connected to an interchange formed by a one-way pair of roads running on the reclaimed Marina Centre, connecting Ophir and Rochor Roads at Beach Road. It would take traffic to Orchard, Chinatown and Little India. It would also run through the reclaimed land in front of Shenton Way and Raffles Quay, before going to the Telok Ayer Basin at South Quay, where it would connect to the one-way pair of roads at Prince Edward Road and Maxwell Road. It was planned to run on the elevated structure across the former Singapore Polytechnic at Shenton Way. A separate project was planned to even extend the expressway to Keppel Road, before going towards the Jurong Expressway (to be known as Ayer Rajah Expressway).
1087: 81: 260: 417:
Reclamation was expected to begin in six to nine months. The 280m long bridge was to be built at a height of 30 ft above high water level to allow ample headroom for ferries to use the channel. The new highway would turn landwards to South Quay and then to the vacant piece of land past the Singapore Polytechnic, before turning towards Anson Road. To provide space for construction work, the government acquired the former
244: 942: 820: 802: 25: 436:
Construction of the first phase of the East Coast Parkway from Fort Road to Marine Parade started in 1971 and was completed in December 1975. It was followed by an extension of Phase 2 which was completed in November 1975 to Bedok South Road and then Phase 3 was built together with Changi Airport in
412:
Plans for the coastal highway to reduce congestion at Golden Mile started on 30 July 1969. Detailed plans were put in place to create interchanges at Nicoll Highway, Bras Basah Road and Stamford Road. On 3 September 1970, a $ 35 million plan was put in place to reclaim more land off of Bedok, with
452:
Traffic lights remained on the expressway until the completion of the last flyover at Fort Road in 1989. The opening of ECP relieved the traffic load of the city area in the 1980s. Traffic volume at Nicoll Highway decreased by 20 per cent, which would otherwise worsen with the implemented ERP
425:
On 12 June 1974, tenders were invited for the construction of the super-highway which would link the east coast of Singapore to the city. The extension of East Coast Parkway was to run from Tanjong Rhu via the Kallang River to Marina Centre. Between the two crossings, the expressway would be
416:
On 24 May 1973, the government proceeded to build a $ 300 million highway across the harbour to the breakwater line outside Clifford Pier to ease peak hour congestion at the Collyer Quay area. The plans involved the reclamation of land off Nicoll Highway and the breakwater at Clifford Pier.
448:
Construction of Phase 4, stretching from Fort Road to Keppel Road began in 1977 and was opened on 18 April 1981 to Ophir Road, and on 26 September 1981 towards Keppel Road. The government had decided to further reclaim the Marina South area, linking Tanjong Rhu and Telok Ayer Basin.
421:
site in 1975, with the polytechnic shifting to Dover. Plans were made on 16 January 1974 to extend Siglap Road to the expressway. On 28 February 1974, the government also acquired two portions of land, for the extension of Bedok South Avenue 1 from Upper East Coast Road to the ECP.
483:
was built in the long, straight section of the ECP close to Changi Airport. This section can be easily identified by removable potted plants instead of the standard large trees on the median strip. However, the highway strip has never been used for emergency landing purposes.
433:. The expressway would also be linked to Ophir/Rochor Road, which would be built together with the flyover. The first phase would cover the portion from Tanjong Rhu Flyover to South Quay, while another section would lead from South Quay to Shenton Way. 464:
expressway was built and maintained with the conscious intention of giving visitors arriving via Singapore Changi Airport a good first impression of the country as they commute from the airport to the city centre.
472:(ERP) gantry near the Tanjong Rhu Flyover in the direction towards the city, one of the first two gantries to be set up in the country, which came into operation on 1 April 1998 together with the other gantry at 387:
The ECP then ends near the 16-kilometre mark and merges with Sheares Avenue (newly formed as part of the truncated section of the former route). From Sheares Avenue, a left turn goes to Marina Boulevard towards
342:
on 29 December 2013, a section of expressway after the Benjamin Sheares Bridge was truncated and another section at the Marina South area realigned and converted into an arterial road.
991: 372:
and Mountbatten areas. After Exit 13 for Fort Road (signed 14A eastbound), the ECP curves further inland passing through the interchange with the MCE and KPE before the
1086: 955: 429:
On 24 April 1975, five international firms were invited to the tender of the construction of East Coast Parkway, leading to the construction of
984: 1060: 964: 1506: 393: 1044: 916: 709: 499:
area realigned and converted to a major arterial road called Sheares Avenue. In the westbound direction, a new expressway called the
317: 1491: 1438: 977: 453:
gantries. Robinson Road and Cecil Street were better managed with lesser traffic jams with the declining load all the way to 1990s.
862: 413:
the final phase starting on 7 October 1970. On 18 December 1970, the government decided to reclaim more than 125 acres of land.
138: 290:. It is approximately 16 kilometres (9.9 mi) in length. As of July 2022, it is Singapore's third-longest expressway. 80: 1121: 1034: 142: 1452: 946: 886: 1237: 1422: 1192: 1167: 1054: 772: 696: 500: 346: 339: 313: 146: 1347: 1001: 952: 924: 328: 294: 248: 232: 205: 160: 331:
whose abbreviation ends with 'E' for 'Expressway', the East Coast Parkway abbreviation ends with 'P' instead.
1417: 1402: 1212: 1010: 492: 469: 430: 373: 298: 252: 376:
which offers a beautiful view of the downtown. The highway (still on the bridge) curves south and into the
1526: 1317: 1297: 1207: 1116: 1029: 838: 461: 1521: 1262: 1152: 1106: 1066: 1024: 782: 777: 532: 504: 438: 418: 377: 350: 335: 321: 302: 189: 150: 1516: 401: 1217: 1076: 536: 283: 1397: 1337: 1322: 1197: 1172: 1071: 739: 389: 437:
1980. Construction of Phase 3 began in May 1976, with two interchanges at Xilin Avenue and the
1377: 1342: 1312: 1272: 1049: 1511: 1407: 1292: 1157: 1137: 1101: 381: 259: 56: 969: 441:. It was expected to be completed by 1978. They were built on reclaimed land by the former 1501: 1307: 1282: 1162: 959: 920: 913: 576: 457: 442: 361: 324:
at the Changi Flyover, about 1 kilometre (0.62 mi) from the end of the expressway.
468:
Traffic congestion during the morning peak hours, however, led to the introduction of an
1496: 1232: 1142: 1111: 863:"East Coast Parkway (ECP) | Projects | Roads & Motoring | Land Transport Authority" 550: 357: 70: 42: 1485: 1382: 1177: 488: 480: 397: 369: 306: 264: 197: 1332: 1277: 1267: 1202: 1187: 1182: 1147: 750: 496: 275: 243: 1387: 1372: 1367: 1352: 1287: 1257: 1247: 1242: 1227: 1222: 1327: 1252: 473: 1467: 1454: 1412: 1362: 1357: 1302: 287: 179: 360:
before curving to follow the coastline after Xilin Avenue. It then follows
941: 563: 213: 1392: 193: 365: 320:(KPE). In the east, there is an interchange that connects ECP to the 201: 396:, or a right turn enters Central Boulevard that heads towards the 353:
could be interpreted as the southern east-west road in Singapore.
258: 242: 209: 24: 973: 312:
In the south, there are interchanges that connects ECP to the
729:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
334:
The East Coast Parkway used to be directly connected to the
34: 460:
on one side and high-rise housing on the other, the well-
541:
Eastbound terminus; continues east as Airport Boulevard
247:
Former section of East Coast Parkway eastbound towards
724:
Westbound terminus; continues west as Sheares Avenue
677:
Eastbound exit and entrance; westbound entrance only
85:
East Coast Parkway is labelled in single purple line.
1431: 1130: 1094: 1017: 223: 185: 175: 170: 156: 132: 124: 119: 111: 103: 95: 90: 21: 985: 48: 8: 914:Government Approves the Construction of MCE 701:Westbound exit and eastbound entrance only 568:Eastbound exit and westbound entrance only 62: 992: 978: 970: 356:The expressway first heads southeast from 286:that runs along the southeastern coast of 887:"5 myths about Changi Airport, debunked!" 263:East Coast Parkway westbound towards the 514: 965:Infopedia article on East Coast Parkway 794: 503:, was built to connect the ECP to the 18: 908: 906: 821:"Parkway: Phase 4 work to begin soon" 487:To facilitate the development of the 7: 338:. However, with the opening of the 953:Traffic cameras monitoring the ECP 491:, the ECP was truncated after the 345:The expressway, together with the 14: 1439:Singapore Underground Road System 646:Eastbound exit and entrance only 635:Eastbound exit and entrance only 604:Eastbound exit and entrance only 593:Westbound exit and entrance only 582:Westbound exit and entrance only 1085: 940: 839:"East Coast Parkway | Infopedia" 79: 23: 803:"THE KATONG TO CITY EXPRESSWAY" 1: 891:nowboarding.changiairport.com 688:Signed as Exit 14A eastbound 654:East Coast Park Service Road 612:East Coast Park Service Road 318:Kallang-Paya Lebar Expressway 99:16 km (9.9 mi) 562:Xilin Avenue, Simei Avenue, 64:கிழக்கு கடற்கரை விரைவுச்சாலை 49: 36:Lebuhraya Taman Pantai Timur 590:East Coast Park Carpark F3 479:A decommissioned emergency 1543: 1507:Downtown Core (Singapore) 1083: 1008: 773:Marina Coastal Expressway 728: 523: 520: 517: 501:Marina Coastal Expressway 314:Marina Coastal Expressway 307:Central Business District 228: 219: 166: 78: 63: 33: 1492:Expressways in Singapore 1002:expressways of Singapore 925:Land Transport Authority 746:     735:     549:Tanah Merah Coast Road, 394:Marina Bay Cruise Centre 329:expressways in Singapore 297:in the east through the 249:Singapore Changi Airport 233:Expressways of Singapore 206:Singapore Changi Airport 161:Singapore Changi Airport 1011:Road names in Singapore 493:Benjamin Sheares Bridge 470:Electronic Road Pricing 443:Public Works Department 431:Benjamin Sheares Bridge 374:Benjamin Sheares Bridge 364:past Upper East Coast, 299:Benjamin Sheares Bridge 255:(current Shears Avenue) 253:Benjamin Sheares Bridge 16:Expressway in Singapore 1117:Outer Ring Road System 495:, with the stretch at 267: 256: 35: 1107:Jurong Island Highway 843:eresources.nlb.gov.sg 825:eresources.nlb.gov.sg 807:eresources.nlb.gov.sg 783:Pan Island Expressway 778:Ayer Rajah Expressway 505:Ayer Rajah Expressway 439:Pan Island Expressway 419:Singapore Polytechnic 322:Pan Island Expressway 309:areas in the south. 262: 246: 1061:North–South Corridor 949:at Wikimedia Commons 674:Tanjong Katong Road 1468:1.3052°N 103.9212°E 1464: /  1218:Jalan Ahmad Ibrahim 134:Major intersections 1198:Eu Tong Sen Street 1122:West Coast Highway 1045:Kallang-Paya Lebar 1040:East Coast Parkway 958:2005-02-13 at the 947:East Coast Parkway 919:2007-08-18 at the 622:Bedok South Ave 1 390:Gardens by the Bay 272:East Coast Parkway 268: 257: 29:East Coast Parkway 1447: 1446: 1408:Upper Bukit Timah 1323:Old Choa Chu Kang 1318:North Buona Vista 1238:Jalan Bukit Merah 945:Media related to 761: 760: 740:Incomplete access 664:Still Road South 293:The ECP connects 241: 240: 115:Completed in 1981 91:Route information 1534: 1479: 1478: 1476: 1475: 1474: 1473:1.3052; 103.9212 1469: 1465: 1462: 1461: 1460: 1457: 1293:Marina Boulevard 1263:Jurong Town Hall 1158:Bencoolen Street 1102:Bukit Timah Road 1095:Semi-expressways 1089: 1000:Major roads and 994: 987: 980: 971: 944: 928: 910: 901: 900: 898: 897: 883: 877: 876: 874: 873: 859: 853: 852: 850: 849: 835: 829: 828: 817: 811: 810: 799: 754: 747: 742: 736: 515: 382:Marina Bay Sands 135: 83: 74: 66: 65: 60: 52: 51: 46: 38: 27: 19: 1542: 1541: 1537: 1536: 1535: 1533: 1532: 1531: 1482: 1481: 1472: 1470: 1466: 1463: 1458: 1455: 1453: 1451: 1450: 1448: 1443: 1427: 1423:Victoria Street 1413:Upper Serangoon 1126: 1090: 1081: 1013: 1004: 998: 960:Wayback Machine 937: 932: 931: 921:Wayback Machine 911: 904: 895: 893: 885: 884: 880: 871: 869: 861: 860: 856: 847: 845: 837: 836: 832: 819: 818: 814: 801: 800: 796: 791: 769: 763: 757: 749: 745: 738: 734: 730: 577:East Coast Park 513: 458:East Coast Park 410: 362:East Coast Park 133: 120:Major junctions 86: 68: 61: 54: 47: 40: 28: 17: 12: 11: 5: 1540: 1538: 1530: 1529: 1524: 1519: 1514: 1509: 1504: 1499: 1494: 1484: 1483: 1445: 1444: 1442: 1441: 1435: 1433: 1429: 1428: 1426: 1425: 1420: 1415: 1410: 1405: 1400: 1395: 1390: 1385: 1380: 1375: 1370: 1365: 1360: 1355: 1350: 1345: 1340: 1335: 1330: 1325: 1320: 1315: 1310: 1305: 1300: 1295: 1290: 1285: 1280: 1275: 1270: 1265: 1260: 1255: 1250: 1245: 1240: 1235: 1233:Jalan Boon Lay 1230: 1225: 1220: 1215: 1210: 1205: 1200: 1195: 1190: 1185: 1180: 1175: 1170: 1165: 1160: 1155: 1150: 1145: 1140: 1134: 1132: 1128: 1127: 1125: 1124: 1119: 1114: 1112:Nicoll Highway 1109: 1104: 1098: 1096: 1092: 1091: 1084: 1082: 1080: 1079: 1074: 1069: 1064: 1057: 1055:Marina Coastal 1052: 1047: 1042: 1037: 1032: 1027: 1021: 1019: 1015: 1014: 1009: 1006: 1005: 999: 997: 996: 989: 982: 974: 968: 967: 962: 950: 936: 935:External links 933: 930: 929: 927:, 27 July 2007 902: 878: 867:www.lta.gov.sg 854: 830: 812: 793: 792: 790: 787: 786: 785: 780: 775: 768: 765: 759: 758: 756: 755: 743: 731: 726: 725: 722: 719: 715: 714: 712: 707: 703: 702: 699: 694: 690: 689: 686: 683: 679: 678: 675: 672: 668: 667: 665: 662: 658: 657: 655: 652: 648: 647: 644: 641: 637: 636: 633: 630: 626: 625: 623: 620: 616: 615: 613: 610: 606: 605: 602: 601:Bayshore Road 599: 595: 594: 591: 588: 584: 583: 580: 574: 570: 569: 566: 560: 556: 555: 553: 551:Changi Village 547: 543: 542: 539: 530: 526: 525: 522: 519: 512: 509: 409: 406: 380:Area, passing 358:Changi Airport 316:(MCE) and the 295:Changi Airport 239: 238: 237: 236: 226: 225: 224:Highway system 221: 220: 217: 216: 187: 183: 182: 177: 173: 172: 168: 167: 164: 163: 158: 154: 153: 136: 130: 129: 128:Sheares Avenue 126: 122: 121: 117: 116: 113: 109: 108: 105: 101: 100: 97: 93: 92: 88: 87: 84: 76: 75: 31: 30: 22: 15: 13: 10: 9: 6: 4: 3: 2: 1539: 1528: 1527:Marine Parade 1525: 1523: 1520: 1518: 1515: 1513: 1510: 1508: 1505: 1503: 1500: 1498: 1495: 1493: 1490: 1489: 1487: 1480: 1477: 1440: 1437: 1436: 1434: 1430: 1424: 1421: 1419: 1418:Upper Thomson 1416: 1414: 1411: 1409: 1406: 1404: 1401: 1399: 1398:Telok Blangah 1396: 1394: 1391: 1389: 1386: 1384: 1383:Stamford Road 1381: 1379: 1376: 1374: 1371: 1369: 1366: 1364: 1361: 1359: 1356: 1354: 1351: 1349: 1346: 1344: 1341: 1339: 1338:Pasir Panjang 1336: 1334: 1331: 1329: 1326: 1324: 1321: 1319: 1316: 1314: 1311: 1309: 1306: 1304: 1301: 1299: 1296: 1294: 1291: 1289: 1286: 1284: 1281: 1279: 1276: 1274: 1271: 1269: 1266: 1264: 1261: 1259: 1256: 1254: 1251: 1249: 1246: 1244: 1241: 1239: 1236: 1234: 1231: 1229: 1226: 1224: 1221: 1219: 1216: 1214: 1211: 1209: 1206: 1204: 1201: 1199: 1196: 1194: 1191: 1189: 1186: 1184: 1181: 1179: 1176: 1174: 1173:Choa Chu Kang 1171: 1169: 1166: 1164: 1161: 1159: 1156: 1154: 1151: 1149: 1146: 1144: 1141: 1139: 1136: 1135: 1133: 1129: 1123: 1120: 1118: 1115: 1113: 1110: 1108: 1105: 1103: 1100: 1099: 1097: 1093: 1088: 1078: 1075: 1073: 1070: 1068: 1065: 1063: 1062: 1058: 1056: 1053: 1051: 1048: 1046: 1043: 1041: 1038: 1036: 1033: 1031: 1028: 1026: 1023: 1022: 1020: 1016: 1012: 1007: 1003: 995: 990: 988: 983: 981: 976: 975: 972: 966: 963: 961: 957: 954: 951: 948: 943: 939: 938: 934: 926: 922: 918: 915: 909: 907: 903: 892: 888: 882: 879: 868: 864: 858: 855: 844: 840: 834: 831: 826: 822: 816: 813: 808: 804: 798: 795: 788: 784: 781: 779: 776: 774: 771: 770: 766: 764: 752: 744: 741: 733: 732: 727: 723: 720: 717: 716: 713: 711: 708: 705: 704: 700: 698: 695: 692: 691: 687: 684: 681: 680: 676: 673: 670: 669: 666: 663: 660: 659: 656: 653: 650: 649: 645: 643:Marine Vista 642: 639: 638: 634: 631: 628: 627: 624: 621: 618: 617: 614: 611: 608: 607: 603: 600: 597: 596: 592: 589: 586: 585: 581: 578: 575: 572: 571: 567: 565: 561: 558: 557: 554: 552: 548: 545: 544: 540: 538: 534: 531: 528: 527: 521:Destinations 516: 511:List of exits 510: 508: 506: 502: 498: 494: 490: 485: 482: 481:highway strip 477: 475: 471: 466: 463: 459: 454: 450: 446: 444: 440: 434: 432: 427: 423: 420: 414: 407: 405: 403: 399: 398:Downtown Core 395: 391: 385: 383: 379: 375: 371: 370:Marine Parade 367: 363: 359: 354: 352: 348: 343: 341: 337: 332: 330: 327:Unlike other 325: 323: 319: 315: 310: 308: 304: 300: 296: 291: 289: 285: 281: 277: 273: 266: 261: 254: 250: 245: 235: 234: 230: 229: 227: 222: 218: 215: 211: 207: 203: 199: 198:Marine Parade 195: 191: 188: 184: 181: 178: 174: 169: 165: 162: 159: 157:East end 155: 152: 148: 144: 140: 137: 131: 127: 125:West end 123: 118: 114: 110: 107:1970s–present 106: 102: 98: 94: 89: 82: 77: 72: 58: 44: 37: 32: 26: 20: 1522:Marina South 1449: 1378:South Bridge 1343:River Valley 1313:North Bridge 1278:Lorong Chuan 1273:Lim Chu Kang 1213:Holland Road 1183:Collyer Quay 1059: 1039: 894:. Retrieved 890: 881: 870:. Retrieved 866: 857: 846:. Retrieved 842: 833: 824: 815: 806: 797: 762: 748:   737:   721:Rochor Road 632:Siglap Road 497:Marina South 489:new downtown 486: 478: 467: 455: 451: 447: 435: 428: 424: 415: 411: 386: 355: 344: 333: 326: 311: 292: 279: 276:Abbreviation 271: 269: 231: 202:Changi South 1517:Marina East 1471: / 1459:103°55′16″E 1373:Sims Avenue 1368:Shenton Way 1248:Jalan Eunos 1243:Jalan Buroh 1228:Jalan Besar 1223:Jalan Bahar 1208:Hill Street 1131:Major roads 1030:Bukit Timah 1018:Expressways 456:Flanked by 1486:Categories 1308:New Bridge 1283:MacPherson 1253:Jalan Kayu 1193:East Coast 1168:Cantonment 1163:Bras Basah 1153:Beach Road 1067:Pan-Island 1025:Ayer Rajah 896:2018-12-25 872:2018-12-25 848:2018-12-25 789:References 753:transition 685:Fort Road 579:Carpark H 533:PIE (Tuas) 474:Ophir Road 462:landscaped 378:Marina Bay 303:Marina Bay 284:expressway 190:Marina Bay 141:(future), 1456:1°18′19″N 1432:Cancelled 1363:Serangoon 1358:Sembawang 1143:Balestier 710:KPE (TPE) 697:MCE (AYE) 537:TPE (SLE) 402:Chinatown 288:Singapore 251:, before 180:Singapore 1348:Robinson 1178:Clementi 1077:Tampines 956:Archived 917:Archived 767:See also 564:Tampines 524:Remarks 392:and the 349:and the 282:) is an 265:downtown 214:Tampines 171:Location 1512:Kallang 1403:Thomson 1393:Tanglin 1333:Orchard 1268:Kallang 1203:Geylang 1188:Dunearn 1148:Bartley 1072:Seletar 1035:Central 408:History 301:to the 194:Kallang 186:Regions 176:Country 112:History 104:Existed 57:Chinese 50:东海岸公园大道 1502:Changi 1388:Sungei 1353:Scotts 1298:Napier 1288:Mandai 1258:Jurong 1050:Kranji 366:Siglap 96:Length 67:  53:  39:  1497:Bedok 1328:Ophir 1138:Anson 751:Route 518:Exit 210:Bedok 71:Tamil 43:Malay 1303:Neil 693:14B 661:10B 651:10A 400:and 305:and 270:The 923:", 718:15 706:14 682:13 671:11 640:8B 629:8A 619:7B 609:7A 559:2B 546:2A 351:AYE 347:MCE 340:MCE 336:AYE 280:ECP 151:PIE 147:MCE 143:KPE 139:NSC 1488:: 905:^ 889:. 865:. 841:. 823:. 805:. 598:6 587:- 573:- 535:, 529:1 507:. 476:. 445:. 404:. 384:. 368:, 278:: 212:, 208:, 204:, 200:, 196:, 192:, 149:, 145:, 993:e 986:t 979:v 912:" 899:. 875:. 851:. 827:. 809:. 274:( 73:) 69:( 59:) 55:( 45:) 41:(

Index


Malay
Chinese
Tamil

NSC
KPE
MCE
PIE
Singapore Changi Airport
Singapore
Marina Bay
Kallang
Marine Parade
Changi South
Singapore Changi Airport
Bedok
Tampines
Expressways of Singapore

Singapore Changi Airport
Benjamin Sheares Bridge

downtown
Abbreviation
expressway
Singapore
Changi Airport
Benjamin Sheares Bridge
Marina Bay

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.