912: 1122: 757: 616:(ARTC) to develop a route alignment following the Far Western sub-corridor as detailed in the 2006 study. The corporation's preliminary analysis was released in May 2009, which showed that the cheapest version of the inland railway would cost $ 2.8 billion to build and would allow freight to be moved from Melbourne to Brisbane in just over 27 hours. Despite this, the analysis also found that, if operational by 2020, the project's costs would outweigh any economic benefits by up to $ 1.1 billion. 3196: 49: 58: 1906: 947: 1003: 975: 778: 1129: 1017: 989: 1143: 961: 933: 919: 764: 1898: 1287:, was awarded a $ 310 million contract for stage 1 of the project between Parkes and Narromine. Work on the Parkes–Narromine railway line and the new Broken Hill railway line connection commenced in December 2018. More than 1,800 people were employed on the project, with works completed in September 2020. 1165:
Following the Independent Inland Rail Review in April 2023, the Inland Rail service offering for double-stacked trains in Queensland, totalling more than 330 kilometres (210 mi), will run from the New South Wales—Queensland border to a proposed new intermodal terminal at Ebenezer. Single-stacked
1074:, with construction works to modify sections of the 173 kilometres (107 mi) of track starting in late 2023. A further 98.4 kilometres (61.1 mi) of track has been upgraded between Parkes and Narromine, in addition to the construction of a new 5.3 kilometres (3.3 mi) connection with the 1105:
The route then continues from North Star and the New South Wales / Queensland border with 14 kilometres (8.7 mi) of new track construction and 25 kilometres (16 mi) of upgrades to existing track required. This section will complete one of the key missing rail links between New South Wales
736:
The Review also recommended that Inland Rail be completed in stages, with the Government deciding to “prioritise Beveridge to Parkes ”, by 2027. The project would also be separated from ARTC, and a subsidiary company, Inland Rail Pty Ltd was operational from early 2024 to complete the construction
355:
Construction of the line is divided into 13 projects, with 600 kilometres (370 mi) of new track to be built and 1,000 kilometres (620 mi) of existing track to be upgraded or modified. Inland Rail Pty Ltd, a subsidiary of Australian Rail Track Corporation (ARTC), is constructing the rail
580:
to Melbourne. A maximum line speed of 100 kilometres per hour (62 mph) would be in place for the corridor, with an additional $ 189 million (equivalent to $ 370.15 million in 2022) upgrade to existing track allowing for speeds of up to 160 kilometres per hour (99 mph) in sections.
1051:. Initial consultations on this section of the route commenced in 2018, with upgrades planned to 185 kilometres (115 mi) of track. A new section of track is planned to be built between Illabo and Stockinbingal, 37 kilometres (23 mi) connecting the Main South railway line to the 724:
The Government agreed to 19 of the Review’s recommendations, including that the route be shortened to extend from Beveridge in Victoria to Ebenezer in Queensland and that existing rail lines be used wherever possible to minimise additional impacts on the environment and communities. New
721:, released in April 2023, “confirmed that Inland Rail is an important project to meet Australia’s growing freight task, improve road safety and to help decarbonise our economy”. However, the Review also found “significant deficiencies in the governance and management of Inland Rail”. 592:
assessing the proposal. It found a new route would save ten hours journey time on the existing coastal route via Sydney, reducing the operating cost for operators from $ 23.16/tonne to $ 17.56/tonne, but would facilitate only a small increase in grain production.
733:. Upgrades to existing track will facilitate the use of double-stacked container trains between the yards. Single-stacked trains will pass through Ebenezer to Kagaru to connect to the existing Sydney to Brisbane Coastal line. 1845: 2435: 2202: 1875: 1097:
will be built along a new alignment, and is the longest stage of the project. A further 186 kilometres (116 mi) of existing railway between Narrabri and North Star will be upgraded, with a bypass at
705:
in Queensland, using a combination of new and existing standard gauge and dual gauge track. Upgrades to existing track would facilitate the use of double-stacked container trains between the three yards.
1311: 2262: 1688: 1337:, critical of ARTC for a lack of consultation with communities along the alignment. Although the ARTC reaffirmed the Yelarbon to Gowrie route would remain across the floodplain, in June 2020, 2232: 1321:
Landholders and farmers have opposed several sections of the project on environmental grounds. In September 2017, Chester announced the Yelarbon to Gowrie section would be built through the
881:
Station precinct (relocating the western rail track, building a new station platform, and adding a new pedestrian underpass) and replacing the Anderson Street bridge with a vehicle underpass
2716: 714:
On 7 October 2022, the Australian Government announced an Independent Review of Inland Rail, after reports of a cost blowout to a projected $ 31b and delay in completion to 2030-31.  
2778: 2685: 2561: 2623: 1950: 2082: 2398:"Inland Rail – Calvert to Kagaru (C2K) project – draft environmental impact statement - Department of State Development, Infrastructure, Local Government and Planning - Citizen Space" 2112: 1837: 1030: 3553: 3184: 2864: 2375: 2293: 911: 2427: 2917: 2530: 2498: 1121: 1156: 2654: 2194: 1977: 1928: 1867: 756: 585: 2465: 791: 2890: 1988: 1721: 2344: 2747: 597: 2592: 3723: 3738: 1044: 569: 2142: 3728: 2254: 1775: 537: 3162: 3262: 3177: 2172: 1698: 1342: 447:
detailed a $ 1.289 billion (equivalent to $ 2.52 billion in 2022) proposal for an inland railway corridor connecting Brisbane and Melbourne. New
1814: 3358: 3297: 3247: 2405: 2224: 2021: 1385: 3483: 2708: 2770: 2677: 2553: 3237: 2910: 2615: 1942: 1189: 1052: 553: 3733: 3718: 3513: 3433: 2945: 2074: 631:
works between Junee and Melbourne and capacity for double-stacked freight trains between Melbourne and Parkes already budgeted by the ARTC.
3558: 3252: 3242: 3170: 2104: 3378: 3257: 2968: 3543: 2857: 2367: 2285: 1693: 1421: 1338: 2958: 2940: 2812: 1365: 545: 3453: 3232: 2903: 2838: 1307: 627:
to Brisbane to build along a new corridor through the Toowoomba range. The report forecast a delivery cost of $ 3.688 billion, with
613: 2051: 1483: 1302:
have stated their opposition to the Narromine to Narrabri section of the project, planned to be built on an alignment through the
3688: 3593: 3428: 3227: 1376: 1213: 874:
Relocating tracks (tracks slews), raising signal gantries and modifying overhead powerlines in numerous areas along the rail line
471: 2520: 2488: 1544: 609: 3743: 3443: 817: 2963: 801: 380:
In the 20th century, several proposals were made for an inland railway route connecting the east coast of Australia. In 1915,
3312: 671: 664: 660: 644: 2646: 1349: 1326: 663:
to purchase land for the project, with an additional $ 8.4 billion in funding over seven years announced in the subsequent
3588: 3222: 2525: 2493: 1390: 683: 557: 463: 2457: 3533: 3508: 3388: 3200: 1665: 1330: 726: 561: 176: 1713: 1512: 718: 30:
This article is about a freight railway under construction in Australia. For the 1300-kilometre railway in Sweden, see
3408: 3398: 3146: 2926: 2336: 1380: 1371: 1229: 1201: 565: 408: 381: 349: 2739: 3523: 2991: 2584: 1771: 3635: 3413: 3393: 3307: 1106:
and Queensland, using the non-operational rail corridor or new track to connect to the operating line running to
541: 467: 3528: 3373: 3083: 2134: 1897:
jurisdiction=Queensland; sector=government; corporateName=State Development, Infrastructure (10 October 2022).
1868:"Federal Budget 2020: $ 150 million investment in additional grade separations of Inland Rail alignment in NSW" 1075: 698: 460: 1783: 619:
The ARTC's final report was released in July 2010. The report recommended a route from Junee to Melbourne via
1451: 812:
between 870 m (2,850 ft) and 6,800 m (22,300 ft) in length. The line north of Seymour is
3578: 3573: 3423: 3368: 3337: 3332: 1352:, along with the NSW Farmers' Association, commenced legal proceedings against ARTC, seeking an independent 1197: 1099: 1071: 821: 805: 577: 487: 479: 420: 416: 2740:"Trouble on Condamine floodplain track in southern Queensland with review of new inland rail route ordered" 2164: 745:
The route alignment extends from Beveridge in Victoria, through New South Wales to Kagaru in Queensland.
3678: 3493: 3458: 3448: 3322: 3317: 3004: 2771:"Inland rail project subject to legal action by NSW Farmers' Association and CWA over hydrology modelling" 1806: 1174: 620: 573: 549: 529: 483: 165: 2428:"ARTC and INLink sign $ 300 million construction contract for Parkes to Narromine section of Inland Rail" 2397: 2013: 3518: 3478: 3438: 3403: 3383: 3055: 1568: 1539: 1193: 1166:
trains will pass through Ebenezer to Kagaru to connect to the existing Sydney to Brisbane Coastal line.
849: 828: 702: 648: 624: 605: 521: 1318:, in November 2017, despite initial plans by the ARTC to build the line through surrounding farmland. 3583: 3548: 3538: 3503: 3342: 1237: 1178: 862:
Removing the two Wangaratta Station footbridges and replacing them with a single pedestrian underpass
730: 348:
along a new route inland through Victoria, New South Wales and Queensland that allows for the use of
2678:"Inland Rail Senate inquiry gets flood of community concerns about building line through floodplain" 838:
The work involves replacing or modifying infrastructure at 12 sites between Beveridge and Albury:
729:
are also to be developed in Melbourne, at Beveridge and Truganina. A third terminal is proposed for
3683: 3640: 3563: 3488: 3468: 3418: 3363: 3121: 3069: 3017: 1807:"Government to spend $ 594 million buying land for Inland Rail line linking Brisbane and Melbourne" 1217: 1209: 896: 843: 694: 675: 656: 475: 122: 3568: 3463: 3302: 3076: 2811:(Report). Canberra: Bureau of Transport and Communications Economics. March 1996. 0 642 24518 5. 1596: 1594: 1581: 1579: 832: 640: 130: 1505:
Wilson, Alex.; Robinson, H. E. C. (1909), "1 map ; 30 x 26.5 cm. + accompanying diagram.",
3473: 3041: 2309: 1922: 869: 652: 628: 601: 341: 1943:"Previous government ignored advice, let Inland Rail cost blow out to an 'astonishing' $ 31b" 3625: 3131: 3090: 3048: 2616:"Inland railway to go across Queensland floodplain despite warning 'lives could be at risk'" 1661: 1060: 679: 404: 345: 1413: 48: 3062: 2805: 2321: 1322: 444: 400: 388: 2831: 800:
In Victoria, the Inland Rail route will follow the existing North East railway line and
682:
works in New South Wales, conditional upon a further $ 37.5 million commitment from the
604:
into a Brisbane–Melbourne railway link, outlining four possible 'sub-corridors' between
3693: 3668: 3498: 3116: 3011: 2043: 1315: 1303: 517: 370: 260: 3712: 3141: 3136: 3126: 1478: 1276: 1067: 589: 384: 835:
contracted to upgrade the track for line speeds up to 130 km/h (81 mph).
3023: 1767: 1482:. Vol. VIII, no. 398. Queensland, Australia. 5 December 1885. p. 3. 1334: 1299: 1284: 1255: 813: 809: 392: 2195:"ARTC to host session as Illabo to Stockinbingal rail project nears construction" 827:
Initial works on the corridor commenced in May 2020 as part of the $ 235 million
1636: 1624: 1612: 1600: 1585: 1056: 374: 224: 31: 2895: 3673: 3195: 1473: 1233: 1170: 856: 448: 303: 161: 17: 1673: 377:
shortened the distance between Brisbane and Sydney by 55 miles (89 km).
1534: 1379:, to be fitted to those sections not fitted with regular signalling such as 1353: 1280: 1259: 1205: 1090: 690: 412: 337: 109: 2585:"Inland rail: Here's what you need to know about the $ 10 billion project" 3327: 2997: 1508:
Part of Australia showing transcontinental railways and state connections
1296: 1247:
Little Liverpool Range Tunnel Inland Railway - 850 metres (2,790 ft)
1200:
north-east of Millmerran. New track will be built between Southbrook and
1185: 1107: 1094: 1079: 428: 396: 888:
Station and removing the existing Benalla Station Approach Road overpass
57: 3111: 1089:
An approximately 300 kilometres (190 mi) stretch of track between
892: 885: 865:
Lowering the tracks and replacing the Green Street bridge at Wangaratta
533: 525: 1543:. No. 21, 401. Victoria, Australia. 27 February 1915. p. 9. 1506: 855:
Relocating the existing track and platform on the eastern side of the
3151: 1254:
These tunnels replace the original narrow gauge-only tunnels between
1048: 1040: 424: 336:
is a 1600-kilometre (990 mi) railway line under construction in
1331:
Senate Rural and Regional Affairs and Transport References Committee
373:
and partly mixed gauge line from Brisbane via Rosewood, Warwick and
2255:"Historic day as Parkes to Narromine Inland Rail section completed" 2837:(Report). Canberra: Australian Rail Track Corporation. July 2010. 1443: 1250:
Toowoomba Range Tunnel Inland Railway - 600 metres (2,000 ft)
1083: 878: 432: 1754: 1742: 1368:, a similar north–south rail corridor connecting inland Australia 1244:
Teviot Range Tunnel Inland Railway - 1,100 metres (3,600 ft)
2458:"INLink celebrates official commencement of Inland Rail project" 1329:. As a consequence, the Inland Rail project was referred to the 3657: 3614: 3279: 3211: 3166: 2899: 2709:"Inland Rail is staying on the Condamine floodplain says ARTC" 2225:"Stockinbingal to Parkes Project a boost for local businesses" 655:
in 2013. A further $ 594 million was allocated to ARTC by the
2614:
Schwartz, Dominique; Blucher, Alexandra (21 September 2017).
1978:"Australian Government Response to the Review of Inland Rail" 2832:
Melbourne–Brisbane Inland Rail Alignment Study: Final report
2583:
Schwartz, Dominique; Blucher, Alexandra (11 December 2017).
2552:
Schwartz, Dominique; Blucher, Alexandra (10 December 2017).
1838:"Budget 2017: Inland rail funding of $ 8.4 billion promised" 1356:
review into the Narromine to Narrabri stage of the project.
1325:
floodplain, which reached its highest recorded level in the
146: 623:
following the North East railway line, with the route from
411:
founder Ken Thomas proposed a route connecting Brisbane to
2337:"Civil work package for Inland Rail missing link awarded" 1474:"Construction of Railway - upon the 4 feet 8½-inch Gauge" 2105:"John Holland wins contract for Australian rail upgrade" 651:
committing to the funding following the election of the
2806:
Economic effects of a Brisbane-Melbourne inland railway
1310:. A route through the Pilliga forests was announced by 1228:
There are three tunnels in Queensland, which allow for
1566:
Thomas, Ken (10 May 1979). "Making our railways pay".
2863:(Report). Canberra: Ernst & Young. 30 June 2006. 2286:"Inland Rail Narrabri to North Star full steam ahead" 1637:
Bureau of Transport and Communications Economics 1996
1625:
Bureau of Transport and Communications Economics 1996
1613:
Bureau of Transport and Communications Economics 1996
1601:
Bureau of Transport and Communications Economics 1996
1586:
Bureau of Transport and Communications Economics 1996
2769:
Bernasconi, Amelia; Condon, Michael (20 July 2020).
643:
announced forward estimates of $ 300 million in the
3351: 3290: 3104: 3033: 2984: 2977: 2933: 1220:and new line 53 kilometres (33 mi) to Kagaru. 1188:, the Inland Rail route joins the alignment of the 223: 215: 207: 202: 187: 182: 172: 157: 152: 142: 115: 105: 97: 89: 72: 67: 41: 1391:Main Line railway, Queensland § First tunnels 2676:Ruddick, Baz; Bradfield, Elly (29 January 2020). 1648: 1196:, with a new alignment connecting the now-closed 1034:Inland Rail project boundaries in New South Wales 2858:North–South Rail Corridor Study Executive Report 1348:In July 2020, the New South Wales branch of the 678:pledged $ 150 million in funding for additional 586:Bureau of Transport and Communications Economics 536:before once again following existing track: the 490:south of the New South Wales–Queensland border. 1689:"Economics will decide inland rail route: ARTC" 1262:with a faster and more maintainable alignment. 1078:west of Parkes allowing services to connect to 2891:Submissions to Senate Inquiry into Inland Rail 493:The route would then have continued along the 387:proposed a "strategic railway" connecting the 3178: 2911: 2489:"Australia launches Inland Rail construction" 1173:, connecting services on both the interstate 808:the line is mostly single track with several 608:and Brisbane. In May 2008, the newly elected 598:Department of Transport and Regional Services 356:line on behalf of the Australian Government. 8: 1927:: CS1 maint: multiple names: authors list ( 1160:Inland Rail project boundaries in Queensland 868:Replacing the Seymour-Avenel Road bridge at 842:Replacing the Beaconsfield Parade bridge at 27:Railway line under construction in Australia 2647:"Inland rail under microscope from inquiry" 1333:in 2019, with the committee chair, Senator 3654: 3611: 3287: 3276: 3208: 3185: 3171: 3163: 2981: 2918: 2904: 2896: 2366:Council, Ipswich City (11 February 2022). 1555:– via National Library of Australia. 1494:– via National Library of Australia. 859:Station to the western side of the station 795:Inland Rail project boundaries in Victoria 313: 3263:List of approved, never constructed lines 1212:on a new line and then along an upgraded 403:railway network, at an estimated cost of 93:Under construction by Inland Rail Pty Ltd 3359:List of Queensland branch line locations 3298:List of Queensland branch line locations 2075:"ARTC work to get NE line up to scratch" 1386:Railway tunnels in Queensland, Australia 1066:The route continues along the line from 2777:. Australian Broadcasting Corporation. 1813:. Australian Broadcasting Corporation. 1402: 315: 2626:from the original on 22 September 2020 2533:from the original on 17 September 2020 2317: 2307: 1920: 1755:Australian Rail Track Corporation 2010 1743:Australian Rail Track Corporation 2010 1666:"Inland rail alignment study underway" 1454:from the original on 23 September 2017 689:The proposed route was to connect the 38: 2054:from the original on 1 September 2021 2008: 2006: 1972: 1970: 1968: 1817:from the original on 11 February 2021 1776:"Inland rail – the future of freight" 1714:"Rail sums do not add up, says study" 1345:, ordered a review of the alignment. 946: 7: 2844:from the original on 24 October 2020 2719:from the original on 12 October 2020 2657:from the original on 16 October 2020 2645:Coughlan, Matt (17 September 2019). 2595:from the original on 29 October 2020 2564:from the original on 26 October 2020 2408:from the original on 2 February 2024 2378:from the original on 2 February 2024 2347:from the original on 2 February 2024 2265:from the original on 2 February 2024 2235:from the original on 27 January 2020 2175:from the original on 2 February 2024 2024:from the original on 2 February 2024 1953:from the original on 2 February 2024 1909:from the original on 2 February 2024 1903:State Development and Infrastructure 1878:from the original on 17 October 2020 1848:from the original on 16 January 2018 1424:from the original on 2 February 2024 1408: 1406: 62:Original Inland Rail route alignment 3724:Proposed railway lines in Australia 2688:from the original on 22 August 2020 2521:"Inland Rail first phase completed" 2501:from the original on 28 August 2021 2464:(Press release). 13 December 2018. 2438:from the original on 29 August 2021 2368:"Ebenezer Regional Industrial Area" 2205:from the original on 29 August 2021 2115:from the original on 12 August 2020 1991:from the original on 9 January 2024 1414:"Download Map of Inland Rail Route" 891:Replacing multiple road bridges at 486:, with new track connecting to the 3739:Rail transport in Victoria (state) 2818:from the original on 24 March 2020 2750:from the original on 8 August 2020 2468:from the original on 23 March 2020 2296:from the original on 21 March 2022 2145:from the original on 8 August 2020 1002: 25: 3729:Rail transport in New South Wales 2870:from the original on 5 March 2020 2781:from the original on 31 July 2020 2487:Carter, Mark (19 December 2018). 2085:from the original on 23 July 2022 1899:"What is the independent review?" 1547:from the original on 23 July 2022 1515:from the original on 23 July 2022 1486:from the original on 23 July 2022 1053:Stockinbingal–Parkes railway line 974: 804:alignment. Between Beveridge and 777: 710:Independent Review of Inland Rail 614:Australian Rail Track Corporation 554:Stockinbingal–Parkes railway line 528:, with a new line connecting the 340:. Once complete, it will connect 3689:Queensland Pioneer Steam Railway 3194: 2073:Ruppert, Simon (18 March 2020). 1724:from the original on 11 May 2009 1377:Advanced Train Management System 1169:These sections will be built as 1141: 1128: 1127: 1120: 1043:, the route continues along the 1016: 1015: 1001: 988: 987: 973: 959: 945: 931: 917: 910: 776: 762: 755: 684:New South Wales state government 451:track would follow the existing 56: 47: 2738:Bradfield, Elly (3 June 2020). 2135:"Economy boost from rail works" 1836:Kotsios, Natalie (9 May 2017). 1782:(Press release). Archived from 1687:Grimson, Ken (20 August 2008). 1672:(Press release). Archived from 899:with higher bridges structures, 717:Undertaken by Kerry Schott AO, 596:In September 2005, the federal 427:, with possible connections to 3616:Proposed or under construction 2707:Phelps, Mark (12 March 2020). 1142: 960: 932: 918: 848:Lowering the tracks under the 763: 612:allocated $ 15 million to the 1: 3659:Tourist and heritage railways 2526:Railway Gazette International 2494:International Railway Journal 1366:Adelaide–Darwin rail corridor 1192:where it extends to south of 546:Parkes–Narromine railway line 3734:Rail transport in Queensland 3719:Interstate rail in Australia 2927:Interstate rail in Australia 1985:Department of Infrastructure 1805:Barbour, Lucy (3 May 2016). 829:North East Rail Line Upgrade 562:Lake Cargelligo railway line 3499:Mackay Railway and branches 3454:Great Western line proposal 3201:Railway lines in Queensland 3147:Southern Shorthaul Railroad 2284:Newsroom (27 August 2020). 1381:centralized traffic control 1372:Rail transport in Australia 1350:Country Women's Association 1312:Minister for Infrastructure 1275:In October 2018, INLink, a 1230:double-stack rail transport 1204:, with the route bypassing 852:bridge at Barnawartha North 816:, with a connection to the 211:1,600 km (990 mi) 3760: 2402:haveyoursay.dsd.qld.gov.au 2335:pamela (12 October 2021). 1780:Liberal Party of Australia 1712:Davis, Mark (7 May 2009). 1291:Opposition to construction 1190:South Western railway line 1102:to remove a long hairpin. 802:Albion–Jacana railway line 697:with the freight yards at 647:commencing 2014, with the 570:Main Southern railway line 399:, with connections to the 79:Brisbane–Melbourne railway 29: 3664: 3653: 3636:Maroochydore railway line 3621: 3610: 3286: 3275: 3218: 3207: 1718:The Sydney Morning Herald 1327:2010–11 Queensland floods 1308:Aboriginal heritage sites 538:Main Western railway line 312: 147:https://inlandrail.com.au 55: 46: 3084:Sydney/Melbourne Express 1300:Aboriginal Land Councils 1076:Broken Hill railway line 457:3 ft 6 in 300:3 ft 6 in 2744:ABC Southern Queensland 2713:Queensland Country Life 1511:, , nla.obj-231830146, 1045:Main South railway line 578:North East railway line 488:Boggabilla railway line 480:Millmerran railway line 3744:2026 in rail transport 3679:Kuranda Scenic Railway 2554:"Tension on the track" 2372:www.ipswich.qld.gov.au 2109:The Construction Index 1670:Australian Labor Party 1649:Ernst & Young 2006 1306:which contain various 530:Coonamble railway line 3056:Intercapital Daylight 2964:Sydney–Adelaide–Perth 2529:. 17 September 2020. 2261:. 16 September 2020. 2165:"Beveridge to Albury" 2079:The Corowa Free Press 1569:Sydney Morning Herald 1540:The Argus (Melbourne) 1339:Deputy Prime Minister 884:Relocating tracks at 850:Murray Valley Highway 818:Oaklands railway line 522:Mungindi railway line 233:Beveridge to Yelarbon 101:Australian Government 3514:Maryborough to Monto 3509:Mareeba to Chillagoe 3281:Country branch lines 3248:Central Western Line 2954:(under construction) 2432:Parkes Champion-Post 2259:Parkes Champion-Post 2229:Parkes Champion-Post 2141:. 12 February 2020. 2139:Wangaratta Chronicle 2111:. 10 December 2019. 2044:"North East SG Line" 1694:The Daily Advertiser 1238:single-track railway 1157:class=notpageimage| 1031:class=notpageimage| 792:class=notpageimage| 731:Ebenezer, Queensland 727:intermodal terminals 635:Approval and funding 472:Western railway line 407:6,500,000. In 1979, 369:In 1889, a proposed 3684:Mary Valley Rattler 3641:Surat Basin railway 3379:Blackall and Yaraka 3122:Magnetic Rail Group 3070:The Southern Spirit 3018:New South Wales XPT 2434:. 23 October 2018. 2231:. 25 January 2020. 2014:"Calvert to Kagaru" 1535:"Strategic Railway" 1420:. 29 January 2024. 695:Tottenham, Victoria 676:Morrison government 672:2020 federal budget 661:2016 federal budget 657:Turnbull government 645:2011 federal budget 482:to its terminus at 123:Beveridge, Victoria 3444:Gladstone to Monto 3429:Dajarra and Selwyn 3238:South Western Line 3077:Spirit of Progress 2946:Melbourne–Adelaide 2651:The Canberra Times 2320:has generic name ( 1874:. 6 October 2020. 1774:(28 August 2013). 1701:on 15 August 2011. 1676:on 5 October 2009. 641:Gillard government 588:(BTCE) released a 267:Yelarbon to Kagaru 131:Kagaru, Queensland 3706: 3705: 3702: 3701: 3649: 3648: 3606: 3605: 3602: 3601: 3313:Cairns-to-Kuranda 3271: 3270: 3160: 3159: 3100: 3099: 2462:BMD Constructions 1786:on 31 August 2013 1745:, pp. 31–33. 1662:Albanese, Anthony 1523:– via Trove 1343:Michael McCormack 1295:The Narrabri and 1281:BMD Constructions 719:the Review report 653:Abbott government 629:track duplication 602:feasibility study 352:freight trains. 331: 330: 327: 326: 16:(Redirected from 3751: 3655: 3626:Cross River Rail 3612: 3554:Redbank-Bundamba 3288: 3277: 3243:North Coast Line 3209: 3199: 3198: 3187: 3180: 3173: 3164: 3132:Pacific National 3091:Trans-Australian 3049:Brisbane Limited 2982: 2978:Passenger trains 2969:Sydney–Melbourne 2955: 2920: 2913: 2906: 2897: 2879: 2877: 2875: 2869: 2862: 2853: 2851: 2849: 2843: 2836: 2827: 2825: 2823: 2817: 2810: 2791: 2790: 2788: 2786: 2775:NSW Country Hour 2766: 2760: 2759: 2757: 2755: 2735: 2729: 2728: 2726: 2724: 2704: 2698: 2697: 2695: 2693: 2673: 2667: 2666: 2664: 2662: 2642: 2636: 2635: 2633: 2631: 2611: 2605: 2604: 2602: 2600: 2580: 2574: 2573: 2571: 2569: 2549: 2543: 2542: 2540: 2538: 2517: 2511: 2510: 2508: 2506: 2484: 2478: 2477: 2475: 2473: 2454: 2448: 2447: 2445: 2443: 2424: 2418: 2417: 2415: 2413: 2394: 2388: 2387: 2385: 2383: 2363: 2357: 2356: 2354: 2352: 2332: 2326: 2325: 2319: 2315: 2313: 2305: 2303: 2301: 2281: 2275: 2274: 2272: 2270: 2251: 2245: 2244: 2242: 2240: 2221: 2215: 2214: 2212: 2210: 2201:. 31 July 2019. 2191: 2185: 2184: 2182: 2180: 2161: 2155: 2154: 2152: 2150: 2131: 2125: 2124: 2122: 2120: 2101: 2095: 2094: 2092: 2090: 2070: 2064: 2063: 2061: 2059: 2040: 2034: 2033: 2031: 2029: 2010: 2001: 2000: 1998: 1996: 1982: 1974: 1963: 1962: 1960: 1958: 1949:. 5 April 2023. 1939: 1933: 1932: 1926: 1918: 1916: 1914: 1894: 1888: 1887: 1885: 1883: 1864: 1858: 1857: 1855: 1853: 1842:The Weekly Times 1833: 1827: 1826: 1824: 1822: 1802: 1796: 1795: 1793: 1791: 1764: 1758: 1752: 1746: 1740: 1734: 1733: 1731: 1729: 1709: 1703: 1702: 1697:. Archived from 1684: 1678: 1677: 1658: 1652: 1646: 1640: 1634: 1628: 1622: 1616: 1610: 1604: 1598: 1589: 1583: 1574: 1573: 1563: 1557: 1556: 1554: 1552: 1531: 1525: 1524: 1522: 1520: 1502: 1496: 1495: 1493: 1491: 1470: 1464: 1463: 1461: 1459: 1440: 1434: 1433: 1431: 1429: 1410: 1145: 1144: 1131: 1130: 1124: 1061:Bethungra Spiral 1019: 1018: 1005: 1004: 991: 990: 977: 976: 963: 962: 949: 948: 935: 934: 921: 920: 914: 780: 779: 766: 765: 759: 737:of Inland Rail. 680:grade separation 520: 514: 512: 511: 507: 504: 496: 458: 454: 389:South Australian 314: 301: 297: 291: 289: 288: 284: 281: 273: 263: 257: 255: 254: 250: 247: 239: 216:Number of tracks 198: 196: 60: 51: 39: 21: 3759: 3758: 3754: 3753: 3752: 3750: 3749: 3748: 3709: 3708: 3707: 3698: 3660: 3645: 3617: 3598: 3389:Brisbane Valley 3347: 3282: 3267: 3258:Tablelands Line 3214: 3203: 3193: 3191: 3161: 3156: 3096: 3063:Southern Aurora 3029: 2973: 2959:Sydney–Brisbane 2953: 2941:Adelaide–Darwin 2929: 2924: 2887: 2882: 2873: 2871: 2867: 2860: 2856: 2847: 2845: 2841: 2834: 2830: 2821: 2819: 2815: 2808: 2804: 2800: 2795: 2794: 2784: 2782: 2768: 2767: 2763: 2753: 2751: 2737: 2736: 2732: 2722: 2720: 2706: 2705: 2701: 2691: 2689: 2675: 2674: 2670: 2660: 2658: 2644: 2643: 2639: 2629: 2627: 2613: 2612: 2608: 2598: 2596: 2582: 2581: 2577: 2567: 2565: 2551: 2550: 2546: 2536: 2534: 2519: 2518: 2514: 2504: 2502: 2486: 2485: 2481: 2471: 2469: 2456: 2455: 2451: 2441: 2439: 2426: 2425: 2421: 2411: 2409: 2396: 2395: 2391: 2381: 2379: 2365: 2364: 2360: 2350: 2348: 2334: 2333: 2329: 2316: 2306: 2299: 2297: 2283: 2282: 2278: 2268: 2266: 2253: 2252: 2248: 2238: 2236: 2223: 2222: 2218: 2208: 2206: 2193: 2192: 2188: 2178: 2176: 2163: 2162: 2158: 2148: 2146: 2133: 2132: 2128: 2118: 2116: 2103: 2102: 2098: 2088: 2086: 2072: 2071: 2067: 2057: 2055: 2042: 2041: 2037: 2027: 2025: 2012: 2011: 2004: 1994: 1992: 1980: 1976: 1975: 1966: 1956: 1954: 1941: 1940: 1936: 1919: 1912: 1910: 1896: 1895: 1891: 1881: 1879: 1866: 1865: 1861: 1851: 1849: 1835: 1834: 1830: 1820: 1818: 1804: 1803: 1799: 1789: 1787: 1766: 1765: 1761: 1753: 1749: 1741: 1737: 1727: 1725: 1711: 1710: 1706: 1686: 1685: 1681: 1664:(21 May 2008). 1660: 1659: 1655: 1647: 1643: 1635: 1631: 1623: 1619: 1611: 1607: 1603:, pp. 6–7. 1599: 1592: 1588:, pp. 5–6. 1584: 1577: 1565: 1564: 1560: 1550: 1548: 1533: 1532: 1528: 1518: 1516: 1504: 1503: 1499: 1489: 1487: 1472: 1471: 1467: 1457: 1455: 1442: 1441: 1437: 1427: 1425: 1412: 1411: 1404: 1399: 1362: 1323:Condamine River 1304:Pilliga forests 1293: 1273: 1268: 1226: 1216:as far east as 1202:Gowrie Junction 1198:Millmerran line 1177:and Queensland 1163: 1162: 1161: 1159: 1153: 1152: 1151: 1150: 1146: 1138: 1137: 1136: 1132: 1116: 1037: 1036: 1035: 1033: 1027: 1026: 1025: 1024: 1020: 1012: 1011: 1010: 1006: 998: 997: 996: 992: 984: 983: 982: 978: 970: 969: 968: 964: 956: 955: 954: 950: 942: 941: 940: 936: 928: 927: 926: 922: 906: 904:New South Wales 798: 797: 796: 794: 788: 787: 786: 785: 781: 773: 772: 771: 767: 751: 743: 712: 637: 610:Rudd government 600:commissioned a 516: 509: 505: 502: 500: 499:4 ft  498: 494: 456: 452: 445:Queensland Rail 441: 439:Later proposals 401:New South Wales 367: 365:Early proposals 362: 319: 308: 299: 295: 286: 282: 279: 277: 276:4 ft  275: 271: 259: 252: 248: 245: 243: 242:4 ft  241: 237: 194: 192: 138: 135: 85: 63: 35: 28: 23: 22: 15: 12: 11: 5: 3757: 3755: 3747: 3746: 3741: 3736: 3731: 3726: 3721: 3711: 3710: 3704: 3703: 3700: 3699: 3697: 3696: 3694:Savannahlander 3691: 3686: 3681: 3676: 3671: 3669:Downs Explorer 3665: 3662: 3661: 3658: 3651: 3650: 3647: 3646: 3644: 3643: 3638: 3633: 3628: 3622: 3619: 3618: 3615: 3608: 3607: 3604: 3603: 3600: 3599: 3597: 3596: 3591: 3586: 3581: 3576: 3571: 3566: 3561: 3556: 3551: 3546: 3541: 3536: 3531: 3526: 3521: 3516: 3511: 3506: 3501: 3496: 3491: 3486: 3481: 3476: 3471: 3466: 3461: 3456: 3451: 3446: 3441: 3436: 3431: 3426: 3421: 3416: 3411: 3409:Callide Valley 3406: 3401: 3396: 3391: 3386: 3381: 3376: 3371: 3366: 3361: 3355: 3353: 3349: 3348: 3346: 3345: 3340: 3335: 3330: 3328:Newlands (GAP) 3325: 3320: 3315: 3310: 3305: 3300: 3294: 3292: 3284: 3283: 3280: 3273: 3272: 3269: 3268: 3266: 3265: 3260: 3255: 3250: 3245: 3240: 3235: 3230: 3225: 3219: 3216: 3215: 3212: 3205: 3204: 3192: 3190: 3189: 3182: 3175: 3167: 3158: 3157: 3155: 3154: 3149: 3144: 3139: 3137:Qube Logistics 3134: 3129: 3124: 3119: 3117:Journey Beyond 3114: 3108: 3106: 3102: 3101: 3098: 3097: 3095: 3094: 3087: 3080: 3073: 3066: 3059: 3052: 3045: 3037: 3035: 3031: 3030: 3028: 3027: 3020: 3015: 3012:Indian Pacific 3008: 3005:Great Southern 3001: 2994: 2988: 2986: 2979: 2975: 2974: 2972: 2971: 2966: 2961: 2956: 2948: 2943: 2937: 2935: 2931: 2930: 2925: 2923: 2922: 2915: 2908: 2900: 2894: 2893: 2886: 2885:External links 2883: 2881: 2880: 2854: 2828: 2801: 2799: 2796: 2793: 2792: 2761: 2730: 2699: 2668: 2637: 2606: 2575: 2544: 2512: 2479: 2449: 2419: 2389: 2358: 2327: 2290:Moree Champion 2276: 2246: 2216: 2199:Southern Cross 2186: 2156: 2126: 2096: 2065: 2035: 2002: 1987:. April 2023. 1964: 1934: 1889: 1872:Moree Champion 1859: 1828: 1797: 1772:Emerson, Scott 1759: 1757:, pp. 53. 1747: 1735: 1704: 1679: 1653: 1641: 1629: 1617: 1605: 1590: 1575: 1558: 1526: 1497: 1465: 1435: 1401: 1400: 1398: 1395: 1394: 1393: 1388: 1383: 1374: 1369: 1361: 1358: 1316:Darren Chester 1292: 1289: 1272: 1269: 1267: 1264: 1252: 1251: 1248: 1245: 1225: 1222: 1184:South-west of 1175:standard gauge 1155: 1154: 1148: 1147: 1140: 1139: 1134: 1133: 1126: 1125: 1119: 1118: 1117: 1115: 1112: 1055:and bypassing 1029: 1028: 1022: 1021: 1014: 1013: 1008: 1007: 1000: 999: 994: 993: 986: 985: 980: 979: 972: 971: 966: 965: 958: 957: 952: 951: 944: 943: 938: 937: 930: 929: 924: 923: 916: 915: 909: 908: 907: 905: 902: 901: 900: 889: 882: 875: 872: 866: 863: 860: 853: 846: 810:crossing loops 790: 789: 783: 782: 775: 774: 769: 768: 761: 760: 754: 753: 752: 750: 747: 742: 739: 711: 708: 636: 633: 518:standard gauge 440: 437: 382:Prime Minister 371:standard gauge 366: 363: 361: 358: 350:double-stacked 329: 328: 325: 324: 321: 320: 317: 310: 309: 307: 306: 293: 269: 264: 261:standard gauge 235: 229: 227: 221: 220: 217: 213: 212: 209: 205: 204: 200: 199: 189: 185: 184: 180: 179: 174: 170: 169: 159: 155: 154: 150: 149: 144: 140: 139: 137: 136: 134: 133: 127: 125: 119: 117: 113: 112: 107: 103: 102: 99: 95: 94: 91: 87: 86: 84: 83: 82:Inland railway 80: 76: 74: 70: 69: 65: 64: 61: 53: 52: 44: 43: 26: 24: 18:Inland Railway 14: 13: 10: 9: 6: 4: 3: 2: 3756: 3745: 3742: 3740: 3737: 3735: 3732: 3730: 3727: 3725: 3722: 3720: 3717: 3716: 3714: 3695: 3692: 3690: 3687: 3685: 3682: 3680: 3677: 3675: 3672: 3670: 3667: 3666: 3663: 3656: 3652: 3642: 3639: 3637: 3634: 3632: 3629: 3627: 3624: 3623: 3620: 3613: 3609: 3595: 3592: 3590: 3587: 3585: 3582: 3580: 3577: 3575: 3572: 3570: 3567: 3565: 3562: 3560: 3557: 3555: 3552: 3550: 3547: 3545: 3542: 3540: 3537: 3535: 3532: 3530: 3527: 3525: 3522: 3520: 3517: 3515: 3512: 3510: 3507: 3505: 3502: 3500: 3497: 3495: 3492: 3490: 3487: 3485: 3482: 3480: 3477: 3475: 3472: 3470: 3467: 3465: 3462: 3460: 3457: 3455: 3452: 3450: 3447: 3445: 3442: 3440: 3437: 3435: 3434:Dawson Valley 3432: 3430: 3427: 3425: 3422: 3420: 3417: 3415: 3412: 3410: 3407: 3405: 3402: 3400: 3397: 3395: 3392: 3390: 3387: 3385: 3382: 3380: 3377: 3375: 3372: 3370: 3367: 3365: 3362: 3360: 3357: 3356: 3354: 3350: 3344: 3341: 3339: 3336: 3334: 3331: 3329: 3326: 3324: 3321: 3319: 3316: 3314: 3311: 3309: 3306: 3304: 3301: 3299: 3296: 3295: 3293: 3289: 3285: 3278: 3274: 3264: 3261: 3259: 3256: 3254: 3251: 3249: 3246: 3244: 3241: 3239: 3236: 3234: 3233:Southern Line 3231: 3229: 3226: 3224: 3221: 3220: 3217: 3210: 3206: 3202: 3197: 3188: 3183: 3181: 3176: 3174: 3169: 3168: 3165: 3153: 3150: 3148: 3145: 3143: 3142:SCT Logistics 3140: 3138: 3135: 3133: 3130: 3128: 3127:NSW TrainLink 3125: 3123: 3120: 3118: 3115: 3113: 3110: 3109: 3107: 3103: 3093: 3092: 3088: 3086: 3085: 3081: 3079: 3078: 3074: 3072: 3071: 3067: 3065: 3064: 3060: 3058: 3057: 3053: 3051: 3050: 3046: 3044: 3043: 3039: 3038: 3036: 3032: 3026: 3025: 3021: 3019: 3016: 3014: 3013: 3009: 3007: 3006: 3002: 3000: 2999: 2995: 2993: 2992:Albury V/Line 2990: 2989: 2987: 2983: 2980: 2976: 2970: 2967: 2965: 2962: 2960: 2957: 2952: 2949: 2947: 2944: 2942: 2939: 2938: 2936: 2932: 2928: 2921: 2916: 2914: 2909: 2907: 2902: 2901: 2898: 2892: 2889: 2888: 2884: 2866: 2859: 2855: 2840: 2833: 2829: 2814: 2807: 2803: 2802: 2797: 2780: 2776: 2772: 2765: 2762: 2749: 2745: 2741: 2734: 2731: 2718: 2714: 2710: 2703: 2700: 2687: 2683: 2679: 2672: 2669: 2656: 2652: 2648: 2641: 2638: 2625: 2621: 2617: 2610: 2607: 2594: 2590: 2586: 2579: 2576: 2563: 2559: 2555: 2548: 2545: 2532: 2528: 2527: 2522: 2516: 2513: 2500: 2496: 2495: 2490: 2483: 2480: 2467: 2463: 2459: 2453: 2450: 2437: 2433: 2429: 2423: 2420: 2407: 2403: 2399: 2393: 2390: 2377: 2373: 2369: 2362: 2359: 2346: 2342: 2338: 2331: 2328: 2323: 2311: 2295: 2291: 2287: 2280: 2277: 2264: 2260: 2256: 2250: 2247: 2234: 2230: 2226: 2220: 2217: 2204: 2200: 2196: 2190: 2187: 2174: 2170: 2166: 2160: 2157: 2144: 2140: 2136: 2130: 2127: 2114: 2110: 2106: 2100: 2097: 2084: 2080: 2076: 2069: 2066: 2053: 2049: 2045: 2039: 2036: 2023: 2019: 2015: 2009: 2007: 2003: 1990: 1986: 1979: 1973: 1971: 1969: 1965: 1952: 1948: 1944: 1938: 1935: 1930: 1924: 1908: 1904: 1900: 1893: 1890: 1877: 1873: 1869: 1863: 1860: 1847: 1843: 1839: 1832: 1829: 1816: 1812: 1808: 1801: 1798: 1785: 1781: 1777: 1773: 1769: 1768:Truss, Warren 1763: 1760: 1756: 1751: 1748: 1744: 1739: 1736: 1723: 1719: 1715: 1708: 1705: 1700: 1696: 1695: 1690: 1683: 1680: 1675: 1671: 1667: 1663: 1657: 1654: 1650: 1645: 1642: 1639:, p. 55. 1638: 1633: 1630: 1627:, p. 21. 1626: 1621: 1618: 1614: 1609: 1606: 1602: 1597: 1595: 1591: 1587: 1582: 1580: 1576: 1571: 1570: 1562: 1559: 1546: 1542: 1541: 1536: 1530: 1527: 1514: 1510: 1509: 1501: 1498: 1485: 1481: 1480: 1479:Logan Witness 1475: 1469: 1466: 1453: 1449: 1445: 1439: 1436: 1423: 1419: 1415: 1409: 1407: 1403: 1396: 1392: 1389: 1387: 1384: 1382: 1378: 1375: 1373: 1370: 1367: 1364: 1363: 1359: 1357: 1355: 1351: 1346: 1344: 1340: 1336: 1332: 1328: 1324: 1319: 1317: 1313: 1309: 1305: 1301: 1298: 1290: 1288: 1286: 1282: 1278: 1277:joint-venture 1270: 1265: 1263: 1261: 1257: 1249: 1246: 1243: 1242: 1241: 1240:. These are: 1239: 1235: 1231: 1223: 1221: 1219: 1215: 1211: 1207: 1203: 1199: 1195: 1191: 1187: 1182: 1180: 1176: 1172: 1167: 1158: 1123: 1113: 1111: 1109: 1103: 1101: 1096: 1092: 1087: 1085: 1081: 1077: 1073: 1069: 1068:Stockinbingal 1064: 1062: 1058: 1054: 1050: 1046: 1042: 1032: 953:Stockinbingal 913: 903: 898: 894: 890: 887: 883: 880: 876: 873: 871: 867: 864: 861: 858: 854: 851: 847: 845: 841: 840: 839: 836: 834: 830: 825: 823: 819: 815: 811: 807: 803: 793: 758: 748: 746: 740: 738: 734: 732: 728: 722: 720: 715: 709: 707: 704: 700: 696: 692: 687: 685: 681: 677: 673: 668: 666: 662: 658: 654: 650: 646: 642: 634: 632: 630: 626: 622: 617: 615: 611: 607: 603: 599: 594: 591: 590:working paper 587: 584:In 1996, the 582: 579: 575: 571: 567: 563: 559: 558:Stockinbingal 555: 551: 547: 543: 539: 535: 531: 527: 523: 519: 495:1,435 mm 491: 489: 485: 481: 477: 473: 469: 465: 462: 453:1,067 mm 450: 446: 438: 436: 434: 430: 426: 422: 418: 414: 410: 406: 402: 398: 394: 390: 386: 385:Andrew Fisher 383: 378: 376: 372: 364: 359: 357: 353: 351: 347: 343: 339: 335: 323: 322: 316: 311: 305: 296:1,067 mm 294: 272:1,435 mm 270: 268: 265: 262: 238:1,435 mm 236: 234: 231: 230: 228: 226: 222: 218: 214: 210: 206: 201: 190: 186: 181: 178: 175: 171: 167: 163: 160: 156: 151: 148: 145: 141: 132: 129: 128: 126: 124: 121: 120: 118: 114: 111: 108: 104: 100: 96: 92: 88: 81: 78: 77: 75: 73:Other name(s) 71: 66: 59: 54: 50: 45: 40: 37: 33: 19: 3630: 3594:Wooloongabba 3414:Cecil Plains 3228:Western Line 3089: 3082: 3075: 3068: 3061: 3054: 3047: 3040: 3024:The Overland 3022: 3010: 3003: 2996: 2950: 2874:12 September 2872:. Retrieved 2848:12 September 2846:. Retrieved 2822:12 September 2820:. Retrieved 2798:Bibliography 2785:12 September 2783:. Retrieved 2774: 2764: 2752:. Retrieved 2746:. ABC News. 2743: 2733: 2721:. Retrieved 2712: 2702: 2690:. Retrieved 2681: 2671: 2659:. Retrieved 2650: 2640: 2628:. Retrieved 2619: 2609: 2597:. Retrieved 2588: 2578: 2566:. Retrieved 2557: 2547: 2537:17 September 2535:. Retrieved 2524: 2515: 2505:17 September 2503:. Retrieved 2492: 2482: 2472:17 September 2470:. Retrieved 2461: 2452: 2442:17 September 2440:. Retrieved 2431: 2422: 2410:. Retrieved 2401: 2392: 2380:. Retrieved 2371: 2361: 2349:. Retrieved 2340: 2330: 2298:. Retrieved 2289: 2279: 2267:. Retrieved 2258: 2249: 2237:. Retrieved 2228: 2219: 2207:. Retrieved 2198: 2189: 2177:. Retrieved 2168: 2159: 2149:12 September 2147:. Retrieved 2138: 2129: 2119:12 September 2117:. Retrieved 2108: 2099: 2089:12 September 2087:. Retrieved 2078: 2068: 2058:14 September 2056:. Retrieved 2047: 2038: 2026:. Retrieved 2017: 1993:. Retrieved 1984: 1955:. Retrieved 1946: 1937: 1911:. Retrieved 1902: 1892: 1880:. Retrieved 1871: 1862: 1852:12 September 1850:. Retrieved 1841: 1831: 1821:12 September 1819:. Retrieved 1810: 1800: 1790:12 September 1788:. Retrieved 1784:the original 1779: 1762: 1750: 1738: 1726:. Retrieved 1717: 1707: 1699:the original 1692: 1682: 1674:the original 1669: 1656: 1651:, p. 5. 1644: 1632: 1620: 1615:, p. 8. 1608: 1572:. p. 7. 1567: 1561: 1551:12 September 1549:. Retrieved 1538: 1529: 1519:12 September 1517:, retrieved 1507: 1500: 1488:. Retrieved 1477: 1468: 1456:. Retrieved 1447: 1438: 1426:. Retrieved 1417: 1347: 1335:Glenn Sterle 1320: 1294: 1285:Fulton Hogan 1274: 1266:Construction 1256:Grandchester 1253: 1227: 1214:Western line 1183: 1179:narrow gauge 1168: 1164: 1104: 1088: 1065: 1038: 837: 833:John Holland 826: 814:double track 799: 744: 735: 723: 716: 713: 699:Acacia Ridge 688: 669: 638: 618: 595: 583: 492: 461:narrow gauge 442: 393:Port Augusta 379: 368: 354: 333: 332: 266: 232: 208:Track length 36: 3631:Inland Rail 3559:South Coast 3291:Operational 3253:Mt Isa Line 2985:Operational 2951:Inland Rail 2341:Railway PRO 2318:|last= 2169:Inland Rail 2018:Inland Rail 1490:24 December 1448:Inland Rail 1418:Inland Rail 1057:Cootamundra 665:2017 budget 566:Cootamundra 417:Wallangarra 375:Wallangarra 334:Inland Rail 225:Track gauge 177:Open access 173:Operator(s) 42:Inland Rail 32:Inland Line 3713:Categories 3674:Gulflander 3579:Wallaville 3524:Mt Edwards 3424:Crows Nest 3369:Beaudesert 3338:Millmerran 3333:Glenmorgan 3308:Blackwater 3303:Moura Line 3213:Main lines 2754:12 October 2723:12 October 2692:12 October 2661:12 October 2630:12 October 2599:12 October 2568:12 October 2412:2 February 2382:2 February 2351:2 February 2300:2 February 2269:2 February 2239:2 February 2209:2 February 2179:2 February 2028:2 February 1995:2 February 1957:2 February 1913:2 February 1882:12 October 1458:2 February 1428:2 February 1397:References 1271:Chronology 1234:dual gauge 1181:networks. 1171:dual gauge 1114:Queensland 1009:North Star 877:Modifying 857:Wangaratta 576:; and the 484:Millmerran 449:dual gauge 304:dual gauge 162:Heavy rail 3544:Pemberton 3494:Killarney 3459:Greenvale 3449:Goomburra 3323:Goonyella 3318:Etheridge 3223:Main Line 3105:Operators 3042:The Alice 2934:Corridors 1811:ABC Rural 1354:hydrology 1260:Toowoomba 1206:Toowoomba 1194:Inglewood 1091:Narromine 981:Narromine 897:Broadford 844:Glenrowan 784:Beveridge 703:Bromelton 691:rail yard 649:Coalition 542:Narromine 468:Toowoomba 464:Main Line 443:In 1995, 413:Melbourne 342:Melbourne 338:Australia 318:Route map 203:Technical 188:Commenced 110:Australia 3534:Mulgowie 3529:Mt Perry 3519:Maryvale 3479:Jandowae 3439:Dugandan 3404:Canungra 2998:The Ghan 2865:Archived 2839:Archived 2813:Archived 2779:Archived 2748:Archived 2717:Archived 2686:Archived 2682:ABC News 2655:Archived 2624:Archived 2620:ABC News 2593:Archived 2589:ABC News 2562:Archived 2558:ABC News 2531:Archived 2499:Archived 2466:Archived 2436:Archived 2406:Archived 2376:Archived 2345:Archived 2310:cite web 2294:Archived 2263:Archived 2233:Archived 2203:Archived 2173:Archived 2143:Archived 2113:Archived 2083:Archived 2052:Archived 2022:Archived 1989:Archived 1951:Archived 1947:ABC News 1923:cite web 1907:Archived 1876:Archived 1846:Archived 1815:Archived 1722:Archived 1545:Archived 1513:archived 1484:Archived 1452:Archived 1422:Archived 1360:See also 1297:Baradine 1279:between 1186:Yelarbon 1135:Yelarbon 1108:Yelarbon 1095:Narrabri 1080:Adelaide 1059:and the 1023:Yelarbon 995:Narrabri 749:Victoria 513: in 478:and the 429:Adelaide 397:Brisbane 391:city of 346:Brisbane 290: in 256: in 68:Overview 3584:Windera 3574:Urangan 3549:Proston 3539:Nanango 3504:Marburg 3484:Kajabbi 3399:Bulimba 3394:Buderim 3343:Wandoan 3112:Aurizon 3034:Defunct 1224:Tunnels 1218:Calvert 1210:Helidon 1100:Camurra 893:Wandong 886:Benalla 870:Seymour 831:, with 822:Benalla 806:Seymour 670:In the 659:in the 534:Wee Waa 526:Bellata 508:⁄ 476:Wyreema 360:History 285:⁄ 251:⁄ 193: ( 183:History 166:freight 153:Service 143:Website 116:Termini 3589:Winton 3564:Tarong 3489:Kilcoy 3469:Injune 3419:Cooyar 3384:Boonah 3364:Amiens 3352:Closed 3152:V/Line 2048:Vicsig 1728:11 May 1444:"Home" 1149:Kagaru 1072:Parkes 1049:Illabo 1041:Albury 967:Parkes 939:Illabo 925:Albury 770:Albury 674:, the 621:Albury 574:Albury 568:; the 560:; the 552:; the 550:Parkes 544:; the 524:until 470:, the 425:Albury 421:Orange 106:Locale 90:Status 3569:Texas 3464:Haden 2868:(PDF) 2861:(PDF) 2842:(PDF) 2835:(PDF) 2816:(PDF) 2809:(PDF) 1981:(PDF) 1084:Perth 1039:From 879:Euroa 741:Route 625:Moree 606:Junee 433:Perth 98:Owner 3474:Isis 3374:Bell 2876:2020 2850:2020 2824:2020 2787:2020 2756:2020 2725:2020 2694:2020 2663:2020 2632:2020 2601:2020 2570:2020 2539:2020 2507:2020 2474:2020 2444:2020 2414:2024 2384:2024 2353:2024 2322:help 2302:2024 2271:2024 2241:2024 2211:2024 2181:2024 2151:2020 2121:2020 2091:2020 2060:2020 2030:2024 1997:2024 1959:2024 1929:link 1915:2024 1884:2020 1854:2020 1823:2020 1792:2020 1730:2009 1553:2020 1521:2020 1492:2020 1460:2024 1430:2024 1283:and 1258:and 1236:and 1232:and 1093:and 1082:and 895:and 701:and 639:The 532:via 431:and 423:and 415:via 344:and 195:2018 191:2018 158:Type 1208:to 1070:to 1047:to 820:at 693:at 572:to 564:to 556:to 548:to 540:to 474:to 466:to 409:TNT 395:to 3715:: 2773:. 2742:. 2715:. 2711:. 2684:. 2680:. 2653:. 2649:. 2622:. 2618:. 2591:. 2587:. 2560:. 2556:. 2523:. 2497:. 2491:. 2460:. 2430:. 2404:. 2400:. 2374:. 2370:. 2343:. 2339:. 2314:: 2312:}} 2308:{{ 2292:. 2288:. 2257:. 2227:. 2197:. 2171:. 2167:. 2137:. 2107:. 2081:. 2077:. 2050:. 2046:. 2020:. 2016:. 2005:^ 1983:. 1967:^ 1945:. 1925:}} 1921:{{ 1905:. 1901:. 1870:. 1844:. 1840:. 1809:. 1778:. 1770:; 1720:. 1716:. 1691:. 1668:. 1593:^ 1578:^ 1537:. 1476:. 1450:. 1446:. 1416:. 1405:^ 1341:, 1314:, 1110:. 1086:. 1063:. 824:. 686:. 667:. 515:) 459:) 435:. 419:, 405:AÂŁ 302:) 292:)/ 258:) 3186:e 3179:t 3172:v 2919:e 2912:t 2905:v 2878:. 2852:. 2826:. 2789:. 2758:. 2727:. 2696:. 2665:. 2634:. 2603:. 2572:. 2541:. 2509:. 2476:. 2446:. 2416:. 2386:. 2355:. 2324:) 2304:. 2273:. 2243:. 2213:. 2183:. 2153:. 2123:. 2093:. 2062:. 2032:. 1999:. 1961:. 1931:) 1917:. 1886:. 1856:. 1825:. 1794:. 1732:. 1462:. 1432:. 510:2 506:1 503:+ 501:8 497:( 455:( 298:( 287:2 283:1 280:+ 278:8 274:( 253:2 249:1 246:+ 244:8 240:( 219:1 197:) 168:) 164:( 34:. 20:)

Index

Inland Railway
Inland Line
Inland Rail logo
Inland Rail route
Australia
Beveridge, Victoria
Kagaru, Queensland
https://inlandrail.com.au
Heavy rail
freight
Open access
Track gauge
standard gauge
dual gauge
Australia
Melbourne
Brisbane
double-stacked
standard gauge
Wallangarra
Prime Minister
Andrew Fisher
South Australian
Port Augusta
Brisbane
New South Wales
AÂŁ
TNT
Melbourne
Wallangarra

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑