Terranora interconnector

Source 📝

416:. The motivation to build the interconnector was the power shortage in Southern Queensland and surplus capacities in New South Wales. It was developed as an Independent Transmission Project. It was commissioned in December 1999 and it started operations in April 2000. It was the first time that transmission systems of New South Wales and Queensland were linked. The construction cost US$ 70 million. 466:
for a limited time period the interconnector has operated in an overloading mode for up to 250 MW. The limiting factor for flow in the New South Wales direction is the thermal ratings of the Terranora–Mudgeeraba 110 kV lines and Mullumbimby–Dunoon 132 kV lines, and for flow in the Queensland direction is the thermal ratings of the Lismore–Dunoon 132 kV lines.
465:
The total rating of the interconnector is 180 MW. The maximum net transfer minus losses is around 170 MW. If one pair of cables malfunctions, the available capacity is around 115 MW. If two pairs of cables are out of service, the capacity is around 57 MW. However, in some cases
772: 616: 426:
Originally, the interconnector operated as a non-regulated market network service. However, on 6 May 2004 an application to convert it to a regulated network service was submitted. The application was approved by the
504: 333: 545: 896: 241: 285: 458:
at each station connected by three pairs of transmission cables. Each pair of cables operates at +/-80 kV and transmits 60 MW. In New South Wales it is connected to a 132 kV
964: 954: 438:) was transferred to the Energy Infrastructure Investments Group, while the APA Group continued as the operator. The ownership of EII is allocated as APA with 19.9%, Japan-based 969: 974: 515: 391: 556: 913: 944: 680: 880: 664: 909: 812: 742: 481: 473: 656: 949: 801:
Electricity Transmission Network Service Providers - Directlink and Murraylink amended Cost Allocation Methodologies - March 2010
484:
modules are rated at 2.5 kV and 500 A, with multiple units connected in series to achieve the required voltage rating.
800: 585: 454:
Directlink (Terranora) interconnector is a 59-kilometre (37 mi) HVDC land cable route. The system has three 65 MVA
378:. The DC cables alternate between above ground in a galvanised steel trough and below ground with depths up to 1 metre. 840: 279: 80: 779: 773:"Electricity Transmission Network Service Providers Directlink & Murraylink Amended Cost Allocation Methodologies" 746: 469: 428: 235: 177: 472:
was chosen for this project for reasons of low environmental impact of the transmission route and the ability of the
419:
In December 2006, it was announced that Directlink would be purchased by Australian Pipeline Trust (APT, a part of
412: 371: 90: 989: 455: 959: 692: 420: 327: 113: 984: 979: 904: 872: 624: 715: 459: 876: 660: 650: 323: 866: 590: 750: 462:
transmission grid and in Queensland to 110 kV alternating current transmission grid.
383: 62: 407: 403: 938: 505:"Development of Electricity Supply to the NSW Far North Coast. Supplementary Report" 688: 595: 652:
HVDC and FACTS controllers: applications of static converters in power systems
435: 387: 349: 335: 301: 287: 257: 243: 844: 552: 511: 443: 423:) for US$ 133 million. The transaction was completed in February 2007. 375: 138: 128: 52: 17: 477: 439: 402:
The interconnector was developed by a joint venture of NorthPower (later
382:
It is one of the two interconnections used to trade electricity between
720: 238:(HVDC) electricity transmission cable route from near Lavertys Gap ( 617:"Network Interconnection: Murraylink: the underground connection" 546:"Directlink Project Queensland – New South Wales in Australia" 476:
converter stations at each end to accurately control both
234:
is a mixed buried and above ground 59 kilometre (37 mi)
813:"electricity transmission interconnectors - APA Group" 434:
In December 2008, ownership of Directlink (as well as
743:"AER final decision approves Directlink conversion" 215: 207: 199: 191: 183: 173: 165: 160: 152: 144: 134: 124: 119: 109: 101: 96: 86: 76: 68: 58: 48: 43: 31: 361:Essential Energy - Terranora Electrical Substation 322:) & connected via a 3.5 km (2.2 mi) 203:110 kV (Bungalora), 132 kV (Mullumbimby) 865:Arrillaga, J.; Liu, Y. H.; Watson, N. R. (2007). 38:Location of Directlink (Terranora) Interconnector 965:Electric power infrastructure in New South Wales 955:Electric power transmission systems in Australia 681:"Electric/Gas Utilities Could Threaten Telecoms" 912:. 17 September 2010. p. 5. Archived from 269:Directlink - Mullumbimby Static Inverter Plant 868:Flexible power transmission: the HVDC options 716:"APA Group H1 profit rises, upgrades outlook" 579: 577: 8: 313:Directlink - Bungalora Static Inverter Plant 970:Electric power infrastructure in Queensland 499: 497: 392:Queensland – New South Wales Interconnector 390:(the other is the 330 kV Dual Circuit 278:), 5 kilometres (3.1 mi) Southwest of 644: 642: 975:Energy infrastructure completed in 2000 897:"Review of Last Resort Planning Powers" 841:"Terranora interconnector (Directlink)" 835: 833: 584:Grant-Taylor, Tony (20 December 2016). 493: 105:Energy Infrastructure Investments (EII) 28: 685:Transmission & Distribution World 540: 538: 536: 514:. May 2010. p. 7. Archived from 32:Directlink (Terranora) Interconnector 7: 25: 691:. 1 February 1999. Archived from 945:2000 establishments in Australia 714:Wong, Fayen (25 February 2008). 406:), TransÉnergie–a subsidiary of 749:. 10 March 2006. Archived from 328:Terranora Electrical Substation 125:Manufacturer of conductor/cable 216: 1: 324:AC Overhead Transmission Line 442:Corporation with 49.9%, and 280:Mullumbimby, New South Wales 429:Australian Energy Regulator 236:High Voltage Direct Current 135:Manufacturer of substations 1006: 586:"APT buys DirectLink line" 480:. Individual water-cooled 372:Terranora, New South Wales 456:Voltage Source Converters 36: 350:28.241194°S 153.503528°E 326:to the NorthEast to the 120:Construction information 950:HVDC transmission lines 649:Sood, Vijay K. (2004). 478:real and reactive power 413:Fonds de solidarité FTQ 187:63 km (39 mi) 355:-28.241194; 153.503528 302:28.25556°S 153.47222°E 258:28.57083°S 153.45222°E 229:Directlink (Terranora) 148:TransÉnergie Australia 873:John Wiley & Sons 659:. pp. 172, 174. 450:Technical description 161:Technical information 97:Ownership information 905:Sinclair Knight Merz 695:on 28 September 2011 625:PennWell Corporation 307:-28.25556; 153.47222 263:-28.57083; 153.45222 621:Power-Gen Worldwide 460:alternating current 345: /  297: /  253: /  169:Land cable (buried) 431:on 10 March 2006. 882:978-0-470-05688-2 745:(Press release). 666:978-1-4020-7890-3 562:on 20 August 2011 226: 225: 69:General direction 16:(Redirected from 997: 929: 928: 926: 924: 918: 901: 893: 887: 886: 862: 856: 855: 853: 851: 837: 828: 827: 825: 823: 809: 803: 798: 792: 791: 789: 787: 777: 769: 763: 762: 760: 758: 753:on 25 March 2012 739: 733: 732: 730: 728: 711: 705: 704: 702: 700: 677: 671: 670: 646: 637: 636: 634: 632: 613: 607: 606: 604: 602: 591:The Courier-Mail 581: 572: 571: 569: 567: 561: 555:. Archived from 550: 542: 531: 530: 528: 526: 520: 509: 501: 369: 368: 366: 365: 364: 362: 357: 356: 351: 346: 343: 342: 341: 338: 321: 320: 318: 317: 316: 314: 309: 308: 303: 298: 295: 294: 293: 290: 277: 276: 274: 273: 272: 270: 265: 264: 259: 254: 251: 250: 249: 246: 218: 29: 21: 1005: 1004: 1000: 999: 998: 996: 995: 994: 990:Northern Rivers 935: 934: 933: 932: 922: 920: 919:on 6 March 2016 916: 899: 895: 894: 890: 883: 875:. p. 310. 864: 863: 859: 849: 847: 839: 838: 831: 821: 819: 811: 810: 806: 799: 795: 785: 783: 775: 771: 770: 766: 756: 754: 741: 740: 736: 726: 724: 713: 712: 708: 698: 696: 679: 678: 674: 667: 648: 647: 640: 630: 628: 615: 614: 610: 600: 598: 583: 582: 575: 565: 563: 559: 548: 544: 543: 534: 524: 522: 521:on 24 July 2011 518: 507: 503: 502: 495: 490: 452: 400: 384:New South Wales 379: 360: 358: 354: 352: 348: 347: 344: 339: 336: 334: 332: 331: 312: 310: 306: 304: 300: 299: 296: 291: 288: 286: 284: 283: 282:and Bungalora ( 268: 266: 262: 260: 256: 255: 252: 247: 244: 242: 240: 239: 174:Type of current 63:New South Wales 39: 23: 22: 15: 12: 11: 5: 1003: 1001: 993: 992: 987: 982: 977: 972: 967: 962: 957: 952: 947: 937: 936: 931: 930: 888: 881: 857: 829: 817:www.apa.com.au 804: 793: 764: 734: 706: 672: 665: 638: 608: 573: 532: 492: 491: 489: 486: 451: 448: 404:Country Energy 399: 396: 232:Interconnector 224: 223: 220: 213: 212: 209: 205: 204: 201: 197: 196: 193: 189: 188: 185: 181: 180: 175: 171: 170: 167: 163: 162: 158: 157: 154: 150: 149: 146: 142: 141: 136: 132: 131: 126: 122: 121: 117: 116: 111: 107: 106: 103: 99: 98: 94: 93: 88: 84: 83: 78: 74: 73: 70: 66: 65: 60: 56: 55: 50: 46: 45: 41: 40: 37: 34: 33: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1002: 991: 988: 986: 983: 981: 978: 976: 973: 971: 968: 966: 963: 961: 958: 956: 953: 951: 948: 946: 943: 942: 940: 915: 911: 907: 906: 898: 892: 889: 884: 878: 874: 870: 869: 861: 858: 846: 842: 836: 834: 830: 818: 814: 808: 805: 802: 797: 794: 781: 774: 768: 765: 752: 748: 744: 738: 735: 723: 722: 717: 710: 707: 694: 690: 686: 682: 676: 673: 668: 662: 658: 654: 653: 645: 643: 639: 626: 622: 618: 612: 609: 597: 593: 592: 587: 580: 578: 574: 558: 554: 547: 541: 539: 537: 533: 517: 513: 506: 500: 498: 494: 487: 485: 483: 479: 475: 471: 467: 463: 461: 457: 449: 447: 445: 441: 437: 432: 430: 424: 422: 417: 415: 414: 409: 405: 397: 395: 393: 389: 385: 380: 377: 373: 367: 340:153°30′12.7″E 329: 325: 319: 281: 275: 237: 233: 230: 221: 214: 210: 206: 202: 198: 194: 190: 186: 182: 179: 176: 172: 168: 164: 159: 155: 151: 147: 143: 140: 137: 133: 130: 127: 123: 118: 115: 112: 108: 104: 100: 95: 92: 89: 85: 82: 79: 75: 71: 67: 64: 61: 57: 54: 51: 47: 42: 35: 30: 27: 19: 960:Hydro-Québec 921:. Retrieved 914:the original 903: 891: 867: 860: 848:. Retrieved 820:. Retrieved 816: 807: 796: 784:. Retrieved 782:. March 2010 767: 755:. Retrieved 751:the original 737: 725:. Retrieved 719: 709: 697:. Retrieved 693:the original 689:Penton Media 684: 675: 651: 629:. Retrieved 627:. 1 May 2001 620: 611: 599:. Retrieved 596:News Limited 589: 564:. Retrieved 557:the original 523:. Retrieved 516:the original 468: 464: 453: 446:with 30.2%. 433: 425: 418: 411: 408:Hydro-Québec 401: 381: 337:28°14′28.3″S 231: 228: 227: 192:Power rating 184:Total length 153:Commissioned 26: 985:Tweed Shire 980:Byron Shire 822:30 December 374:in Eastern 353: / 305: / 292:153°28′20″E 261: / 219:of circuits 211:±80 kV 195:180 MW 145:Contractors 81:Mullumbimby 72:south-north 939:Categories 488:References 436:Murraylink 388:Queensland 359: ( 311: ( 289:28°15′20″S 267: ( 248:153°27′8″E 245:28°34′15″S 208:DC voltage 200:AC voltage 18:Directlink 512:TransGrid 444:Osaka Gas 421:APA Group 376:Australia 114:APA Group 91:Bungalora 53:Australia 657:Springer 470:HVDC VSC 440:Marubeni 394:(QNI)). 178:HVDC VSC 110:Operator 44:Location 923:12 June 786:12 June 757:12 June 727:12 June 721:Reuters 699:12 June 601:12 June 525:12 June 398:History 49:Country 879:  850:9 June 663:  631:8 June 566:9 June 410:, and 917:(PDF) 900:(PDF) 776:(PDF) 560:(PDF) 549:(PDF) 519:(PDF) 508:(PDF) 102:Owner 59:State 925:2011 910:AEMC 877:ISBN 852:2011 824:2018 788:2011 759:2011 729:2011 701:2011 661:ISBN 633:2011 603:2011 568:2011 527:2011 482:IGBT 474:IGBT 386:and 370:) @ 166:Type 156:2000 77:From 845:ABB 780:AER 747:AER 553:ABB 217:No. 139:ABB 129:ABB 941:: 908:. 902:. 871:. 843:. 832:^ 815:. 778:. 718:. 687:. 683:. 655:. 641:^ 623:. 619:. 594:. 588:. 576:^ 551:. 535:^ 510:. 496:^ 87:To 927:. 885:. 854:. 826:. 790:. 761:. 731:. 703:. 669:. 635:. 605:. 570:. 529:. 363:) 330:( 315:) 271:) 222:3 20:)

Index

Directlink
Australia
New South Wales
Mullumbimby
Bungalora
APA Group
ABB
ABB
HVDC VSC
High Voltage Direct Current
28°34′15″S 153°27′8″E / 28.57083°S 153.45222°E / -28.57083; 153.45222 (Directlink - Mullumbimby Static Inverter Plant)
Mullumbimby, New South Wales
28°15′20″S 153°28′20″E / 28.25556°S 153.47222°E / -28.25556; 153.47222 (Directlink - Bungalora Static Inverter Plant)
AC Overhead Transmission Line
Terranora Electrical Substation
28°14′28.3″S 153°30′12.7″E / 28.241194°S 153.503528°E / -28.241194; 153.503528 (Essential Energy - Terranora Electrical Substation)
Terranora, New South Wales
Australia
New South Wales
Queensland
Queensland – New South Wales Interconnector
Country Energy
Hydro-Québec
Fonds de solidarité FTQ
APA Group
Australian Energy Regulator
Murraylink
Marubeni
Osaka Gas