Greenway CSP Mersin Solar Tower

Source 📝

489: 37: 409: 395: 20: 272:
and has a capacity of 5 MWth. The complete heliostat field is Greenway's own proprietary design, with many innovative features like wireless heliostat field communication, precise solar position calculation, automated heliostat tracking correction, accurate reflection angle calculation, and
268:(TÜBİTAK) and the Technology Development Foundation of Turkey (TTGV). After extensive research and development, the Greenway CSP Mersin Solar Plant began operation in March 2013. The power plant consists of 510 273:
positioning of heliostats autonomously in dual axis for optimum exposure to solar rays. In addition the Greenway heliostat design allows high reflecting efficiency and reduced manufacturing and assembly costs.
265: 1146: 1077: 444: 488: 1151: 218: 76: 1166: 798: 512: 1141: 1161: 1105: 518: 437: 792: 933: 430: 1017: 915: 903: 896: 453: 1047: 1053: 1065: 1082: 1041: 975: 342: 1156: 1023: 981: 927: 815: 468: 963: 476: 849: 999: 987: 289: 142: 1029: 1005: 969: 320: 775: 414: 297: 159: 1059: 1035: 727: 667: 951: 293: 116: 861: 769: 685: 1071: 993: 939: 909: 709: 945: 921: 831: 301: 757: 1011: 957: 184: 843: 837: 553: 535: 1099: 661: 541: 242: 152: 583: 246: 619: 601: 867: 673: 613: 577: 571: 1135: 855: 649: 400: 172: 763: 679: 366: 751: 739: 721: 715: 697: 691: 655: 643: 559: 408: 371: 264:
Greenway invested 50 million dollars in the project, which was supported by the
36: 19: 745: 631: 625: 595: 390: 258: 91: 78: 733: 703: 637: 607: 589: 565: 285: 269: 254: 422: 257:
boiler operates at 550 °C and 55 bars pressure. The receiver has four
227: 547: 277: 281: 250: 64: 54: 343:"Turkey's first concentrated solar power built in southern city" 426: 203: 266:
Scientific and Technological Research Council of Turkey
1092: 888: 881: 824: 808: 785: 528: 505: 496: 460: 214: 198: 193: 183: 178: 168: 158: 148: 138: 133: 125: 115: 107: 70: 60: 50: 29: 1121:Power stations projected or under construction in 438: 8: 1147:Buildings and structures in Mersin Province 261:and a super-heater, and is angled at 135°. 885: 502: 445: 431: 423: 26: 276:The solar tower plant is situated in the 18: 1152:Energy infrastructure completed in 2013 312: 219:Related media on Commons 280:district in the northern outskirts of 41:Greenway Mersin CSP field solar tower 7: 360: 358: 356: 1167:21st-century architecture in Turkey 14: 284:city, south of the Adana-Erdemli 241:is a 60-metre (200 ft) high 487: 407: 393: 35: 239:Greenway CSP Mersin Solar Tower 30:Greenway CSP Mersin Solar Tower 1142:Solar power stations in Turkey 1: 1162:2013 establishments in Turkey 341:Llamas, David (2013-04-21). 365:Erdil, Merve (2013-04-17). 1183: 816:Istanbul Waste Power Plant 323:. Greenway CSP Solar Tower 1119: 1078:List of active coal-fired 485: 224: 46: 34: 454:Power stations in Turkey 290:concentrated solar power 253:. A natural circulation 1106:Unimar Marmara Ereğlisi 415:Renewable energy portal 367:"lk yerli güneş kulesi" 298:solar thermal collector 255:direct steam generation 185:Nameplate capacity 292:tower in Turkey. Most 24: 294:solar power in Turkey 179:Power generation 92:36.86583°N 34.60972°E 22: 117:Commission date 793:Greenway CSP Mersin 288:, and is the first 194:External links 149:CSP technology 88: /  900:– 1800 MW proposed 169:Solar tracker 97:36.86583; 34.60972 25: 1157:Toroslar District 1129: 1128: 1115: 1114: 877: 876: 243:solar power tower 235: 234: 153:Solar power tower 16:Solar power tower 1174: 916:Afşin-Elbistan A 904:Afşin-Elbistan B 897:Afşin-Elbistan C 886: 503: 491: 447: 440: 433: 424: 417: 412: 411: 403: 398: 397: 396: 384: 383: 381: 380: 362: 351: 350: 338: 332: 331: 329: 328: 317: 228:edit on Wikidata 210: 207: 205: 134:Solar farm 103: 102: 100: 99: 98: 93: 89: 86: 85: 84: 81: 39: 27: 23:Mersin CSP field 1182: 1181: 1177: 1176: 1175: 1173: 1172: 1171: 1132: 1131: 1130: 1125: 1111: 1088: 873: 820: 804: 781: 524: 498: 492: 483: 456: 451: 421: 420: 413: 406: 399: 394: 392: 387: 378: 376: 364: 363: 354: 340: 339: 335: 326: 324: 319: 318: 314: 310: 247:Mersin Province 231: 202: 96: 94: 90: 87: 82: 79: 77: 75: 74: 42: 17: 12: 11: 5: 1180: 1178: 1170: 1169: 1164: 1159: 1154: 1149: 1144: 1134: 1133: 1127: 1126: 1120: 1117: 1116: 1113: 1112: 1110: 1109: 1103: 1096: 1094: 1090: 1089: 1087: 1086: 1080: 1075: 1069: 1063: 1057: 1051: 1045: 1039: 1033: 1027: 1021: 1015: 1009: 1003: 997: 991: 985: 979: 973: 967: 961: 955: 949: 943: 937: 931: 925: 919: 913: 907: 901: 892: 890: 883: 879: 878: 875: 874: 872: 871: 865: 859: 853: 847: 841: 835: 828: 826: 822: 821: 819: 818: 812: 810: 806: 805: 803: 802: 796: 789: 787: 783: 782: 780: 779: 773: 767: 761: 755: 749: 743: 737: 731: 725: 719: 713: 707: 701: 695: 689: 683: 677: 671: 665: 659: 653: 647: 641: 635: 629: 623: 617: 611: 605: 599: 593: 587: 581: 575: 569: 563: 557: 551: 545: 539: 532: 530: 526: 525: 523: 522: 516: 509: 507: 500: 494: 493: 486: 484: 482: 481: 473: 464: 462: 458: 457: 452: 450: 449: 442: 435: 427: 419: 418: 404: 389: 388: 386: 385: 352: 333: 311: 309: 306: 233: 232: 225: 222: 221: 216: 212: 211: 200: 196: 195: 191: 190: 187: 181: 180: 176: 175: 170: 166: 165: 162: 156: 155: 150: 146: 145: 140: 136: 135: 131: 130: 127: 123: 122: 119: 113: 112: 109: 105: 104: 72: 68: 67: 62: 58: 57: 52: 48: 47: 44: 43: 40: 32: 31: 15: 13: 10: 9: 6: 4: 3: 2: 1179: 1168: 1165: 1163: 1160: 1158: 1155: 1153: 1150: 1148: 1145: 1143: 1140: 1139: 1137: 1124: 1118: 1107: 1104: 1101: 1098: 1097: 1095: 1091: 1085:– now museums 1084: 1081: 1079: 1076: 1073: 1070: 1067: 1064: 1061: 1058: 1055: 1052: 1049: 1046: 1043: 1040: 1037: 1034: 1031: 1028: 1025: 1022: 1019: 1018:Şırnak Silopi 1016: 1013: 1010: 1007: 1004: 1001: 998: 995: 992: 989: 986: 983: 980: 977: 974: 971: 968: 965: 962: 959: 956: 953: 950: 947: 944: 941: 938: 935: 932: 929: 926: 923: 920: 917: 914: 911: 908: 905: 902: 899: 898: 894: 893: 891: 887: 884: 880: 869: 866: 863: 860: 857: 854: 851: 848: 845: 842: 839: 836: 833: 830: 829: 827: 823: 817: 814: 813: 811: 807: 800: 797: 794: 791: 790: 788: 784: 777: 774: 771: 768: 765: 762: 759: 756: 753: 750: 747: 744: 741: 738: 735: 732: 729: 726: 723: 720: 717: 714: 711: 708: 705: 702: 699: 696: 693: 690: 687: 684: 681: 678: 675: 672: 669: 666: 663: 660: 657: 654: 651: 648: 645: 642: 639: 636: 633: 630: 627: 624: 621: 618: 615: 612: 609: 606: 603: 600: 597: 594: 591: 588: 585: 582: 579: 576: 573: 570: 567: 564: 561: 558: 555: 552: 549: 546: 543: 540: 537: 534: 533: 531: 529:Hydroelectric 527: 520: 517: 514: 511: 510: 508: 504: 501: 495: 490: 479: 478: 474: 471: 470: 466: 465: 463: 459: 455: 448: 443: 441: 436: 434: 429: 428: 425: 416: 410: 405: 402: 401:Turkey portal 391: 374: 373: 368: 361: 359: 357: 353: 348: 344: 337: 334: 322: 316: 313: 307: 305: 303: 299: 295: 291: 287: 283: 279: 274: 271: 267: 262: 260: 256: 252: 248: 244: 240: 229: 223: 220: 217: 213: 209: 201: 197: 192: 189:5 MWth, 1 MWe 188: 186: 182: 177: 174: 171: 167: 163: 161: 157: 154: 151: 147: 144: 141: 137: 132: 128: 124: 120: 118: 114: 110: 106: 101: 73: 69: 66: 63: 59: 56: 53: 49: 45: 38: 33: 28: 21: 1122: 934:İsken Sugözü 928:Emba Hunutlu 895: 728:Devecikonağı 475: 467: 377:. Retrieved 375:(in Turkish) 370: 346: 336: 325:. Retrieved 315: 302:photovoltaic 286:O51 motorway 275: 263: 238: 236: 206:.greenwaycsp 129:Greenway CSP 1083:Silahtarağa 1054:Bolu Göynük 1042:18 Mart Çan 296:is rooftop 259:evaporators 249:, southern 111:Operational 95: / 71:Coordinates 1136:Categories 1000:Tufanbeyli 988:Soma Kolin 889:Coal-fired 870:– 140.4 MW 801:– 1,000 MW 710:Demirköprü 662:Burç Bendi 616:– 2,400 MW 578:Alpaslan-2 572:Alpaslan-1 506:Geothermal 480:– 4,480 MW 472:– 4,800 MW 379:2014-12-06 327:2014-12-05 321:"Projects" 308:References 270:heliostats 160:Collectors 83:34°36′35″E 80:36°51′57″N 1102:- 1540 MW 1093:Gas-fired 1066:Çolakoğlu 1048:Çatalağzı 1024:Tunçbilek 982:Seyitömer 954:– 1200 MW 948:– 1200 MW 942:– 1230 MW 936:– 1308 MW 930:– 1320 MW 924:– 1320 MW 918:– 1355 MW 912:– 1400 MW 906:– 1440 MW 850:Dağpazarı 846:– 47.5 MW 799:Karapınar 758:Gökçekaya 668:Çamlıgöze 664:– 27.9 MW 584:Altınkaya 562:– 265.5 M 519:Kızıldere 497:Renewable 347:HELIOSCSP 173:Dual-axis 1108:– 480 MW 1074:– 160 MW 1068:– 190 MW 1062:– 210 MW 1060:Orhaneli 1056:– 270 MW 1050:– 315 MW 1044:– 320 MW 1038:– 330 MW 1032:– 350 MW 1026:– 365 MW 1020:– 405 MW 1014:– 405 MW 1008:– 420 MW 1002:– 450 MW 996:– 457 MW 990:– 510 MW 984:– 600 MW 978:– 620 MW 976:Çayırhan 972:– 630 MW 966:– 653 MW 964:Kemerköy 960:– 990 MW 864:– 174 MW 840:– 135 MW 834:– 193 MW 776:Gürsöğüt 770:Güllübağ 760:– 278 MW 754:– 159 MW 742:– 300 MW 736:– 110 MW 724:– 670 MW 688:– 100 MW 686:Çınarcık 682:– 405 MW 676:– 169 MW 658:– 513 MW 652:– 300 MW 646:– 672 MW 640:– 510 MW 628:– 160 MW 620:Bahçelik 604:– 138 MW 602:Aslantaş 598:– 340 MW 592:– 237 MW 586:– 700 MW 580:– 280 MW 574:– 160 MW 554:Alaköprü 544:– 115 MW 536:Adıgüzel 513:Gümüşköy 372:Hürriyet 278:Toroslar 126:Owner(s) 61:Location 1123:italics 1072:ZETES-1 1030:İzdemir 1006:Yeniköy 970:Yatağan 952:Bekirli 940:ZETES-2 910:ZETES-3 858:– 33 MW 852:– 39 MW 778:−242 MW 772:– 96 MW 766:– 11 MW 752:Gezende 748:– 49 MW 740:Ermenek 730:– 29 MW 722:Deriner 718:– 58 MW 716:Derbent 712:– 69 MW 706:−240 MW 700:– 47 MW 694:– 29 MW 692:Cindere 674:Çatalan 670:– 33 MW 656:Boyabat 644:Birecik 634:– 10 MW 614:Atatürk 568:– 27 MW 560:Alkumru 556:– 26 MW 550:– 13 MW 542:Akköprü 538:– 62 MW 521:– 95 MW 515:– 13 MW 461:Nuclear 215:Commons 199:Website 51:Country 994:Kangal 882:Fossil 832:Aliağa 795:– 6 MW 746:Garzan 650:Borçka 632:Berdan 626:Batman 622:– 7 MW 610:– 5 MW 596:Artvin 499:energy 469:Akkuyu 282:Mersin 251:Turkey 108:Status 65:Mersin 55:Turkey 1100:Gebze 1036:Çan-2 946:Atlas 922:Cenal 862:Şamlı 844:Çanta 838:Bahçe 809:Waste 786:Solar 764:Gönen 734:Dicle 704:Cizre 680:Çetin 638:Berke 608:Atasu 590:Arkun 566:Almus 477:Sinop 226:[ 1012:Biga 958:Soma 868:Soma 825:Wind 698:Çine 548:Aksu 300:and 237:The 208:.com 139:Type 121:2013 856:Mut 245:in 204:www 164:510 143:CSP 1138:: 369:. 355:^ 345:. 304:. 446:e 439:t 432:v 382:. 349:. 330:. 230:]

Index


Angled mirrors in the foreground. A guyed metal tower topped with a white box with black rectangle on one side.
Turkey
Mersin
36°51′57″N 34°36′35″E / 36.86583°N 34.60972°E / 36.86583; 34.60972
Commission date
CSP
Solar power tower
Collectors
Dual-axis
Nameplate capacity
www.greenwaycsp.com
Related media on Commons
edit on Wikidata
solar power tower
Mersin Province
Turkey
direct steam generation
evaporators
Scientific and Technological Research Council of Turkey
heliostats
Toroslar
Mersin
O51 motorway
concentrated solar power
solar power in Turkey
solar thermal collector
photovoltaic
"Projects"
"Turkey's first concentrated solar power built in southern city"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.