501:
48:
425:
151:
1060:
260:
479:
Passenger service on the line continued until
September 5, 1958, except for a discontinuance from 1949 to 1952. However, most local stops including Assonet, Crystal Spring, and Somerset Junction were discontinued by the 1930s; by the end of service, trains ran nonstop from Fall River to Taunton. The
369:
opened through
Freetown in 1845. Two stations on the line in Freetown were open until the 1930s. Freetown was announced as a potential South Coast Rail station in 2009. The planned station site was relocated slightly to the northeast in 2018. A construction contract was issued in 2020, and the
551:
The MBTA awarded a $ 159 million contract for construction of the Fall River
Secondary portion of the project, including Freetown station, in May 2020. Service was then planned to begin in November 2023. The station was 27% complete by February 2022, with 82% of platform foundations complete.
527:
village. Station plans released as part of the Final
Environmental Impact Report in 2013 were nearly identical to the 2009 plans. On June 11, 2010, the state took ownership of the Fall River Subdivision (renamed the Fall River Secondary) and several other
535:
In 2017, the project was re-evaluated due to cost issues. A new proposal released in March 2017 called for early service via
Middleborough by 2024, followed by full service via Stoughton by 2029. Freetown would have only been built as an
552:
Substantial completion of the Fall River
Secondary work was announced at an event at Freetown station in December 2022. Opening was delayed to mid-2024 in September 2023. In June 2024, the opening of the project was delayed to May 2025.
1034:
410:
lane will be located next to the platform, with a driveway to South Main Street. A canopy will cover the portion of the platform adjacent to the entrance from the parking lot, with smaller canopies near the ends of the platform.
1089:
597:
856:
Volume II: FEIS/FEIR Figures Final
Environmental Impact Statement/Final Environmental Impact Report on the South Coast Rail Project proposed by the Massachusetts Department of Transportation
1042:
822:
1084:
958:
1094:
468:, was located further to the south in northern Fall River near the Freetown border. Service was consolidated in 1854 under the Old Colony and Fall River Railroad (later the
520:
serving one track, with a second track allowing freight trains to pass the high-level platform. The station was planned to be the anchor of
Assonet Village, a new
774:
894:
84:
605:
1019:
701:
263:
259:
684:
869:
758:
830:. Massachusetts Executive Office of Transportation and Executive Office of Housing and Economic Development. June 2009. p. 79. Archived from
154:
930:
798:
831:
985:
548:
moved the planned station about 0.2 miles (0.32 km) northeast, as the previously planned site had been developed for use by a business.
516:
project, including a
Freetown station off South Main Street near the Route 24/79 expressway. A 2009 conceptual design called for a single
540:
during the second phase. By mid-2017, plans called for the first phase to be completed in 2022, and to include stations at
Freetown and
962:
1020:"Baker-Polito Administration Celebrates Substantial Completion of $ 159 Million Contract for South Coast Rail Main Line Construction"
1002:
848:
726:
649:
1079:
500:
47:
465:
916:
524:
781:
902:
1064:
433:
366:
441:
876:
541:
383:
347:
72:
437:
391:
387:
379:
343:
68:
665:
619:
521:
577:
941:
805:
763:. New York, New Haven and Hartford Railroad. April 24, 1955. p. 31 – via Wikimedia Commons.
399:
355:
273:
119:
469:
529:
489:
473:
339:
293:
986:"MBTA Construction Contract No. K78CN03: Fall River Secondary Commuter Rail Expansion Project"
722:
645:
513:
351:
286:
402:. A freight passing siding will be located on the east side of the main track. A 107-space
1035:"South Coast Rail passenger service is being delayed. Here's why, explained in 60 seconds"
424:
961:(Press release). Massachusetts Department of Transportation. May 11, 2020. Archived from
537:
17:
1073:
517:
407:
403:
395:
359:
278:
130:
940:. Massachusetts Department of Transportation. Summer 2017. p. 3. Archived from
598:"'MBTA owes this region an apology': South Coast Rail start is delayed another year"
481:
875:. Massachusetts Department of Transportation. June 2010. p. 7. Archived from
480:
line continued to be used for freight service by the New Haven and its successors
780:. Massachusetts Executive Office of Transportation. October 2008. Archived from
1022:(Press release). Massachusetts Bay Transportation Authority. December 8, 2022.
354:
project. The station will have a single side platform on the west side of the
99:
86:
746:. New York, New Haven and Hartford Railroad. September 26, 1937. p. 28.
1008:. Massachusetts Bay Transportation Authority. February 24, 2022. p. 6.
804:. Massachusetts Department of Transportation. June 30, 2009. Archived from
622:. Massachusetts Department of Transportation. October 25, 2018. p. 13.
1059:
919:. Massachusetts Department of Transportation. March 15, 2017. p. 5.
394:
expressway. It will have a single 800-foot (240 m)-long high-level
509:
485:
689:. Everts & Richards. 1895. pp. 148–149 – via Ward Maps.
350:. It is planned to open in May 2025 as part of the first phase of the
444:
in December 1846. Two stations were located on the line in Freetown:
706:. Everts & Richards. 1895. pp. 48–49 – via Ward Maps.
576:
VHB/HNTB (January 31, 2018). "Chapter 2 – Alternatives Analysis".
499:
423:
858:. U.S. Army Corps of Engineers New England District. August 2013.
378:
Freetown station will be located in the southwestern part of the
849:"Figure 3.2-27 Freetown Depot Station Conceptual Station Design"
824:
South Coast Rail Economic Development and Land Use Corridor Plan
703:
New Topological Atlas of Surveys, Bristol County, Massachusetts
686:
New Topological Atlas of Surveys, Bristol County, Massachusetts
579:
South Coast Rail Draft Supplemental Environmental Impact Report
1090:
MBTA Commuter Rail stations in Bristol County, Massachusetts
959:"South Coast Rail Main Line Construction Contract Approved"
760:
The Scenic Shoreline Route Serving New York and New England
895:"State changes gears on Middleborough commuter rail plan"
52:
Freetown station during a ribbon cutting in December 2022
1003:"South Coast Rail Briefing for MBTA Board of Directors"
370:
station was substantially completed in December 2022.
721:. Boston Street Railway Association. pp. 34–36.
672:. June 5, 1845. p. 2 – via Newspapers.com.
620:"South Coast Rail Project Phase 1 - Freetown Meeting"
257:
29:
Future railway station in Freetown, Massachusetts, US
504:
Construction of the new passing siding in April 2021
644:(2 ed.). Branch Line Press. pp. 401–405.
318:
245:
225:
216:
208:
203:
195:
190:
182:
174:
166:
161:
145:
137:
125:
115:
78:
62:
57:
34:
544:in Phase 1 rather than Phase 2. The January 2018
398:on the west side of the single main track of the
1085:Under-construction MBTA Commuter Rail stations
717:Humphrey, Thomas J.; Clark, Norton D. (1985).
546:Draft Supplemental Environmental Impact Report
991:. Massachusetts Bay Transportation Authority.
582:. Massachusetts Department of Transportation.
8:
512:released 18 potential station sites for the
386:between the South Main Street and the Route
775:"South Coast Rail Fact Sheet: October 2008"
757:"Table 19: Boston-New Bedford-Fall River".
719:Boston's Commuter Rail: The First 150 Years
1095:Railway stations scheduled to open in 2025
315:
251:
46:
31:
938:South Coast Rail - Summer 2017 Fact Sheet
591:
589:
267:
254:
571:
569:
567:
565:
561:
799:"Freetown - Freetown Rail Alternative"
642:The Rail Lines of Southern New England
635:
633:
631:
629:
464:), the junction with the 1866-opened
440:on June 9, 1845; it was completed to
150:
7:
1033:Medeiros, Dan (September 29, 2023).
472:); the Old Colony was leased to the
532:lines as part of a sale agreement.
984:Tabakin, Jennifer (May 11, 2020).
25:
893:Dungca, Nicole (March 22, 2017).
1058:
870:"The Massachusetts Rail Program"
258:
229:60 (projected weekday boardings)
149:
931:"South Coast Rail Corridor Map"
596:Medeiros, Dan (June 13, 2024).
1:
466:Dighton and Somerset Railroad
428:A postcard of Assonet station
525:transit-oriented development
1111:
917:"Notice of Project Change"
640:Karr, Ronald Dale (2017).
436:opened from Fall River to
325:
314:
310:
306:
250:
241:
237:
233:
221:
100:41.7726528°N 71.0936889°W
45:
670:The Brooklyn Daily Eagle
492:Fall River Subdivision.
1080:Freetown, Massachusetts
348:Freetown, Massachusetts
342:station located in the
105:41.7726528; -71.0936889
73:Freetown, Massachusetts
1045:on September 30, 2023.
700:"City of Fall River".
505:
488:, then finally as the
429:
388:Massachusetts Route 24
18:Crystal Spring station
1067:at Wikimedia Commons
947:on September 5, 2017.
666:"Fall River Railroad"
503:
427:
837:on December 7, 2013.
683:"Town of Freetown".
400:Fall River Secondary
356:Fall River Secondary
120:Fall River Secondary
787:on August 12, 2017.
508:In September 2008,
470:Old Colony Railroad
456:) at Copicut Road.
448:at Elm Street, and
434:Fall River Railroad
367:Fall River Railroad
96: /
58:General information
905:on April 11, 2017.
811:on March 21, 2012.
506:
474:New Haven Railroad
430:
340:MBTA Commuter Rail
268:Following station
255:Preceding station
212:May 2025 (planned)
175:Bicycle facilities
1063:Media related to
608:on June 14, 2024.
458:Somerset Junction
420:Previous stations
333:
332:
329:
328:
302:
301:
191:Other information
66:South Main Street
16:(Redirected from
1102:
1065:Freetown station
1062:
1047:
1046:
1041:. Archived from
1030:
1024:
1023:
1016:
1010:
1009:
1007:
999:
993:
992:
990:
981:
975:
974:
972:
970:
955:
949:
948:
946:
935:
927:
921:
920:
913:
907:
906:
901:. Archived from
890:
884:
883:
882:on May 24, 2012.
881:
874:
866:
860:
859:
853:
845:
839:
838:
836:
829:
819:
813:
812:
810:
803:
795:
789:
788:
786:
779:
771:
765:
764:
754:
748:
747:
739:
733:
732:
714:
708:
707:
697:
691:
690:
680:
674:
673:
662:
656:
655:
637:
624:
623:
616:
610:
609:
604:. Archived from
593:
584:
583:
573:
514:South Coast Rail
496:South Coast Rail
352:South Coast Rail
336:Freetown station
316:
287:South Coast Rail
262:
252:
246:Planned services
153:
152:
111:
110:
108:
107:
106:
101:
97:
94:
93:
92:
89:
50:
32:
21:
1110:
1109:
1105:
1104:
1103:
1101:
1100:
1099:
1070:
1069:
1056:
1051:
1050:
1039:The Herald News
1032:
1031:
1027:
1018:
1017:
1013:
1005:
1001:
1000:
996:
988:
983:
982:
978:
968:
966:
965:on May 16, 2020
957:
956:
952:
944:
933:
929:
928:
924:
915:
914:
910:
892:
891:
887:
879:
872:
868:
867:
863:
851:
847:
846:
842:
834:
827:
821:
820:
816:
808:
801:
797:
796:
792:
784:
777:
773:
772:
768:
756:
755:
751:
741:
740:
736:
729:
716:
715:
711:
699:
698:
694:
682:
681:
677:
664:
663:
659:
652:
639:
638:
627:
618:
617:
613:
602:The Herald News
595:
594:
587:
575:
574:
563:
558:
542:Battleship Cove
498:
442:South Braintree
422:
417:
376:
358:, along with a
321:
298:
281:
104:
102:
98:
95:
90:
87:
85:
83:
82:
67:
53:
41:
40:
39:
30:
23:
22:
15:
12:
11:
5:
1108:
1106:
1098:
1097:
1092:
1087:
1082:
1072:
1071:
1055:
1054:External links
1052:
1049:
1048:
1025:
1011:
994:
976:
950:
922:
908:
885:
861:
840:
814:
790:
766:
749:
734:
727:
709:
692:
675:
657:
650:
625:
611:
585:
560:
559:
557:
554:
538:infill station
497:
494:
450:Crystal Spring
421:
418:
416:
413:
375:
374:Station design
372:
331:
330:
327:
326:
323:
322:
319:
312:
311:
308:
307:
304:
303:
300:
299:
296:
291:
289:
284:
282:
276:
270:
269:
266:
256:
248:
247:
243:
242:
239:
238:
235:
234:
231:
230:
227:
223:
222:
219:
218:
214:
213:
210:
206:
205:
201:
200:
197:
193:
192:
188:
187:
184:
180:
179:
176:
172:
171:
168:
164:
163:
159:
158:
147:
143:
142:
139:
135:
134:
127:
123:
122:
117:
113:
112:
80:
76:
75:
64:
60:
59:
55:
54:
51:
43:
42:
37:
36:
35:
28:
24:
14:
13:
10:
9:
6:
4:
3:
2:
1107:
1096:
1093:
1091:
1088:
1086:
1083:
1081:
1078:
1077:
1075:
1068:
1066:
1061:
1053:
1044:
1040:
1036:
1029:
1026:
1021:
1015:
1012:
1004:
998:
995:
987:
980:
977:
964:
960:
954:
951:
943:
939:
932:
926:
923:
918:
912:
909:
904:
900:
896:
889:
886:
878:
871:
865:
862:
857:
850:
844:
841:
833:
826:
825:
818:
815:
807:
800:
794:
791:
783:
776:
770:
767:
762:
761:
753:
750:
745:
738:
735:
730:
728:9780685412947
724:
720:
713:
710:
705:
704:
696:
693:
688:
687:
679:
676:
671:
667:
661:
658:
653:
651:9780942147124
647:
643:
636:
634:
632:
630:
626:
621:
615:
612:
607:
603:
599:
592:
590:
586:
581:
580:
572:
570:
568:
566:
562:
555:
553:
549:
547:
543:
539:
533:
531:
526:
523:
519:
518:side platform
515:
511:
502:
495:
493:
491:
487:
483:
477:
475:
471:
467:
463:
459:
455:
451:
447:
443:
439:
435:
426:
419:
414:
412:
409:
408:kiss-and-ride
405:
404:park and ride
401:
397:
396:side platform
393:
389:
385:
381:
373:
371:
368:
363:
361:
360:park and ride
357:
353:
349:
345:
341:
337:
324:
317:
313:
309:
305:
295:
292:
290:
288:
285:
283:
280:
279:South Station
275:
272:
271:
265:
261:
253:
249:
244:
240:
236:
232:
228:
224:
220:
215:
211:
207:
202:
198:
194:
189:
185:
181:
177:
173:
169:
165:
160:
156:
148:
144:
140:
136:
132:
131:side platform
128:
124:
121:
118:
114:
109:
88:41°46′21.55″N
81:
77:
74:
70:
65:
61:
56:
49:
44:
33:
27:
19:
1057:
1043:the original
1038:
1028:
1014:
997:
979:
967:. Retrieved
963:the original
953:
942:the original
937:
925:
911:
903:the original
899:Boston Globe
898:
888:
877:the original
864:
855:
843:
832:the original
823:
817:
806:the original
793:
782:the original
769:
759:
752:
743:
742:"Table 31".
737:
718:
712:
702:
695:
685:
678:
669:
660:
641:
614:
606:the original
601:
578:
550:
545:
534:
507:
482:Penn Central
478:
461:
457:
453:
449:
445:
431:
377:
364:
338:is a future
335:
334:
274:East Taunton
162:Construction
91:71°5′37.28″W
26:
406:lot with a
382:village in
346:village of
146:Connections
103: /
79:Coordinates
1074:Categories
556:References
294:Fall River
217:Passengers
183:Accessible
170:170 spaces
522:mixed-use
476:in 1893.
196:Fare zone
133:(planned)
126:Platforms
744:Form 200
454:Thwaites
384:Freetown
320:Location
297:Terminus
178:8 spaces
63:Location
38:Freetown
969:May 12,
510:MassDOT
486:Conrail
462:Millers
446:Assonet
438:Myricks
415:History
380:Assonet
344:Assonet
277:toward
209:Opening
204:History
167:Parking
116:Line(s)
69:Assonet
725:
648:
138:Tracks
1006:(PDF)
989:(PDF)
945:(PDF)
934:(PDF)
880:(PDF)
873:(PDF)
852:(PDF)
835:(PDF)
828:(PDF)
809:(PDF)
802:(PDF)
785:(PDF)
778:(PDF)
362:lot.
157:: 102
971:2020
723:ISBN
646:ISBN
484:and
432:The
365:The
264:MBTA
226:2030
155:SRTA
530:CSX
490:CSX
186:Yes
1076::
1037:.
936:.
897:.
854:.
668:.
628:^
600:.
588:^
564:^
392:79
129:1
71:,
973:.
731:.
654:.
460:(
452:(
390:/
199:8
141:2
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.