Dogger Bank Wind Farm

Source 📝

439: 2668: 1952: 3954: 3181: 1966: 1938: 3942: 2818: 415:. The two sites lie 131 kilometres (81 mi) from the East Yorkshire coast. Dogger Bank Creyke Beck A will cover an area of 515 square kilometres (199 sq mi), and Dogger Bank Creyke Beck B will cover an area of 599 square kilometres (231 sq mi). Planning consent was granted for up to 400 turbines on 17 February 2015. These two projects were owned by 367:(RWE subsidiary) has taken Teesside B and renamed it to Sofia Offshore Wind Farm. Originally projected to produce up to 9 GW of power, the plan was scaled down to 7.2 GW in 2014, and scaled down even further to 4.8 GW in 2015. As of 2023, it is projected that Dogger Bank A, B and C will produce 3.6 GW of power. Some of the steel used is from 3966: 3193: 359:– in November 2008 in response to the third licence round. In January 2010, Forewind was announced as the developer for the Dogger Bank Zone, the largest of the Round 3 zones. Statoil increases its share from Statkraft, beginning in 2017. In August 2017 new ownership arrangements were announced, SSE and 474:
Dogger Bank C will use GE Haliade 14 MW turbines. Installation of the turbines is set to begin in 2025 with completion of the overall project in 2026. Similar to Dogger Bank A&B, a 15-year Power Purchase Agreement was agreed in November 2021. All output (estimated at 18 TWh/year) from A, B
584:
This second application (C and D) was planned to comprise two wind farms, each generating up to 1.2 GW of electricity. It was originally expected that planning consent would be determined in 2017. However, in August 2015 Forewind scrapped the final phase and returned the remaining area of the
567:
Dogger Bank Teesside A & B comprised two wind farms, each generating up to 1.2 GW of electricity. Dogger Bank Teesside A lies 196 kilometres (122 mi) from the shore and will cover an area of 560 square kilometres (220 sq mi). Dogger Bank Teesside B lies 165 kilometres
509:
is moving forward with two new offshore wind farms in the Dogger Bank area, Dogger Bank South West and Dogger Bank South East. Each will have a capacity of 1.5 GW generation. Following the Round 4 leasing process, RWE obtained approval from the UK Secretary of State for Business, Energy and
450:
Haliade-X 13 MW offshore wind turbines over both sites, meaning that 95 turbines will be used on each site. The availability of upgraded Haliade-X turbines rated at 13 MW rather than 12 MW means that each site will be capable of generating up to 1.235 GW, for a total of
331:
The Dogger Bank is an attractive location for offshore wind farms because it is far away from shore, avoiding complaints about the visual impact of wind turbines, yet the water depth is shallow enough for traditional fixed foundation wind turbine designs. Fixed-foundation wind turbines are
406:
The first phase was called Dogger Bank Creyke Beck A and B. The original plan called for two offshore wind farms each generating up to 1.2 GW of electricity, with a total installed capacity of up to 2.4 GW. They would connect to the existing Creyke Beck substation near
601:
complex on one or more artificial islands to be constructed on Dogger Bank as part of a European system for sustainable electricity. The power hub would interconnect the three national power grids with each other and with the Dogger Bank Wind Farm.
550:
Dogger Bank Teesside were intended to be the second and third stage of development of the Dogger Bank Zone. It was divided into two phases of development: Dogger Bank Teesside A & B and Dogger Bank Teesside C & D. These would connect to the
280:). In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2  2036: 568:(103 mi) from the shore and will cover an area of 593 square kilometres (229 sq mi). Planning consent was granted for 400 turbines on 5 August 2015. Since 2017 SSE and Equinor own Dogger Bank Teesside A (renamed to 538:
are investigating the potential to increase the size of the Dogger Bank Wind Farm, which is currently under construction. This additional phase will be known as Dogger Bank D. The grid has the capability to support up to 1320 MW.
2841: 4027: 374:
In 2022 it was announced that the Dogger Bank A, B & C wind farms would be expanded to add an additional wind farm Dogger Bank D. Additionally the Crown Estate leased out a 3 GW zone named Dogger Bank South.
462:
In April 2023, SSE announced that the world's first unmanned High Voltage Direct Current (HVDC) substation had been installed at Dogger Bank A, with similar infrastructure to be completed for Dogger Bank B and C.
605:
A study commissioned by Dutch electrical grid operator TenneT reported in February 2017 that as much as 110 gigawatts of wind energy generating capacity could ultimately be developed at the Dogger Bank location.
2029: 1498: 398:
As of November 2022 there are four zones in the Dogger Bank Wind Farm project that are either in the pre-construction or full construction phase. They are Dogger Bank A, B & C as well as Sophia.
2022: 3231: 1018: 2687: 1371: 547:
This section provides the historical context for the development of the Dogger Bank Wind Farm and the various name and design changes that have occurred since it was first proposed.
1457: 1890: 1327: 3271: 2762: 3915: 3614: 1084: 3339: 482:
to stabilize the grid and reduce grid cost. The converter will provide up to 200 megavolt amperes with a price of 0.34 £/MVAr/SP from April 2025 and ten years on.
3224: 455:, an activity that will lead to the creation of 120 skilled jobs at the port during construction. Turbine installation commenced in August 2023 at Dogger Bank A. 3997: 1780: 1235: 459:(PPA) for 15 years were signed in November 2020. Offshore cable laying started in April 2022. Installation of the turbine foundations was started in July 2022. 379: 1490: 1287: 1261: 1309: 494:
14 MW turbines. Offshore construction is set to begin in 2023 with completion of the overall project in 2026. 44 turbines use recyclable blades made in
3958: 3261: 3217: 2961: 3969: 3654: 1184: 819: 709: 4002: 478:
As a first for UK offshore wind, Dogger Bank C onshore converter station was among the winners of an auction to provide the cheapest options for
320:, located between 130 and 200 kilometres (81 and 124 mi) off the east coast of Yorkshire. It is one of nine offshore zones belonging to the 1104: 3256: 2004: 1995: 1026: 1677: 1563: 69: 1652: 1129: 284:, creating a combined capacity of 4.8 GW. As of 2024, a total of 8.1 GW generating capacity is expected to be installed on Dogger Bank. 4007: 626: 408: 1816: 3749: 2851: 1449: 2513: 1475: 907: 873: 793: 3699: 3664: 2941: 2857: 2345: 1630: 1581: 510:
Industrial Strategy (BEIS) to enter into an Agreement for Lease with The Crown Estate in summer 2022. . In December 2023, RWE and
3875: 3684: 3240: 3152: 3569: 2378: 2180: 2081: 1422: 1076: 742: 3769: 3709: 3054: 2976: 1051: 637: 302:. All four farms were successful in the 2019 contract for difference auction and have a delivery date between 2023 and 2025. 3644: 3514: 2725: 630: 552: 3251: 3044: 3024: 2498: 2368: 2363: 2340: 2260: 2124: 3744: 3369: 2108: 1791: 929: 438: 3805: 3774: 3649: 2971: 2951: 2926: 2772: 2623: 2523: 2270: 2220: 2210: 2129: 2092: 2103: 1397: 332:
economically limited to maximum water depths of 40 to 50 metres (130 to 160 ft), at greater water depths new
3704: 3659: 3629: 3049: 3029: 2539: 2215: 1838: 2593: 3815: 3674: 3639: 3579: 3559: 3479: 3399: 3394: 3069: 2578: 2255: 2235: 2200: 2150: 2049: 598: 456: 412: 2330: 2325: 2383: 3920: 3846: 3554: 3519: 3489: 3389: 3374: 3004: 2936: 2793: 2518: 2350: 2275: 2265: 2250: 2230: 2190: 1971: 3925: 3851: 3739: 3534: 3504: 3484: 3449: 3074: 3059: 2608: 2245: 2185: 2098: 2045: 1262:"GE Renewable Energy launches the uprated Haliade-X 13 MW wind turbine for the UK's Dogger Bank Wind Farm" 368: 3856: 3564: 3499: 3464: 3444: 3429: 3404: 3039: 3014: 2981: 2966: 2897: 2875: 2692: 2667: 2613: 2588: 2568: 2508: 333: 3897: 956: 556: 2583: 1328:"Export Cable Installation Marks Official Start of Offshore Construction on World's Largest Wind Farm" 988: 3734: 3549: 3539: 3419: 3384: 2946: 2788: 2452: 2412: 2355: 2225: 2205: 2014: 1653:"Forewind development consent order application for Dogger Bank accepted by UK Planning Inspectorate" 3719: 3595: 3544: 3509: 3379: 3364: 3359: 3354: 3294: 2598: 2240: 1951: 1732: 1681: 363:(formerly Statoil) have each taken 50% share in Dogger Bank Creyke Beck A, B and Teesside A, while 2466: 1209: 1158: 4022: 3890: 3754: 3634: 3574: 3454: 2618: 2427: 2291: 2195: 2086: 495: 181: 2649: 2320: 17: 2573: 1608: 1372:"World's first unmanned HVDC offshore platform installed at world's largest offshore wind farm" 390:
would significantly fund the Dogger Bank wind farm projects through an £11 billion investment.
3946: 3883: 3800: 3795: 3724: 3714: 2718: 2644: 2432: 717: 325: 4017: 3992: 3810: 3764: 3759: 3600: 3469: 3136: 3116: 3111: 3106: 2931: 2869: 2437: 2422: 2397: 1491:"SSE and Equinor's Dogger Bank C to be 'first UK offshore wind farm to help stabilise grid'" 597:
Dutch, German, and Danish electrical grid operators are cooperating in a project to build a
447: 3197: 1471: 466:
A 107m long wind turbine blade failed during commissioning of the Dogger Bank A wind farm.
305:
On 10 October 2023 Dogger Bank wind farm started producing electricity for the first time.
3689: 3679: 3474: 3424: 3414: 3319: 3101: 2483: 1863: 1345: 846: 252:. It is considered to be the world's largest offshore windfarm. It was developed by the 3836: 3669: 3459: 3434: 3314: 3309: 3034: 3009: 1957: 1943: 1891:"Tesla builds 'Europe's largest battery' near Dogger Bank offshore wind power landfall" 634: 531: 491: 479: 47: 1703: 1288:"First campaign to install turbines at world's largest offshore wind farm is underway" 682: 657: 3986: 3524: 3409: 3329: 3299: 2442: 2057: 1755: 4012: 3841: 3820: 3694: 3209: 3185: 3096: 3079: 2881: 2803: 2711: 2503: 2447: 2417: 2335: 1180: 824: 815: 586: 321: 244:
under construction 130 to 200 kilometres (81 to 124 mi) off the east coast of
3494: 2956: 2478: 2305: 1965: 313: 57: 3861: 3729: 3529: 3439: 3279: 3064: 2682: 2603: 2553: 2145: 1933: 1916: 452: 721: 446:
On 21 September 2020, it was announced that Dogger Bank A and B will use 190
84: 71: 2986: 2817: 1917:"MASSIVE Storage. THIS is How To Power the Grid With 100% Renewable Energy!" 610: 356: 317: 249: 245: 241: 122: 3941: 563:
Dogger Bank Teesside A & B (Dogger Bank C and Sofia Offshore Wind Farm)
1236:"HVDC technology to connect world's largest offshore windfarm to the grid" 220: 2846: 2373: 340: 281: 253: 2842:
Deutsche Gesellschaft zum Bau und Betrieb von Endlagern für Abfallstoffe
1105:"BREAKING: SSE, Equinor Plan 1.3 GW Dogger Bank D Offshore Wind Project" 336:
designs are required, which currently cost significantly more to build.
3284: 2757: 2066: 1586: 535: 420: 416: 360: 352: 344: 768: 3324: 3289: 2863: 2798: 2767: 1537: 1512: 614: 515: 387: 364: 348: 298:
while Teesside B is developed by Sofia Offshore Wind Farm Limited as
1817:"Artificial island is planned on Dogger Bank for cheaper wind power" 1564:"108-Metre Recyclable Blades to Spin on Sofia Wind Farm Offshore UK" 518:
signed an agreement to develop a 3GW windfarm at Dogger Bank South.
451:
2.47 GW. Turbines will be pre-assembled at Able Seaton Port in
710:"World's largest offshore windfarm project starts powering UK grid" 613:
will sign a contract to work with the German and Dutch branches of
1582:"RWE and Masdar to co-develop giant British offshore wind project" 1346:"Dogger Bank: Work starts on 'world's largest' offshore wind farm" 1130:"Sunak wraps up 11-hour Cop28 trip with new deal for UK wind farm" 437: 1864:"Cottingham: Europe's biggest battery storage system switched on" 475:
and C were thus in contract, a stepping stone towards financing.
2165: 1185:"World's biggest offshore windfarm approved for Yorkshire coast" 820:"World's biggest offshore windfarm approved for Yorkshire coast" 572:), while Dogger Bank Teesside B was taken by Innogy and renamed 432: 4028:
Nationally Significant Infrastructure Projects (United Kingdom)
3213: 2707: 2018: 287:
Since 2017 Creyke Beck A and B and Teesside A are developed by
3304: 2734: 1450:"Entire Output of World's Largest Offshore Wind Farm Sold Out" 989:"Dogger Bank Creyke Beck offshore wind farm plans move closer" 511: 506: 428: 424: 383: 1019:"Dogger Bank wind farm zone to be scaled back by 20 per cent" 609:
At the North Seas Energy Forum in Brussels on 23 March 2017,
794:"Contracts for Difference (CfD) Allocation Round 3: results" 629:
in the East Riding of Yorkshire, the Pillswood 196 MWh
874:"Floating Wind Farms: Great Concept, Implausible Economics" 625:
Adjacent to Creyke Beck substation for the wind farm, near
1982: 1310:"Power Purchase Agreements signed for Dogger Bank A and B" 1210:"Eni buys 20% stake in UK's Dogger Bank wind farm project" 743:"Forewind Abandons Dogger Bank Teesside C & D Project" 208: 1756:"Dogger Bank Teesside C & D 2.4GW projects cancelled" 1052:"Utility Week – Forewind scraps final Dogger Bank phase" 256:
consortium, with three phases envisioned - first phase (
1423:"GE's Haliade-X 14MW turbine to debut at Dogger Bank C" 683:"Largest offshore wind farm celebrates power milestone" 2703: 1290:(Press release). Dogger Bank Wind Farm. 3 August 2023 847:"Deep Water - The next step for offshore wind energy" 1077:"Dogger Bank Offshore Wind Farm to Feature UK Steel" 382:
on 1 December 2023, it was agreed that energy firms
343:
consortium was formed by the four owner companies –
3908: 3874: 3829: 3783: 3622: 3613: 3588: 3347: 3338: 3270: 3145: 3129: 3089: 2995: 2919: 2910: 2890: 2834: 2825: 2781: 2763:
Elektriciteits Produktiemaatschappij Zuid-Nederland
2750: 2741: 2675: 2632: 2561: 2552: 2532: 2491: 2477: 2461: 2405: 2396: 2313: 2304: 2284: 2173: 2164: 2138: 2117: 2074: 2065: 2056: 617:; thereafter a feasibility study will be produced. 203: 198: 180: 139: 131: 121: 116: 108: 100: 63: 53: 43: 34: 3916:List of offshore wind farms in the United Kingdom 1398:"Turbine blade fails on Dogger Bank installation" 853:. European Wind Energy Association. 31 July 2013 1704:"Dogger Bank wind farm plan off Teesside coast" 640:, capable of producing 98 MW for 2 hours. 3225: 2719: 2030: 8: 2688:Pre-nationalisation electric power companies 1727: 1725: 1672: 1670: 1631:"First application for Dogger Bank projects" 1153: 1151: 27:Group of wind farms off the coast of England 1655:. Renewable Energy Magazine. 1 October 2013 3619: 3344: 3232: 3218: 3210: 2916: 2831: 2747: 2726: 2712: 2704: 2558: 2488: 2402: 2310: 2170: 2071: 2062: 2037: 2023: 2015: 1839:"First meeting of North Seas Energy Forum" 31: 3262:Offshore wind power in the United Kingdom 3655:European Offshore Wind Deployment Centre 983: 981: 930:"Statoil increases in UK offshore wind" 902: 900: 898: 896: 894: 649: 3257:Renewable energy in the United Kingdom 1472:"NOA Pennines High Voltage Pathfinder" 1012: 1010: 1790:. Royal Haskoning DHV. Archived from 1501:from the original on 8 February 2022. 1478:from the original on 9 February 2022. 1460:from the original on 2 December 2021. 1448:Durakovic, Adnan (24 November 2021). 1268:. General Electric. 21 September 2020 1098: 1096: 1094: 1087:from the original on 13 January 2022. 1046: 1044: 951: 949: 947: 7: 3998:Offshore wind farms in the North Sea 3965: 3192: 1781:"Offshore Wind Capacity Dogger Bank" 1396:Harper, Rachael (5 September 2024). 677: 675: 585:Dogger Bank development zone to the 2962:Mülheim-Kärlich Nuclear Power Plant 1103:Buljan, Adrijana (6 October 2022). 1017:Laister, David (19 February 2014). 2870:Nabucco Gas Pipeline International 1489:Richard, Craig (8 February 2022). 957:"Dogger Bank Windfarms Newsletter" 25: 2942:Gundremmingen Nuclear Power Plant 2858:Gundremmingen Nuclear Power Plant 1991:National Infrastructure Planning 1562:Durakovic, Adnan (9 March 2023). 3964: 3953: 3952: 3940: 3241:Wind power in the United Kingdom 3191: 3180: 3179: 3153:Advanced Plant Management System 2852:Gesellschaft für Nuklear-Service 2816: 2666: 1964: 1950: 1936: 1889:Lee, Andrew (21 November 2022). 1733:"Dogger Bank Teesside C & D" 1678:"Dogger Bank Teesside A & B" 435:power transfer cables to shore. 162:Siemens Gamesa 14-222 DD (Sofia) 18:Dogger Bank A Offshore Wind Farm 708:Lawson, Alex (9 October 2023). 4003:Proposed wind farms in England 3055:North Hoyle Offshore Wind Farm 2977:Nordsee-Ost offshore wind farm 1633:. Statkraft. 29 September 2013 1314:www.windtech-international.com 580:Dogger Bank Teesside C & D 1: 631:battery storage power station 394:Final design and construction 289:Dogger Bank Wind Farm Limited 132:Distance from shore 3252:Energy in the United Kingdom 3045:Little Barford Power Station 3025:Great Yarmouth Power Station 2089:(co-fires, and full biomass) 2006:Dogger Bank Teesside A&B 633:was installed in 2022 using 328:for UK offshore wind farms. 4008:Round 3 offshore wind farms 2773:RWE Supply & Trading CZ 908:"Dogger Bank offshore zone" 4044: 2972:Niederaussem Power Station 2952:Lingen Nuclear Power Plant 2927:Biblis Nuclear Power Plant 1919:. Fully Charged. May 2023. 1680:. Forewind. Archived from 522:Potential additional zones 3934: 3247: 3161: 3050:Littlebrook Power Station 3030:Greater Gabbard wind farm 2814: 2664: 1819:. Sky News. 13 March 2017 1760:www.windpoweroffshore.com 1159:"Dogger Bank Creyke Beck" 457:Power Purchase Agreements 324:which formed part of the 217: 148: 144: 39: 3816:Sofia Offshore Wind Farm 3070:Staythorpe Power Station 2211:Ferrybridge A, B & C 2050:Yorkshire and the Humber 1788:North Sea Wind Power Hub 1542:Sofia Offshore Wind Farm 1517:Sofia Offshore Wind Farm 1495:www.windpowermonthly.com 599:North Sea Wind Power Hub 593:North Sea Wind Power Hub 574:Sofia Offshore Wind Farm 413:East Riding of Yorkshire 300:Sofia Offshore Wind Farm 176:100 × 14 MW (Sofia) 160:GE Haliade-X 14.7 MW (C) 153:Make and model 135:125 km (78 mi) 3921:North Sea Offshore Grid 3005:Aberthaw power stations 2937:Garzweiler surface mine 1997:Dogger Bank Creyke Beck 1972:Renewable energy portal 240:is a group of offshore 182:Nameplate capacity 3926:Wind power in Scotland 3700:Lynn and Inner Dowsing 3075:Tilbury power stations 3060:Pembroke Power Station 2524:Ferrybridge Multi-fuel 2046:Electricity generation 1984:Dogger Bank Wind Farms 1609:"Dogger Bank Teesside" 1240:Riviera Maritime Media 658:"Forewind Dogger Bank" 557:Redcar & Cleveland 443: 369:Port Talbot Steelworks 293:Dogger Bank A, B and C 158:GE Haliade-X 13 MW (B) 156:GE Haliade-X 13 MW (A) 3947:Wind power portal 3040:Knabs Ridge wind farm 3020:Dogger Bank Wind Farm 3015:Didcot power stations 2982:Rostock Power Station 2967:Neurath Power Station 2898:Horizon Nuclear Power 2876:Rostock Power Station 2693:Yorkshire Electricity 2093:Ferrybridge Multifuel 1538:"Indicative Timeline" 1474:. . 7 February 2022. 1427:Dogger Bank Wind Farm 1376:www.sserenewables.com 878:MIT Technology Review 773:Dogger Bank Wind Farm 441: 334:floating wind turbine 238:Dogger Bank Wind Farm 174:87 × 14.7 MW (C) 140:Power generation 35:Dogger Bank Wind Farm 3876:Installation vessels 3770:West of Duddon Sands 3082:(proposed wind farm) 2947:Hambach surface mine 1684:on 21 September 2014 1513:"Components Summary" 1183:(17 February 2015). 1083:. 22 December 2021. 818:(17 February 2015). 427:acquired 20% stake. 194:3000 MW (South) 192:1400 MW (Sofia) 3615:Offshore wind farms 3515:Little Cheyne Court 2241:Monckton Coke Works 1843:European Commission 1797:on 16 February 2021 1316:. 24 November 2020. 995:. 25 September 2013 796:. 20 September 2019 555:at a substation in 490:Sofia will use 100 431:was chosen for the 423:, in December 2020 402:Dogger Bank A and B 326:third licence round 272:) and third phase ( 199:External links 172:95 × 13 MW (B) 170:95 × 13 MW (A) 81: /  3340:Onshore wind farms 2146:ARBRE (Eggborough) 1987:(official website) 1870:. 21 November 2022 1429:. 18 December 2020 444: 167:Units planned 104:Under construction 3980: 3979: 3870: 3869: 3609: 3608: 3370:Askam and Ireleth 3207: 3206: 3125: 3124: 2906: 2905: 2812: 2811: 2701: 2700: 2662: 2661: 2658: 2657: 2548: 2547: 2473: 2472: 2392: 2391: 2379:South Humber Bank 2346:Humber Energy CHP 2300: 2299: 2181:Blackburn Meadows 2160: 2159: 2082:Blackburn Meadows 1242:. 30 October 2019 1216:. 4 December 2020 1136:. 1 December 2023 1056:utilityweek.co.uk 1023:Grimsby Telegraph 872:Martin, Richard. 689:. 10 October 2023 502:Dogger Bank South 248:, England in the 228: 227: 16:(Redirected from 4035: 3968: 3967: 3956: 3955: 3945: 3944: 3811:Neart Na Gaoithe 3775:Westermost Rough 3750:Sheringham Shoal 3620: 3345: 3234: 3227: 3220: 3211: 3195: 3194: 3183: 3182: 3174: 3169: 3137:Fritz Vahrenholt 3117:Nakhchivan field 3112:Nabucco pipeline 2932:Innogy Nordsee 1 2917: 2832: 2820: 2748: 2728: 2721: 2714: 2705: 2670: 2624:Westermost Rough 2559: 2489: 2403: 2311: 2171: 2072: 2063: 2039: 2032: 2025: 2016: 2009: 2000: 1988: 1974: 1969: 1968: 1960: 1955: 1954: 1946: 1941: 1940: 1939: 1921: 1920: 1913: 1907: 1906: 1904: 1902: 1886: 1880: 1879: 1877: 1875: 1860: 1854: 1853: 1851: 1849: 1835: 1829: 1828: 1826: 1824: 1813: 1807: 1806: 1804: 1802: 1796: 1785: 1777: 1771: 1770: 1768: 1766: 1751: 1745: 1744: 1742: 1740: 1729: 1720: 1719: 1717: 1715: 1700: 1694: 1693: 1691: 1689: 1674: 1665: 1664: 1662: 1660: 1649: 1643: 1642: 1640: 1638: 1627: 1621: 1620: 1618: 1616: 1605: 1599: 1598: 1596: 1594: 1578: 1572: 1571: 1559: 1553: 1552: 1550: 1548: 1534: 1528: 1527: 1525: 1523: 1509: 1503: 1502: 1486: 1480: 1479: 1468: 1462: 1461: 1445: 1439: 1438: 1436: 1434: 1419: 1413: 1412: 1410: 1408: 1393: 1387: 1386: 1384: 1382: 1368: 1362: 1361: 1359: 1357: 1342: 1336: 1335: 1334:. 29 April 2022. 1324: 1318: 1317: 1306: 1300: 1299: 1297: 1295: 1284: 1278: 1277: 1275: 1273: 1258: 1252: 1251: 1249: 1247: 1232: 1226: 1225: 1223: 1221: 1206: 1200: 1199: 1197: 1195: 1177: 1171: 1170: 1168: 1166: 1155: 1146: 1145: 1143: 1141: 1126: 1120: 1119: 1117: 1115: 1100: 1089: 1088: 1073: 1067: 1066: 1064: 1062: 1048: 1039: 1038: 1036: 1034: 1025:. Archived from 1014: 1005: 1004: 1002: 1000: 985: 976: 975: 973: 971: 961: 953: 942: 941: 939: 937: 926: 920: 919: 917: 915: 904: 889: 888: 886: 884: 869: 863: 862: 860: 858: 843: 837: 836: 834: 832: 812: 806: 805: 803: 801: 790: 784: 783: 781: 779: 765: 759: 758: 756: 754: 739: 733: 732: 730: 728: 705: 699: 698: 696: 694: 679: 670: 669: 667: 665: 660:. Forewind. 2017 654: 442:Able Seaton Port 309:Project overview 264:, second phase ( 232:Wind farm layout 221:edit on Wikidata 213: 210: 190:1218 MW (C) 188:1235 MW (B) 186:1235 MW (A) 96: 95: 93: 92: 91: 86: 85:54.750°N 1.917°E 82: 79: 78: 77: 74: 32: 21: 4043: 4042: 4038: 4037: 4036: 4034: 4033: 4032: 3983: 3982: 3981: 3976: 3939: 3930: 3904: 3866: 3825: 3779: 3680:Hywind Scotland 3660:Greater Gabbard 3605: 3584: 3475:Goonhilly Downs 3334: 3320:Talisman Energy 3266: 3243: 3238: 3208: 3203: 3170: 3165: 3157: 3141: 3121: 3102:Gazela Pipeline 3085: 2997: 2991: 2912: 2902: 2886: 2827: 2826:Joint ventures 2821: 2808: 2777: 2743: 2737: 2732: 2702: 2697: 2671: 2654: 2633:Proposed/future 2628: 2544: 2528: 2481: 2469: 2462:Proposed/future 2457: 2388: 2331:Conoco Phillips 2296: 2280: 2156: 2134: 2130:Stallingborough 2118:Proposed/future 2113: 2052: 2043: 2003: 1994: 1981: 1978: 1977: 1970: 1963: 1956: 1949: 1942: 1937: 1935: 1930: 1925: 1924: 1915: 1914: 1910: 1900: 1898: 1888: 1887: 1883: 1873: 1871: 1862: 1861: 1857: 1847: 1845: 1837: 1836: 1832: 1822: 1820: 1815: 1814: 1810: 1800: 1798: 1794: 1783: 1779: 1778: 1774: 1764: 1762: 1754:Weston, David. 1753: 1752: 1748: 1738: 1736: 1731: 1730: 1723: 1713: 1711: 1710:. 5 August 2015 1702: 1701: 1697: 1687: 1685: 1676: 1675: 1668: 1658: 1656: 1651: 1650: 1646: 1636: 1634: 1629: 1628: 1624: 1614: 1612: 1607: 1606: 1602: 1592: 1590: 1580: 1579: 1575: 1561: 1560: 1556: 1546: 1544: 1536: 1535: 1531: 1521: 1519: 1511: 1510: 1506: 1488: 1487: 1483: 1470: 1469: 1465: 1447: 1446: 1442: 1432: 1430: 1421: 1420: 1416: 1406: 1404: 1395: 1394: 1390: 1380: 1378: 1370: 1369: 1365: 1355: 1353: 1344: 1343: 1339: 1326: 1325: 1321: 1308: 1307: 1303: 1293: 1291: 1286: 1285: 1281: 1271: 1269: 1260: 1259: 1255: 1245: 1243: 1234: 1233: 1229: 1219: 1217: 1208: 1207: 1203: 1193: 1191: 1179: 1178: 1174: 1164: 1162: 1157: 1156: 1149: 1139: 1137: 1134:The Independent 1128: 1127: 1123: 1113: 1111: 1102: 1101: 1092: 1075: 1074: 1070: 1060: 1058: 1050: 1049: 1042: 1032: 1030: 1016: 1015: 1008: 998: 996: 987: 986: 979: 969: 967: 959: 955: 954: 945: 935: 933: 928: 927: 923: 913: 911: 906: 905: 892: 882: 880: 871: 870: 866: 856: 854: 845: 844: 840: 830: 828: 814: 813: 809: 799: 797: 792: 791: 787: 777: 775: 767: 766: 762: 752: 750: 749:. 7 August 2015 741: 740: 736: 726: 724: 707: 706: 702: 692: 690: 681: 680: 673: 663: 661: 656: 655: 651: 646: 623: 621:Battery storage 595: 582: 565: 545: 524: 504: 488: 396: 311: 235: 234: 233: 224: 207: 193: 191: 189: 187: 175: 173: 171: 161: 159: 157: 117:Wind farm 89: 87: 83: 80: 75: 72: 70: 68: 67: 28: 23: 22: 15: 12: 11: 5: 4041: 4039: 4031: 4030: 4025: 4020: 4015: 4010: 4005: 4000: 3995: 3985: 3984: 3978: 3977: 3975: 3974: 3962: 3950: 3935: 3932: 3931: 3929: 3928: 3923: 3918: 3912: 3910: 3906: 3905: 3903: 3902: 3895: 3892:MPI Resolution 3888: 3880: 3878: 3872: 3871: 3868: 3867: 3865: 3864: 3859: 3854: 3849: 3844: 3839: 3837:Atlantic Array 3833: 3831: 3827: 3826: 3824: 3823: 3818: 3813: 3808: 3803: 3798: 3793: 3787: 3785: 3781: 3780: 3778: 3777: 3772: 3767: 3762: 3757: 3752: 3747: 3742: 3737: 3732: 3727: 3722: 3717: 3712: 3707: 3702: 3697: 3692: 3687: 3682: 3677: 3675:Humber Gateway 3672: 3667: 3665:Gunfleet Sands 3662: 3657: 3652: 3647: 3642: 3637: 3632: 3626: 3624: 3617: 3611: 3610: 3607: 3606: 3604: 3603: 3598: 3592: 3590: 3586: 3585: 3583: 3582: 3580:Winscales Moor 3577: 3572: 3567: 3562: 3560:Trimdon Grange 3557: 3552: 3547: 3542: 3537: 3532: 3527: 3522: 3517: 3512: 3507: 3502: 3497: 3492: 3487: 3482: 3480:Great Eppleton 3477: 3472: 3467: 3462: 3457: 3452: 3447: 3442: 3437: 3435:Cold Northcott 3432: 3427: 3422: 3417: 3412: 3407: 3402: 3400:Brechfa Forest 3397: 3395:Braes of Doune 3392: 3387: 3382: 3377: 3375:Beinn an Tuirc 3372: 3367: 3362: 3357: 3351: 3349: 3342: 3336: 3335: 3333: 3332: 3327: 3322: 3317: 3315:SSE Renewables 3312: 3310:Siemens Gamesa 3307: 3302: 3297: 3292: 3287: 3282: 3276: 3274: 3268: 3267: 3265: 3264: 3259: 3254: 3248: 3245: 3244: 3239: 3237: 3236: 3229: 3222: 3214: 3205: 3204: 3202: 3201: 3189: 3176: 3175: 3172:Decommissioned 3162: 3159: 3158: 3156: 3155: 3149: 3147: 3143: 3142: 3140: 3139: 3133: 3131: 3127: 3126: 3123: 3122: 3120: 3119: 3114: 3109: 3104: 3099: 3093: 3091: 3087: 3086: 3084: 3083: 3077: 3072: 3067: 3062: 3057: 3052: 3047: 3042: 3037: 3032: 3027: 3022: 3017: 3012: 3010:Atlantic Array 3007: 3001: 2999: 2993: 2992: 2990: 2989: 2984: 2979: 2974: 2969: 2964: 2959: 2954: 2949: 2944: 2939: 2934: 2929: 2923: 2921: 2914: 2908: 2907: 2904: 2903: 2901: 2900: 2894: 2892: 2888: 2887: 2885: 2884: 2879: 2873: 2867: 2861: 2855: 2849: 2844: 2838: 2836: 2829: 2823: 2822: 2815: 2813: 2810: 2809: 2807: 2806: 2801: 2796: 2791: 2789:American Water 2785: 2783: 2779: 2778: 2776: 2775: 2770: 2765: 2760: 2754: 2752: 2745: 2739: 2738: 2733: 2731: 2730: 2723: 2716: 2708: 2699: 2698: 2696: 2695: 2690: 2685: 2679: 2677: 2673: 2672: 2665: 2663: 2660: 2659: 2656: 2655: 2653: 2652: 2647: 2642: 2636: 2634: 2630: 2629: 2627: 2626: 2621: 2616: 2611: 2606: 2601: 2596: 2591: 2586: 2581: 2579:Humber Gateway 2576: 2571: 2565: 2563: 2556: 2550: 2549: 2546: 2545: 2543: 2542: 2536: 2534: 2530: 2529: 2527: 2526: 2521: 2516: 2511: 2506: 2501: 2495: 2493: 2486: 2475: 2474: 2471: 2470: 2465: 2463: 2459: 2458: 2456: 2455: 2450: 2445: 2440: 2435: 2430: 2425: 2420: 2415: 2409: 2407: 2400: 2394: 2393: 2390: 2389: 2387: 2386: 2381: 2376: 2371: 2369:Killingholme B 2366: 2364:Killingholme A 2361: 2353: 2348: 2343: 2341:Glanford Brigg 2338: 2333: 2328: 2323: 2317: 2315: 2308: 2302: 2301: 2298: 2297: 2295: 2294: 2288: 2286: 2282: 2281: 2279: 2278: 2273: 2268: 2263: 2261:Skelton Grange 2258: 2253: 2248: 2243: 2238: 2233: 2228: 2223: 2218: 2213: 2208: 2203: 2198: 2193: 2188: 2183: 2177: 2175: 2168: 2162: 2161: 2158: 2157: 2155: 2154: 2148: 2142: 2140: 2136: 2135: 2133: 2132: 2127: 2121: 2119: 2115: 2114: 2112: 2111: 2106: 2104:Markham Grange 2101: 2096: 2090: 2084: 2078: 2076: 2069: 2060: 2058:Power stations 2054: 2053: 2044: 2042: 2041: 2034: 2027: 2019: 2013: 2012: 2011: 2010: 2001: 1989: 1976: 1975: 1961: 1958:Weather portal 1947: 1944:England portal 1932: 1931: 1929: 1928:External links 1926: 1923: 1922: 1908: 1881: 1855: 1830: 1808: 1772: 1746: 1721: 1695: 1666: 1644: 1622: 1600: 1573: 1554: 1529: 1504: 1481: 1463: 1440: 1414: 1388: 1363: 1352:. 26 July 2022 1337: 1319: 1301: 1279: 1253: 1227: 1201: 1172: 1147: 1121: 1090: 1068: 1040: 1006: 977: 964:doggerbank.com 943: 921: 890: 864: 851:WindEurope.org 838: 807: 785: 760: 734: 700: 671: 648: 647: 645: 642: 635:Tesla Megapack 622: 619: 594: 591: 581: 578: 564: 561: 544: 541: 532:SSE Renewables 523: 520: 503: 500: 492:Siemens Gamesa 487: 484: 480:reactive power 395: 392: 310: 307: 231: 230: 229: 226: 225: 218: 215: 214: 205: 201: 200: 196: 195: 184: 178: 177: 168: 164: 163: 154: 150: 149: 146: 145: 142: 141: 137: 136: 133: 129: 128: 125: 119: 118: 114: 113: 110: 106: 105: 102: 98: 97: 65: 61: 60: 55: 51: 50: 48:United Kingdom 45: 41: 40: 37: 36: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 4040: 4029: 4026: 4024: 4021: 4019: 4016: 4014: 4011: 4009: 4006: 4004: 4001: 3999: 3996: 3994: 3991: 3990: 3988: 3973: 3972: 3963: 3961: 3960: 3951: 3949: 3948: 3943: 3937: 3936: 3933: 3927: 3924: 3922: 3919: 3917: 3914: 3913: 3911: 3907: 3901: 3900: 3899:MPI Discovery 3896: 3894: 3893: 3889: 3887: 3886: 3885:MPI Adventure 3882: 3881: 3879: 3877: 3873: 3863: 3860: 3858: 3855: 3853: 3850: 3848: 3847:Docking Shoal 3845: 3843: 3840: 3838: 3835: 3834: 3832: 3828: 3822: 3819: 3817: 3814: 3812: 3809: 3807: 3804: 3802: 3799: 3797: 3794: 3792: 3789: 3788: 3786: 3782: 3776: 3773: 3771: 3768: 3766: 3763: 3761: 3758: 3756: 3753: 3751: 3748: 3746: 3743: 3741: 3738: 3736: 3733: 3731: 3728: 3726: 3723: 3721: 3718: 3716: 3713: 3711: 3708: 3706: 3703: 3701: 3698: 3696: 3693: 3691: 3688: 3686: 3685:Kentish Flats 3683: 3681: 3678: 3676: 3673: 3671: 3668: 3666: 3663: 3661: 3658: 3656: 3653: 3651: 3648: 3646: 3643: 3641: 3638: 3636: 3633: 3631: 3628: 3627: 3625: 3621: 3618: 3616: 3612: 3602: 3599: 3597: 3594: 3593: 3591: 3587: 3581: 3578: 3576: 3573: 3571: 3568: 3566: 3563: 3561: 3558: 3556: 3555:Slieve Rushen 3553: 3551: 3548: 3546: 3543: 3541: 3538: 3536: 3533: 3531: 3528: 3526: 3525:Moel Maelogan 3523: 3521: 3520:Milton Keynes 3518: 3516: 3513: 3511: 3508: 3506: 3503: 3501: 3498: 3496: 3493: 3491: 3490:Holmside Hall 3488: 3486: 3483: 3481: 3478: 3476: 3473: 3471: 3468: 3466: 3463: 3461: 3458: 3456: 3453: 3451: 3448: 3446: 3443: 3441: 3438: 3436: 3433: 3431: 3428: 3426: 3423: 3421: 3418: 3416: 3413: 3411: 3410:Carland Cross 3408: 3406: 3403: 3401: 3398: 3396: 3393: 3391: 3390:Blyth Harbour 3388: 3386: 3383: 3381: 3378: 3376: 3373: 3371: 3368: 3366: 3363: 3361: 3358: 3356: 3353: 3352: 3350: 3346: 3343: 3341: 3337: 3331: 3330:ScottishPower 3328: 3326: 3323: 3321: 3318: 3316: 3313: 3311: 3308: 3306: 3303: 3301: 3300:REG WindPower 3298: 3296: 3293: 3291: 3288: 3286: 3283: 3281: 3278: 3277: 3275: 3273: 3269: 3263: 3260: 3258: 3255: 3253: 3250: 3249: 3246: 3242: 3235: 3230: 3228: 3223: 3221: 3216: 3215: 3212: 3200: 3199: 3190: 3188: 3187: 3178: 3177: 3173: 3168: 3164: 3163: 3160: 3154: 3151: 3150: 3148: 3144: 3138: 3135: 3134: 3132: 3128: 3118: 3115: 3113: 3110: 3108: 3107:Gjøa oilfield 3105: 3103: 3100: 3098: 3095: 3094: 3092: 3088: 3081: 3078: 3076: 3073: 3071: 3068: 3066: 3063: 3061: 3058: 3056: 3053: 3051: 3048: 3046: 3043: 3041: 3038: 3036: 3033: 3031: 3028: 3026: 3023: 3021: 3018: 3016: 3013: 3011: 3008: 3006: 3003: 3002: 3000: 2994: 2988: 2985: 2983: 2980: 2978: 2975: 2973: 2970: 2968: 2965: 2963: 2960: 2958: 2955: 2953: 2950: 2948: 2945: 2943: 2940: 2938: 2935: 2933: 2930: 2928: 2925: 2924: 2922: 2918: 2915: 2909: 2899: 2896: 2895: 2893: 2889: 2883: 2880: 2877: 2874: 2871: 2868: 2865: 2862: 2859: 2856: 2853: 2850: 2848: 2845: 2843: 2840: 2839: 2837: 2833: 2830: 2824: 2819: 2805: 2802: 2800: 2797: 2795: 2792: 2790: 2787: 2786: 2784: 2780: 2774: 2771: 2769: 2766: 2764: 2761: 2759: 2756: 2755: 2753: 2749: 2746: 2742:Divisions and 2740: 2736: 2729: 2724: 2722: 2717: 2715: 2710: 2709: 2706: 2694: 2691: 2689: 2686: 2684: 2681: 2680: 2678: 2676:Organisations 2674: 2669: 2651: 2648: 2646: 2643: 2641: 2638: 2637: 2635: 2631: 2625: 2622: 2620: 2617: 2615: 2612: 2610: 2607: 2605: 2602: 2600: 2597: 2595: 2592: 2590: 2587: 2585: 2582: 2580: 2577: 2575: 2572: 2570: 2567: 2566: 2564: 2560: 2557: 2555: 2551: 2541: 2538: 2537: 2535: 2531: 2525: 2522: 2520: 2517: 2515: 2512: 2510: 2507: 2505: 2502: 2500: 2499:Allerton Park 2497: 2496: 2494: 2490: 2487: 2485: 2480: 2476: 2468: 2464: 2460: 2454: 2451: 2449: 2446: 2444: 2441: 2439: 2436: 2434: 2431: 2429: 2426: 2424: 2421: 2419: 2416: 2414: 2411: 2410: 2408: 2404: 2401: 2399: 2395: 2385: 2382: 2380: 2377: 2375: 2372: 2370: 2367: 2365: 2362: 2360: 2357: 2354: 2352: 2349: 2347: 2344: 2342: 2339: 2337: 2334: 2332: 2329: 2327: 2324: 2322: 2319: 2318: 2316: 2312: 2309: 2307: 2303: 2293: 2290: 2289: 2287: 2283: 2277: 2274: 2272: 2269: 2267: 2264: 2262: 2259: 2257: 2254: 2252: 2249: 2247: 2244: 2242: 2239: 2237: 2234: 2232: 2229: 2227: 2224: 2222: 2219: 2217: 2214: 2212: 2209: 2207: 2204: 2202: 2199: 2197: 2194: 2192: 2189: 2187: 2184: 2182: 2179: 2178: 2176: 2172: 2169: 2167: 2163: 2152: 2149: 2147: 2144: 2143: 2141: 2137: 2131: 2128: 2126: 2123: 2122: 2120: 2116: 2110: 2109:Templeborough 2107: 2105: 2102: 2100: 2097: 2094: 2091: 2088: 2085: 2083: 2080: 2079: 2077: 2073: 2070: 2068: 2064: 2061: 2059: 2055: 2051: 2047: 2040: 2035: 2033: 2028: 2026: 2021: 2020: 2017: 2008: 2007: 2002: 1999: 1998: 1993: 1992: 1990: 1986: 1985: 1980: 1979: 1973: 1967: 1962: 1959: 1953: 1948: 1945: 1934: 1927: 1918: 1912: 1909: 1896: 1892: 1885: 1882: 1869: 1865: 1859: 1856: 1844: 1840: 1834: 1831: 1818: 1812: 1809: 1793: 1789: 1782: 1776: 1773: 1761: 1757: 1750: 1747: 1734: 1728: 1726: 1722: 1709: 1705: 1699: 1696: 1683: 1679: 1673: 1671: 1667: 1654: 1648: 1645: 1632: 1626: 1623: 1610: 1604: 1601: 1589: 1588: 1583: 1577: 1574: 1569: 1568:Offshore Wind 1565: 1558: 1555: 1543: 1539: 1533: 1530: 1518: 1514: 1508: 1505: 1500: 1496: 1492: 1485: 1482: 1477: 1473: 1467: 1464: 1459: 1455: 1454:Offshore Wind 1451: 1444: 1441: 1428: 1424: 1418: 1415: 1403: 1399: 1392: 1389: 1377: 1373: 1367: 1364: 1351: 1347: 1341: 1338: 1333: 1332:Offshore Wind 1329: 1323: 1320: 1315: 1311: 1305: 1302: 1289: 1283: 1280: 1267: 1263: 1257: 1254: 1241: 1237: 1231: 1228: 1215: 1211: 1205: 1202: 1190: 1186: 1182: 1181:Harvey, Fiona 1176: 1173: 1160: 1154: 1152: 1148: 1135: 1131: 1125: 1122: 1110: 1109:Offshore Wind 1106: 1099: 1097: 1095: 1091: 1086: 1082: 1081:Offshore Wind 1078: 1072: 1069: 1057: 1053: 1047: 1045: 1041: 1029:on 2 May 2014 1028: 1024: 1020: 1013: 1011: 1007: 994: 990: 984: 982: 978: 965: 958: 952: 950: 948: 944: 931: 925: 922: 909: 903: 901: 899: 897: 895: 891: 879: 875: 868: 865: 852: 848: 842: 839: 827: 826: 821: 817: 816:Harvey, Fiona 811: 808: 795: 789: 786: 774: 770: 769:"Our History" 764: 761: 748: 747:Offshore Wind 744: 738: 735: 723: 719: 715: 711: 704: 701: 688: 684: 678: 676: 672: 659: 653: 650: 643: 641: 639: 638:LFP batteries 636: 632: 628: 620: 618: 616: 612: 607: 603: 600: 592: 590: 588: 579: 577: 575: 571: 570:Dogger Bank C 562: 560: 558: 554: 553:National Grid 548: 543:Initial plans 542: 540: 537: 533: 529: 528: 527:Dogger Bank D 521: 519: 517: 513: 508: 501: 499: 497: 493: 485: 483: 481: 476: 472: 471: 470:Dogger Bank C 467: 464: 460: 458: 454: 449: 440: 436: 434: 430: 426: 422: 418: 414: 410: 404: 403: 399: 393: 391: 389: 385: 381: 376: 372: 370: 366: 362: 358: 354: 350: 346: 342: 337: 335: 329: 327: 323: 319: 315: 308: 306: 303: 301: 297: 296: 290: 285: 283: 279: 275: 271: 267: 263: 259: 258:Creyke Beck A 255: 251: 247: 243: 239: 222: 216: 212: 206: 202: 197: 185: 183: 179: 169: 166: 165: 155: 152: 151: 147: 143: 138: 134: 130: 126: 124: 120: 115: 111: 107: 103: 99: 94: 90:54.750; 1.917 66: 62: 59: 56: 52: 49: 46: 42: 38: 33: 30: 19: 3970: 3957: 3938: 3898: 3891: 3884: 3852:First Flight 3842:Celtic Array 3821:Triton Knoll 3790: 3740:Scroby Sands 3695:London Array 3535:Ovenden Moor 3505:Langley Park 3485:Hadyard Hill 3196: 3184: 3171: 3166: 3097:Amercentrale 3080:Triton Knoll 3019: 2882:Urenco Group 2828:and holdings 2804:Thames Water 2744:subsidiaries 2639: 2609:Ovenden Moor 2479:Incinerators 2428:Linton Falls 2359:(mothballed) 2358: 2336:East Knapton 2271:Thorpe Marsh 2221:Huddersfield 2005: 1996: 1983: 1911: 1899:. Retrieved 1897:. NHST Media 1894: 1884: 1872:. Retrieved 1867: 1858: 1846:. Retrieved 1842: 1833: 1821:. Retrieved 1811: 1799:. Retrieved 1792:the original 1787: 1775: 1763:. Retrieved 1759: 1749: 1737:. Retrieved 1712:. Retrieved 1707: 1698: 1686:. Retrieved 1682:the original 1657:. Retrieved 1647: 1635:. Retrieved 1625: 1613:. Retrieved 1603: 1591:. Retrieved 1585: 1576: 1567: 1557: 1545:. Retrieved 1541: 1532: 1520:. Retrieved 1516: 1507: 1494: 1484: 1466: 1453: 1443: 1431:. Retrieved 1426: 1417: 1405:. Retrieved 1402:Fishing News 1401: 1391: 1379:. Retrieved 1375: 1366: 1354:. Retrieved 1349: 1340: 1331: 1322: 1313: 1304: 1294:30 September 1292:. Retrieved 1282: 1272:23 September 1270:. Retrieved 1265: 1256: 1244:. Retrieved 1239: 1230: 1218:. Retrieved 1213: 1204: 1192:. Retrieved 1189:The Guardian 1188: 1175: 1163:. Retrieved 1138:. Retrieved 1133: 1124: 1112:. Retrieved 1108: 1080: 1071: 1059:. Retrieved 1055: 1031:. Retrieved 1027:the original 1022: 997:. Retrieved 992: 968:. Retrieved 963: 934:. Retrieved 924: 912:. Retrieved 881:. Retrieved 877: 867: 855:. Retrieved 850: 841: 829:. Retrieved 825:The Guardian 823: 810: 800:20 September 798:. Retrieved 788: 776:. Retrieved 772: 763: 751:. Retrieved 746: 737: 725:. Retrieved 714:The Guardian 713: 703: 691:. Retrieved 686: 662:. Retrieved 652: 624: 608: 604: 596: 587:Crown Estate 583: 573: 569: 566: 559:, Teesside. 549: 546: 530: 526: 525: 505: 489: 477: 473: 469: 468: 465: 461: 445: 405: 401: 400: 397: 380:COP28 summit 377: 373: 338: 330: 322:Crown Estate 312: 304: 299: 294: 292: 288: 286: 277: 273: 269: 265: 261: 257: 237: 236: 29: 3857:Navitus Bay 3796:East Anglia 3791:Dogger Bank 3710:North Hoyle 3670:Gwynt y Môr 3565:West Durham 3500:Knabs Ridge 3495:Kilgallioch 3465:Fraisthorpe 3445:Crystal Rig 3430:Coal Clough 3405:Burton Wold 3035:Gwynt y Môr 2957:Mittelplate 2640:Dogger Bank 2589:Knabs Ridge 2569:Fraisthorpe 2540:Foss Island 2433:Linton Lock 2216:Foss Island 1901:22 November 1874:22 November 1593:19 February 1407:9 September 936:9 September 314:Dogger Bank 88: / 64:Coordinates 58:Dogger Bank 3987:Categories 3862:Shell Flat 3806:Moray East 3735:Robin Rigg 3730:Rhyl Flats 3645:Burbo Bank 3550:Scout Moor 3540:Pates Hill 3530:Out Newton 3440:Conisholme 3420:Cefn Croes 3385:Blood Hill 3280:Ecotricity 3065:Rhyl Flats 2913:facilities 2911:Places and 2683:Drax Group 2650:Sober Hill 2604:Out Newton 2438:River Bain 2423:Kirkthorpe 2413:Brotherton 2326:Castleford 2321:A.H. Marks 2292:White Rose 2256:Sculcoates 2236:Mexborough 2201:Eggborough 2153:(co-fired) 2151:Eggborough 2095:(co-fires) 1765:8 December 1735:. Forewind 1611:. Forewind 1246:30 October 1214:www.ft.com 1194:21 October 1161:. Forewind 1140:1 December 1114:6 November 970:8 December 727:10 October 693:10 October 644:References 627:Cottingham 453:Hartlepool 409:Cottingham 316:is in the 274:Teesside C 266:Teesside A 242:wind farms 209:doggerbank 4023:Statkraft 3830:Cancelled 3720:Race Bank 3596:Den Brook 3545:Royd Moor 3510:Lindhurst 3380:Black Law 3365:Arecleoch 3360:Ardrossan 3355:Alltwalis 3272:Companies 2987:RWE Tower 2599:Royd Moor 2574:Hook Moor 2514:Sheffield 2453:Thrybergh 2384:Thornhill 2351:Immingham 2276:Wakefield 2266:Thornhill 2251:Rotherham 2231:Kirkstall 2191:Doncaster 1547:3 January 1522:3 January 1433:3 January 1220:3 January 1061:12 August 932:. Statoil 778:3 January 753:3 January 722:0261-3077 611:Energinet 411:, in the 357:Statkraft 318:North Sea 250:North Sea 246:Yorkshire 3959:Category 3784:Proposed 3755:Teesside 3745:Seagreen 3635:Beatrice 3589:Proposed 3575:Whitelee 3570:Westmill 3455:Delabole 3450:Dagenham 3186:Category 2872:(16.67%) 2847:Forewind 2619:Teesside 2614:Rusholme 2519:Wheldale 2509:Newlincs 2504:Kirklees 2374:Salt End 2285:Proposed 2246:Neepsend 2186:Bradford 2099:Glanford 1895:Recharge 1868:BBC News 1848:23 March 1823:23 March 1714:6 August 1708:BBC News 1499:Archived 1476:Archived 1458:Archived 1381:21 April 1350:BBC News 1085:Archived 993:BBC News 687:BBC News 341:Forewind 254:Forewind 127:Offshore 112:multiple 109:Owner(s) 54:Location 4018:SSE plc 3993:Equinor 3971:Commons 3801:Hornsea 3725:Rampion 3715:Ormonde 3650:Dudgeon 3285:Equinor 3198:Commons 2998:Kingdom 2996:United 2920:Germany 2878:(24.6%) 2835:Current 2799:RWE Dea 2758:Amprion 2751:Current 2645:Hornsea 2594:Lissett 2443:Ruswarp 2067:Biomass 1739:22 July 1688:22 July 1659:22 July 1637:22 July 1615:22 July 1587:Reuters 1356:27 July 1165:22 July 999:22 July 914:22 July 883:26 July 857:26 July 831:26 July 536:Equinor 421:Equinor 378:At the 361:Equinor 353:Statoil 204:Website 73:54°45′N 44:Country 3765:Walney 3760:Thanet 3705:Methil 3630:Barrow 3623:Active 3601:Viking 3470:Garves 3348:Active 3325:Vestas 3295:Ørsted 3290:Innogy 3130:People 2891:Former 2864:Innogy 2794:Npower 2782:Former 2768:Essent 2584:Keadby 2562:Active 2533:Closed 2492:Active 2467:Naburn 2448:Settle 2418:Burley 2406:Active 2356:Keadby 2314:Active 2226:Keadby 2206:Elland 2174:Closed 2139:Closed 2075:Active 1801:26 May 966:. 2018 720:  664:9 June 615:TenneT 516:Masdar 388:Masdar 365:Innogy 101:Status 76:1°55′E 3909:Other 3690:Lincs 3640:Blyth 3425:Clyde 3415:Carno 3146:Other 3090:Other 2866:(75%) 2860:(75%) 2854:(28%) 2484:waste 2398:Hydro 2125:Brigg 1795:(PDF) 1784:(PDF) 1033:1 May 960:(PDF) 910:. RWE 514:firm 486:Sofia 219:[ 3460:Farr 3167:Sold 2554:Wind 2196:Drax 2166:Coal 2087:Drax 1903:2022 1876:2022 1850:2017 1825:2017 1803:2019 1767:2018 1741:2014 1716:2015 1690:2014 1661:2014 1639:2014 1617:2014 1595:2024 1549:2021 1524:2021 1435:2021 1409:2024 1383:2023 1358:2022 1296:2023 1274:2020 1248:2019 1222:2021 1196:2020 1167:2014 1142:2023 1116:2022 1063:2015 1035:2014 1001:2014 972:2018 938:2016 916:2014 885:2017 859:2017 833:2017 802:2019 780:2021 755:2021 729:2023 718:ISSN 695:2023 666:2017 534:and 496:Hull 433:HVDC 419:and 386:and 355:and 339:The 276:and 268:and 260:and 211:.com 123:Type 4013:RWE 3305:RWE 2735:RWE 2306:Gas 2048:in 512:UAE 507:RWE 429:ABB 425:Eni 417:SSE 384:RWE 349:RWE 345:SSE 291:as 3989:: 1893:. 1866:. 1841:. 1786:. 1758:. 1724:^ 1706:. 1669:^ 1584:. 1566:. 1540:. 1515:. 1497:. 1493:. 1456:. 1452:. 1425:. 1400:. 1374:. 1348:. 1330:. 1312:. 1266:GE 1264:. 1238:. 1212:. 1187:. 1150:^ 1132:. 1107:. 1093:^ 1079:. 1054:. 1043:^ 1021:. 1009:^ 991:. 980:^ 962:. 946:^ 893:^ 876:. 849:. 822:. 771:. 745:. 716:. 712:. 685:. 674:^ 589:. 576:. 498:. 448:GE 371:. 351:, 347:, 282:GW 262:B) 3233:e 3226:t 3219:v 2727:e 2720:t 2713:v 2482:/ 2038:e 2031:t 2024:v 1905:. 1878:. 1852:. 1827:. 1805:. 1769:. 1743:. 1718:. 1692:. 1663:. 1641:. 1619:. 1597:. 1570:. 1551:. 1526:. 1437:. 1411:. 1385:. 1360:. 1298:. 1276:. 1250:. 1224:. 1198:. 1169:. 1144:. 1118:. 1065:. 1037:. 1003:. 974:. 940:. 918:. 887:. 861:. 835:. 804:. 782:. 757:. 731:. 697:. 668:. 295:, 278:D 270:B 223:] 20:)

Index

Dogger Bank A Offshore Wind Farm
United Kingdom
Dogger Bank
54°45′N 1°55′E / 54.750°N 1.917°E / 54.750; 1.917
Type
Nameplate capacity
doggerbank.com
edit on Wikidata
wind farms
Yorkshire
North Sea
Forewind
GW
Dogger Bank
North Sea
Crown Estate
third licence round
floating wind turbine
Forewind
SSE
RWE
Statoil
Statkraft
Equinor
Innogy
Port Talbot Steelworks
COP28 summit
RWE
Masdar
Cottingham