57:
182:
196:
129:
in
Yorkshire, England. The northern converter station will be next to the existing power station at Peterhead. The subsea portion of the cable will be approximately 440 km (270 mi) long, from the Aberdeenshire coast to the East Riding of Yorkshire.
52:
billion for the two links, the
Eastern HVDC projects would be the largest electricity transmission investment project in the recent history of Great Britain." They approved the schemes as part of the Accelerated Strategic Transmission Investment Framework.
92:, County Durham. Landfall in England will be to the North of Seaham, on the Durham Coast. It is developed by Scottish Power Transmission plc (SPT) and National Grid Electricity Transmission plc (National Grid) with a budget of £1.294
145:, to "alleviate existing and future constraints on the electricity transmission network", and support new renewable electricity generation. The main contractors are Prysmian, Hitachi Energy, and BAM.
546:
148:
Contracts to construct the cable were finalised in
February 2024, and work is scheduled to commence after the final approvals from OfGEM came in August 2024. Target date for energisation was 2029.
405:
162:
kV, using
Voltage Source converter (VSC) technology, carried on Cross-linked polyethylene (XLPE) cables, with a fall back option of mass impregnated (MI) cables.
113:
kV, using voltage source converter (VSC) technology, carried on cross-linked polyethylene (XLPE) cables, with a fall back option of mass impregnated (MI) cables.
99:
In
December 2022, the connection received approval from the UK energy regulator Ofgem. As of July 2024, construction was expected to run from 2025 to 2029.
475:
45:
236:
170:
Eastern Green Link 3 is proposed from
Aberdeenshire to Lincolnshire and Eastern Green Link 4 is proposed from Fife to Lincolnshire.
526:
293:
551:
142:
27:
531:
456:
56:
23:
434:
354:
493:
319:
187:
521:
522:
SEGL1 project website at
Scottish Power Energy Networks (where it is known as the "Eastern Link Project")
89:
264:
532:
EGL2 project website at
National Grid, where it is known as "Scotland to England Green Link SEGL2"
126:
72:
for the
Eastern HVDC project, confirming its choice of two separate HVDC links, each rated at 2
208:
35:
540:
201:
137:
Transmission and
National Grid Electricity Transmission (NGET). with a budget of £2.1
26:
power cables from the East coast of Scotland to Northeast England to strengthen the
380:
177:
195:
122:
39:
527:
EGL2 project website at SSEN, where it is known as "Eastern Green Link 2"
476:"New $ 5.5bn UK electricity 'superhighway' to ease wind power bottleneck"
155:
106:
237:"Eastern HVDC – Conditional Decision on the projects' Final Needs Case"
85:
494:"Eastern Green Link 3 and Eastern Green Link 4 | National Grid Group"
240:
65:
55:
134:
60:
Ofgem's schematic map of cables for Eastern HVDC projects
547:
Electrical interconnectors to and from Great Britain
88:
in Southeast Scotland to Hawthorn Pit substation in
288:
286:
265:"New subsea cables 'could help ease energy crisis'"
231:
229:
227:
225:
223:
349:
347:
345:
343:
341:
339:
337:
428:
426:
259:
257:
8:
457:"EGL2 gets provisional regulatory approval"
68:published its conditional decision on the
121:The cable will run from Sandford Bay, at
433:Dimitris Mavrokefalidis (1 March 2024).
320:"Scotland to England Green Link - SEGL1"
48:state that "At an estimated cost of £3.4
435:"UK's largest subsea cable deal sealed"
219:
141:billion. It is needed to reinforce the
30:. The two links combined will deliver 4
80:Scotland-England Green Link 1 (SEGL1)
7:
474:Sanderson, Cosmo (13 August 2024).
14:
194:
180:
133:EGL2 is a joint venture between
269:BBC News: Highlands and Islands
158:. The DC voltage will be +/-525
109:. The DC voltage will be +/-525
1:
385:www.easterngreenlink1.co.uk
117:Eastern Green Link 2 (EGL2)
24:high voltage direct current
568:
22:are two planned submarine
461:transformers-magazine.com
188:the United Kingdom portal
552:Submarine power cables
381:"Eastern Green Link 1"
294:"Eastern Green Link 2"
151:The cable will carry 2
102:The cable will carry 2
61:
16:Submarine power cables
355:"Green Links All Go!"
59:
498:www.nationalgrid.com
411:. SSEN. October 2021
125:in Scotland, to the
84:SEGL1 will run from
406:"Eastern HVDC Link"
359:SSEN News and Views
20:Eastern Green Links
437:. Energy Live News
271:. BBC. 15 Dec 2022
127:Drax Power Station
62:
463:. March 29, 2024.
209:Western HVDC Link
166:Further proposals
559:
509:
508:
506:
504:
490:
484:
483:
480:rechargenews.com
471:
465:
464:
453:
447:
446:
444:
442:
430:
421:
420:
418:
416:
410:
402:
396:
395:
393:
391:
377:
371:
370:
368:
366:
351:
332:
331:
329:
327:
316:
310:
309:
307:
305:
290:
281:
280:
278:
276:
261:
252:
251:
249:
247:
233:
204:
199:
198:
190:
185:
184:
183:
161:
154:
140:
112:
105:
95:
75:
70:Final needs case
51:
36:renewable energy
33:
567:
566:
562:
561:
560:
558:
557:
556:
537:
536:
518:
513:
512:
502:
500:
492:
491:
487:
473:
472:
468:
455:
454:
450:
440:
438:
432:
431:
424:
414:
412:
408:
404:
403:
399:
389:
387:
379:
378:
374:
364:
362:
353:
352:
335:
325:
323:
322:. National Grid
318:
317:
313:
303:
301:
292:
291:
284:
274:
272:
263:
262:
255:
245:
243:
235:
234:
221:
216:
200:
193:
186:
181:
179:
176:
168:
159:
152:
138:
119:
110:
103:
93:
82:
73:
49:
31:
17:
12:
11:
5:
565:
563:
555:
554:
549:
539:
538:
535:
534:
529:
524:
517:
516:External links
514:
511:
510:
485:
466:
448:
422:
397:
372:
333:
311:
282:
253:
218:
217:
215:
212:
206:
205:
191:
175:
172:
167:
164:
118:
115:
81:
78:
64:In July 2022,
38:from Scottish
15:
13:
10:
9:
6:
4:
3:
2:
564:
553:
550:
548:
545:
544:
542:
533:
530:
528:
525:
523:
520:
519:
515:
499:
495:
489:
486:
481:
477:
470:
467:
462:
458:
452:
449:
436:
429:
427:
423:
407:
401:
398:
386:
382:
376:
373:
360:
356:
350:
348:
346:
344:
342:
340:
338:
334:
321:
315:
312:
299:
298:SSEN Projects
295:
289:
287:
283:
270:
266:
260:
258:
254:
242:
238:
232:
230:
228:
226:
224:
220:
213:
211:
210:
203:
202:Energy portal
197:
192:
189:
178:
173:
171:
165:
163:
157:
149:
146:
144:
143:National Grid
136:
131:
128:
124:
116:
114:
108:
100:
97:
91:
87:
79:
77:
71:
67:
58:
54:
47:
43:
41:
37:
29:
28:National Grid
25:
21:
501:. Retrieved
497:
488:
479:
469:
460:
451:
439:. Retrieved
413:. Retrieved
400:
388:. Retrieved
384:
375:
363:. Retrieved
358:
324:. Retrieved
314:
302:. Retrieved
297:
273:. Retrieved
268:
244:. Retrieved
207:
169:
150:
147:
132:
120:
101:
98:
83:
69:
63:
44:
42:to England.
19:
18:
415:16 December
365:15 December
326:16 December
304:15 December
275:15 December
246:16 December
541:Categories
214:References
40:wind farms
503:13 August
390:13 August
123:Peterhead
96:billion.
174:See also
441:2 March
86:Torness
361:. SSEN
300:. SSEN
160:
153:
139:
111:
104:
94:
90:Murton
74:
50:
34:GW of
32:
409:(PDF)
241:Ofgem
66:Ofgem
46:Ofgem
505:2024
443:2024
417:2022
392:2024
367:2022
328:2022
306:2022
277:2022
248:2022
135:SSEN
76:GW.
543::
496:.
478:.
459:.
425:^
383:.
357:.
336:^
296:.
285:^
267:.
256:^
239:.
222:^
156:GW
107:GW
507:.
482:.
445:.
419:.
394:.
369:.
330:.
308:.
279:.
250:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.