Furka Base Tunnel

Source 📝

1136: 27: 1068:
Tunnel's construction for the removal of excavating spoil as well as to convey supplies into the construction site. The Bedretto tunnel was abandoned for a time following the completion of the Furka tunnel, being used neither for emergency access nor for maintenance purposes, in part due to three separate collapses. During the 2010s, it was restored to accommodate a new ventilation system for the Furka tunnel, intended to supply fresh air in the event of a major fire within the latter tunnel.
1146: 1166: 1156: 1128:
various safety measures. The tunnel is typically kept operational throughout the process by performing the majority of the work at night. Particular attention has been paid to the tunnel ventilation, intended to control threats such as fires. However, the study of several operational scenarios points out the weaknesses of the existing ventilation system and difficulties to dissipate the smokes without modifying the ventilation system.
526: 793: 515: 801: 588: 561: 425: 534: 482: 442: 434: 351: 714: 698: 472: 464: 853: 769: 615: 490: 373: 739: 706: 667: 637: 1035:. This section of the line was particularly challenging to operate, its closure being necessary during the winter months due to the risks associated with heavy snowfalls. These seasonal cycles of closures and reopenings required civil engineering works each time, as large sections of the railway's overhead electrical lines to be dismantled and reinstated as well. 828: 400: 1496: 1444: 1127:
During August 2018, a comprehensive modernisation of the Furka Base Tunnel's infrastructure commenced. This programme, costed at CHF 190 million, largely revolves around the refurbishment of the tunnel's structure, the wholesale replacement of the track and trackbed, as well as the incorporation of
1091:
In spite of the presence of multiple complex geological features along the bore, work typically proceeded at a steady pace. Typically 400 metres of the tunnel were lined each month, this rate being supported via five individual shotcrete machines that were operated simultaneously. By the end of its
1087:
lining along the majority of its length. Areas of particularly high rock pressure were addressed via the excavation of an elliptical or circular profile and the application of steel ribs. Engineers were guided in the use of support measures by a series of geological studies, along with construction
1067:
During 1971, work commenced on the boring of the Bedretto tunnel, which functioned as an annex tunnel for the Furka Base Tunnel. Excavated by conventional techniques, including both drilling and blasting, it was a relatively narrow tunnel through the bare rock. It was used during the Furka Base
1095:
The completed Furka Base Tunnel accommodates a single track throughout, its cross section varying between 26 and 42 m throughout its length. This often narrow cross section has been attributed as one reason for the tunnel's construction requiring ten years, as it hindered the movement of bulky
993:
within a railway tunnel. The tunnel has a relatively narrow cross section, which has been attributed with slowing the construction effort somewhat. The interconnecting Bedretto tunnel was used during the Furka Base Tunnel's construction for the removal of excavating spoil as well as to moving
997:
The Furka Base Tunnel is 15,407 m (16,849 yd) in length, and replaced the previous track that climbed to an apex of 2,160 m (7,090 ft) above sea level, thus allowing year-round service through service on the Furka–Oberalp line. In the middle of the base tunnel, is a
1038:
The replacement of the Furka Summit Tunnel with a base tunnel had long been identified as an attractive solution, but the prospects for constructing such a tunnel were complicated by multiple factors in both its design and construction. Initial authorisation from the
1448: 1104:
During 1982, the Furka Base Tunnel was opened to traffic. During its initial year of operation, the tunnel was used to transport in excess of 75,000 passenger cars, trucks and buses. As of 2009, the base tunnel serves both an hourly regional train and ten daily
1055:. However, these estimates proved to be drastically inadequate as the project proceeded, with figures in excess of 300 million francs being reached prior to the base tunnel's completion. There was substantial political tensions surrounding these 1059:, which have been said to have contributed to Bonvin's ill health toward the end of the project; Bonvin died just prior to its opening in 1982. A plaque commemorating Roger Bonvin is installed as the base tunnel's entrance in Oberwald. 1006:(elevation 1,480 m (4,860 ft)); some proponents of the project hoped to eventually build a Y-shaped tunnel connecting all three locations. The Furka Base Tunnel is completed by a bypass tunnel around Oberwald. 977:, which was only available seasonally due to the threat posed by heavy snowfalls. Construction commenced during 1971, taking ten years to complete. An innovative permanent support system was used, comprising 1079:
to make the rock surrounding the tunnel portals impermeable. It was reportedly the first use of such material within a railway tunnel. The permanent support for the tunnel consisted only of
1120:
While the older high level route was initially closed following the diversion of all regular services through the new Furka Base Tunnel, this line has since been reopened by the
1375: 1071:
The construction techniques used for the Furka Base Tunnel were relatively innovative for the era. One such technique involved the application of a recently developed
1524: 1549: 1529: 913: 1519: 1414: 1392: 1474: 1534: 306: 74: 1040: 906: 1539: 1092:
construction, roughly 70,000 m of dry aggregate and cement mixture had been used, while 115,000 rock bolts have been applied.
1020: 947: 1544: 332: 67: 1500: 973:
Prior to its construction, all traffic had to use the historic high-level route via the 1.8 km (1.1 mi) long
899: 1044: 864: 943: 411: 190: 180: 127: 117: 1475:"Investigating different operational scenarios for the proposed emergency ventilation system in Furka Tunnel" 1124:, which routinely put on tourist trains through the historic Furka Pass, including the Furka Summit Tunnel. 286: 1117:. During the winter skiing season, traffic in the tunnel has consistently approached its maximum capacity. 1121: 238: 1554: 1369: 1135: 839: 145: 1145: 1341: 1272: 384: 1165: 1032: 974: 812: 545: 243: 26: 1155: 1357: 1288: 45: 1410: 1306: 291: 1430: 1349: 1280: 1188: 1183: 1106: 1345: 1276: 1329: 1260: 1513: 1361: 1292: 1056: 1028: 955: 149: 59: 1072: 1051:; the total cost of its construction had been initially estimated to be 76 million 1048: 986: 753: 651: 1226: 1052: 939: 935: 278: 250: 135: 1114: 1047:
passed a comprehensive bill for the base tunnel's construction, sponsored by
89: 76: 1084: 1080: 982: 978: 963: 1031:
via the historic high-level route using the 1.8 km (1.1 mi) long
1495: 1019:
Prior to the opening of the Furka Base Tunnel, all railway traffic on the
1076: 999: 990: 959: 723: 1473:
Yuosaf, Rehan; Melchior, Tom; (Poyry Switzerland Ltd.) (25 April 2016).
1353: 1284: 1110: 327: 1207:
Die Furka-Basislinie Oberwald-Realp, Schweizer Ingenieur und Architekt
1024: 1003: 951: 131: 55: 1164: 1154: 1144: 1134: 967: 994:
supplies inwards; it has since been reused for ventilation.
1088:
experience, to predict and monitor systematic deformation.
1330:"Schotcrete as permanent lining for the Furka base tunnel" 1271:(4). Rock Mechanics and Rock Engineering volume: 215–231. 1043:
for preparatory work was given in 1971. During 1976, the
320: 312: 300: 285: 249: 233: 225: 217: 212: 204: 196: 186: 176: 161: 156: 141: 123: 113: 105: 66: 51: 41: 36: 1261:"Design and construction of the Furka base tunnel" 998:5,221-metre-long (5,710 yd) access tunnel to 1409:. Verlag Schweers + Wall GmbH. 2012. p. 34. 950:, an east–west railway connecting the cantons of 1393:"Furka Base Tunnel modernisation gets underway" 1184:Bedretto Underground Laboratory for Geoenergies 1468: 1466: 1387: 1385: 1254: 1252: 1250: 1248: 1246: 1244: 1221: 1219: 1217: 1215: 1213: 907: 8: 1374:: CS1 maint: multiple names: authors list ( 962:(VS), at 1,390 m (4,560 ft) above 19: 1139:Oberwald bypass tunnel (1366 m a.s.l.) 533: 525: 1023:traversed the challenging terrain between 914: 900: 800: 792: 340: 25: 18: 985:coating, which included the first use of 1328:Amberg, R. and Sala, A. (January 1984). 1200: 970:(UR), at 1,550 m (5,090 ft). 1447:. engineering-group.ch. Archived from 1367: 489: 481: 471: 463: 441: 433: 1480:. www.tunnel-graz.at. pp. 45–52. 1395:. railwaygazette.com. 31 August 2018. 16:Railway tunnel in central Switzerland 7: 1525:Buildings and structures in Obwalden 1169:Bedretto window (1480 m a.s.l.) 705: 697: 1334:Rock Mechanics and Rock Engineering 1265:Rock Mechanics and Rock Engineering 1550:1982 establishments in Switzerland 1530:Buildings and structures in Valais 966:and its east portal lies south of 514: 14: 1494: 1159:East portal (1550 m a.s.l.) 1149:West portal (1390 m a.s.l.) 851: 826: 799: 791: 767: 737: 712: 704: 696: 665: 635: 613: 587: 586: 560: 559: 532: 524: 513: 488: 480: 470: 462: 440: 432: 423: 398: 371: 349: 958:. Its west portal lies east of 350: 1520:Railway tunnels in Switzerland 713: 424: 234: 229:15.407 km (9.573 mi) 221:15.407 km (9.573 mi) 1: 1445:"Furka Tunnel Update Project" 852: 768: 614: 372: 1307:"History of Glacier Express" 1259:Amberg, R. (November 1983). 738: 666: 636: 316:1,390 m (4,560 ft) 304:1,564 m (5,131 ft) 31:Tunnel near the Realp portal 1113:and the ski resort town of 827: 399: 1571: 1535:Tunnels completed in 1982 1045:Parliament of Switzerland 860: 845: 838: 820: 809: 783: 776: 761: 749: 731: 721: 688: 659: 647: 629: 622: 607: 580: 553: 542: 505: 500:Oberwald deviation tunnel 498: 454: 450: 417: 410: 392: 380: 365: 361: 343: 325: 24: 1096:construction equipment. 944:Matterhorn Gotthard Bahn 191:Matterhorn Gotthard Bahn 181:Matterhorn Gotthard Bahn 118:Matterhorn Gotthard Bahn 1227:"History of the tunnel" 1407:Eisenbahnatlas Schweiz 1170: 1160: 1150: 1140: 1122:Furka Heritage Railway 165:25 June 1982 1229:. bedrettolab.ethz.ch 1168: 1158: 1148: 1138: 208:Passenger and freight 1503:at Wikimedia Commons 1431:"Swiss steam trains" 90:46.53528°N 8.45333°E 1545:Tunnels in the Alps 1346:1984RMRE...17....1A 1309:. glacierexpress.ch 1277:1983RMRE...16..215A 1033:Furka Summit Tunnel 975:Furka Summit Tunnel 813:Furka Steam Railway 546:Furka Steam Railway 86: /  21: 1451:on 4 February 2022 1354:10.1007/BF01088367 1285:10.1007/BF01042358 1171: 1161: 1151: 1141: 1021:Furka–Oberalp line 948:Furka–Oberalp line 726:ventilation tunnel 296:11 kV AC 16 2/3 Hz 46:Furka Oberalp Bahn 1540:Uri–Valais border 1501:Furka Base Tunnel 1499:Media related to 1416:978-3-89494-130-7 1175: 1174: 1002:in the canton of 932:Furka Base Tunnel 928: 927: 924: 923: 888: 887: 677:Furka Base Tunnel 301:Highest elevation 292:Overhead catenary 95:46.53528; 8.45333 20:Furka Base Tunnel 1562: 1498: 1482: 1481: 1479: 1470: 1461: 1460: 1458: 1456: 1441: 1435: 1434: 1427: 1421: 1420: 1403: 1397: 1396: 1389: 1380: 1379: 1373: 1365: 1325: 1319: 1318: 1316: 1314: 1303: 1297: 1296: 1256: 1239: 1238: 1236: 1234: 1223: 1208: 1205: 1131: 1130: 916: 909: 902: 896: 855: 854: 830: 829: 803: 802: 795: 794: 771: 770: 741: 740: 716: 715: 708: 707: 700: 699: 669: 668: 639: 638: 617: 616: 590: 589: 563: 562: 536: 535: 528: 527: 517: 516: 492: 491: 484: 483: 474: 473: 466: 465: 444: 443: 436: 435: 427: 426: 402: 401: 375: 374: 353: 352: 341: 328: 313:Lowest elevation 281: 275: 273: 272: 268: 265: 257: 236: 172: 170: 101: 100: 98: 97: 96: 91: 87: 84: 83: 82: 79: 29: 22: 1570: 1569: 1565: 1564: 1563: 1561: 1560: 1559: 1510: 1509: 1507: 1491: 1486: 1485: 1477: 1472: 1471: 1464: 1454: 1452: 1443: 1442: 1438: 1429: 1428: 1424: 1417: 1405: 1404: 1400: 1391: 1390: 1383: 1366: 1327: 1326: 1322: 1312: 1310: 1305: 1304: 1300: 1258: 1257: 1242: 1232: 1230: 1225: 1224: 1211: 1206: 1202: 1197: 1189:Rotondo Granite 1180: 1109:trains between 1107:Glacier Express 1102: 1065: 1041:Federal Council 1017: 1012: 920: 894: 868: 856: 836: 831: 816: 805: 804: 797: 796: 779: 772: 757: 747: 742: 727: 717: 710: 709: 702: 701: 684: 679: 670: 655: 645: 640: 625: 618: 603: 598: 591: 576: 571: 564: 549: 538: 537: 530: 529: 520: 519: 518: 501: 494: 493: 486: 485: 476: 475: 468: 467: 446: 445: 438: 437: 428: 408: 403: 388: 376: 359: 354: 335: 305: 295: 277: 270: 266: 263: 261: 260:3 ft  259: 255: 168: 166: 94: 92: 88: 85: 80: 77: 75: 73: 72: 32: 17: 12: 11: 5: 1568: 1566: 1558: 1557: 1552: 1547: 1542: 1537: 1532: 1527: 1522: 1512: 1511: 1505: 1504: 1490: 1489:External links 1487: 1484: 1483: 1462: 1436: 1422: 1415: 1398: 1381: 1320: 1298: 1240: 1209: 1199: 1198: 1196: 1193: 1192: 1191: 1186: 1179: 1176: 1173: 1172: 1162: 1152: 1142: 1101: 1098: 1064: 1061: 1016: 1013: 1011: 1008: 926: 925: 922: 921: 919: 918: 911: 904: 895:This diagram: 893: 890: 889: 886: 885: 883: 881: 879: 877: 875: 873: 870: 869: 861: 859: 857: 850: 848: 846: 843: 842: 837: 834: 832: 825: 823: 821: 818: 817: 810: 808: 806: 798: 790: 789: 788: 786: 784: 781: 780: 777: 775: 773: 766: 764: 762: 759: 758: 751: 748: 745: 743: 736: 734: 732: 729: 728: 722: 720: 718: 711: 703: 695: 694: 693: 691: 689: 686: 685: 682: 680: 675: 673: 671: 664: 662: 660: 657: 656: 649: 646: 643: 641: 634: 632: 630: 627: 626: 623: 621: 619: 612: 610: 608: 605: 604: 601: 599: 596: 594: 592: 585: 583: 581: 578: 577: 574: 572: 569: 567: 565: 558: 556: 554: 551: 550: 543: 541: 539: 531: 523: 522: 521: 512: 511: 510: 508: 506: 503: 502: 499: 497: 495: 487: 479: 478: 477: 469: 461: 460: 459: 457: 455: 452: 451: 449: 447: 439: 431: 430: 429: 422: 420: 418: 415: 414: 409: 406: 404: 397: 395: 393: 390: 389: 381: 379: 377: 370: 368: 366: 363: 362: 360: 357: 355: 348: 346: 344: 337: 336: 331: 323: 322: 318: 317: 314: 310: 309: 302: 298: 297: 289: 283: 282: 253: 247: 246: 241: 231: 230: 227: 223: 222: 219: 215: 214: 210: 209: 206: 202: 201: 198: 194: 193: 188: 184: 183: 178: 174: 173: 163: 159: 158: 154: 153: 143: 139: 138: 125: 121: 120: 115: 111: 110: 107: 103: 102: 70: 64: 63: 53: 49: 48: 43: 39: 38: 34: 33: 30: 15: 13: 10: 9: 6: 4: 3: 2: 1567: 1556: 1553: 1551: 1548: 1546: 1543: 1541: 1538: 1536: 1533: 1531: 1528: 1526: 1523: 1521: 1518: 1517: 1515: 1508: 1502: 1497: 1493: 1492: 1488: 1476: 1469: 1467: 1463: 1450: 1446: 1440: 1437: 1432: 1426: 1423: 1418: 1412: 1408: 1402: 1399: 1394: 1388: 1386: 1382: 1377: 1371: 1363: 1359: 1355: 1351: 1347: 1343: 1339: 1335: 1331: 1324: 1321: 1308: 1302: 1299: 1294: 1290: 1286: 1282: 1278: 1274: 1270: 1266: 1262: 1255: 1253: 1251: 1249: 1247: 1245: 1241: 1228: 1222: 1220: 1218: 1216: 1214: 1210: 1204: 1201: 1194: 1190: 1187: 1185: 1182: 1181: 1177: 1167: 1163: 1157: 1153: 1147: 1143: 1137: 1133: 1132: 1129: 1125: 1123: 1118: 1116: 1112: 1108: 1099: 1097: 1093: 1089: 1086: 1082: 1078: 1074: 1069: 1062: 1060: 1058: 1057:cost overruns 1054: 1050: 1046: 1042: 1036: 1034: 1030: 1026: 1022: 1014: 1009: 1007: 1005: 1001: 995: 992: 988: 984: 980: 976: 971: 969: 965: 961: 957: 953: 949: 945: 941: 937: 933: 917: 912: 910: 905: 903: 898: 897: 892: 891: 884: 882: 880: 878: 876: 874: 872: 871: 867: 866: 858: 849: 847: 844: 841: 833: 824: 822: 819: 815: 814: 807: 787: 785: 782: 774: 765: 763: 760: 755: 744: 735: 733: 730: 725: 719: 692: 690: 687: 681: 678: 674: 672: 663: 661: 658: 653: 642: 633: 631: 628: 620: 611: 609: 606: 600: 595: 593: 584: 582: 579: 573: 568: 566: 557: 555: 552: 548: 547: 540: 509: 507: 504: 496: 458: 456: 453: 448: 421: 419: 416: 413: 405: 396: 394: 391: 387: 386: 378: 369: 367: 364: 356: 347: 345: 342: 339: 338: 334: 330: 329: 324: 319: 315: 311: 308: 307:above the Sea 303: 299: 293: 290: 288: 284: 280: 256:1,000 mm 254: 252: 248: 245: 242: 240: 232: 228: 224: 220: 216: 211: 207: 203: 199: 195: 192: 189: 185: 182: 179: 175: 164: 160: 155: 152:, Switzerland 151: 147: 144: 140: 137: 133: 129: 126: 122: 119: 116: 112: 108: 104: 99: 71: 69: 65: 62:, Switzerland 61: 57: 54: 50: 47: 44: 40: 35: 28: 23: 1555:Base tunnels 1506: 1453:. Retrieved 1449:the original 1439: 1433:. June 2011. 1425: 1406: 1401: 1370:cite journal 1340:(17): 1–14. 1337: 1333: 1323: 1311:. Retrieved 1301: 1268: 1264: 1231:. Retrieved 1203: 1126: 1119: 1103: 1100:Service life 1094: 1090: 1081:rock anchors 1073:polyurethane 1070: 1066: 1063:Construction 1049:Roger Bonvin 1037: 1018: 996: 987:polyurethane 979:rock anchors 972: 931: 929: 862: 811: 754:passing loop 676: 652:passing loop 544: 382: 244:Single track 940:base tunnel 778:East portal 624:West portal 570:Rhonebrücke 287:Electrified 279:metre gauge 251:Track gauge 226:Line length 136:Switzerland 93: / 68:Coordinates 1514:Categories 1455:2 February 1313:2 February 1233:2 February 1195:References 1115:St. Moritz 1015:Background 597:Goneribrug 169:1982-06-25 1362:129176961 1293:128741128 1085:shotcrete 983:shotcrete 964:sea level 865:Andermatt 321:Route map 213:Technical 205:Character 157:Operation 81:8°27′12″E 78:46°32′7″N 1178:See also 1077:grouting 1000:Bedretto 991:grouting 960:Oberwald 938:railway 750:Rotondo 724:Bedretto 683:15,442 m 412:Oberwald 274: in 187:Operator 128:Oberwald 52:Location 37:Overview 1342:Bibcode 1273:Bibcode 1111:Zermatt 1075:-based 1010:History 989:-based 942:on the 269:⁄ 197:Traffic 167: ( 1413:  1360:  1291:  1083:and a 1053:francs 1025:Valais 1004:Ticino 981:and a 952:Valais 648:Geren 333:Legend 326: 239:tracks 218:Length 162:Opened 132:Valais 114:System 106:Status 56:Valais 1478:(PDF) 1358:S2CID 1289:S2CID 968:Realp 936:Swiss 934:is a 840:Realp 200:Train 177:Owner 146:Realp 124:Start 1457:2021 1411:ISBN 1376:link 1315:2021 1235:2020 1027:and 954:and 930:The 915:edit 908:talk 901:view 835:59.4 746:53.0 644:47.2 602:60 m 575:59 m 407:41.3 385:Visp 109:Open 42:Line 1350:doi 1281:doi 1029:Uri 956:Uri 946:'s 863:to 383:to 237:of 235:No. 150:Uri 142:End 60:Uri 1516:: 1465:^ 1384:^ 1372:}} 1368:{{ 1356:. 1348:. 1338:17 1336:. 1332:. 1287:. 1279:. 1269:16 1267:. 1263:. 1243:^ 1212:^ 358:km 276:) 148:, 134:, 130:, 58:/ 1459:. 1419:. 1378:) 1364:. 1352:: 1344:: 1317:. 1295:. 1283:: 1275:: 1237:. 756:) 752:( 654:) 650:( 294:, 271:8 267:3 264:+ 262:3 258:( 171:)

Index


Furka Oberalp Bahn
Valais
Uri
Coordinates
46°32′7″N 8°27′12″E / 46.53528°N 8.45333°E / 46.53528; 8.45333
Matterhorn Gotthard Bahn
Oberwald
Valais
Switzerland
Realp
Uri
Matterhorn Gotthard Bahn
Matterhorn Gotthard Bahn
tracks
Single track
Track gauge
metre gauge
Electrified
Overhead catenary
above the Sea
Legend
Visp
Oberwald
Furka Steam Railway
passing loop
Furka Base Tunnel
Bedretto
passing loop
Furka Steam Railway