43:
235:
300:
31:
214:
292:
134:
applied for a design patent that had a circular cross-section. Theoretically this made the shield easier to build and better able to support surrounding soil; theoretically, because no shield was ever built using this design. The 1864 Barlow patent was further improved and given a provisional patent
74:
hazard to workers and the project itself from falling materials or a cave-in. A tunnelling shield can be used as a temporary support structure. It is usually in place for the short-term from when the tunnel section is excavated until it can be lined with a permanent support structure. The permanent
142:
who was granted three patents for different shield designs. Additionally, he invented the concept of sprayed concrete grout to stabilise earthworks with injected concrete, a gritting pan that hydraulically injected reinforcing grout into the cavities between the constructed lining and the circular
258:
Behind the chamber there is a set of hydraulic jacks supported by the finished part of the tunnel which are used to push the TBM forward. Once a certain distance has been excavated (roughly 1.5–2 meters (5–7 ft)), a new tunnel ring is built using the erector. The erector is a rotating system
126:
journal, was the first to suggest a circular design would be superior to Brunel's rectangular design. In 1868 Beach built a circular shield - a picture of which was printed in a New York news article about his pneumatic tunnel system idea. The design was based upon Brunel's shield lattice and
255:(so-called slurry TBM) or left as-is (earth pressure balance or EPB shield), depending on the type of the TBM. The choice of TBM type depends on the soil conditions. Systems are also present for removal of the soil (or the soil mixed with slurry).
266:
Several support mechanisms can be found behind the shield, inside the finished part of the tunnel, which are part of the TBM: dirt removal, slurry pipelines if applicable, control rooms, rails for transport of the precast segments, etc.
221:
In early shield tunnelling, the shield functioned as a way to protect labourers who performed the digging and moved the shield forward, progressively replacing it with pre-built sections of tunnel wall. The early deep tunnels for the
195:
which opened in 1898. The station tunnels at the City station (now known as Bank) were the largest diameter tunnelling shields in the world at the time, measuring 23 feet (7.0 m).
75:
structure may be made up of, depending on the period, bricks, concrete, cast iron, or steel. Although modern shields are commonly cylindrical, the first "shield", designed by
275:
The tunnel lining is the wall of the tunnel. It usually consists of precast concrete segments which form rings. Cast iron linings were traditionally used in the
251:
A rotating cutting wheel is located at the front end of the shield. Behind the cutting wheel there is a chamber where the excavated soil is either mixed with
279:
tunnels, while steel liners were sometimes used elsewhere. The concept of using precast moulded lining sections is not new and was first patented in 1874 by
309:
This tunnel looks like two overlapping circles. There are also shields with computerized arms which can be used to dig a tunnel in virtually any shape.
417:
96:
83:-bearing top surface. The structure protected the men from cave-ins as they laboured within it, digging the tunnel out in front of the shield.
401:
177:) in 1884, with tunnels 10 feet 2 inches (3.10 m) in diameter. His shield was also used in the driving of the 12 foot
107:
beginning in 1825 (though the tunnel was not opened until 1843). Brunel is said to have been inspired in his design by the shell of the
198:
An original
Greathead shield used in the excavation of the deep London Underground lines remains in place in disused tunnels beneath
354:
111:, a mollusc whose efficiency at boring through submerged timber he observed while working in a shipyard. The shield was built by
79:, was actually a large, rectangular, scaffold-like iron structure with three levels and twelve sections per level, with a solid
456:
71:
146:
Greathead was the first to ever use a cylindrical tunnelling shield, which he did in the course of the construction of the
166:
441:
371:
226:
were built in this way. The shield divided the workface into overlapping portions that each worker could excavate.
42:
367:
248:
A tunnel boring machine (TBM) consists of a shield (a large metal cylinder) and trailing support mechanisms.
307:
In Japan there are several innovative approaches to shield tunnelling, e.g. the Double-O-Tube or DOT-tunnel.
192:
100:
413:
47:
280:
243:
139:
92:
76:
70:. When excavating through ground that is soft, liquid, or otherwise unstable, there is a potential
158:
in 1869. The
Greathead shield was 7 feet 3 inches (2.21 m) in diameter. Similarly,
276:
223:
170:
346:
397:
350:
234:
260:
199:
159:
119:
318:
131:
80:
238:
Tunnel boring machine case left in the tunnel and used as part of the support structure
112:
450:
174:
104:
35:
299:
30:
147:
51:
213:
17:
291:
115:
of
Lambeth, London, who also built the steam pumps for de-watering the tunnel.
66:
is a protective structure used during the excavation of large, human-made
38:; the permanent brick supporting structure is built immediately behind it.
217:
The
Greathead tunnelling shield in use on the Waterloo & City Railway
108:
205:
Most tunnelling shields are still loosely based on
Greathead's design.
252:
155:
151:
67:
55:
34:
Side view of the tunnelling shield (far right) used to construct the
91:
The first successful rectangular tunnelling shield was developed by
135:
in 1868 but never ratified as Barlow died a short time afterwards.
298:
290:
233:
212:
41:
29:
191: inches (3.702 m) diameter running tunnels for the
138:
Brunel's original design was substantially improved upon by
321:, a coal-mining method using a series of hydraulic shields
27:
Protective structure used during the excavation of tunnels
368:"The Tube: An Underground History, broadcast 16 May 2013"
46:
The tunnelling shield used for the construction of the
442:
A picture of manual tunneling using a
Greathead shield
127:
screw-jacked forwards as the face advanced manually.
165:Greathead also used one in the construction of the
263:segments and places them in the desired position.
295:Tunnel boring machine to excavate a Double-O-Tube
162:opened his tunnel to the public on March 1, 1870
416:. Nippon Civic Consulting Engineers Co., Ltd.
8:
337:
335:
331:
7:
99:in January 1818. Brunel and his son
25:
374:from the original on 28 July 2023
396:, The Oakwood Press, Usk, 2001,
420:from the original on 2011-07-22
394:The Waterloo & City Railway
1:
230:Modern tunnel boring machines
167:City and South London Railway
303:Double-O tube tunnel example
193:Waterloo & City Railway
473:
241:
113:Maudslay, Sons & Field
414:"Special Shield Tunnels"
357:. Chapter 10: "Tunnels".
341:Becket, Derrick (1980).
209:Manual shield tunnelling
103:used it to excavate the
95:and patented by him and
101:Isambard Kingdom Brunel
457:Tunnel boring machines
304:
296:
239:
218:
59:
39:
302:
294:
281:James Henry Greathead
244:Tunnel boring machine
237:
216:
140:James Henry Greathead
45:
33:
93:Marc Isambard Brunel
77:Marc Isambard Brunel
370:. bbc.co.uk. 2013.
347:David & Charles
124:Scientific American
305:
297:
277:London Underground
240:
224:London Underground
219:
171:London Underground
60:
40:
72:health and safety
64:tunnelling shield
16:(Redirected from
464:
429:
428:
426:
425:
410:
404:
392:John C Gillham,
390:
384:
383:
381:
379:
364:
358:
345:. Newton Abbot:
343:Brunel's Britain
339:
287:Shields in Japan
261:precast concrete
200:Moorgate station
190:
189:
185:
182:
160:Alfred Ely Beach
150:under the River
120:Alfred Ely Beach
21:
18:Greathead shield
472:
471:
467:
466:
465:
463:
462:
461:
447:
446:
438:
433:
432:
423:
421:
412:
411:
407:
391:
387:
377:
375:
366:
365:
361:
340:
333:
328:
319:Longwall mining
315:
308:
289:
273:
259:which picks up
246:
232:
211:
187:
183:
180:
178:
169:(today part of
132:Peter W. Barlow
89:
28:
23:
22:
15:
12:
11:
5:
470:
468:
460:
459:
449:
448:
445:
444:
437:
436:External links
434:
431:
430:
405:
385:
359:
330:
329:
327:
324:
323:
322:
314:
311:
288:
285:
272:
269:
242:Main article:
231:
228:
210:
207:
88:
85:
26:
24:
14:
13:
10:
9:
6:
4:
3:
2:
469:
458:
455:
454:
452:
443:
440:
439:
435:
419:
415:
409:
406:
403:
402:0 85361 525 X
399:
395:
389:
386:
373:
369:
363:
360:
356:
355:0-7153-7973-9
352:
348:
344:
338:
336:
332:
325:
320:
317:
316:
312:
310:
301:
293:
286:
284:
282:
278:
270:
268:
264:
262:
256:
254:
249:
245:
236:
229:
227:
225:
215:
208:
206:
203:
201:
196:
194:
176:
175:Northern line
172:
168:
163:
161:
157:
153:
149:
144:
143:tunnel wall.
141:
136:
133:
128:
125:
121:
116:
114:
110:
106:
105:Thames Tunnel
102:
98:
97:Lord Cochrane
94:
86:
84:
82:
78:
73:
69:
65:
57:
53:
49:
44:
37:
36:Thames Tunnel
32:
19:
422:. Retrieved
408:
393:
388:
376:. Retrieved
362:
342:
306:
274:
265:
257:
250:
247:
220:
204:
197:
164:
148:Tower Subway
145:
137:
129:
123:
122:, editor of
117:
90:
63:
61:
52:Taipei Metro
154:in central
424:2011-07-24
326:References
54:system in
48:Xinyi Line
118:In 1840,
451:Category
418:Archived
372:Archived
313:See also
130:In 1864
109:shipworm
186:⁄
87:History
68:tunnels
50:on the
400:
378:17 May
353:
271:Lining
253:slurry
156:London
152:Thames
56:Taiwan
398:ISBN
380:2013
351:ISBN
81:load
173:'s
453::
349:.
334:^
283:.
202:.
62:A
427:.
382:.
188:4
184:3
181:+
179:1
58:.
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.