scenery of Tseung Kwan O. It is the first time that a cycle track is provided on a marine viaduct in Hong Kong, and with the bridge's completion, a 5 km (3.1 mi) loop cycleway encircling Junk Bay is formed. While the bridge is designed to withstand typhoons with wind speeds up to 320 km per hour, pedestrians and cyclists would be barred from accessing the bridge when the wind speed reaches 40 km/h.
384:. Meinhardt Infrastructure & Environment Ltd. and Hewson Consulting were appointed as the designers for China Road and Bridge Corporation to provide alternative permanent works design, erection engineering and temporary works design for the bridgeworks. The steel bridge components, including the main span, were 336:
steel bridge section in its middle. With a length of 200 m and a weight of 10,000 tonnes, the main span is the longest and heaviest steel arch bridge in Hong Kong. The main span has a maximum clearance of 160 m (520 ft) in width by 17 m (56 ft) in height. The remaining sections of
347:
The bridge's deck, 34 m (112 ft) in width, carries (from north to south) a footpath, a cycle track, and the eastbound and westbound carriageways, with green strips separating each of them. Three observation platforms are also built along the footpath for pedestrians to appreciate the
456:
chief engineer Wong Wai Man claimed that there are thousands of bridges in the world that are over 200 m (220 yd) long, and as such, there was no way the designers could go through all of them to make sure the CBL was not similar to another bridge in design.
296: 279:
steel bridge. It is the first marine crossing in Hong Kong that combines the functions of carriageway, footway and cycle track in one bridge. The rest of the link is the bridge's at-grade approach named Wan O Road
320:
and Tseung Kwan O Town Centre. At its eastern end, the bridge continues as the at-grade Wan O Road (codenamed Road D9 during its construction), which intersects with the north-south artery Wan Po Road linking to
425: 724: 699: 436:
Along with the Tseung Kwan O-Lam Tin Tunnel, the Cross Bay Link opened to traffic at 8am on 11 December 2022. The two new roads were expected to reduce the travelling time between LOHAS Park and
392:, China before being delivered progressively to Hong Kong by sea. The main span was carried by a semi-submersible barge, and arrived at the works site on 16 February 2021 after an 8-day voyage. 36: 344:(∞), is said to signify the vitality, boundless energy and vigour found in the vibrant town of Tseung Kwan O. The arches are illuminated by LED spotlights from 7pm to 9pm every evening. 938: 366:
event was held in August 2009 and the winning entry was selected on 9 November 2009. In March 2010, six bridge design options collected have been developed for detailed evaluation.
373:
was selected as the preferred option for Cross Bay Link to the next phase of design works. AECOM was employed to carry out the detailed design and supervise the construction.
802: 453: 300:
The Cross Bay Bridge is the first marine viaduct in Hong Kong boasting a cycle track. The landmark double arches are seen illuminated in the background.
413: 54: 811: 466: 837: 872: 842: 725:"Mostly smooth traffic on first working day for Hong Kong's new Tseung Kwan O tunnel-and-bridge link, but warnings of bottleneck near exit" 795: 381: 305: 452:
claimed that although the bridge's design was similar to Nanning Yonghe Bridge in Guangxi, he believed it is not a direct copy.
907: 401: 322: 237: 567: 312:. At the western end of the bridge, vehicle may enter or leave the bridge either through the TKOLTT, or via the spur route of 281: 264: 225: 928: 788: 253: 47: 340:
The design concept "Eternity Arch" was adopted for the main span. The two outward leaning arches, which resemble the
700:"Traffic in Tseung Kwan O to worsen on Sunday after opening of 2 new road links, Hong Kong's transport chief warns" 652: 847: 933: 245: 107: 902: 897: 313: 832: 369:
On 6 July 2010, after detailed analysis of public engagement results and technical assessments, the
304:
The Tseung Kwan O Cross Bay Bridge links up the Tseung Kwan O Interchange, where it connects to the
877: 852: 827: 672: 326: 494: 862: 822: 545: 857: 233: 892: 882: 656: 341: 249: 752: 624: 437: 385: 360:
was employed to undertake the investigation and preliminary design of Cross Bay Link.
922: 867: 317: 333: 276: 123: 309: 241: 69: 56: 677:
The Government of the Hong Kong Special Administrative Region Press Releases
146: 449: 357: 272: 97: 780: 389: 598: 649: 523: 673:"Double-arch steel bridge for Cross Bay Link arrives in Hong Kong" 546:"Cross Bay Link, Tseung Kwan O – Main Bridge and Associated Works" 295: 784: 495:"Innovations and delivery of the Cross Bay Link, Tseung Kwan O" 377: 380:
2.5 billion contract to construct the bridge was awarded to
396:
Construction progress of the Tseung Kwan O Cross Bay Bridge
364:
The My vision of the Cross Bay Link Design Ideas Invitation
337:
the bridge are concrete bridges with concrete box girders.
259:
The mainstay of the link is the 1.0 km (0.62 mi)
493:
Civil Engineering and Development Department (June 2021).
773: 524:"Cross Bay Link, Tseung Kwan O and Southern Bridge" 332:The centrepiece of the bridge is the prefabricated 209: 201: 196: 178: 160: 155: 145: 137: 129: 119: 114: 103: 93: 85: 46: 23: 316:(of which the bridge is part of) connecting to 939:Proposed transport infrastructure in Hong Kong 526:. Civil Engineering and Development Department 796: 440:by 20 minutes during the morning peak hours. 8: 454:Civil Engineering and Development Department 41:The site of the bridge link in October 2022. 325:. Unlike TKOLTT, the bridge is not part of 803: 789: 781: 518: 516: 20: 358:Ove Arup & Partners Hong Kong Limited 275:incorporating a 200 m (660 ft) 467:List of tunnels and bridges in Hong Kong 501:. The Hong Kong Institute of Architects 478: 394: 593: 591: 589: 488: 486: 484: 482: 660:CBL-TKO official website – What's New 7: 838:Hong Kong–Shenzhen Western Corridor 308:(TKOLTT), with Wan O Road outside 16:Bridge in Tseung Kwan O, Hong Kong 14: 382:China Road and Bridge Corporation 232:) is a 1.8 km (1.1 mi) 698:Yau, Cannix (10 December 2022). 424: 412: 400: 35: 908:Duplicate Tsing Yi South Bridge 568:"Going batty over a new bridge" 323:Tseung Kwan O Industrial Estate 238:Tseung Kwan O Industrial Estate 89:Vehicles, pedestrians, bicycles 888:Tseung Kwan O Cross Bay Bridge 599:"將軍澳跨灣大橋設風速限制 風速40公里即禁行人及單車使用" 285: 268: 261:Tseung Kwan O Cross Bay Bridge 229: 1: 843:Hong Kong–Zhuhai–Macau Bridge 271:), a marine viaduct spanning 28: 306:Tseung Kwan O–Lam Tin Tunnel 254:Tseung Kwan O-Lam Tin Tunnel 133:1,800 m (5,900 ft) 955: 166:; 6 years ago 70:22.2939111°N 114.2597167°E 818: 234:dual two-lane carriageway 214: 34: 833:New Clear Water Bay Road 729:South China Morning Post 704:South China Morning Post 407:Preliminary works (2010) 141:200 m (660 ft) 848:Island Eastern Corridor 288:) south of LOHAS Park. 184:; 21 months ago 75:22.2939111; 114.2597167 873:Rambler Channel Bridge 301: 246:Tseung Kwan O New Town 151:17 m (56 ft) 108:Tseung Kwan O New Town 903:Tsing Yi South Bridge 898:Tsing Yi North Bridge 655:25 April 2012 at the 438:Kwun Tong Town Centre 299: 182:11 December 2022 929:Bridges in Hong Kong 812:Bridges in Hong Kong 448:District councillor 878:Stonecutters Bridge 853:Kap Shui Mun Bridge 828:Cheung Tsing Bridge 66: /  863:Lai Chi Kok Bridge 823:Ap Lei Chau Bridge 731:. 12 December 2022 679:. 16 February 2021 605:. 15 November 2022 574:. 10 November 2022 499:Hong Kong Engineer 444:Design controversy 356:On 16 March 2009, 314:Tseung Lam Highway 302: 161:Construction start 916: 915: 252:, Hong Kong with 218: 217: 946: 858:Kwun Tong Bypass 805: 798: 791: 782: 777: 776: 774:Official website 759: 751: 747: 741: 740: 738: 736: 721: 715: 714: 712: 710: 695: 689: 688: 686: 684: 669: 663: 647: 641: 640: 638: 636: 621: 615: 614: 612: 610: 595: 584: 583: 581: 579: 564: 558: 557: 555: 553: 542: 536: 535: 533: 531: 520: 511: 510: 508: 506: 490: 428: 416: 404: 287: 270: 231: 192: 190: 185: 174: 172: 167: 81: 80: 78: 77: 76: 71: 67: 64: 63: 62: 59: 39: 21: 954: 953: 949: 948: 947: 945: 944: 943: 919: 918: 917: 912: 893:Tsing Ma Bridge 883:Ting Kau Bridge 814: 809: 772: 771: 768: 763: 762: 749: 748: 744: 734: 732: 723: 722: 718: 708: 706: 697: 696: 692: 682: 680: 671: 670: 666: 657:Wayback Machine 648: 644: 634: 632: 631:. 10 March 2010 623: 622: 618: 608: 606: 597: 596: 587: 577: 575: 566: 565: 561: 551: 549: 544: 543: 539: 529: 527: 522: 521: 514: 504: 502: 492: 491: 480: 475: 463: 446: 432: 429: 420: 417: 408: 405: 354: 342:infinity symbol 294: 250:New Territories 236:connecting the 188: 186: 183: 170: 168: 165: 147:Clearance below 115:Characteristics 74: 72: 68: 65: 60: 57: 55: 53: 52: 42: 30: 27: 26: 17: 12: 11: 5: 952: 950: 942: 941: 936: 931: 921: 920: 914: 913: 911: 910: 905: 900: 895: 890: 885: 880: 875: 870: 865: 860: 855: 850: 845: 840: 835: 830: 825: 819: 816: 815: 810: 808: 807: 800: 793: 785: 779: 778: 767: 766:External links 764: 761: 760: 758:. 7 July 2010. 742: 716: 690: 664: 662:. 6 July 2010. 642: 616: 585: 559: 537: 512: 477: 476: 474: 471: 470: 469: 462: 459: 445: 442: 434: 433: 430: 423: 421: 418: 411: 409: 406: 399: 397: 353: 350: 293: 290: 222:Cross Bay Link 216: 215: 212: 211: 207: 206: 205:Free of charge 203: 199: 198: 194: 193: 180: 176: 175: 162: 158: 157: 153: 152: 149: 143: 142: 139: 135: 134: 131: 127: 126: 121: 117: 116: 112: 111: 105: 101: 100: 95: 91: 90: 87: 83: 82: 61:114°15′34.98″E 50: 44: 43: 40: 32: 31: 25:Cross Bay Link 24: 15: 13: 10: 9: 6: 4: 3: 2: 951: 940: 937: 935: 934:Tseung Kwan O 932: 930: 927: 926: 924: 909: 906: 904: 901: 899: 896: 894: 891: 889: 886: 884: 881: 879: 876: 874: 871: 869: 868:Liu To Bridge 866: 864: 861: 859: 856: 854: 851: 849: 846: 844: 841: 839: 836: 834: 831: 829: 826: 824: 821: 820: 817: 813: 806: 801: 799: 794: 792: 787: 786: 783: 775: 770: 769: 765: 757: 754: 746: 743: 730: 726: 720: 717: 705: 701: 694: 691: 678: 674: 668: 665: 661: 658: 654: 651: 646: 643: 630: 626: 620: 617: 604: 600: 594: 592: 590: 586: 573: 569: 563: 560: 547: 541: 538: 525: 519: 517: 513: 500: 496: 489: 487: 485: 483: 479: 472: 468: 465: 464: 460: 458: 455: 451: 443: 441: 439: 427: 422: 415: 410: 403: 398: 395: 393: 391: 387: 386:prefabricated 383: 379: 376:In 2018, the 374: 372: 371:Eternity Arch 367: 365: 361: 359: 351: 349: 345: 343: 338: 335: 330: 328: 324: 319: 318:Tiu Keng Leng 315: 311: 307: 298: 291: 289: 283: 278: 274: 266: 262: 257: 255: 251: 247: 243: 239: 235: 227: 223: 213: 208: 204: 200: 195: 181: 177: 163: 159: 154: 150: 148: 144: 140: 136: 132: 128: 125: 122: 118: 113: 109: 106: 102: 99: 96: 92: 88: 84: 79: 58:22°17′38.08″N 51: 49: 45: 38: 33: 22: 19: 887: 755: 750:(in Chinese) 745: 733:. Retrieved 728: 719: 707:. Retrieved 703: 693: 681:. Retrieved 676: 667: 659: 645: 633:. Retrieved 628: 625:"將軍澳跨灣大橋六揀一" 619: 607:. Retrieved 602: 576:. Retrieved 572:The Standard 571: 562: 550:. Retrieved 540: 528:. Retrieved 503:. Retrieved 498: 447: 435: 431:January 2022 375: 370: 368: 363: 362: 355: 346: 339: 331: 303: 260: 258: 221: 219: 138:Longest span 130:Total length 18: 753:將軍澳跨灣橋造價22億 334:double-arch 292:Description 277:double-arch 124:Arch bridge 110:, Hong Kong 73: / 48:Coordinates 923:Categories 756:Wen Wei Po 735:26 January 709:26 January 683:26 January 650:What's New 635:26 January 609:27 January 578:27 January 552:27 January 530:27 January 505:27 January 473:References 419:March 2021 310:LOHAS Park 242:LOHAS Park 197:Statistics 189:2022-12-11 244:areas in 653:Archived 461:See also 450:Gary Fan 273:Junk Bay 230:將軍澳跨灣連接路 210:Location 98:Junk Bay 29:將軍澳跨灣連接路 629:The Sun 548:. AECOM 390:Nantong 352:History 327:Route 6 282:Chinese 269:將軍澳跨灣大橋 265:Chinese 226:Chinese 187: ( 169: ( 156:History 94:Crosses 86:Carries 284:: 267:: 228:: 179:Opened 120:Design 104:Locale 737:2023 711:2023 685:2023 637:2023 611:2023 603:HK01 580:2023 554:2023 532:2023 507:2023 378:HK$ 240:and 220:The 202:Toll 171:2018 164:2018 388:in 286:環澳路 256:. 925:: 727:. 702:. 675:. 627:. 601:. 588:^ 570:. 515:^ 497:. 481:^ 329:. 248:, 804:e 797:t 790:v 739:. 713:. 687:. 639:. 613:. 582:. 556:. 534:. 509:. 280:( 263:( 224:( 191:) 173:)

Index


Coordinates
22°17′38.08″N 114°15′34.98″E / 22.2939111°N 114.2597167°E / 22.2939111; 114.2597167
Junk Bay
Tseung Kwan O New Town
Arch bridge
Clearance below
Chinese
dual two-lane carriageway
Tseung Kwan O Industrial Estate
LOHAS Park
Tseung Kwan O New Town
New Territories
Tseung Kwan O-Lam Tin Tunnel
Chinese
Junk Bay
double-arch
Chinese

Tseung Kwan O–Lam Tin Tunnel
LOHAS Park
Tseung Lam Highway
Tiu Keng Leng
Tseung Kwan O Industrial Estate
Route 6
double-arch
infinity symbol
Ove Arup & Partners Hong Kong Limited
HK$
China Road and Bridge Corporation

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.