built on Main Street at North River Street in
Thompsonville, near the downtown area. Plans released in 2013 called for the station to have two 180-foot high-level platforms, each with a 100-foot shelter, connected by an elevated pedestrian bridge. A small parking lot would be built on the west side of the tracks, with a larger lot shared with the Bigelow Commons development on the east side. The station was estimated to cost $ 6–9.5 million.
1138:
159:
284:
207:
488:
announced $ 13.8 million in federal funding for the station. At that time, design was expected to be complete in mid-2023, with construction beginning in early 2024. In March 2021, the adjacent vacant "Casket
Building", a brick building that was once used to manufacture casket hardware burnt down; plans for the station had connected the structure to the southbound platform to provide station amenities.
1078:
491:
As of
October 2023, plans call for a single 350-foot (110 m)-long platform and a 550-square-foot (51 m) waiting room to be built on the east side of the track. The single-track bridge over Main Street would be rebuilt with a two-track deck and an accessible sidewalk added along the roadway,
478:
In
February 2017, the state announced an additional $ 50 million in funds, including money to complete design of Enfield station. Design was to be completed by 2020. Hartford Line service began operation on June 16, 2018. In April 2019, the town proposed to fund construction of an interim station – a
431:
in 1974 - but passengers waited on the bare platform. Amtrak bought the line in 1976; after frequent vandalism and a
January 26, 1980, fire, they proposed to remove the boarded-up century-old building. Although it was kept for several more years for the possibility of restoration and inclusion on the
487:
By
January 2021, the station was expected to be complete by the end of 2022. By April 2021, platform construction was expected to begin in October 2022, with the station opening about a year later. The state designated $ 35 million for the station project in December 2021. In June 2022, the state
474:
In 2004, the
Recommended Action of the New Haven Hartford Springfield Commuter Rail Implementation Study included the construction of a new Enfield station at Main Street. A preliminary design located parking lots on Main Street with a smaller lot east of the tracks. The station is proposed to be
492:
which would also serve as access to a possible future second platform. Asnuntuck Street would be closed at the tracks, with the existing substandard bridge there eliminated. Construction was expected to begin in early 2025 with completion in late 2027 at a cost of $ 45 million. An
457:
starting with the
February 1981 schedule. Service to Enfield and North Haven ended on October 28, 1986, due to low ridership; Enfield averaged five daily passengers spread between eight trains. The shelters were subsequently removed, but the crumbling platform is extant.
483:
on the west side of the single track. That proposal would allow service to
Enfield to begin while the state searches for funding for full double-tracking and a permanent station. The town set aside $ 670,000 of the estimated $ 2.5 million cost in October 2019.
1095:
967:
910:
820:
1666:
1696:
1686:
975:
936:
1676:
412:
station, located on the east side of the tracks just north of Main Street, opened with the line. It was replaced by a two-story brick station around 1870, with a wooden addition for the
1006:
1486:
839:
877:
1691:
732:
66:
1681:
670:
439:
In 1980, Amtrak constructed several small shelters at
Thompsonville station. It was part of a $ 12 million effort to improve the line, which included opening the
1050:
858:
1089:
419:
In 1946, the second story - then rented out as apartments - and the wooden addition were removed. The modified station building was used until 1971, when
1100:
578:
1479:
1164:
944:
405:
319:
242:
192:
1427:
1410:
1127:
1082:
1192:
1014:
1472:
1331:
433:
1572:
1215:
466:
1527:
1267:
397:
1392:
375:. As of September 2023, construction is expected to begin in 2025. A previous station at the site was open from 1844 to 1986.
101:
1567:
1547:
1292:
1227:
525:
1671:
1629:
1603:
1577:
1354:
1277:
1272:
1181:
770:
739:
1616:
1542:
1522:
1205:
677:
1120:
1057:
792:
640:
1199:
449:
33:
1552:
1297:
1232:
302:
225:
177:
1557:
1250:
496:
was released in May 2024. As of June 2024, the project is expected to be advertised for bidding in April 2025.
493:
1500:
1440:
1537:
1532:
1364:
1210:
1186:
1113:
413:
401:
311:
234:
1582:
1176:
388:
297:
220:
172:
1007:"Proposed Thompsonville train station would restore rail service to Enfield for first time since 1986"
895:
1562:
1341:
1262:
372:
54:
1645:
1634:
1221:
1105:
440:
1444:
1402:
624:
596:
470:
Former Thompsonville station platform and site of the future Enfield station photographed in 2014
427:
took over passenger service. Thompsonville remained a stop - daily ridership exceeded 40 on the
610:
521:
1621:
1598:
1287:
1282:
937:"CT to build five all-new train stations, using nearly $ 32 million in state, federal funds"
797:
1349:
1256:
1242:
1036:
756:
555:
1660:
1156:
480:
444:
368:
185:
1056:. Connecticut Department of Transportation. June 11, 2024. p. 5. Archived from
1372:
613:. National Passenger Rail Corporation (as Amtrak). October 26, 1986. pp. 9, 11
420:
1464:
703:
1506:
911:"Bond Commission approves funds for Enfield train station, other local projects"
821:"Officials present alternative plan for proposed train station in Thompsonville"
599:. Amtrak. February 1, 1981. p. 10 – via Museum of Railway Timetables.
1326:
1318:
989:
759:(Press release). Connecticut Department of Transportation. February 20, 2017.
81:
68:
436:, the station and the adjacent freight house were demolished in early 1983.
1077:
757:"CTDOT Announces $ 50 Million in Additional Funding for NHHS Rail Program"
1141:
1137:
162:
158:
1051:"State Projects Scheduled for Advertising: June 2024 through May 2025"
1495:
1435:
1406:
1396:
579:"SENATOR BAKER APPEARS IN HARTFORD FOR WEICKER AND STATE REPUBLICANS"
424:
287:
283:
210:
206:
780:. Connecticut Department of Transportation. Summer 2017. p. 3.
968:"Massive fire destroys vacant, historic former factory in Enfield"
465:
387:
859:"Enfield council, legislators, hear update on train station plan"
648:
New Haven Hartford Springfield Commuter Rail Implementation Study
738:. Connecticut Department of Transportation. 2006. Archived from
1468:
1109:
1037:"Enfield Railroad Station Environmental Assessment- May 2024"
793:"Thousands Take A Free Ride On Hartford Line's Inaugural Run"
994:. Connecticut Department of Transportation. October 4, 2023.
991:
State Project 320-0005 Proposed Railroad Station in Enfield
676:. Connecticut Department of Transportation. Archived from
840:"Enfield council designates $ 670,000 for train platform"
1092:| Permitting Dashboard, Federal Infrastructure Projects
711:
New Haven-Hartford-Springfield Environmental Assessment
778:
New Haven-Hartford Springfield Rail Program Newsletter
281:
204:
156:
1697:
Railway stations in the United States closed in 1986
1687:
Railway stations in the United States opened in 1844
1667:
Proposed stations on the New Haven–Springfield Line
1591:
1515:
1420:
1385:
1363:
1340:
1317:
1310:
1241:
1155:
1148:
344:
144:
128:
123:
115:
107:
97:
60:
48:
43:
20:
771:"Design Continues for New Hartford Line Stations"
1677:Railway stations in Hartford County, Connecticut
1039:. Federal Railroad Administration. May 27, 2024.
791:Porter, Mikaela; Owens, David (June 17, 2018).
416:built later on the north end of the structure.
878:"DOT details plans for Enfield train platform"
1480:
1121:
621:– via The Museum of Railway Timetables.
8:
1692:Railway stations scheduled to open in 2025
1487:
1473:
1465:
1314:
1152:
1128:
1114:
1106:
966:Staff, Journal Inquirer (March 24, 2021).
713:. Connecticut Department of Transportation
650:. Connecticut Department of Transportation
634:
632:
341:
275:
264:
150:
38:An Amtrak train at Enfield in January 1980
32:
17:
639:Wilbur Smith Associates (November 2004).
291:
278:
214:
201:
166:
153:
1428:Connecticut Department of Transportation
704:"Station and Layover Site Concept Plans"
447:railcars to increase frequencies on the
392:Thompsonville station on a 1909 postcard
1096:Station site on Google Maps Street View
577:Madden, Richard L. (October 20, 1982).
505:
1101:Image of Thompsonville station in 1967
1005:Danseyar, Susan (September 29, 2023).
898:. Enfield Town Council. April 5, 2021.
518:The Rail Lines of Southern New England
1682:Former Amtrak stations in Connecticut
549:
547:
545:
543:
541:
539:
537:
520:. Branch Line Press. pp. 74–78.
511:
509:
7:
838:Lerner, Jessica (October 15, 2019).
434:National Register of Historic Places
909:Bedner, Eric (December 22, 2021).
819:Lerner, Jessica (April 22, 2019).
14:
857:Smith, Steve (January 25, 2021).
1456:Italics indicate future stations
1136:
1076:
282:
205:
157:
935:Brone, Abigail (June 2, 2022).
702:CDM Smith (February 24, 2012).
398:Hartford and New Haven Railroad
896:"Minutes of a Special Meeting"
876:Hushin, Adam (April 8, 2021).
671:"Enfield Conceptual Site Plan"
1:
1083:Enfield station (Connecticut)
453:. The station was renamed as
611:"National Train Timetables"
597:"National Train Timetables"
1713:
1393:New Haven–Springfield Line
516:Karr, Ronald Dale (1995).
450:Connecticut Valley Service
312:Connecticut Valley Service
111:1 side platforms (planned)
102:New Haven–Springfield Line
1453:
733:"Enfield Station Concept"
423:closed it shortly before
351:
340:
336:
263:
259:
255:
149:
140:
136:
31:
1090:Enfield Railroad Station
494:environmental assessment
1441:TransitAmerica Services
1298:New Haven Union Station
1233:New Haven Union Station
400:(H&NH) opened from
178:New Haven Union Station
1548:New Haven State Street
1293:New Haven State Street
1228:New Haven State Street
745:on September 19, 2006.
471:
414:Railway Express Agency
393:
1085:at Wikimedia Commons
683:on September 19, 2006
469:
391:
1672:Enfield, Connecticut
641:"Recommended Action"
625:April 1986 timetable
558:. Tyler City Station
373:Enfield, Connecticut
132:Late 2020s (planned)
55:Enfield, Connecticut
1017:on December 3, 2023
441:North Haven station
82:41.9992°N 72.6044°W
78: /
44:General information
1445:Alternate Concepts
1403:Northeast Corridor
978:on March 24, 2021.
472:
443:and buying twelve
429:Connecticut Yankee
408:in December 1844.
394:
292:Following station
279:Preceding station
215:Following station
202:Preceding station
167:Following station
154:Preceding station
1654:
1653:
1462:
1461:
1381:
1380:
1306:
1305:
1081:Media related to
554:Belletzkie, Bob.
359:
358:
355:
354:
332:
331:
328:
327:
251:
250:
87:41.9992; -72.6044
1704:
1509:
1503:
1498:
1489:
1482:
1475:
1466:
1315:
1153:
1140:
1130:
1123:
1116:
1107:
1080:
1065:
1064:
1063:on July 2, 2024.
1062:
1055:
1047:
1041:
1040:
1033:
1027:
1026:
1024:
1022:
1013:. Archived from
1002:
996:
995:
986:
980:
979:
974:. Archived from
972:Journal Inquirer
963:
957:
956:
954:
952:
943:. Archived from
932:
926:
925:
923:
921:
915:Journal Inquirer
906:
900:
899:
892:
886:
885:
882:Journal Inquirer
873:
867:
866:
863:Hartford Courant
854:
848:
847:
844:Journal Inquirer
835:
829:
828:
825:Journal Inquirer
816:
810:
809:
807:
805:
798:Hartford Courant
788:
782:
781:
775:
767:
761:
760:
753:
747:
746:
744:
737:
729:
723:
722:
720:
718:
708:
699:
693:
692:
690:
688:
682:
675:
666:
660:
659:
657:
655:
645:
636:
627:
622:
620:
618:
607:
601:
600:
593:
587:
586:
574:
568:
567:
565:
563:
556:"Stations: T-TH"
551:
532:
531:
513:
342:
286:
276:
265:
209:
161:
151:
93:
92:
90:
89:
88:
83:
79:
76:
75:
74:
71:
36:
18:
1712:
1711:
1707:
1706:
1705:
1703:
1702:
1701:
1657:
1656:
1655:
1650:
1592:Former stations
1587:
1553:New Haven Union
1516:Active stations
1511:
1507:
1501:
1496:
1493:
1463:
1458:
1449:
1416:
1377:
1359:
1336:
1302:
1243:Shore Line East
1237:
1144:
1134:
1074:
1069:
1068:
1060:
1053:
1049:
1048:
1044:
1035:
1034:
1030:
1020:
1018:
1004:
1003:
999:
988:
987:
983:
965:
964:
960:
950:
948:
947:on June 3, 2022
934:
933:
929:
919:
917:
908:
907:
903:
894:
893:
889:
875:
874:
870:
856:
855:
851:
837:
836:
832:
818:
817:
813:
803:
801:
790:
789:
785:
773:
769:
768:
764:
755:
754:
750:
742:
735:
731:
730:
726:
716:
714:
706:
701:
700:
696:
686:
684:
680:
673:
668:
667:
663:
653:
651:
643:
638:
637:
630:
616:
614:
609:
608:
604:
595:
594:
590:
576:
575:
571:
561:
559:
553:
552:
535:
528:
515:
514:
507:
502:
464:
386:
381:
364:is a planned CT
362:Enfield station
347:
324:
305:
270:
269:Former services
247:
228:
197:
180:
145:Future services
86:
84:
80:
77:
72:
69:
67:
65:
64:
53:
39:
27:
26:
25:
12:
11:
5:
1710:
1708:
1700:
1699:
1694:
1689:
1684:
1679:
1674:
1669:
1659:
1658:
1652:
1651:
1649:
1648:
1643:
1640:
1637:
1632:
1627:
1626:Leete's Island
1624:
1619:
1614:
1609:
1606:
1601:
1595:
1593:
1589:
1588:
1586:
1585:
1580:
1575:
1570:
1565:
1560:
1555:
1550:
1545:
1540:
1535:
1530:
1525:
1519:
1517:
1513:
1512:
1494:
1492:
1491:
1484:
1477:
1469:
1460:
1459:
1454:
1451:
1450:
1448:
1447:
1438:
1433:
1430:
1424:
1422:
1418:
1417:
1415:
1414:
1400:
1389:
1387:
1386:Infrastructure
1383:
1382:
1379:
1378:
1376:
1375:
1369:
1367:
1365:Multiple units
1361:
1360:
1358:
1357:
1352:
1346:
1344:
1338:
1337:
1335:
1334:
1329:
1323:
1321:
1312:
1308:
1307:
1304:
1303:
1301:
1300:
1295:
1290:
1285:
1280:
1275:
1270:
1265:
1260:
1253:
1247:
1245:
1239:
1238:
1236:
1235:
1230:
1225:
1218:
1213:
1208:
1203:
1196:
1189:
1184:
1179:
1174:
1167:
1161:
1159:
1150:
1146:
1145:
1135:
1133:
1132:
1125:
1118:
1110:
1104:
1103:
1098:
1093:
1073:
1072:External links
1070:
1067:
1066:
1042:
1028:
997:
981:
958:
927:
901:
887:
868:
849:
830:
811:
783:
762:
748:
724:
694:
661:
628:
602:
588:
583:New York Times
569:
533:
526:
504:
503:
501:
498:
463:
460:
385:
382:
380:
377:
357:
356:
353:
352:
349:
348:
345:
338:
337:
334:
333:
330:
329:
326:
325:
322:
317:
315:
308:
306:
300:
294:
293:
290:
280:
272:
271:
268:
261:
260:
257:
256:
253:
252:
249:
248:
245:
240:
238:
231:
229:
223:
217:
216:
213:
203:
199:
198:
195:
190:
188:
183:
181:
175:
169:
168:
165:
155:
147:
146:
142:
141:
138:
137:
134:
133:
130:
126:
125:
121:
120:
117:
113:
112:
109:
105:
104:
99:
95:
94:
62:
58:
57:
50:
46:
45:
41:
40:
37:
29:
28:
23:
22:
21:
13:
10:
9:
6:
4:
3:
2:
1709:
1698:
1695:
1693:
1690:
1688:
1685:
1683:
1680:
1678:
1675:
1673:
1670:
1668:
1665:
1664:
1662:
1647:
1644:
1641:
1638:
1636:
1633:
1631:
1628:
1625:
1623:
1620:
1618:
1615:
1613:
1610:
1607:
1605:
1602:
1600:
1597:
1596:
1594:
1590:
1584:
1583:Windsor Locks
1581:
1579:
1576:
1574:
1571:
1569:
1566:
1564:
1561:
1559:
1556:
1554:
1551:
1549:
1546:
1544:
1541:
1539:
1536:
1534:
1531:
1529:
1526:
1524:
1521:
1520:
1518:
1514:
1510:
1504:
1499:
1490:
1485:
1483:
1478:
1476:
1471:
1470:
1467:
1457:
1452:
1446:
1442:
1439:
1437:
1434:
1431:
1429:
1426:
1425:
1423:
1419:
1412:
1408:
1404:
1401:
1398:
1394:
1391:
1390:
1388:
1384:
1374:
1371:
1370:
1368:
1366:
1362:
1356:
1353:
1351:
1348:
1347:
1345:
1343:
1339:
1333:
1330:
1328:
1325:
1324:
1322:
1320:
1316:
1313:
1311:Rolling stock
1309:
1299:
1296:
1294:
1291:
1289:
1286:
1284:
1281:
1279:
1276:
1274:
1271:
1269:
1266:
1264:
1261:
1259:
1258:
1254:
1252:
1249:
1248:
1246:
1244:
1240:
1234:
1231:
1229:
1226:
1224:
1223:
1219:
1217:
1214:
1212:
1209:
1207:
1204:
1202:
1201:
1197:
1195:
1194:
1193:West Hartford
1190:
1188:
1185:
1183:
1180:
1178:
1177:Windsor Locks
1175:
1173:
1172:
1168:
1166:
1163:
1162:
1160:
1158:
1157:Hartford Line
1154:
1151:
1147:
1143:
1139:
1131:
1126:
1124:
1119:
1117:
1112:
1111:
1108:
1102:
1099:
1097:
1094:
1091:
1088:
1087:
1086:
1084:
1079:
1071:
1059:
1052:
1046:
1043:
1038:
1032:
1029:
1016:
1012:
1008:
1001:
998:
993:
992:
985:
982:
977:
973:
969:
962:
959:
946:
942:
938:
931:
928:
916:
912:
905:
902:
897:
891:
888:
883:
879:
872:
869:
864:
860:
853:
850:
845:
841:
834:
831:
826:
822:
815:
812:
800:
799:
794:
787:
784:
779:
772:
766:
763:
758:
752:
749:
741:
734:
728:
725:
712:
705:
698:
695:
679:
672:
665:
662:
649:
642:
635:
633:
629:
626:
612:
606:
603:
598:
592:
589:
584:
580:
573:
570:
557:
550:
548:
546:
544:
542:
540:
538:
534:
529:
523:
519:
512:
510:
506:
499:
497:
495:
489:
485:
482:
481:side platform
476:
468:
462:Hartford Line
461:
459:
456:
452:
451:
446:
445:Budd SPV-2000
442:
437:
435:
430:
426:
422:
417:
415:
411:
410:Thompsonville
407:
403:
399:
390:
383:
378:
376:
374:
370:
369:Hartford Line
367:
363:
350:
343:
339:
335:
321:
318:
316:
314:
313:
309:
307:
304:
299:
298:Windsor Locks
296:
295:
289:
285:
277:
274:
273:
267:
266:
262:
258:
254:
244:
241:
239:
237:
236:
235:Hartford Line
232:
230:
227:
222:
221:Windsor Locks
219:
218:
212:
208:
200:
194:
191:
189:
187:
186:Hartford Line
184:
182:
179:
174:
173:Windsor Locks
171:
170:
164:
160:
152:
148:
143:
139:
135:
131:
127:
122:
118:
114:
110:
106:
103:
100:
96:
91:
63:
59:
56:
51:
47:
42:
35:
30:
19:
16:
1639:Pine Orchard
1611:
1563:Old Saybrook
1455:
1421:Affiliations
1263:Old Saybrook
1255:
1220:
1198:
1191:
1170:
1169:
1075:
1058:the original
1045:
1031:
1019:. Retrieved
1015:the original
1010:
1000:
990:
984:
976:the original
971:
961:
949:. Retrieved
945:the original
940:
930:
920:December 31,
918:. Retrieved
914:
904:
890:
881:
871:
862:
852:
843:
833:
824:
814:
802:. Retrieved
796:
786:
777:
765:
751:
740:the original
727:
715:. Retrieved
710:
697:
685:. Retrieved
678:the original
664:
652:. Retrieved
647:
615:. Retrieved
605:
591:
582:
572:
560:. Retrieved
517:
490:
486:
477:
473:
454:
448:
438:
428:
421:Penn Central
418:
409:
395:
365:
361:
360:
310:
233:
15:
1646:Willimantic
1642:Stony Creek
1635:North Haven
1573:Wallingford
1508:Connecticut
1373:Kawasaki M8
1332:EMD GP40-3H
1319:Locomotives
1222:North Haven
1216:Wallingford
1165:Springfield
1021:December 3,
623:Compare to
406:Springfield
371:station in
320:Springfield
243:Springfield
193:Springfield
85: /
61:Coordinates
52:Main Street
1661:Categories
1558:New London
1528:Bridgeport
1251:New London
1011:CT Insider
941:CT Insider
527:0942147022
500:References
73:72°36′16″W
70:41°59′57″N
1608:East Lyme
1432:Operators
1268:Westbrook
1200:Newington
303:New Haven
226:New Haven
108:Platforms
1622:Guilford
1599:Branford
1568:Stamford
1533:Hartford
1502:stations
1327:GE P40DC
1288:Branford
1283:Guilford
1187:Hartford
1149:Stations
804:June 17,
717:April 3,
687:April 3,
654:April 3,
617:April 3,
562:April 7,
402:Hartford
346:Location
323:Terminus
246:Terminus
196:Terminus
49:Location
1630:Madison
1612:Enfield
1604:Clinton
1578:Windsor
1538:Meriden
1350:Mafersa
1342:Coaches
1278:Madison
1273:Clinton
1257:Niantic
1211:Meriden
1182:Windsor
1171:Enfield
1142:CT Rail
951:June 3,
479:single
455:Enfield
379:History
301:toward
224:toward
176:toward
163:CT Rail
129:Opening
124:History
98:Line(s)
24:Enfield
1617:Groton
1543:Mystic
1523:Berlin
1497:Amtrak
1436:Amtrak
1407:Amtrak
1397:Amtrak
1206:Berlin
524:
425:Amtrak
384:Amtrak
288:Amtrak
211:Amtrak
116:Tracks
1411:CTDOT
1355:MBB-3
1061:(PDF)
1054:(PDF)
774:(PDF)
743:(PDF)
736:(PDF)
707:(PDF)
681:(PDF)
674:(PDF)
669:URS.
644:(PDF)
1409:and
1023:2023
953:2022
922:2021
806:2018
719:2013
689:2013
656:2013
619:2013
564:2016
522:ISBN
396:The
366:rail
1505:in
404:to
1663::
1009:.
970:.
939:.
913:.
880:.
861:.
842:.
823:.
795:.
776:.
709:.
646:.
631:^
581:.
536:^
508:^
1488:e
1481:t
1474:v
1443:/
1413:)
1405:(
1399:)
1395:(
1129:e
1122:t
1115:v
1025:.
955:.
924:.
884:.
865:.
846:.
827:.
808:.
721:.
691:.
658:.
585:.
566:.
530:.
119:1
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.