. 1278:. 1266:^ 1249:. 1232:^ 1203:. 1185:. 1032:^ 1010:. 986:^ 977:, 947:, 896:. 869:. 657:C5 524:. 430:. 426:, 422:, 63:, 59:, 1827:e 1820:t 1813:v 1795:. 1753:. 1728:. 1692:. 1667:) 1653:. 1623:. 1597:. 1571:. 1557:. 1529:. 1504:. 1474:. 1448:. 1429:. 1397:. 1369:. 1343:. 1314:. 1289:. 1260:. 1214:. 1189:. 1128:. 1104:. 1053:. 1026:. 934:. 908:. 881:. 855:. 395:] 205:) 196:) 187:) 178:) 161:) 152:) 143:) 134:) 125:)

Index

Pakistan
Chashma
Mianwali
Punjab
32°23′25″N 71°27′45″E / 32.39028°N 71.46250°E / 32.39028; 71.46250
Commission date
Pakistan Atomic Energy Commission
China–Pakistan Power Corp.
Pakistan Nuclear Fuel Complex
China National Nuclear Corp.
Indus River
CNP-300
Hualong One
Nameplate capacity
Capacity factor
Chashma Nuclear Power Plant
edit on Wikidata
nuclear power plant
Chashma
Mianwali
Punjab
Pakistan
China
International Atomic Energy Agency
monitoring and safeguards
France
Pakistan Atomic Energy Commission
Munir Ahmad Khan
Chashma Lake
France