Knowledge

Tunnelling shield

Source 📝

43: 235: 300: 31: 214: 292: 134:
applied for a design patent that had a circular cross-section. Theoretically this made the shield easier to build and better able to support surrounding soil; theoretically, because no shield was ever built using this design. The 1864 Barlow patent was further improved and given a provisional patent
74:
hazard to workers and the project itself from falling materials or a cave-in. A tunnelling shield can be used as a temporary support structure. It is usually in place for the short-term from when the tunnel section is excavated until it can be lined with a permanent support structure. The permanent
142:
who was granted three patents for different shield designs. Additionally, he invented the concept of sprayed concrete grout to stabilise earthworks with injected concrete, a gritting pan that hydraulically injected reinforcing grout into the cavities between the constructed lining and the circular
258:
Behind the chamber there is a set of hydraulic jacks supported by the finished part of the tunnel which are used to push the TBM forward. Once a certain distance has been excavated (roughly 1.5–2 meters (5–7 ft)), a new tunnel ring is built using the erector. The erector is a rotating system
126:
journal, was the first to suggest a circular design would be superior to Brunel's rectangular design. In 1868 Beach built a circular shield - a picture of which was printed in a New York news article about his pneumatic tunnel system idea. The design was based upon Brunel's shield lattice and
255:(so-called slurry TBM) or left as-is (earth pressure balance or EPB shield), depending on the type of the TBM. The choice of TBM type depends on the soil conditions. Systems are also present for removal of the soil (or the soil mixed with slurry). 266:
Several support mechanisms can be found behind the shield, inside the finished part of the tunnel, which are part of the TBM: dirt removal, slurry pipelines if applicable, control rooms, rails for transport of the precast segments, etc.
221:
In early shield tunnelling, the shield functioned as a way to protect labourers who performed the digging and moved the shield forward, progressively replacing it with pre-built sections of tunnel wall. The early deep tunnels for the
195:
which opened in 1898. The station tunnels at the City station (now known as Bank) were the largest diameter tunnelling shields in the world at the time, measuring 23 feet (7.0 m).
75:
structure may be made up of, depending on the period, bricks, concrete, cast iron, or steel. Although modern shields are commonly cylindrical, the first "shield", designed by
275:
The tunnel lining is the wall of the tunnel. It usually consists of precast concrete segments which form rings. Cast iron linings were traditionally used in the
251:
A rotating cutting wheel is located at the front end of the shield. Behind the cutting wheel there is a chamber where the excavated soil is either mixed with
279:
tunnels, while steel liners were sometimes used elsewhere. The concept of using precast moulded lining sections is not new and was first patented in 1874 by
309:
This tunnel looks like two overlapping circles. There are also shields with computerized arms which can be used to dig a tunnel in virtually any shape.
417: 96: 83:-bearing top surface. The structure protected the men from cave-ins as they laboured within it, digging the tunnel out in front of the shield. 401: 177:) in 1884, with tunnels 10 feet 2 inches (3.10 m) in diameter. His shield was also used in the driving of the 12 foot 107:
beginning in 1825 (though the tunnel was not opened until 1843). Brunel is said to have been inspired in his design by the shell of the
198:
An original Greathead shield used in the excavation of the deep London Underground lines remains in place in disused tunnels beneath
354: 111:, a mollusc whose efficiency at boring through submerged timber he observed while working in a shipyard. The shield was built by 79:, was actually a large, rectangular, scaffold-like iron structure with three levels and twelve sections per level, with a solid 456: 71: 146:
Greathead was the first to ever use a cylindrical tunnelling shield, which he did in the course of the construction of the
166: 441: 371: 226:
were built in this way. The shield divided the workface into overlapping portions that each worker could excavate.
42: 367: 248:
A tunnel boring machine (TBM) consists of a shield (a large metal cylinder) and trailing support mechanisms.
307:
In Japan there are several innovative approaches to shield tunnelling, e.g. the Double-O-Tube or DOT-tunnel.
192: 100: 413: 47: 280: 243: 139: 92: 76: 70:. When excavating through ground that is soft, liquid, or otherwise unstable, there is a potential 158:
in 1869. The Greathead shield was 7 feet 3 inches (2.21 m) in diameter. Similarly,
276: 223: 170: 346: 397: 350: 234: 260: 199: 159: 119: 318: 131: 80: 238:
Tunnel boring machine case left in the tunnel and used as part of the support structure
112: 450: 174: 104: 35: 299: 30: 147: 51: 213: 17: 291: 115:
of Lambeth, London, who also built the steam pumps for de-watering the tunnel.
66:
is a protective structure used during the excavation of large, human-made
38:; the permanent brick supporting structure is built immediately behind it. 217:
The Greathead tunnelling shield in use on the Waterloo & City Railway
108: 205:
Most tunnelling shields are still loosely based on Greathead's design.
252: 155: 151: 67: 55: 34:
Side view of the tunnelling shield (far right) used to construct the
91:
The first successful rectangular tunnelling shield was developed by
135:
in 1868 but never ratified as Barlow died a short time afterwards.
298: 290: 233: 212: 41: 29: 191: inches (3.702 m) diameter running tunnels for the 138:
Brunel's original design was substantially improved upon by
321:, a coal-mining method using a series of hydraulic shields 27:
Protective structure used during the excavation of tunnels
368:"The Tube: An Underground History, broadcast 16 May 2013" 46:
The tunnelling shield used for the construction of the
442:
A picture of manual tunneling using a Greathead shield
127:
screw-jacked forwards as the face advanced manually.
165:Greathead also used one in the construction of the 263:segments and places them in the desired position. 295:Tunnel boring machine to excavate a Double-O-Tube 162:opened his tunnel to the public on March 1, 1870 416:. Nippon Civic Consulting Engineers Co., Ltd. 8: 337: 335: 331: 7: 99:in January 1818. Brunel and his son 25: 374:from the original on 28 July 2023 396:, The Oakwood Press, Usk, 2001, 420:from the original on 2011-07-22 394:The Waterloo & City Railway 1: 230:Modern tunnel boring machines 167:City and South London Railway 303:Double-O tube tunnel example 193:Waterloo & City Railway 473: 241: 113:Maudslay, Sons & Field 414:"Special Shield Tunnels" 357:. Chapter 10: "Tunnels". 341:Becket, Derrick (1980). 209:Manual shield tunnelling 103:used it to excavate the 95:and patented by him and 101:Isambard Kingdom Brunel 457:Tunnel boring machines 304: 296: 239: 218: 59: 39: 302: 294: 281:James Henry Greathead 244:Tunnel boring machine 237: 216: 140:James Henry Greathead 45: 33: 93:Marc Isambard Brunel 77:Marc Isambard Brunel 370:. bbc.co.uk. 2013. 347:David & Charles 124:Scientific American 305: 297: 277:London Underground 240: 224:London Underground 219: 171:London Underground 60: 40: 72:health and safety 64:tunnelling shield 16:(Redirected from 464: 429: 428: 426: 425: 410: 404: 392:John C Gillham, 390: 384: 383: 381: 379: 364: 358: 345:. Newton Abbot: 343:Brunel's Britain 339: 287:Shields in Japan 261:precast concrete 200:Moorgate station 190: 189: 185: 182: 160:Alfred Ely Beach 150:under the River 120:Alfred Ely Beach 21: 18:Greathead shield 472: 471: 467: 466: 465: 463: 462: 461: 447: 446: 438: 433: 432: 423: 421: 412: 411: 407: 391: 387: 377: 375: 366: 365: 361: 340: 333: 328: 319:Longwall mining 315: 308: 289: 273: 259:which picks up 246: 232: 211: 187: 183: 180: 178: 169:(today part of 132:Peter W. Barlow 89: 28: 23: 22: 15: 12: 11: 5: 470: 468: 460: 459: 449: 448: 445: 444: 437: 436:External links 434: 431: 430: 405: 385: 359: 330: 329: 327: 324: 323: 322: 314: 311: 288: 285: 272: 269: 242:Main article: 231: 228: 210: 207: 88: 85: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 469: 458: 455: 454: 452: 443: 440: 439: 435: 419: 415: 409: 406: 403: 402:0 85361 525 X 399: 395: 389: 386: 373: 369: 363: 360: 356: 355:0-7153-7973-9 352: 348: 344: 338: 336: 332: 325: 320: 317: 316: 312: 310: 301: 293: 286: 284: 282: 278: 270: 268: 264: 262: 256: 254: 249: 245: 236: 229: 227: 225: 215: 208: 206: 203: 201: 196: 194: 176: 175:Northern line 172: 168: 163: 161: 157: 153: 149: 144: 143:tunnel wall. 141: 136: 133: 128: 125: 121: 116: 114: 110: 106: 105:Thames Tunnel 102: 98: 97:Lord Cochrane 94: 86: 84: 82: 78: 73: 69: 65: 57: 53: 49: 44: 37: 36:Thames Tunnel 32: 19: 422:. Retrieved 408: 393: 388: 376:. Retrieved 362: 342: 306: 274: 265: 257: 250: 247: 220: 204: 197: 164: 148:Tower Subway 145: 137: 129: 123: 122:, editor of 117: 90: 63: 61: 52:Taipei Metro 154:in central 424:2011-07-24 326:References 54:system in 48:Xinyi Line 118:In 1840, 451:Category 418:Archived 372:Archived 313:See also 130:In 1864 109:shipworm 186:⁄ 87:History 68:tunnels 50:on the 400:  378:17 May 353:  271:Lining 253:slurry 156:London 152:Thames 56:Taiwan 398:ISBN 380:2013 351:ISBN 81:load 173:'s 453:: 349:. 334:^ 283:. 202:. 62:A 427:. 382:. 188:4 184:3 181:+ 179:1 58:. 20:)

Index

Greathead shield

Thames Tunnel

Xinyi Line
Taipei Metro
Taiwan
tunnels
health and safety
Marc Isambard Brunel
load
Marc Isambard Brunel
Lord Cochrane
Isambard Kingdom Brunel
Thames Tunnel
shipworm
Maudslay, Sons & Field
Alfred Ely Beach
Peter W. Barlow
James Henry Greathead
Tower Subway
Thames
London
Alfred Ely Beach
City and South London Railway
London Underground
Northern line
Waterloo & City Railway
Moorgate station

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.