381:, with 2,700MW, Garabi with 1,800MW and San Pedro with 1,700MW. Arguments in favor of the projects were that they would support development of the local and regional economies, help make the two countries independent of external energy suppliers using a renewable resource and would avoid using hard currency resources.In 2003 the Garabí Dam which would flood 300 square kilometres (120 sq mi) in southern Misiones, was still on hold as was the Roncador/Panambí dam. 25: 84: 365:
81 metres (266 ft) and a length of about 3,800 metres (12,500 ft). The two machine houses would share a common tunnel in the river bed. The reservoir would be 145 kilometres (90 mi) long, with an area of 810 square kilometres (310 sq mi). As of March 1986 the estimated cost was US$ 1,357 million and by December 1994 the estimate had been revised to US$ 1,789 million.
91: 404:
A cooperation agreement was signed in Rio de Janeiro on 1 September 2008 between Emprendimientos Energéticos Binacionales S.A. (EBISA) and Centrais Elétricas Brasileiras S.A. (ELETROBRAS). The hydroelectric inventory study was concluded in 2010, recommending the Garabí have 1,152 MW with a 642 square
364:
In 1988 the proposed dam would have a reservoir at an altitude of 94 metres (308 ft) above sea level, two engine houses with 6 Kaplan turbines each giving a total installed capacity of 1,400 to 1,800MW with an annual average of 6,100GWh.The dam would have a maximum height from the foundation of
384:
Brazil and Argentina signed an agreement in 2005 for two possible dams, the Garabí Dam with 1,150MW and the Panambí Dam with 1,050MW. Eletrobras and EBISA were to undertake the project expected to be completed by 2013, although it had met some local opposition.In November 2007 the Brazilian head of
368:
Under a revised plan in 2010 the proposed dam would have an altitude of 89 metres (292 ft) above sea level, one engine house with 8 Kaplan turbines, giving an installed capacity of 1,152MW, with an annual average of 5,970GWh.The dam would be about 40 metres (130 ft) high and 3,200 metres
323:
municipality of Rio Grande do Sul in Brazil. The exact location would depend on the results of geological studies of the sites.The Garabí Dam would be about 6 kilometres (3.7 mi) downstream from the town of Garruchos, and in Brazil its reservoir would cover parts of the municipalities of
68: 406: 623: 405:
kilometres (248 sq mi) reservoir. The environmental and engineering studies and social communications plan were started in May 2013 as well as the technical bidding documents.In February 2014 the
767: 772: 393:
agreed to prioritize construction of the Garabí binational dam.The next day, the planning ministers of Brazil and Argentina endorsed these agreements on exchange of energy. The governments of
377:
Proposed hydroelectric exploitation of the Uruguay River has a long history.In a convention between Argentina and Brazil signed on 14 March 1972, three sites were selected: Roncador, or
762: 409:(IBAMA) approved the terms of reference for rescuing the fauna.The survey was to start in April 2014.Studies were expected to be completed by the end of 2016. 304: 727: 701: 607: 657: 128: 757: 337: 390: 329: 325: 83: 386: 320: 752: 558: 316: 292: 624:"Ambientalistas cerram fileiras contrárias aos novos aproveitamentos hidrelétricos do Rio Uruguai" 450: 448: 446: 444: 442: 440: 256: 596:"Grands Barrages Internationaux: Aspects du Droit de la Cooperation dans le Bassin de la Plata" 576: 723: 697: 691: 603: 595: 398: 717: 674: 641: 341: 266: 529: 427: 425: 423: 421: 38:
Please help update this article to reflect recent events or newly available information.
378: 276: 236: 746: 307:. There is some controversy over the environmental impact on the fast-flowing river. 300: 246: 517: 454: 349: 345: 67: 693:
The Atlantic Forest of South America: Biodiversity Status, Threats, and Outlook
394: 353: 356:
of Brazil and Emprendimientos Energéticos Binacionales (Ebisa) of Argentina.
143: 130: 577:"Brasil y Argentina acordaron priorizar la concreción de la represa Garabí" 431: 369:(10,500 ft) long.As of 2016 the estimated cost was US$ 2,728 million. 333: 401:
wanted to implement the Garabí Binational Project as quickly as possible.
407:
Brazilian Institute of Environment and Renewable Natural Resources
181: 18: 530:
Argentina y Brasil ratifican acuerdos por Garabí – Mo Mirandu
32:
Parts of this article (those related to 2014) need to be
477: 475: 518:
Brasil y Argentina acordaron priorizar la concreción ..
455:
Construcción de Planta Hidroeléctrica de Garabí – IIRSA
690:
Leal, Carlos Galindo; Câmara, Ibsen de Gusmão (2003),
768:
Proposed renewable energy power stations in Argentina
275: 265: 255: 245: 235: 227: 219: 214: 206: 198: 190: 180: 175: 167: 159: 122: 114: 106: 60: 773:Proposed renewable energy power stations in Brazil 559:"Argentina y Brasil ratifican acuerdos por Garabí" 299:), is a planned dam and generating station on the 662:(in Portuguese), Eletrobras CGTEE, 7 April 2014 659:Eletrobras apresenta Garabi-Panambi a prefeitos 643:Construcción de Planta Hidroeléctrica de Garabí 432:Eletrobras apresenta Garabi-Panambi a prefeitos 72:2007 projection of the Garabí Dam and reservoir 8: 223:642 square kilometres (248 sq mi) 505: 303:between Argentina and Brazil. Part of the 66: 57: 481: 466: 417: 600:Barrages internationaux et coopération 541: 493: 763:Proposed hydroelectric power stations 719:Integración energética en el Cono Sur 7: 305:Garabí-Panambi Hydroelectric Complex 594:Caubet, Christian G. (1995-01-01), 352:.The project is a joint venture of 16:Planned dam in Brazil and Argentina 90: 14: 716:Wiegers, Mario A. (1996-01-01), 602:(in French), KARTHALA Editions, 389:and his Argentinian counterpart 98:Location of Garabí Dam in Brazil 89: 82: 23: 319:provinces of Argentina and the 622:Cigana, Caio (29 March 2014), 583:(in Spanish), 21 November 2007 565:(in Spanish), 20 November 2007 391:Cristina Fernández de Kirchner 315:The dam would be built in the 1: 679:, Enerdata, GGKEY:XK288JCZUJF 373:Planning and approval process 194:3,200 metres (10,500 ft) 722:(in Portuguese), BID-INTAL, 199:Elevation at crest 789: 630:(in Portuguese), Grupo RBS 758:Dams in Rio Grande do Sul 387:Luiz Inácio Lula da Silva 326:Santo Antônio das Missões 77: 65: 676:Brazilian Energy Report 257:Installed capacity 241:33 metres (108 ft) 231:89 metres (292 ft) 202:93 metres (305 ft) 144:28.227032°S 55.716181°W 506:Leal & Câmara 2003 296: 277:Annual generation 210:10 metres (33 ft) 149:-28.227032; -55.716181 228:Normal elevation 182:Type of dam 267:Capacity factor 646:(in Spanish), IIRSA 140: /  207:Width (crest) 753:Dams in Argentina 729:978-950-738-053-2 703:978-1-55963-989-7 673:Enerdata (2011), 609:978-2-86537-587-5 399:Rio Grande do Sul 297:Represa de Garabí 285: 284: 220:Surface area 176:Dam and spillways 118:Argentina, Brazil 110:Represa de Garabí 53: 52: 780: 738: 737: 736: 712: 711: 710: 696:, Island Press, 686: 685: 684: 669: 668: 667: 653: 652: 651: 637: 636: 635: 618: 617: 616: 590: 589: 588: 572: 571: 570: 545: 539: 533: 527: 521: 515: 509: 503: 497: 491: 485: 479: 470: 464: 458: 452: 435: 429: 155: 154: 152: 151: 150: 145: 141: 138: 137: 136: 133: 93: 92: 86: 70: 58: 48: 45: 39: 27: 26: 19: 788: 787: 783: 782: 781: 779: 778: 777: 743: 742: 741: 734: 732: 730: 715: 708: 706: 704: 689: 682: 680: 672: 665: 663: 656: 649: 647: 640: 633: 631: 621: 614: 612: 610: 593: 586: 584: 575: 568: 566: 557: 553: 548: 540: 536: 528: 524: 516: 512: 504: 500: 492: 488: 480: 473: 465: 461: 453: 438: 430: 419: 415: 375: 362: 342:Porto Vera Cruz 313: 148: 146: 142: 139: 134: 131: 129: 127: 126: 102: 101: 100: 99: 96: 95: 94: 73: 56: 49: 43: 40: 37: 28: 24: 17: 12: 11: 5: 786: 784: 776: 775: 770: 765: 760: 755: 745: 744: 740: 739: 728: 713: 702: 687: 670: 654: 638: 619: 608: 591: 573: 554: 552: 549: 547: 546: 534: 522: 510: 508:, p. 219. 498: 496:, p. 119. 486: 471: 459: 436: 416: 414: 411: 374: 371: 361: 358: 338:Roque Gonzales 312: 309: 283: 282: 279: 273: 272: 269: 263: 262: 259: 253: 252: 249: 243: 242: 239: 237:Hydraulic head 233: 232: 229: 225: 224: 221: 217: 216: 212: 211: 208: 204: 203: 200: 196: 195: 192: 188: 187: 184: 178: 177: 173: 172: 169: 165: 164: 161: 157: 156: 124: 120: 119: 116: 112: 111: 108: 104: 103: 97: 88: 87: 81: 80: 79: 78: 75: 74: 71: 63: 62: 54: 51: 50: 31: 29: 22: 15: 13: 10: 9: 6: 4: 3: 2: 785: 774: 771: 769: 766: 764: 761: 759: 756: 754: 751: 750: 748: 731: 725: 721: 720: 714: 705: 699: 695: 694: 688: 678: 677: 671: 661: 660: 655: 645: 644: 639: 629: 625: 620: 611: 605: 601: 597: 592: 582: 581:El Territorio 578: 574: 564: 560: 556: 555: 550: 543: 538: 535: 531: 526: 523: 519: 514: 511: 507: 502: 499: 495: 490: 487: 484:, p. 26. 483: 482:Enerdata 2011 478: 476: 472: 469:, p. 76. 468: 463: 460: 456: 451: 449: 447: 445: 443: 441: 437: 433: 428: 426: 424: 422: 418: 412: 410: 408: 402: 400: 396: 392: 388: 382: 380: 372: 370: 366: 359: 357: 355: 351: 347: 343: 339: 335: 331: 327: 322: 318: 310: 308: 306: 302: 301:Uruguay River 298: 294: 290: 280: 278: 274: 270: 268: 264: 260: 258: 254: 250: 248: 244: 240: 238: 234: 230: 226: 222: 218: 213: 209: 205: 201: 197: 193: 189: 185: 183: 179: 174: 170: 166: 163:Hydroelectric 162: 158: 153: 125: 121: 117: 113: 109: 107:Official name 105: 85: 76: 69: 64: 59: 47: 44:December 2019 35: 30: 21: 20: 733:, retrieved 718: 707:, retrieved 692: 681:, retrieved 675: 664:, retrieved 658: 648:, retrieved 642: 632:, retrieved 627: 613:, retrieved 599: 585:, retrieved 580: 567:, retrieved 562: 537: 525: 513: 501: 489: 467:Wiegers 1996 462: 403: 383: 376: 367: 363: 350:Porto Xavier 346:Porto Lucena 314: 288: 286: 41: 33: 542:Cigana 2014 494:Caubet 1995 330:São Nicolau 324:Garruchos, 147: / 123:Coordinates 747:Categories 735:2016-11-15 709:2016-11-15 683:2016-11-15 666:2016-11-11 650:2016-11-18 634:2016-11-11 615:2016-11-15 587:2016-11-14 569:2016-11-14 563:Mo Mirandu 395:Corrientes 354:Eletrobras 317:Corrientes 293:Portuguese 289:Garabí Dam 186:Earth fill 135:55°42′58″W 132:28°13′37″S 61:Garabí Dam 628:Zero Hora 360:Technical 321:Garruchos 215:Reservoir 311:Location 251:8 Kaplan 247:Turbines 551:Sources 379:Panambí 281:5,970GW 261:1,152MW 171:Planned 160:Purpose 115:Country 34:updated 726:  700:  606:  385:state 334:Pirapó 191:Length 168:Status 413:Notes 724:ISBN 698:ISBN 604:ISBN 397:and 348:and 287:The 271:0.60 55:Dam 749:: 626:, 598:, 579:, 561:, 474:^ 439:^ 420:^ 344:, 340:, 336:, 332:, 328:, 295:: 544:. 532:. 520:. 457:. 434:. 291:( 46:) 42:( 36:.

Index


Garabí Dam is located in Brazil
28°13′37″S 55°42′58″W / 28.227032°S 55.716181°W / -28.227032; -55.716181
Type of dam
Hydraulic head
Turbines
Installed capacity
Capacity factor
Annual generation
Portuguese
Uruguay River
Garabí-Panambi Hydroelectric Complex
Corrientes
Garruchos
Santo Antônio das Missões
São Nicolau
Pirapó
Roque Gonzales
Porto Vera Cruz
Porto Lucena
Porto Xavier
Eletrobras
Panambí
Luiz Inácio Lula da Silva
Cristina Fernández de Kirchner
Corrientes
Rio Grande do Sul
Brazilian Institute of Environment and Renewable Natural Resources

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.