653: 278: 263: 385:. The section of highway between Martin Luther King Jr. Boulevard was built between 1955 and 1959. The southern portion, located between I-24 and Martin Luther King Jr. Boulevard, was built between 1961 and 1963, when that corresponding section of I-24 was built. The interchange with I-24, known as the "Big Scramble", was reworked in the late 1980s and early 1990s, and the I-124 signage was removed at this time. 449: 665: 563: 26: 569: 130: 107: 455: 443: 102: 545:
Signed as exit 1B (Martin Luther King Boulevard) and 1C (4th Street) from the northbound lanes; signed as exits 1B-C (4th Street, 6th Street, W Martin Luther King Boulevard) and exit 1A (E Martin Luther King Boulevard) from southbound lanes; no northbound access to 6th Street; unsigned SR 316 and SR
388:
A major reconstruction project commenced in December 2015 to widen and modernize I-124, which reconstructed all interchanges, provided adequate shoulders and median dividers, widened the route to six lanes, and removed the S-curve at the 4th Street interchange. Originally scheduled to be
348:. The river is the point at which the I-124 designation ends. After crossing the river, the freeway continues under the US 27 designation for another 30 miles (48 km), beyond which the spur continues under the 728: 215: 940: 955: 960: 328:
to downtown Chattanooga. The road segment has not been signed as I-124 since the late 1980s (it is marked on overhead signs and milemarkers as US 27), and the
720: 945: 236: 356: 950: 870: 786: 332:
official map no longer designates it as I-124, but some DOT publications still make reference to the designation, and its exit numbers remain.
329: 59: 690: 205: 916: 210: 382: 378: 241: 220: 246: 807: 691:"Table 2: Auxiliary Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways as of October 31, 2002" 862: 753: 698: 389:
completed by July 2019, the project ran into multiple setbacks, which delayed the completion until January 2021.
228: 837: 344:, continues north through downtown Chattanooga, and then across the Tennessee River as a limited-access freeway on the 200: 593: 573: 463: 402: 368: 325: 317: 173: 133: 114: 110: 51: 536: 532: 349: 281: 266: 192: 581: 577: 471: 467: 377:
to provide a secondary access across the Tennessee River and relieve congestion, which had developed on the
970: 965: 398: 359:, a system of routes determined to be the most important for the nation's economy, mobility, and defense. 306: 118: 513:
Partial interchange consisting of an exit from the northbound lanes and entrance to the southbound lanes
657: 603: 540: 487: 483: 345: 585: 491: 496:
Southern terminus; southern end of US 27 concurrency; southbound exit and northbound entrance
632: 620: 907: 669: 589: 758: 302: 838:"Why did they name it the "Ol' Johnny Bridge?" | David Carroll's Chattanooga Radio and TV" 599: 341: 934: 475: 459: 153: 374: 373:
The route that is now I-124 was proposed in the 1950s by then-mayor of Chattanooga
782: 340:
The US 27 freeway diverges from I-24 just before the Moccasin Bend in the
925: 321: 310: 163: 479: 559: 440: 316:
During periods where this two-mile-long (3.2 km) segment of
25: 509: 352:(SR 111) designation for a further 20 miles (32 km). 305:
for a short segment of a controlled-access highway located in
610:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
915: 783:"Fiscal Years 2008-2010 Transportation Improvement Program" 320:(US 27) has been signed as I-124, it has served as a 903: 898: 597: 556: 495: 437: 815:(Map). Federal Highway Administration. May 10, 2019 512: 506: 183: 169: 159: 149: 144: 124: 96: 91: 81: 73: 65: 44: 21: 729:American Association of State Highway Officials 82: 863:"US 27 Reconstruction in Downtown Chattanooga" 754:"Where Do Our Interstate Highways Terminate?" 8: 941:Transportation in Hamilton County, Tennessee 809:National Highway System: Chattanooga, TN--GA 407: 355:The entire length of I-124 is part of the 255: 920: 369:U.S. Route 27 in Tennessee Β§ History 956:Transportation in Chattanooga, Tennessee 747: 745: 681: 961:Unsigned auxiliary Interstate Highways 871:Tennessee Department of Transportation 787:Tennessee Department of Transportation 330:Tennessee Department of Transportation 18: 832: 830: 550: 530: 517: 500: 431: 7: 917:Template:Attached KML/Interstate 124 721:"Correspondence to Herbert M. Bates" 719:Johnson, A. E. (November 12, 1958). 598:Continuation as US 27 at the 416: 14: 946:Interstate Highways in Tennessee 689:DeSimone, Tony (April 6, 2011). 663: 651: 567: 561: 453: 447: 441: 276: 261: 128: 105: 100: 69:1.97 mi (3.17 km) 24: 752:Jolley, Harmon (July 9, 2004). 699:Federal Highway Administration 695:FHWA Route Log and Finder List 531:Martin Luther King Boulevard ( 1: 951:Auxiliary Interstate Highways 411: 510:Carter Street, W Main Street 535:), 6th Street, 4th Street ( 987: 842:www.chattanoogaradiotv.com 366: 609: 553: 544: 527: 522: 503: 434: 426: 423: 420: 415: 410: 254: 193:Interstate Highway System 188: 179: 140: 77:November 12, 1958–present 57: 49: 37: 762:. Chattanooga, Tennessee 658:United States portal 628:     616:     39:I-124 highlighted in red 397:The entire route is in 357:National Highway System 229:Tennessee State Routes 781:Staff (May 1, 2007). 670:U.S. Roads portal 383:Walnut Street Bridges 921:KML is from Wikidata 604:P. R. Olgiati Bridge 350:State Route 111 346:P. R. Olgiati Bridge 303:unsigned designation 16:Highway in Tennessee 375:P.R. "Rudy" Olgiati 295:Interstate 124 50:Auxiliary route of 873:. October 16, 2015 318:U.S. Route 27 844:. 24 October 2013 642: 641: 633:Incomplete access 336:Route description 292: 291: 288: 287: 45:Route information 978: 926:I-124 at AARoads 911: 883: 882: 880: 878: 859: 853: 852: 850: 849: 834: 825: 824: 822: 820: 814: 804: 798: 797: 795: 793: 778: 772: 771: 769: 767: 759:The Chattanoogan 749: 740: 739: 737: 735: 716: 710: 709: 707: 705: 686: 668: 667: 666: 656: 655: 654: 635: 629: 624: 617: 572: 571: 570: 565: 564: 458: 457: 456: 451: 450: 445: 444: 418: 413: 408: 284: 280: 279: 269: 265: 264: 256: 132: 131: 109: 108: 104: 103: 84: 28: 19: 986: 985: 981: 980: 979: 977: 976: 975: 931: 930: 922: 919: 914: 913: 912: 896: 892: 887: 886: 876: 874: 861: 860: 856: 847: 845: 836: 835: 828: 818: 816: 812: 806: 805: 801: 791: 789: 780: 779: 775: 765: 763: 751: 750: 743: 733: 731: 718: 717: 713: 703: 701: 688: 687: 683: 678: 664: 662: 652: 650: 647: 638: 631: 627: 619: 615: 611: 600:Tennessee River 594:Signal Mountain 568: 566: 562: 560: 524: 519: 454: 452: 448: 446: 442: 403:Hamilton County 395: 371: 365: 342:Tennessee River 338: 277: 275: 262: 260: 129: 106: 101: 92:Major junctions 40: 33: 32: 29: 17: 12: 11: 5: 984: 982: 974: 973: 968: 963: 958: 953: 948: 943: 933: 932: 929: 928: 895: 894: 893: 891: 890:External links 888: 885: 884: 854: 826: 799: 773: 741: 711: 680: 679: 677: 674: 673: 672: 660: 646: 643: 640: 639: 637: 636: 625: 612: 607: 606: 596: 584:north) β€“ 558: 555: 552: 548: 547: 543: 529: 526: 521: 515: 514: 511: 508: 505: 502: 498: 497: 494: 439: 436: 433: 429: 428: 425: 422: 419: 414: 394: 391: 364: 361: 337: 334: 290: 289: 286: 285: 272: 270: 252: 251: 250: 249: 244: 239: 233: 232: 224: 223: 218: 213: 208: 203: 197: 196: 186: 185: 184:Highway system 181: 180: 177: 176: 171: 167: 166: 161: 157: 156: 151: 147: 146: 142: 141: 138: 137: 136:in Chattanooga 126: 125:North end 122: 121: 98: 97:South end 94: 93: 89: 88: 85: 79: 78: 75: 71: 70: 67: 63: 62: 58:Maintained by 55: 54: 47: 46: 42: 41: 38: 35: 34: 31:Interstate 124 30: 23: 22: 15: 13: 10: 9: 6: 4: 3: 2: 983: 972: 971:U.S. Route 27 969: 967: 966:Interstate 24 964: 962: 959: 957: 954: 952: 949: 947: 944: 942: 939: 938: 936: 927: 924: 923: 918: 909: 905: 901: 900: 889: 872: 868: 864: 858: 855: 843: 839: 833: 831: 827: 811: 810: 803: 800: 788: 784: 777: 774: 761: 760: 755: 748: 746: 742: 730: 726: 722: 715: 712: 700: 696: 692: 685: 682: 675: 671: 661: 659: 649: 648: 644: 634: 626: 622: 614: 613: 608: 605: 601: 595: 591: 587: 583: 579: 575: 549: 542: 538: 534: 516: 499: 493: 489: 485: 481: 477: 473: 469: 465: 461: 430: 409: 406: 404: 400: 392: 390: 386: 384: 380: 379:Market Street 376: 370: 362: 360: 358: 353: 351: 347: 343: 335: 333: 331: 327: 323: 319: 314: 312: 308: 304: 300: 296: 283: 273: 271: 268: 258: 257: 253: 248: 245: 243: 240: 238: 235: 234: 231: 230: 226: 225: 222: 219: 217: 214: 212: 209: 207: 204: 202: 199: 198: 195: 194: 190: 189: 187: 182: 178: 175: 172: 168: 165: 162: 158: 155: 154:United States 152: 148: 143: 139: 135: 127: 123: 120: 116: 112: 99: 95: 90: 86: 80: 76: 72: 68: 64: 61: 56: 53: 48: 43: 36: 27: 20: 897: 875:. Retrieved 866: 857: 846:. Retrieved 841: 817:. Retrieved 808: 802: 790:. Retrieved 776: 764:. Retrieved 757: 732:. Retrieved 724: 714: 702:. Retrieved 694: 684: 630:   618:   424:Destinations 396: 387: 372: 354: 339: 315: 298: 294: 293: 227: 191: 87:Entire route 725:VisualVault 621:Concurrency 399:Chattanooga 307:Chattanooga 282:SR 124 267:SR 123 119:Chattanooga 935:Categories 848:2015-10-06 819:August 15, 766:16 January 676:References 574:US 27 492:Birmingham 474:south) to 464:US 27 367:See also: 322:spur route 237:Interstate 134:US 27 115:US 27 877:April 21, 734:August 8, 602:, on the 488:Nashville 484:Knoxville 393:Exit list 311:Tennessee 206:Auxiliary 164:Tennessee 899:KML file 792:March 4, 704:March 4, 645:See also 623:terminus 586:Red Bank 541:Downtown 528:1A/1B/1C 478: β€“ 301:) is an 216:Business 211:Suffixed 174:Hamilton 170:Counties 145:Location 113: / 576:north ( 480:Atlanta 363:History 150:Country 74:Existed 590:Dayton 537:SR 389 533:SR 316 466:south/ 221:Future 66:Length 813:(PDF) 582:SR 29 580:west/ 578:SR 27 472:SR 29 470:east/ 468:SR 27 427:Notes 299:I-124 247:State 160:State 908:help 904:edit 879:2018 867:TDOT 821:2019 794:2012 768:2018 736:2023 706:2010 546:389. 523:1.1– 518:0.7– 504:0.80 476:I-75 460:I-24 421:Exit 381:and 326:I-24 201:Main 111:I-24 60:TDOT 52:I-24 554:2.7 551:1.7 539:)– 525:1.9 520:1.2 501:0.5 435:0.0 432:0.0 324:of 313:. 117:in 83:NHS 937:: 906:β€’ 869:. 865:. 840:. 829:^ 785:. 756:. 744:^ 727:. 723:. 697:. 693:. 592:, 588:, 507:1A 490:, 486:, 482:, 417:km 412:mi 405:. 401:, 309:, 274:β†’ 259:← 242:US 910:) 902:( 881:. 851:. 823:. 796:. 770:. 738:. 708:. 557:β€” 462:( 438:β€” 297:(

Index

Interstate 124 marker
I-24
TDOT
I-24
US 27
Chattanooga
US 27
United States
Tennessee
Hamilton
Interstate Highway System
Main
Auxiliary
Suffixed
Business
Future
Tennessee State Routes
Interstate
US
State
SR 123
SR 124
unsigned designation
Chattanooga
Tennessee
U.S. Route 27
spur route
I-24
Tennessee Department of Transportation
Tennessee River

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑