426:
connected to an interchange formed by a one-way pair of roads running on the reclaimed Marina Centre, connecting Ophir and Rochor Roads at Beach Road. It would take traffic to
Orchard, Chinatown and Little India. It would also run through the reclaimed land in front of Shenton Way and Raffles Quay, before going to the Telok Ayer Basin at South Quay, where it would connect to the one-way pair of roads at Prince Edward Road and Maxwell Road. It was planned to run on the elevated structure across the former Singapore Polytechnic at Shenton Way. A separate project was planned to even extend the expressway to Keppel Road, before going towards the Jurong Expressway (to be known as Ayer Rajah Expressway).
1087:
81:
260:
417:
Reclamation was expected to begin in six to nine months. The 280m long bridge was to be built at a height of 30 ft above high water level to allow ample headroom for ferries to use the channel. The new highway would turn landwards to South Quay and then to the vacant piece of land past the
Singapore Polytechnic, before turning towards Anson Road. To provide space for construction work, the government acquired the former
244:
942:
820:
802:
25:
436:
Construction of the first phase of the East Coast
Parkway from Fort Road to Marine Parade started in 1971 and was completed in December 1975. It was followed by an extension of Phase 2 which was completed in November 1975 to Bedok South Road and then Phase 3 was built together with Changi Airport in
412:
Plans for the coastal highway to reduce congestion at Golden Mile started on 30 July 1969. Detailed plans were put in place to create interchanges at Nicoll
Highway, Bras Basah Road and Stamford Road. On 3 September 1970, a $ 35 million plan was put in place to reclaim more land off of Bedok, with
452:
Traffic lights remained on the expressway until the completion of the last flyover at Fort Road in 1989. The opening of ECP relieved the traffic load of the city area in the 1980s. Traffic volume at Nicoll
Highway decreased by 20 per cent, which would otherwise worsen with the implemented ERP
425:
On 12 June 1974, tenders were invited for the construction of the super-highway which would link the east coast of
Singapore to the city. The extension of East Coast Parkway was to run from Tanjong Rhu via the Kallang River to Marina Centre. Between the two crossings, the expressway would be
416:
On 24 May 1973, the government proceeded to build a $ 300 million highway across the harbour to the breakwater line outside
Clifford Pier to ease peak hour congestion at the Collyer Quay area. The plans involved the reclamation of land off Nicoll Highway and the breakwater at Clifford Pier.
448:
Construction of Phase 4, stretching from Fort Road to Keppel Road began in 1977 and was opened on 18 April 1981 to Ophir Road, and on 26 September 1981 towards Keppel Road. The government had decided to further reclaim the Marina South area, linking
Tanjong Rhu and Telok Ayer Basin.
421:
site in 1975, with the polytechnic shifting to Dover. Plans were made on 16 January 1974 to extend Siglap Road to the expressway. On 28 February 1974, the government also acquired two portions of land, for the extension of Bedok South Avenue 1 from Upper East Coast Road to the ECP.
483:
was built in the long, straight section of the ECP close to Changi
Airport. This section can be easily identified by removable potted plants instead of the standard large trees on the median strip. However, the highway strip has never been used for emergency landing purposes.
433:. The expressway would also be linked to Ophir/Rochor Road, which would be built together with the flyover. The first phase would cover the portion from Tanjong Rhu Flyover to South Quay, while another section would lead from South Quay to Shenton Way.
464:
expressway was built and maintained with the conscious intention of giving visitors arriving via
Singapore Changi Airport a good first impression of the country as they commute from the airport to the city centre.
472:(ERP) gantry near the Tanjong Rhu Flyover in the direction towards the city, one of the first two gantries to be set up in the country, which came into operation on 1 April 1998 together with the other gantry at
387:
The ECP then ends near the 16-kilometre mark and merges with Sheares Avenue (newly formed as part of the truncated section of the former route). From Sheares Avenue, a left turn goes to Marina Boulevard towards
342:
on 29 December 2013, a section of expressway after the Benjamin Sheares Bridge was truncated and another section at the Marina South area realigned and converted into an arterial road.
991:
372:
and Mountbatten areas. After Exit 13 for Fort Road (signed 14A eastbound), the ECP curves further inland passing through the interchange with the MCE and KPE before the
1086:
955:
429:
On 24 April 1975, five international firms were invited to the tender of the construction of East Coast Parkway, leading to the construction of
984:
1060:
964:
1506:
393:
1044:
916:
709:
499:
area realigned and converted to a major arterial road called Sheares Avenue. In the westbound direction, a new expressway called the
317:
1491:
1438:
977:
453:
gantries. Robinson Road and Cecil Street were better managed with lesser traffic jams with the declining load all the way to 1990s.
862:
413:
the final phase starting on 7 October 1970. On 18 December 1970, the government decided to reclaim more than 125 acres of land.
138:
290:. It is approximately 16 kilometres (9.9 mi) in length. As of July 2022, it is Singapore's third-longest expressway.
80:
1121:
1034:
142:
1452:
946:
886:
1237:
1422:
1192:
1167:
1054:
772:
696:
500:
346:
339:
313:
146:
1347:
1001:
952:
924:
328:
294:
248:
232:
205:
160:
331:
whose abbreviation ends with 'E' for 'Expressway', the East Coast Parkway abbreviation ends with 'P' instead.
1417:
1402:
1212:
1010:
492:
469:
430:
373:
298:
252:
376:
which offers a beautiful view of the downtown. The highway (still on the bridge) curves south and into the
1526:
1317:
1297:
1207:
1116:
1029:
838:
461:
1521:
1262:
1152:
1106:
1066:
1024:
782:
777:
532:
504:
438:
418:
377:
350:
335:
321:
302:
189:
150:
1516:
401:
1217:
1076:
536:
283:
1397:
1337:
1322:
1197:
1172:
1071:
739:
389:
437:
1980. Construction of Phase 3 began in May 1976, with two interchanges at Xilin Avenue and the
1377:
1342:
1312:
1272:
1049:
1511:
1407:
1292:
1157:
1137:
1101:
381:
259:
56:
969:
441:. It was expected to be completed by 1978. They were built on reclaimed land by the former
1501:
1307:
1282:
1162:
959:
920:
913:
576:
457:
442:
361:
324:
at the Changi Flyover, about 1 kilometre (0.62 mi) from the end of the expressway.
468:
Traffic congestion during the morning peak hours, however, led to the introduction of an
1496:
1232:
1142:
1111:
863:"East Coast Parkway (ECP) | Projects | Roads & Motoring | Land Transport Authority"
550:
357:
70:
42:
1485:
1382:
1177:
488:
480:
397:
369:
306:
264:
197:
1332:
1277:
1267:
1202:
1187:
1182:
1147:
750:
496:
275:
243:
1387:
1372:
1367:
1352:
1287:
1257:
1247:
1242:
1227:
1222:
1327:
1252:
473:
1467:
1454:
1412:
1362:
1357:
1302:
287:
179:
360:
before curving to follow the coastline after Xilin Avenue. It then follows
941:
563:
213:
1392:
193:
365:
320:(KPE). In the east, there is an interchange that connects ECP to the
201:
396:, or a right turn enters Central Boulevard that heads towards the
353:
could be interpreted as the southern east-west road in Singapore.
258:
242:
209:
24:
973:
312:
In the south, there are interchanges that connects ECP to the
729:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
334:
The East Coast Parkway used to be directly connected to the
34:
460:
on one side and high-rise housing on the other, the well-
541:
Eastbound terminus; continues east as Airport Boulevard
247:
Former section of East Coast Parkway eastbound towards
724:
Westbound terminus; continues west as Sheares Avenue
677:
Eastbound exit and entrance; westbound entrance only
85:
East Coast Parkway is labelled in single purple line.
1431:
1130:
1094:
1017:
223:
185:
175:
170:
156:
132:
124:
119:
111:
103:
95:
90:
21:
985:
48:
8:
914:Government Approves the Construction of MCE
701:Westbound exit and eastbound entrance only
568:Eastbound exit and westbound entrance only
62:
992:
978:
970:
356:The expressway first heads southeast from
286:that runs along the southeastern coast of
887:"5 myths about Changi Airport, debunked!"
263:East Coast Parkway westbound towards the
514:
965:Infopedia article on East Coast Parkway
794:
503:, was built to connect the ECP to the
18:
908:
906:
821:"Parkway: Phase 4 work to begin soon"
487:To facilitate the development of the
7:
338:. However, with the opening of the
953:Traffic cameras monitoring the ECP
491:, the ECP was truncated after the
345:The expressway, together with the
14:
1439:Singapore Underground Road System
646:Eastbound exit and entrance only
635:Eastbound exit and entrance only
604:Eastbound exit and entrance only
593:Westbound exit and entrance only
582:Westbound exit and entrance only
1085:
940:
839:"East Coast Parkway | Infopedia"
79:
23:
803:"THE KATONG TO CITY EXPRESSWAY"
1:
891:nowboarding.changiairport.com
688:Signed as Exit 14A eastbound
654:East Coast Park Service Road
612:East Coast Park Service Road
318:Kallang-Paya Lebar Expressway
99:16 km (9.9 mi)
562:Xilin Avenue, Simei Avenue,
64:கிழக்கு கடற்கரை விரைவுச்சாலை
49:
36:Lebuhraya Taman Pantai Timur
590:East Coast Park Carpark F3
479:A decommissioned emergency
1543:
1507:Downtown Core (Singapore)
1083:
1008:
773:Marina Coastal Expressway
728:
523:
520:
517:
501:Marina Coastal Expressway
314:Marina Coastal Expressway
307:Central Business District
228:
219:
166:
78:
63:
33:
1492:Expressways in Singapore
1002:expressways of Singapore
925:Land Transport Authority
746:
735:
549:Tanah Merah Coast Road,
394:Marina Bay Cruise Centre
329:expressways in Singapore
297:in the east through the
249:Singapore Changi Airport
233:Expressways of Singapore
206:Singapore Changi Airport
161:Singapore Changi Airport
1011:Road names in Singapore
493:Benjamin Sheares Bridge
470:Electronic Road Pricing
443:Public Works Department
431:Benjamin Sheares Bridge
374:Benjamin Sheares Bridge
364:past Upper East Coast,
299:Benjamin Sheares Bridge
255:(current Shears Avenue)
253:Benjamin Sheares Bridge
16:Expressway in Singapore
1117:Outer Ring Road System
495:, with the stretch at
267:
256:
35:
1107:Jurong Island Highway
843:eresources.nlb.gov.sg
825:eresources.nlb.gov.sg
807:eresources.nlb.gov.sg
783:Pan Island Expressway
778:Ayer Rajah Expressway
505:Ayer Rajah Expressway
439:Pan Island Expressway
419:Singapore Polytechnic
322:Pan Island Expressway
309:areas in the south.
262:
246:
1061:North–South Corridor
949:at Wikimedia Commons
674:Tanjong Katong Road
1468:1.3052°N 103.9212°E
1464: /
1218:Jalan Ahmad Ibrahim
134:Major intersections
1198:Eu Tong Sen Street
1122:West Coast Highway
1045:Kallang-Paya Lebar
1040:East Coast Parkway
958:2005-02-13 at the
947:East Coast Parkway
919:2007-08-18 at the
622:Bedok South Ave 1
390:Gardens by the Bay
272:East Coast Parkway
268:
257:
29:East Coast Parkway
1447:
1446:
1408:Upper Bukit Timah
1323:Old Choa Chu Kang
1318:North Buona Vista
1238:Jalan Bukit Merah
945:Media related to
761:
760:
740:Incomplete access
664:Still Road South
293:The ECP connects
241:
240:
115:Completed in 1981
91:Route information
1534:
1479:
1478:
1476:
1475:
1474:
1473:1.3052; 103.9212
1469:
1465:
1462:
1461:
1460:
1457:
1293:Marina Boulevard
1263:Jurong Town Hall
1158:Bencoolen Street
1102:Bukit Timah Road
1095:Semi-expressways
1089:
1000:Major roads and
994:
987:
980:
971:
944:
928:
910:
901:
900:
898:
897:
883:
877:
876:
874:
873:
859:
853:
852:
850:
849:
835:
829:
828:
817:
811:
810:
799:
754:
747:
742:
736:
515:
382:Marina Bay Sands
135:
83:
74:
66:
65:
60:
52:
51:
46:
38:
27:
19:
1542:
1541:
1537:
1536:
1535:
1533:
1532:
1531:
1482:
1481:
1472:
1470:
1466:
1463:
1458:
1455:
1453:
1451:
1450:
1448:
1443:
1427:
1423:Victoria Street
1413:Upper Serangoon
1126:
1090:
1081:
1013:
1004:
998:
960:Wayback Machine
937:
932:
931:
921:Wayback Machine
911:
904:
895:
893:
885:
884:
880:
871:
869:
861:
860:
856:
847:
845:
837:
836:
832:
819:
818:
814:
801:
800:
796:
791:
769:
763:
757:
749:
745:
738:
734:
730:
577:East Coast Park
513:
458:East Coast Park
410:
362:East Coast Park
133:
120:Major junctions
86:
68:
61:
54:
47:
40:
28:
17:
12:
11:
5:
1540:
1538:
1530:
1529:
1524:
1519:
1514:
1509:
1504:
1499:
1494:
1484:
1483:
1445:
1444:
1442:
1441:
1435:
1433:
1429:
1428:
1426:
1425:
1420:
1415:
1410:
1405:
1400:
1395:
1390:
1385:
1380:
1375:
1370:
1365:
1360:
1355:
1350:
1345:
1340:
1335:
1330:
1325:
1320:
1315:
1310:
1305:
1300:
1295:
1290:
1285:
1280:
1275:
1270:
1265:
1260:
1255:
1250:
1245:
1240:
1235:
1233:Jalan Boon Lay
1230:
1225:
1220:
1215:
1210:
1205:
1200:
1195:
1190:
1185:
1180:
1175:
1170:
1165:
1160:
1155:
1150:
1145:
1140:
1134:
1132:
1128:
1127:
1125:
1124:
1119:
1114:
1112:Nicoll Highway
1109:
1104:
1098:
1096:
1092:
1091:
1084:
1082:
1080:
1079:
1074:
1069:
1064:
1057:
1055:Marina Coastal
1052:
1047:
1042:
1037:
1032:
1027:
1021:
1019:
1015:
1014:
1009:
1006:
1005:
999:
997:
996:
989:
982:
974:
968:
967:
962:
950:
936:
935:External links
933:
930:
929:
927:, 27 July 2007
902:
878:
867:www.lta.gov.sg
854:
830:
812:
793:
792:
790:
787:
786:
785:
780:
775:
768:
765:
759:
758:
756:
755:
743:
731:
726:
725:
722:
719:
715:
714:
712:
707:
703:
702:
699:
694:
690:
689:
686:
683:
679:
678:
675:
672:
668:
667:
665:
662:
658:
657:
655:
652:
648:
647:
644:
641:
637:
636:
633:
630:
626:
625:
623:
620:
616:
615:
613:
610:
606:
605:
602:
601:Bayshore Road
599:
595:
594:
591:
588:
584:
583:
580:
574:
570:
569:
566:
560:
556:
555:
553:
551:Changi Village
547:
543:
542:
539:
530:
526:
525:
522:
519:
512:
509:
409:
406:
380:Area, passing
358:Changi Airport
316:(MCE) and the
295:Changi Airport
239:
238:
237:
236:
226:
225:
224:Highway system
221:
220:
217:
216:
187:
183:
182:
177:
173:
172:
168:
167:
164:
163:
158:
154:
153:
136:
130:
129:
128:Sheares Avenue
126:
122:
121:
117:
116:
113:
109:
108:
105:
101:
100:
97:
93:
92:
88:
87:
84:
76:
75:
31:
30:
22:
15:
13:
10:
9:
6:
4:
3:
2:
1539:
1528:
1527:Marine Parade
1525:
1523:
1520:
1518:
1515:
1513:
1510:
1508:
1505:
1503:
1500:
1498:
1495:
1493:
1490:
1489:
1487:
1480:
1477:
1440:
1437:
1436:
1434:
1430:
1424:
1421:
1419:
1418:Upper Thomson
1416:
1414:
1411:
1409:
1406:
1404:
1401:
1399:
1398:Telok Blangah
1396:
1394:
1391:
1389:
1386:
1384:
1383:Stamford Road
1381:
1379:
1376:
1374:
1371:
1369:
1366:
1364:
1361:
1359:
1356:
1354:
1351:
1349:
1346:
1344:
1341:
1339:
1338:Pasir Panjang
1336:
1334:
1331:
1329:
1326:
1324:
1321:
1319:
1316:
1314:
1311:
1309:
1306:
1304:
1301:
1299:
1296:
1294:
1291:
1289:
1286:
1284:
1281:
1279:
1276:
1274:
1271:
1269:
1266:
1264:
1261:
1259:
1256:
1254:
1251:
1249:
1246:
1244:
1241:
1239:
1236:
1234:
1231:
1229:
1226:
1224:
1221:
1219:
1216:
1214:
1211:
1209:
1206:
1204:
1201:
1199:
1196:
1194:
1191:
1189:
1186:
1184:
1181:
1179:
1176:
1174:
1173:Choa Chu Kang
1171:
1169:
1166:
1164:
1161:
1159:
1156:
1154:
1151:
1149:
1146:
1144:
1141:
1139:
1136:
1135:
1133:
1129:
1123:
1120:
1118:
1115:
1113:
1110:
1108:
1105:
1103:
1100:
1099:
1097:
1093:
1088:
1078:
1075:
1073:
1070:
1068:
1065:
1063:
1062:
1058:
1056:
1053:
1051:
1048:
1046:
1043:
1041:
1038:
1036:
1033:
1031:
1028:
1026:
1023:
1022:
1020:
1016:
1012:
1007:
1003:
995:
990:
988:
983:
981:
976:
975:
972:
966:
963:
961:
957:
954:
951:
948:
943:
939:
938:
934:
926:
922:
918:
915:
909:
907:
903:
892:
888:
882:
879:
868:
864:
858:
855:
844:
840:
834:
831:
826:
822:
816:
813:
808:
804:
798:
795:
788:
784:
781:
779:
776:
774:
771:
770:
766:
764:
752:
744:
741:
733:
732:
727:
723:
720:
717:
716:
713:
711:
708:
705:
704:
700:
698:
695:
692:
691:
687:
684:
681:
680:
676:
673:
670:
669:
666:
663:
660:
659:
656:
653:
650:
649:
645:
643:Marine Vista
642:
639:
638:
634:
631:
628:
627:
624:
621:
618:
617:
614:
611:
608:
607:
603:
600:
597:
596:
592:
589:
586:
585:
581:
578:
575:
572:
571:
567:
565:
561:
558:
557:
554:
552:
548:
545:
544:
540:
538:
534:
531:
528:
527:
521:Destinations
516:
511:List of exits
510:
508:
506:
502:
498:
494:
490:
485:
482:
481:highway strip
477:
475:
471:
466:
463:
459:
454:
450:
446:
444:
440:
434:
432:
427:
423:
420:
414:
407:
405:
403:
399:
398:Downtown Core
395:
391:
385:
383:
379:
375:
371:
370:Marine Parade
367:
363:
359:
354:
352:
348:
343:
341:
337:
332:
330:
327:Unlike other
325:
323:
319:
315:
310:
308:
304:
300:
296:
291:
289:
285:
281:
277:
273:
266:
261:
254:
250:
245:
235:
234:
230:
229:
227:
222:
218:
215:
211:
207:
203:
199:
198:Marine Parade
195:
191:
188:
184:
181:
178:
174:
169:
165:
162:
159:
157:East end
155:
152:
148:
144:
140:
137:
131:
127:
125:West end
123:
118:
114:
110:
107:1970s–present
106:
102:
98:
94:
89:
82:
77:
72:
58:
44:
37:
32:
26:
20:
1522:Marina South
1449:
1378:South Bridge
1343:River Valley
1313:North Bridge
1278:Lorong Chuan
1273:Lim Chu Kang
1213:Holland Road
1183:Collyer Quay
1059:
1039:
894:. Retrieved
890:
881:
870:. Retrieved
866:
857:
846:. Retrieved
842:
833:
824:
815:
806:
797:
762:
748:
737:
721:Rochor Road
632:Siglap Road
497:Marina South
489:new downtown
486:
478:
467:
455:
451:
447:
435:
428:
424:
415:
411:
386:
355:
344:
333:
326:
311:
292:
279:
276:Abbreviation
271:
269:
231:
202:Changi South
1517:Marina East
1471: /
1459:103°55′16″E
1373:Sims Avenue
1368:Shenton Way
1248:Jalan Eunos
1243:Jalan Buroh
1228:Jalan Besar
1223:Jalan Bahar
1208:Hill Street
1131:Major roads
1030:Bukit Timah
1018:Expressways
456:Flanked by
1486:Categories
1308:New Bridge
1283:MacPherson
1253:Jalan Kayu
1193:East Coast
1168:Cantonment
1163:Bras Basah
1153:Beach Road
1067:Pan-Island
1025:Ayer Rajah
896:2018-12-25
872:2018-12-25
848:2018-12-25
789:References
753:transition
685:Fort Road
579:Carpark H
533:PIE (Tuas)
474:Ophir Road
462:landscaped
378:Marina Bay
303:Marina Bay
284:expressway
190:Marina Bay
141:(future),
1456:1°18′19″N
1432:Cancelled
1363:Serangoon
1358:Sembawang
1143:Balestier
710:KPE (TPE)
697:MCE (AYE)
537:TPE (SLE)
402:Chinatown
288:Singapore
251:, before
180:Singapore
1348:Robinson
1178:Clementi
1077:Tampines
956:Archived
917:Archived
767:See also
564:Tampines
524:Remarks
392:and the
349:and the
282:) is an
265:downtown
214:Tampines
171:Location
1512:Kallang
1403:Thomson
1393:Tanglin
1333:Orchard
1268:Kallang
1203:Geylang
1188:Dunearn
1148:Bartley
1072:Seletar
1035:Central
408:History
301:to the
194:Kallang
186:Regions
176:Country
112:History
104:Existed
57:Chinese
50:东海岸公园大道
1502:Changi
1388:Sungei
1353:Scotts
1298:Napier
1288:Mandai
1258:Jurong
1050:Kranji
366:Siglap
96:Length
67:
53:
39:
1497:Bedok
1328:Ophir
1138:Anson
751:Route
518:Exit
210:Bedok
71:Tamil
43:Malay
1303:Neil
693:14B
661:10B
651:10A
400:and
305:and
270:The
923:",
718:15
706:14
682:13
671:11
640:8B
629:8A
619:7B
609:7A
559:2B
546:2A
351:AYE
347:MCE
340:MCE
336:AYE
280:ECP
151:PIE
147:MCE
143:KPE
139:NSC
1488::
905:^
889:.
865:.
841:.
823:.
805:.
598:6
587:-
573:-
535:,
529:1
507:.
476:.
445:.
404:.
384:.
368:,
278::
212:,
208:,
204:,
200:,
196:,
192:,
149:,
145:,
993:e
986:t
979:v
912:"
899:.
875:.
851:.
827:.
809:.
274:(
73:)
69:(
59:)
55:(
45:)
41:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.