Construction on the line began in December 2018. Tracklaying began in May 2020 and by April 2021, over half the track had been laid. On 27 September 2021, the construction of the track was fully completed with the laying of the last length of track. Rail welding was completed on 28 October 2021, with
290:
The route includes five viaducts over the sand with a combined length of 49.7 km (30.9 mi), designed to allow sandstorms to blow under them. 434 bridge piers were factory-built and assembled on site. The longest is Niya River Grand Bridge, which has a total length of 18,628.46 metres
209:
that opened on 16 June 2022 with a design speed of 120 kilometres per hour (75 mph). It serves over 10 million people with 20 new stations. Heruo Railway is part of the Taklimakan Desert railway loop, together with sections of the
658: 624: 617: 493: 425: 284: 653: 610: 648: 399: 643: 28: 291:(61,117 ft 0 in). Further protection against sand has been provided by putting about 13 million shrubs, such as 182: 324:[456 km, over half the track for the Hotan–Ruoqiang railway has been laid] (in Chinese). cnr.cn. 30 April 2021 518: 244: 215: 85: 211: 256: 231:
track bed tamping and fine adjustment of the line required before scheduled opening of the entire line in 2022.
219: 95: 71: 557: 272: 426:"New railway completes 2,700km loop of Taklamakan Desert in move to integrate Xinjiang with rest of China" 292: 240: 66: 299:, into 5,000 ha (12,000 acres) of grass grids (straw-edged rectangles of about a metre square). 259:. Together with those railways it forms a 2,712 km (1,685 mi) loop around the west of the 321: 343: 468: 252: 594: 443: 365: 637: 248: 198: 190: 239:
The line is 825.5 kilometres (512.9 mi) long and runs from west to east. In
542: 268: 260: 130: 280: 110: 446:[Completed track laying, the desert loop railway line is completed]. 586: 296: 276: 202: 264: 543:"Construction of Hotan-Ruoqiang Railway Underway in China's Xinjiang" 471:[The rail welding of Xinjiang Heruo Railway is completed]. 400:"China opens last section of world's first rail loop around desert" 206: 194: 494:"Hotan – Ruoqiang opening completes Taklimakan desert loop" 593:
This People's Republic of China rail-related article is a
598: 163: 129: 121: 116: 106: 101: 91: 81: 59: 51: 43: 38: 21: 659:People's Republic of China rail transport stubs 558:"New tool, methods turn Ningxia deserts green" 316: 314: 312: 618: 8: 625: 611: 33:Location of the railway in Xinjiang, China 519:"Hotan-Ruoqiang Railway Project, China" 308: 18: 7: 583: 581: 394: 392: 390: 388: 386: 14: 585: 175:Hotan–Ruoqiang (Qakilik) railway 27: 22:Hotan–Ruoqiang (Qakilik) railway 346:(in Chinese). Sina. 8 May 2018 186: 1: 498:Railway Gazette International 344:"国家发改委同意新建和田至若羌铁路,总投资221.5亿元" 654:Railway lines opened in 2022 597:. You can help Knowledge by 424:Zhang, Kate (17 June 2022). 167:120 km/h (75 mph) 125:825.5 km (513 mi) 675: 649:Rail transport in Xinjiang 580: 473:中国新闻网 (China News Network) 189:) is a 825.5 km long 253:Ruoqiang (Qakilik) County 212:Southern Xinjiang railway 193:connecting the cities of 26: 475:(in Chinese). 2021-10-28 450:(in Chinese). 2021-09-29 430:South China Morning Post 404:Latest News - The Nation 372:(in Chinese). 2021-11-19 644:Railway lines in China 562:www.chinadaily.com.cn 245:Kashgar–Hotan railway 216:Kashgar–Hotan railway 86:Kashgar–Hotan railway 257:Golmud–Korla railway 255:it branches off the 243:it continues as the 220:Golmud–Korla railway 96:Golmud–Korla railway 556:江巍 (15 Jun 2021). 523:Railway Technology 249:Qakilik (Ruoqiang) 16:Chinese train line 606: 605: 263:, linking Hotan, 171: 170: 666: 627: 620: 613: 589: 582: 572: 571: 569: 568: 553: 547: 546: 539: 533: 532: 530: 529: 515: 509: 508: 506: 505: 490: 484: 483: 481: 480: 465: 459: 458: 456: 455: 444:"完成铺轨,沙漠环形铁路网闭环" 440: 434: 433: 421: 415: 414: 412: 411: 396: 381: 380: 378: 377: 362: 356: 355: 353: 351: 340: 334: 333: 331: 329: 322:"456公里,和若铁路铺轨过半" 318: 188: 159: 155: 153: 152: 148: 145: 137: 92:Connecting lines 31: 19: 674: 673: 669: 668: 667: 665: 664: 663: 634: 633: 632: 631: 578: 576: 575: 566: 564: 555: 554: 550: 541: 540: 536: 527: 525: 517: 516: 512: 503: 501: 492: 491: 487: 478: 476: 467: 466: 462: 453: 451: 442: 441: 437: 423: 422: 418: 409: 407: 398: 397: 384: 375: 373: 364: 363: 359: 349: 347: 342: 341: 337: 327: 325: 320: 319: 310: 305: 237: 228: 164:Operating speed 157: 150: 146: 143: 141: 140:4 ft  139: 135: 77: 34: 17: 12: 11: 5: 672: 670: 662: 661: 656: 651: 646: 636: 635: 630: 629: 622: 615: 607: 604: 603: 590: 574: 573: 548: 534: 510: 485: 469:"新疆和若铁路全线焊轨完成" 460: 435: 416: 382: 357: 335: 307: 306: 304: 301: 236: 233: 227: 224: 169: 168: 165: 161: 160: 158:standard gauge 133: 127: 126: 123: 119: 118: 114: 113: 108: 104: 103: 99: 98: 93: 89: 88: 83: 82:Continues from 79: 78: 76: 75: 69: 63: 61: 57: 56: 53: 49: 48: 45: 41: 40: 36: 35: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 671: 660: 657: 655: 652: 650: 647: 645: 642: 641: 639: 628: 623: 621: 616: 614: 609: 608: 602: 600: 596: 591: 588: 584: 579: 563: 559: 552: 549: 545:. 2020-12-02. 544: 538: 535: 524: 520: 514: 511: 499: 495: 489: 486: 474: 470: 464: 461: 449: 445: 439: 436: 431: 427: 420: 417: 406:. 20 Jun 2022 405: 401: 395: 393: 391: 389: 387: 383: 371: 367: 361: 358: 345: 339: 336: 323: 317: 315: 313: 309: 302: 300: 298: 297:sea buckthorn 294: 288: 286: 282: 278: 274: 270: 266: 262: 258: 254: 250: 246: 242: 234: 232: 225: 223: 221: 217: 213: 208: 204: 200: 196: 192: 184: 180: 179:Heruo Railway 176: 166: 162: 136:1,435 mm 134: 132: 128: 124: 120: 115: 112: 109: 105: 100: 97: 94: 90: 87: 84: 80: 73: 70: 68: 65: 64: 62: 58: 54: 50: 46: 42: 37: 30: 25: 20: 599:expanding it 592: 577: 565:. Retrieved 561: 551: 537: 526:. Retrieved 522: 513: 502:. Retrieved 500:. 2022-06-17 497: 488: 477:. Retrieved 472: 463: 452:. Retrieved 447: 438: 429: 419: 408:. Retrieved 403: 374:. Retrieved 369: 366:"和若铁路正式"闭环"" 360: 348:. Retrieved 338: 326:. Retrieved 289: 238: 229: 201:in southern 191:railway line 178: 174: 172: 261:Tarim Basin 131:Track gauge 122:Line length 55:Operational 44:Native name 638:Categories 567:2022-06-24 528:2022-06-18 504:2022-06-18 479:2021-11-25 454:2021-09-29 410:2022-06-24 376:2021-11-20 303:References 285:Bayingolin 111:Heavy rail 117:Technical 74:(Qakilik) 350:30 April 328:30 April 293:sacsaoul 203:Xinjiang 199:Ruoqiang 154: in 72:Ruoqiang 39:Overview 277:Minfeng 247:and in 226:History 183:Chinese 149:⁄ 102:Service 60:Termini 273:Yutian 218:, and 185:: 52:Status 281:Qiemo 241:Hotan 235:Route 207:China 195:Hotan 67:Hotan 595:stub 352:2021 330:2021 295:and 283:and 269:Qira 197:and 187:和若铁路 173:The 107:Type 47:和若铁路 448:高铁网 370:高铁网 265:Lop 177:or 640:: 560:. 521:. 496:. 428:. 402:. 385:^ 368:. 311:^ 287:. 279:, 275:, 271:, 267:, 251:, 222:. 214:, 205:, 156:) 626:e 619:t 612:v 601:. 570:. 531:. 507:. 482:. 457:. 432:. 413:. 379:. 354:. 332:. 181:( 151:2 147:1 144:+ 142:8 138:(

Index


Hotan
Ruoqiang
Kashgar–Hotan railway
Golmud–Korla railway
Heavy rail
Track gauge
Chinese
railway line
Hotan
Ruoqiang
Xinjiang
China
Southern Xinjiang railway
Kashgar–Hotan railway
Golmud–Korla railway
Hotan
Kashgar–Hotan railway
Qakilik (Ruoqiang)
Ruoqiang (Qakilik) County
Golmud–Korla railway
Tarim Basin
Lop
Qira
Yutian
Minfeng
Qiemo
Bayingolin
sacsaoul
sea buckthorn

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.