Knowledge (XXG)

Kanti Thermal Power Station

Source 📝

283:. The construction of the plant began during George's first tenure as MP of Muzaffarpur in 1978. In November 2014, Kanti plant was renamed as George Fernandes Thermal Power Plant to acknowledge his contribution. To take over Muzaffarpur Thermal Power Station (2*110MW), a subsidiary company named Vaishali Power Generating Company Limited with NTPC on 06/09/2006,-contributing 51% of equity; and the balance equity was contributed by Bihar State Electricity Board. The company was rechristened as ‘Kanti Bijlee Utpadan Nigam Limited’ on April 10, 2008. Present equity holding is 100% by ntpc and now it's not a joint venture but is a wholly owned subsidiary company of ntpc. The company renovated and modernized the existing unit.The total cost of its renovation and modernization has been over Rs. 500 crores. 1478: 481: 467: 37: 248:. George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC. The share of the company is 100% of the NTPC. The plant was not functional between 2003 and 2013; however, renovation of both older units paved the way for commercial production of electricity by the end of 2013. 384:
This unit too is non functional since 2003 and was also renovated by Bharat Heavy Electricals. But, since November 2014 this unit has been functional after the renovation and modernization work and was running at full capacity till 2022. Being old unit the same was decided to scrap down.
286:
In March 2013, the renovation work of two old units was completed. MTPS started commercial production from November 1, 2013, by supplying 94 MW. This is first generation in 11 years since 2002. On 17 April 2018, Bihar state cabinet, headed by chief minister
278:
First started in 1985, Kanti Power Plant had an initial installed capacity of 110×2 MW. An additional capacity of 195×2 MW was erected in 2015–16. Kanti thermal Power Plant came into existence with the efforts of then MP of Muzaffarpur,
714: 1317: 411:
Bhel commissioned the first 195MW unit at Muzaffarpur Thermal Power Station in India on 5 May 2015. The commissioning is the first of the two units at 390MW Muzaffarpur Thermal Power Station (TPS).
683: 1412: 1312: 1637: 258:
The second unit of the 2×195 MW was commissioned on 13 June 2016. Muzaffarpur Thermal Power Station has an installed capacity of 610 MW. Another 500 MW extension has been planned.
724: 624: 1514: 1407: 1307: 1663: 937: 1106: 1601: 1596: 851: 997: 870: 578: 812: 774: 663: 534: 919: 837: 1658: 1632: 1159: 255:
said that another new 500 MW power plant will be set up at Kanti. The first 195 MW unit was commissioned by BHEL at the 2×195 MW plant in March 2015.
1056: 792: 1027: 693: 1591: 494: 140: 899: 971: 745: 302:
In May 2023, NTPC Kanti secured the first position in Bihar and tenth position in India among power generation corporations, in terms of better
1673: 1570: 1560: 1507: 1204: 509: 307: 1611: 1120: 83: 1322: 267: 1332: 1481: 296: 292: 1337: 603: 642: 553: 1550: 1500: 514: 364:
in April 2008 and was running at full capacity since November 2013 till 2022. Being old unit the same was decided to scrap down.
1327: 1575: 1272: 1219: 1152: 1397: 1342: 1253: 1238: 1668: 1545: 504: 144: 1392: 1627: 1005: 1417: 1199: 1081: 1145: 406: 1402: 1248: 1214: 778: 1555: 923: 259: 1282: 295:. On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to 361: 303: 198: 1437: 1527: 878: 263: 123: 753: 538: 432:
Original planned capacity was 250 MW but reduced to 195 MW. Total installed capacity becomes 610 MW.
1287: 1243: 1442: 1277: 1035: 942: 904: 797: 719: 688: 668: 237: 205: 67: 958:"NTPC signs MoU with Government of Bihar; aims to improve performance of Power Sector in Bihar" 405:
The original planned capacity of the unit was 250 MW but was reduced to 195 MW Scheduled after
957: 1492: 280: 17: 1523: 1452: 1209: 1652: 1447: 1371: 486: 1606: 499: 472: 288: 252: 136: 1367: 1357: 1347: 1299: 1264: 1194: 241: 1462: 1457: 462: 98: 85: 1361: 480: 1107:"Bhel commissions 195MW unit at Muzaffarpur Thermal Power Station in India" 1085: 217: 36: 328: 1384: 1351: 1137: 1531: 1230: 1169: 291:, gave its nod to handing over of Kanti Thermal Power Station to 245: 71: 838:"NTPC to take over Kanti, Nabinagar JV plants for Rs3,000 crore" 167: 1496: 1141: 604:"Trial Run Successful at renovated Kanti Thermal Power Station" 360:
This unit went down in 2003 and then its renovation started by
1318:
Muzaffarpur–Gorakhpur line (via Hajipur, Raxaul and Sitamarhi)
938:"Bihar transfers 3 power plants to NTPC on lease for 30 years" 643:"BHEL gains 2.5%, commissions 195 MW thermal unit in Bihar" 1638:
Indian states ranking by households having electricity
684:"Barh, Karanpura projects leave questions unanswered" 625:"BHEL commissions 195-MW thermal power unit in Bihar" 579:"Kanit, Barauni power plants to be ready by December" 664:"Railways assures NTPC of uninterrupted coal supply" 1620: 1584: 1538: 1430: 1381: 1296: 1262: 1228: 1185: 1176: 1121:"BHEL commissions 195 MW unit at Muzaffarpur plant" 1057:"Kanti's 110MW second unit starts power generation" 813:"Key Contests: George Fernandes vs Bhagwan L Sahni" 793:"Kanti's 110MW second unit starts power generation" 204: 173: 163: 158: 150: 132: 122: 114: 77: 63: 55: 51:
Muzaffarpur Thermal Power Station, MTPS/KBUNL/GFTPS
47: 29: 262:will provide uninterrupted supply of coal to the 1602:North Bihar Power Distribution Company Limited 1597:South Bihar Power Distribution Company Limited 852:"NTPC to take over Kanti, Nabinagar JV plants" 1508: 1153: 8: 1408:Barauni–Gorakhpur, Raxaul and Jainagar lines 1308:Barauni–Gorakhpur, Raxaul and Jainagar lines 234:George Fernandes Thermal Power Plant Station 1633:States of India by installed power capacity 1413:Barauni–Samastipur–Muzaffarpur–Hajipur line 1313:Barauni–Samastipur–Muzaffarpur–Hajipur line 900:"Patna to hand over 3 power plants to NTPC" 1515: 1501: 1493: 1182: 1160: 1146: 1138: 535:"Nitish vocal tonic to counter BJP claims" 317: 26: 1592:Bihar State Power Holding Company Limited 972:"500MW power plant at Kanti soon: Nitish" 495:Bihar State Power Holding Company Limited 310:. Its plant load factor stood at 87.58%. 409:raised concern over its chimney height. 378:March 1986, recommissioned November 2014 354:March 1985, recommissioned November 2013 30:Kanti Thermal Power Station (NTPC Kanti) 1664:Energy infrastructure completed in 1985 526: 154:Kanti Bijlee Utpadan Nigam Ltd. (KBUNL) 746:"The Telegraph Calcutta : Nation" 1571:Nabinagar Super Thermal Power Project 1561:Kahalgaon Super Thermal Power Station 510:Kahalgaon Super Thermal Power Station 308:Central Electricity Authority (India) 7: 1612:Bhartiya Rail Bijlee Company Limited 715:"George hopes for a smooth comeback" 752:. India. 2004-04-26. Archived from 266:. The electrification work between 1659:Coal-fired power stations in Bihar 552:Pranava K Chaudhary (2014-01-30). 297:National Thermal Power Corporation 293:National Thermal Power Corporation 25: 723:. TNN. 2004-04-25. Archived from 251:In November 2013, Chief Minister 1551:Barh Super Thermal Power Station 1477: 1476: 577:Mishra, Satyavrat (2013-03-31). 515:Barh Super Thermal Power Station 479: 465: 159:Thermal power station 35: 1576:Nabinagar Thermal Power Project 1323:Muzaffarpur–Gorakhpur main line 998:"Power trickle boost to energy" 871:"Power trickle boost to energy" 1333:Samastipur–Muzaffarpur section 1123:. Moneycontrol.com. 2016-06-14 1: 1546:Barauni Thermal Power Station 1338:Muzaffarpur–Sitamarhi section 920:"State happy with power deal" 505:Barauni Thermal Power Station 1674:1985 establishments in Bihar 1205:Howrah–Allahabad–Mumbai line 1028:"Baby steps to power target" 554:"Bihar to get 5k MW by 2015" 306:in the rankings released by 268:Kaparpura and Kanti stations 1628:Electricity sector in India 1566:Kanti Thermal Power Station 1328:Muzaffarpur–Hajipur section 18:Kanti thermal power station 1690: 1398:Barauni–Samastipur section 1343:Barauni–Samastipur section 407:Airport Authority of India 1556:Buxar Thermal Power Plant 1482:Railway stations in Bihar 1472: 1374:line (under construction) 1364:line (under construction) 1354:line (under construction) 1254:Bakhtiyarpur–Tilaiya line 1239:Patna–Mughalsarai section 214: 182: 178: 43: 34: 1026:Anand Raj (2014-11-09). 996:Anand Raj (2013-11-05). 869:Anand Raj (1999-03-01). 362:Bharat Heavy Electricals 195:Make and model 1393:Barauni–Katihar section 1034:. India. Archived from 1004:. India. Archived from 877:. India. Archived from 299:for a 33- years lease. 206:Nameplate capacity 1418:Mokama–Barauni section 1273:Howrah–Gaya–Delhi line 1220:Howrah–Gaya–Delhi line 1200:Howrah–Delhi main line 819:. India. 23 April 2004 187:Units operational 1403:Barauni–Guwahati line 1249:Asansol–Patna section 1215:Barauni–Guwahati line 334:Date of commissioning 264:thermal power station 174:Power generation 1669:Muzaffarpur district 1283:Asansol–Gaya section 1038:on November 29, 2014 775:"Leading by example" 631:. India. 4 May 2015. 327:Installed capacity ( 260:East Central Railway 124:Commission date 1443:Munger Ganga Bridge 1438:Digha–Sonpur Bridge 1008:on November 5, 2013 881:on November 5, 2013 270:will be completed. 95: /  1061:The Times of India 976:The Times of India 943:The Times of India 905:The Times of India 856:The Economic Times 798:The Times of India 720:The Times of India 689:The Times of India 669:The Times of India 558:The Times of India 541:on March 28, 2015. 1646: 1645: 1490: 1489: 1426: 1425: 817:Business Standard 645:. StocksMarket.in 629:Business Standard 583:Business Standard 456: 455: 381:Under dismantling 357:Under dismantling 304:plant load factor 227: 226: 164:Primary fuel 16:(Redirected from 1681: 1517: 1510: 1503: 1494: 1480: 1479: 1186:National network 1183: 1162: 1155: 1148: 1139: 1132: 1131: 1129: 1128: 1117: 1111: 1110: 1103: 1097: 1096: 1094: 1093: 1084:. Archived from 1078: 1072: 1071: 1069: 1068: 1053: 1047: 1046: 1044: 1043: 1023: 1017: 1016: 1014: 1013: 993: 987: 986: 984: 983: 968: 962: 961: 954: 948: 947: 934: 928: 927: 926:on May 18, 2018. 922:. Archived from 916: 910: 909: 896: 890: 889: 887: 886: 866: 860: 859: 848: 842: 841: 840:. 11 March 2018. 834: 828: 827: 825: 824: 809: 803: 802: 789: 783: 782: 781:on May 10, 2014. 777:. Archived from 771: 765: 764: 762: 761: 756:on June 24, 2004 742: 736: 735: 733: 732: 711: 705: 704: 702: 701: 692:. Archived from 680: 674: 673: 660: 654: 653: 651: 650: 639: 633: 632: 621: 615: 614: 612: 610: 600: 594: 593: 591: 590: 574: 568: 567: 565: 564: 549: 543: 542: 537:. Archived from 531: 489: 484: 483: 475: 470: 469: 468: 318: 281:George Fernandes 218:edit on Wikidata 110: 109: 107: 106: 105: 100: 96: 93: 92: 91: 88: 39: 27: 21: 1689: 1688: 1684: 1683: 1682: 1680: 1679: 1678: 1649: 1648: 1647: 1642: 1616: 1580: 1534: 1521: 1491: 1486: 1468: 1422: 1383: 1377: 1298: 1292: 1288:Patna–Gaya line 1258: 1244:Patna–Gaya line 1224: 1187: 1178: 1172: 1166: 1136: 1135: 1126: 1124: 1119: 1118: 1114: 1105: 1104: 1100: 1091: 1089: 1080: 1079: 1075: 1066: 1064: 1055: 1054: 1050: 1041: 1039: 1025: 1024: 1020: 1011: 1009: 995: 994: 990: 981: 979: 970: 969: 965: 956: 955: 951: 936: 935: 931: 918: 917: 913: 898: 897: 893: 884: 882: 868: 867: 863: 850: 849: 845: 836: 835: 831: 822: 820: 811: 810: 806: 791: 790: 786: 773: 772: 768: 759: 757: 744: 743: 739: 730: 728: 713: 712: 708: 699: 697: 682: 681: 677: 662: 661: 657: 648: 646: 641: 640: 636: 623: 622: 618: 608: 606: 602: 601: 597: 588: 586: 576: 575: 571: 562: 560: 551: 550: 546: 533: 532: 528: 523: 485: 478: 471: 466: 464: 461: 316: 276: 222: 221: 190:2 X 195 MW 103: 101: 99:26.07°N 85.24°E 97: 94: 89: 86: 84: 82: 81: 23: 22: 15: 12: 11: 5: 1687: 1685: 1677: 1676: 1671: 1666: 1661: 1651: 1650: 1644: 1643: 1641: 1640: 1635: 1630: 1624: 1622: 1621:Related topics 1618: 1617: 1615: 1614: 1609: 1604: 1599: 1594: 1588: 1586: 1582: 1581: 1579: 1578: 1573: 1568: 1563: 1558: 1553: 1548: 1542: 1540: 1539:Power stations 1536: 1535: 1524:Power stations 1522: 1520: 1519: 1512: 1505: 1497: 1488: 1487: 1485: 1484: 1473: 1470: 1469: 1467: 1466: 1460: 1455: 1453:Koilwar Bridge 1450: 1445: 1440: 1434: 1432: 1428: 1427: 1424: 1423: 1421: 1420: 1415: 1410: 1405: 1400: 1395: 1389: 1387: 1379: 1378: 1376: 1375: 1365: 1355: 1345: 1340: 1335: 1330: 1325: 1320: 1315: 1310: 1304: 1302: 1294: 1293: 1291: 1290: 1285: 1280: 1278:Gaya–Kiul line 1275: 1269: 1267: 1260: 1259: 1257: 1256: 1251: 1246: 1241: 1235: 1233: 1226: 1225: 1223: 1222: 1217: 1212: 1210:Sahibganj loop 1207: 1202: 1197: 1191: 1189: 1180: 1174: 1173: 1167: 1165: 1164: 1157: 1150: 1142: 1134: 1133: 1112: 1098: 1082:"New Projects" 1073: 1048: 1018: 988: 963: 949: 929: 911: 891: 861: 843: 829: 804: 784: 766: 737: 706: 675: 655: 634: 616: 595: 569: 544: 525: 524: 522: 519: 518: 517: 512: 507: 502: 497: 491: 490: 476: 460: 457: 454: 453: 451: 449: 447: 442: 440: 434: 433: 430: 427: 424: 421: 418: 414: 413: 403: 400: 397: 394: 391: 387: 386: 382: 379: 376: 373: 370: 366: 365: 358: 355: 352: 349: 346: 342: 341: 338: 335: 332: 325: 322: 315: 312: 275: 272: 236:is located in 232:also known as 225: 224: 223:7 MW ( approx) 215: 212: 211: 208: 202: 201: 196: 192: 191: 188: 184: 183: 180: 179: 176: 175: 171: 170: 165: 161: 160: 156: 155: 152: 148: 147: 134: 130: 129: 126: 120: 119: 116: 112: 111: 79: 75: 74: 65: 61: 60: 57: 53: 52: 49: 45: 44: 41: 40: 32: 31: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1686: 1675: 1672: 1670: 1667: 1665: 1662: 1660: 1657: 1656: 1654: 1639: 1636: 1634: 1631: 1629: 1626: 1625: 1623: 1619: 1613: 1610: 1608: 1605: 1603: 1600: 1598: 1595: 1593: 1590: 1589: 1587: 1585:Organizations 1583: 1577: 1574: 1572: 1569: 1567: 1564: 1562: 1559: 1557: 1554: 1552: 1549: 1547: 1544: 1543: 1541: 1537: 1533: 1529: 1528:organizations 1525: 1518: 1513: 1511: 1506: 1504: 1499: 1498: 1495: 1483: 1475: 1474: 1471: 1464: 1461: 1459: 1456: 1454: 1451: 1449: 1448:Rajendra Setu 1446: 1444: 1441: 1439: 1436: 1435: 1433: 1429: 1419: 1416: 1414: 1411: 1409: 1406: 1404: 1401: 1399: 1396: 1394: 1391: 1390: 1388: 1386: 1380: 1373: 1372:Janakpur Road 1369: 1366: 1363: 1359: 1356: 1353: 1349: 1346: 1344: 1341: 1339: 1336: 1334: 1331: 1329: 1326: 1324: 1321: 1319: 1316: 1314: 1311: 1309: 1306: 1305: 1303: 1301: 1295: 1289: 1286: 1284: 1281: 1279: 1276: 1274: 1271: 1270: 1268: 1266: 1263:Lines around 1261: 1255: 1252: 1250: 1247: 1245: 1242: 1240: 1237: 1236: 1234: 1232: 1229:Lines around 1227: 1221: 1218: 1216: 1213: 1211: 1208: 1206: 1203: 1201: 1198: 1196: 1193: 1192: 1190: 1188:/ trunk lines 1184: 1181: 1177:Network lines 1175: 1171: 1163: 1158: 1156: 1151: 1149: 1144: 1143: 1140: 1122: 1116: 1113: 1109:. 4 May 2015. 1108: 1102: 1099: 1088:on 2013-10-15 1087: 1083: 1077: 1074: 1062: 1058: 1052: 1049: 1037: 1033: 1032:The Telegraph 1029: 1022: 1019: 1007: 1003: 1002:The Telegraph 999: 992: 989: 977: 973: 967: 964: 959: 953: 950: 945: 944: 939: 933: 930: 925: 921: 915: 912: 907: 906: 901: 895: 892: 880: 876: 875:The Telegraph 872: 865: 862: 857: 853: 847: 844: 839: 833: 830: 818: 814: 808: 805: 800: 799: 794: 788: 785: 780: 776: 770: 767: 755: 751: 750:The Telegraph 747: 741: 738: 727:on 2013-10-21 726: 722: 721: 716: 710: 707: 696:on 2013-10-21 695: 691: 690: 685: 679: 676: 671: 670: 665: 659: 656: 644: 638: 635: 630: 626: 620: 617: 605: 599: 596: 584: 580: 573: 570: 559: 555: 548: 545: 540: 536: 530: 527: 520: 516: 513: 511: 508: 506: 503: 501: 498: 496: 493: 492: 488: 487:Energy portal 482: 477: 474: 463: 458: 452: 450: 448: 446: 443: 441: 439: 436: 435: 431: 428: 425: 422: 419: 416: 415: 412: 408: 404: 401: 398: 395: 392: 389: 388: 383: 380: 377: 374: 371: 368: 367: 363: 359: 356: 353: 350: 347: 344: 343: 339: 336: 333: 330: 326: 323: 320: 319: 313: 311: 309: 305: 300: 298: 294: 290: 284: 282: 273: 271: 269: 265: 261: 256: 254: 249: 247: 243: 239: 235: 231: 219: 213: 209: 207: 203: 200: 197: 194: 193: 189: 186: 185: 181: 177: 172: 169: 166: 162: 157: 153: 149: 146: 142: 138: 135: 131: 127: 125: 121: 117: 113: 108: 80: 76: 73: 69: 66: 62: 58: 54: 50: 48:Official name 46: 42: 38: 33: 28: 19: 1607:NTPC Limited 1565: 1431:Rail bridges 1382:Lines around 1297:Lines around 1168:Railways in 1125:. Retrieved 1115: 1101: 1090:. Retrieved 1086:the original 1076: 1065:. Retrieved 1063:. 2014-11-15 1060: 1051: 1040:. Retrieved 1036:the original 1031: 1021: 1010:. Retrieved 1006:the original 1001: 991: 980:. Retrieved 978:. 2013-11-18 975: 966: 952: 941: 932: 924:the original 914: 903: 894: 883:. Retrieved 879:the original 874: 864: 855: 846: 832: 821:. Retrieved 816: 807: 796: 787: 779:the original 769: 758:. Retrieved 754:the original 749: 740: 729:. Retrieved 725:the original 718: 709: 698:. Retrieved 694:the original 687: 678: 667: 658: 647:. Retrieved 637: 628: 619: 607:. Retrieved 598: 587:. Retrieved 582: 572: 561:. Retrieved 557: 547: 539:the original 529: 500:NTPC Limited 473:India portal 444: 437: 426:13 June 2016 410: 301: 289:Nitish Kumar 285: 277: 257: 253:Nitish Kumar 250: 233: 229: 228: 104:26.07; 85.24 1465:rail bridge 1368:Muzaffarpur 1358:Muzaffarpur 1348:Muzaffarpur 1300:Muzaffarpur 1195:Grand Chord 429:Operational 402:Operational 324:Unit number 242:Muzaffarpur 151:Operator(s) 118:Operational 102: / 78:Coordinates 1653:Categories 1458:Nehru Setu 1127:2016-08-07 1092:2014-08-21 1067:2016-08-07 1042:2016-08-07 1012:2016-08-07 982:2016-08-07 885:2013-11-05 823:2016-08-07 760:2013-11-05 731:2013-11-05 700:2013-11-05 649:2016-08-07 589:2013-11-05 563:2016-08-07 521:References 399:5 May 2015 230:NTPC Kanti 1362:Darbhanga 609:22 August 1179:Sections 459:See also 314:Capacity 133:Owner(s) 64:Location 1385:Barauni 1352:Chhapra 585:. India 417:Stage-2 390:Stage-2 369:Stage-1 345:Stage-1 274:History 90:85°14′E 87:26°04′N 56:Country 340:Notes 337:Status 210:390 MW 141:BSPHCL 115:Status 1532:Bihar 1231:Patna 1170:Bihar 438:Total 321:Stage 246:Bihar 238:Kanti 216:[ 72:Bihar 68:Kanti 59:India 1526:and 1463:Kosi 1265:Gaya 611:2013 199:BHEL 168:Coal 145:BSEB 139:and 137:NTPC 128:1985 1530:of 445:610 423:195 396:195 375:110 351:110 143:or 1655:: 1059:. 1030:. 1000:. 974:. 940:. 902:. 873:. 854:. 815:. 795:. 748:. 717:. 686:. 666:. 627:. 581:. 556:. 329:MW 244:, 240:, 70:, 1516:e 1509:t 1502:v 1370:– 1360:– 1350:– 1161:e 1154:t 1147:v 1130:. 1095:. 1070:. 1045:. 1015:. 985:. 960:. 946:. 908:. 888:. 858:. 826:. 801:. 763:. 734:. 703:. 672:. 652:. 613:. 592:. 566:. 420:4 393:3 372:2 348:1 331:) 220:] 20:)

Index

Kanti thermal power station

Kanti
Bihar
26°04′N 85°14′E / 26.07°N 85.24°E / 26.07; 85.24
Commission date
NTPC
BSPHCL
BSEB
Coal
BHEL
Nameplate capacity
edit on Wikidata
Kanti
Muzaffarpur
Bihar
Nitish Kumar
East Central Railway
thermal power station
Kaparpura and Kanti stations
George Fernandes
Nitish Kumar
National Thermal Power Corporation
National Thermal Power Corporation
plant load factor
Central Electricity Authority (India)
MW
Bharat Heavy Electricals
Airport Authority of India
India portal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑