217:
337:
36:
279:. The crash resulted in multiple explosions and a subsequent fire. This forced the evacuation of motorists from the Burnley Tunnel. The Domain Tunnel was closed and any drivers in the Domain Tunnel at the time drove out normally. Cross passage tunnels between the Domain and Burnley Tunnels were used by evacuees to exit from the Burnley Tunnel into the Domain Tunnel.
325:
Regular radio transmission cannot be received while in the tunnel. Commercial stations have installed their own transmitters. A variable speed limit applies in the tunnel. In normal circumstances, the speed limit is 80 km/h. During maintenance, a 40 km/h speed limit applies and normal
317:
being moved as construction continued, permitting the river to keep flowing. The tunnel carries three 3.5-metre wide traffic lanes with 0.5-metre wide shoulders, and has two cross tunnels to the Domain Tunnel. The road level is a maximum depth of 40 metres, and has a
369:
288:
film crew investigating the safety of the tunnel in light of previous events. Authorities are currently investigating if the crew, who were driving vehicles in the tunnel, may have contributed in instigating the crash.
796:
806:
527:
301:
tunnel at the west end, 680 metres of driven tunnel and 500m of cut and cover which includes a shallow river crossing. The western portal is shared with the longer
272:-Obayashi Joint Venture. It was officially opened to traffic on 16 April 2000 with a temporary 60 km/h speed limit, and was free to use until 26 April.
791:
284:
216:
66:
781:
771:
520:
309:
were used to dig the bored section of tunnel, while at the eastern end the 170-metre final section of cut and cover was built under the
500:
786:
776:
457:
220:
Interchange consisting of the
Burnley Tunnel entrance, Domain Tunnel entrance, Westgate freeway and Power Street/Kings Way ramps
669:
421:
391:
659:
513:
447:
801:
536:
59:
606:
727:
621:
689:
636:
586:
341:
249:
491:
714:
649:
709:
626:
571:
399:
576:
740:
664:
596:
591:
269:
719:
694:
611:
453:
241:
22:
21:
This article is about the tunnel in
Melbourne. For the tunnel of the same name in Sydney, see
750:
745:
732:
704:
699:
616:
566:
505:
336:
631:
581:
495:
684:
674:
561:
347:
302:
276:
237:
35:
765:
679:
644:
298:
654:
551:
310:
245:
282:
In May 2007 a dramatic incident involving a truck and a sedan was caught by an
556:
306:
275:
On 23 March 2007 just before 10am, three trucks and four cars collided in the
257:
157:
81:
68:
540:
314:
233:
229:
501:
Australian
Underground Construction and Tunnelling Association Project Page
319:
253:
109:
297:
The Domain Tunnel is 1.6 km long and comprises 460 metres of
215:
40:
The Domain Tunnel entrance adjacent to the Batman Avenue exit ramp
197:
509:
488:
483:
350:, the east-bound tunnel running parallel to the Domain Tunnel.
446:
Jian Zhao, Zhao; J. Nicholas
Shirlaw; Rajan Krishnan (2000).
326:
radio broadcast is regularly interrupted by announcements.
260:
and provides a bypass of the central business district.
797:
Buildings and structures in the City of
Melbourne (LGA)
268:
The tunnel was constructed between 1996 and 1999 by
206:
192:
184:
179:
171:
163:
153:
145:
137:
132:
124:
116:
105:
97:
58:
50:
45:
398:. thewest.com.au. 23 March 2007. Archived from
521:
305:that carries traffic in the other direction.
8:
28:
236:, which carries traffic westbound from the
528:
514:
506:
34:
27:
807:Transport in the City of Melbourne (LGA)
452:. Taylor & Francis. pp. 158–9.
392:"Three dead in Burnley Tunnel explosion"
360:
370:"Media Release: Domain Tunnel Opening"
7:
441:
439:
16:Road tunnel in Melbourne, Australia
449:Tunnels and Underground Structures
14:
792:2000 establishments in Australia
627:Gardiners Creek Trail Footbridge
422:"TV crew faces probe over crash"
335:
724:Swan Street/Wallen Road Bridge
695:Ruffey Trail Suspension Bridge
597:Diamond Creek Trail Footbridge
592:Darebin Creek Trail Footbridge
193:
1:
252:. The tunnel is part of the
782:Crossings of the Yarra River
537:Crossings of the Yarra River
228:is a road tunnel located in
141:Roadheader and cut and cover
772:Tunnels in Victoria (state)
751:Westerfolds Park Footbridge
368:Transurban (7 April 2000).
342:Australian Roads portal
823:
20:
787:Tunnels completed in 2000
777:Toll tunnels in Australia
547:
175:Controlled access highway
33:
733:Walmer Street Footbridge
567:Chandler Highway Bridges
637:Hawthorn Railway Bridge
607:Eastern Freeway Bridges
587:Cremorne Railway Bridge
715:Spotswood sewer tunnel
670:Manningham Road Bridge
650:Johnston Street Bridge
622:Fitzsimons Lane Bridge
494:1 October 2004 at the
424:. The Age. 12 May 2007
221:
710:Spencer Street Bridge
641:Heyington Rail Bridge
617:Fairfield Pipe Bridge
572:Charles Grimes Bridge
219:
577:Church Street Bridge
402:on 19 September 2006
256:Tollway operated by
244:, running under the
82:37.8257°S 144.9799°E
54:Melbourne, Australia
802:Southbank, Victoria
665:MacRobertson Bridge
396:The West Australian
372:. transurban.com.au
78: /
30:
720:Swan Street Bridge
660:King Street Bridge
612:Evan Walker Bridge
222:
87:-37.8257; 144.9799
759:
758:
737:Warrandyte Bridge
557:Burke Road Bridge
322:of less than 2%.
242:West Gate Freeway
214:
213:
112:tollway westbound
23:Cahill Expressway
814:
746:West Gate Bridge
705:Seafarers Bridge
700:Sandridge Bridge
530:
523:
516:
507:
471:
470:
468:
466:
443:
434:
433:
431:
429:
418:
412:
411:
409:
407:
388:
382:
381:
379:
377:
365:
340:
339:
285:A Current Affair
195:
93:
92:
90:
89:
88:
83:
79:
76:
75:
74:
71:
38:
31:
822:
821:
817:
816:
815:
813:
812:
811:
762:
761:
760:
755:
728:Victoria Bridge
632:Hawthorn Bridge
543:
534:
496:Wayback Machine
480:
475:
474:
464:
462:
460:
445:
444:
437:
427:
425:
420:
419:
415:
405:
403:
390:
389:
385:
375:
373:
367:
366:
362:
357:
334:
332:
295:
266:
207:Operating speed
86:
84:
80:
77:
72:
69:
67:
65:
64:
41:
26:
17:
12:
11:
5:
820:
818:
810:
809:
804:
799:
794:
789:
784:
779:
774:
764:
763:
757:
756:
754:
753:
748:
743:
738:
735:
730:
725:
722:
717:
712:
707:
702:
697:
692:
687:
685:Princes Bridge
682:
677:
675:Monash Freeway
672:
667:
662:
657:
652:
647:
642:
639:
634:
629:
624:
619:
614:
609:
604:
599:
594:
589:
584:
582:Collins Bridge
579:
574:
569:
564:
562:Burnley Tunnel
559:
554:
548:
545:
544:
535:
533:
532:
525:
518:
510:
504:
503:
498:
486:
479:
478:External links
476:
473:
472:
458:
435:
413:
383:
359:
358:
356:
353:
352:
351:
348:Burnley Tunnel
331:
328:
303:Burnley Tunnel
294:
291:
277:Burnley Tunnel
265:
262:
238:Monash Freeway
212:
211:
208:
204:
203:
200:
190:
189:
186:
182:
181:
177:
176:
173:
169:
168:
165:
161:
160:
155:
151:
150:
147:
143:
142:
139:
135:
134:
130:
129:
126:
122:
121:
118:
114:
113:
107:
103:
102:
99:
95:
94:
62:
56:
55:
52:
48:
47:
43:
42:
39:
15:
13:
10:
9:
6:
4:
3:
2:
819:
808:
805:
803:
800:
798:
795:
793:
790:
788:
785:
783:
780:
778:
775:
773:
770:
769:
767:
752:
749:
747:
744:
742:
739:
736:
734:
731:
729:
726:
723:
721:
718:
716:
713:
711:
708:
706:
703:
701:
698:
696:
693:
691:
690:Queens Bridge
688:
686:
683:
681:
680:Morell Bridge
678:
676:
673:
671:
668:
666:
663:
661:
658:
656:
653:
651:
648:
646:
645:Hoddle Bridge
643:
640:
638:
635:
633:
630:
628:
625:
623:
620:
618:
615:
613:
610:
608:
605:
603:
602:Domain Tunnel
600:
598:
595:
593:
590:
588:
585:
583:
580:
578:
575:
573:
570:
568:
565:
563:
560:
558:
555:
553:
550:
549:
546:
542:
538:
531:
526:
524:
519:
517:
512:
511:
508:
502:
499:
497:
493:
490:
487:
485:
482:
481:
477:
461:
459:90-5809-171-6
455:
451:
450:
442:
440:
436:
423:
417:
414:
401:
397:
393:
387:
384:
371:
364:
361:
354:
349:
346:
345:
344:
343:
338:
329:
327:
323:
321:
316:
312:
308:
304:
300:
299:cut and cover
292:
290:
287:
286:
280:
278:
273:
271:
263:
261:
259:
255:
251:
247:
243:
239:
235:
231:
227:
226:Domain Tunnel
218:
209:
205:
201:
199:
191:
187:
183:
178:
174:
170:
166:
162:
159:
156:
152:
149:16 April 2000
148:
144:
140:
136:
131:
127:
123:
119:
115:
111:
108:
104:
100:
96:
91:
63:
61:
57:
53:
49:
44:
37:
32:
29:Domain Tunnel
24:
19:
655:Kanes Bridge
601:
552:Bolte Bridge
463:. Retrieved
448:
428:30 September
426:. Retrieved
416:
404:. Retrieved
400:the original
395:
386:
374:. Retrieved
363:
333:
324:
296:
283:
281:
274:
267:
250:Kings Domain
225:
223:
210:80 km/h
18:
741:Webb Bridge
311:Yarra River
307:Roadheaders
246:Yarra River
188:1.6 km
138:Constructed
85: /
73:144°58′48″E
60:Coordinates
766:Categories
489:Transurban
355:References
270:Transfield
258:Transurban
167:Automotive
158:Transurban
70:37°49′33″S
541:Melbourne
315:cofferdam
313:, with a
234:Australia
230:Melbourne
180:Technical
172:Character
133:Operation
128:Southbank
492:Archived
484:CityLink
330:See also
320:gradient
254:CityLink
154:Operator
120:Richmond
110:CityLink
51:Location
46:Overview
264:History
240:to the
202:3 lanes
164:Traffic
465:8 July
456:
406:8 July
376:8 July
293:Design
185:Length
146:Opened
101:Active
98:Status
198:lanes
117:Start
106:Route
467:2008
454:ISBN
430:2021
408:2008
378:2008
248:and
224:The
539:in
196:of
194:No.
125:End
768::
438:^
394:.
232:,
529:e
522:t
515:v
469:.
432:.
410:.
380:.
25:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.