322:, was issued the construction license for the project in 2008. At that time, construction costs were estimated at US$ 25 million. The 33kV transmission line that connects the power from the station to the Uganda national electricity grid was constructed and completed ahead of station commissioning. Some of the power is sold to
369:(ERA), in October 2014. SBI International AG was awarded the construction contract. The construction cost was reported at US$ 50 million, in 2018. Construction started in February 2018, with commissioning planned for the first half of 2021. In March 2019, the project received a total of US$ 27 million in funding from the
596:
623:
290:
Kikagati Power
Station is a mini-hydropower plant, with initial planned capacity installation of 10 MW (13,000 hp). The project involved the construction of a dam, creating a 4,000 square metres (0.99 acres) reservoir lake. The new reservoir lies partly within
416:(FMO) (b) Africa Renewable Energy Fund (c) Emerging Africa Infrastructure Fund (EAIF) and (d) Private Infrastructure Development Group (PIDG). All loans are to be repaid within 16 years, from date of commercial commissioning.
650:
988:
404:). The total construction cost was reported as US$ 87 million. A 33kV medium voltage evacuation line transmits the generated energy to a point where it enters the Ugandan electricity grid.
1124:
282:, the capital of Uganda and the largest city in that country. The geographical coordinates of the power station are 01°03'27.0"S, 30°39'33.0"E (Latitude:-1.057500; Longitude:30.659167).
357:, a proposed 39 MW (52,000 hp) minihydroplant, approximately 13 kilometres (8.1 mi), downstream of Kikagati, on which TronderEnergi has development rights as well.
392:
In
January 2022, Voith Hydro completed the installation of three turbines, each rated at 5.19 MW, for total generation capacity of 15.57 MW, to be sold directly to the
1240:
1215:
393:
85:
1230:
1015:
306:
In
September 2011, the planned capacity installation was increased to 16.5 MW. This power project received partial funding from the Uganda GetFit Program.
353:. In July 2013, TronderEnergi advertised for suitable firms to bid on the construction of Kikagati Power Station. Bids were also sought on the nearby
32:
1145:
1235:
1245:
1119:
834:
907:
960:
880:
295:. The new power station was built at the location of another smaller power station that was destroyed in 1979 during the war that removed
784:
930:
478:
366:
1225:
1008:
993:
354:
315:
753:
678:
263:
1220:
1001:
505:
811:
463:
788:
473:
350:
327:
1140:
550:
396:(UETCL), via a 33kV evacuation line. UETCL, in turn, sells half of the power station's energy to
218:
1083:
1031:
413:
378:
275:
73:
1189:
1184:
338:
120:
707:
730:
574:
385:-funded GET-FiT program. In August 2019, Afrik21 reported that the project had reached
334:
228:
1209:
1179:
543:
435:
205:
1194:
1163:
449:
259:
177:
538:
278:. Kikagati lies approximately 331 kilometres (206 mi), by road, southwest of
655:
628:
601:
457:
539:"Tanzania: Year Ender. 2023 - Milestone in Tanzania-Uganda Joint Power Project"
757:
683:
513:
425:
412:
Kikagati HPP received funding from a number of funding sources including: (a)
961:"Uganda: EAIF and PIDG invest $ 27 million in Kikagati hydroelectric project"
881:"Uganda: EAIF and PIDG invest $ 27 million in Kikagati hydroelectric project"
100:
87:
1098:
908:"Tanzania/Uganda: KPCL completes project financing for Kikagati Dam Project"
761:
443:
857:
1062:
1057:
1041:
323:
296:
292:
267:
69:
835:"Kikagati Hydropower Project In Uganda Receives US $ 27 Million Funding"
1073:
401:
279:
271:
246:, is a 15.57 MW (20,880 hp) hydroelectric power station, in
346:
342:
300:
247:
59:
931:"Uganda/Tanzania: Voith Hydro Commissions Kikagati Hydropower Plant"
812:"Contractors To Develop The Kikagati Hydro Power Project In Uganda"
210:
377:(PIDG). An equal amount of funding (50 percent) was provided by
997:
365:
Kikagati Power
Station was awarded a production license by the
382:
270:, approximately 75 kilometres (47 mi), by road, south of
858:"About Kikagati Hydroelectric Power Station: Project Details"
624:"Road Distance Between Kampala, Uganda And Kikagati, Uganda"
597:"Road Distance Between Mbarara, Uganda And Kikagati, Uganda"
337:
pulled out of the deal. Development rights were taken up by
47:
Map of Uganda showing the location of
Kikagati Power Station
39:
575:"GetFit Uganda: 2017 Annual Report, Kikagati Power Station"
506:"Government Calls for Timely Completion of Kikagati Dam"
1172:
1154:
1133:
1107:
1091:
1048:
227:
217:
204:
196:
188:
183:
173:
168:
158:
150:
142:
134:
126:
116:
79:
65:
55:
21:
708:"Tanzania And Uganda To Build Dam On Kagera River"
651:"Location of Kikagati Hydroelectric Power Station"
1125:Mirama–Kikagati–Nsongezi High Voltage Power Line
394:Uganda Electricity Transmission Company Limited
262:, along Uganda's International border with the
1009:
8:
731:"Uganda GET Fit Program: 2017 Annual Report"
414:Netherlands Development Finance Corporation
1016:
1002:
994:
18:
954:
952:
785:"Cross-Border Electrification Programme"
398:Tanzania Electric Supply Company Limited
375:Private Infrastructure Development Group
258:The power station is located across the
1241:Energy infrastructure completed in 2022
989:Museveni Commissions Kabalega Power Dam
929:Jean Marie Takouleu (18 January 2022).
516:Quoted by SBI International Holdings AG
489:
381:. The project also benefitted from the
1216:Hydroelectric power stations in Uganda
1120:Nshungyezi Hydroelectric Power Station
906:Jean Marie Takouleu (14 August 2019).
326:, under arrangements made through the
266:. This location lies near the town of
837:. Nairobi: Construction Review Online
679:"Tanzania, Uganda To Build Power Dam"
7:
1115:Kikagati Hydroelectric Power Station
959:Jean Marie Takouleu (7 March 2019).
879:Jean Marie Takouleu (7 March 2019).
856:FMO Netherlands (14 February 2018).
706:Infrastructure (21 September 2011).
499:
497:
495:
493:
240:Kikagati Hydroelectric Power Station
729:Uganda GET Fit (31 December 2017).
677:Fred Turyakira (3 September 2008).
371:Emerging Africa Infrastructure Fund
1231:Buildings and structures in Uganda
833:Patrick Mulyungi (20 March 2019).
573:GetFit Uganda (31 December 2017).
16:Dam in Kikagati, Isingiro District
14:
733:. Kampala: Uganda GET Fit Program
537:Meddy Mulisa (29 December 2023).
1082:
1025:
504:Odyek, John (19 February 2018).
456:
442:
428:
367:Electricity Regulatory Authority
38:
31:
754:"More Power Licenses Given Out"
752:Kasita, Ibrahim (15 May 2008).
1146:Isingiro–Ntantamuki–Rakai Road
223:15.57 MW (20,880 hp)
163:Kikagati Power Company Limited
1:
1246:2022 establishments in Uganda
355:Nshungyezi Hydropower Station
192:1,300 m (4,300 ft)
710:. Arusha.WantedInAfrica.com
333:Between 2008 and 2013, the
264:United Republic of Tanzania
1262:
814:. DevBusiness.com (DevBus)
274:, the largest city in the
1236:Tanzania–Uganda relations
1080:
1038:
554:. Dar es Salaam, Tanzania
26:
860:. The Hague, Netherlands
464:Renewable energy portal
219:Installed capacity
135:Construction began
1226:Western Region, Uganda
810:DevBus (4 July 2013).
789:East African Community
361:Construction timetable
351:Tronder Energy Limited
345:power company, with a
328:East African Community
244:Kikagati Power Station
242:, also referred to as
229:Annual generation
151:Construction cost
22:Kikagati Power Station
1141:Mbarara-Kikagati Road
551:Daily News (Tanzania)
479:Uganda Power Stations
189:Normal elevation
197:Commission date
101:1.05750°S 30.65917°E
97: /
310:Development rights
106:-1.05750; 30.65917
1221:Isingiro District
1203:
1202:
1032:Isingiro District
379:FMO (Netherlands)
237:
236:
169:Dam and spillways
143:Opening date
74:Isingiro District
1253:
1190:Gordon Wavamunno
1185:Bright Rwamirama
1086:
1030:
1029:
1028:
1018:
1011:
1004:
995:
977:
976:
974:
972:
956:
947:
946:
944:
942:
926:
920:
919:
917:
915:
903:
897:
896:
894:
892:
876:
870:
869:
867:
865:
853:
847:
846:
844:
842:
830:
824:
823:
821:
819:
807:
801:
800:
798:
796:
780:
774:
773:
771:
769:
760:. Archived from
749:
743:
742:
740:
738:
726:
720:
719:
717:
715:
703:
697:
696:
694:
692:
674:
668:
667:
665:
663:
647:
641:
640:
638:
636:
620:
614:
613:
611:
609:
593:
587:
586:
584:
582:
570:
564:
563:
561:
559:
547:
534:
528:
527:
525:
523:
510:
501:
466:
461:
460:
452:
447:
446:
438:
433:
432:
431:
320:China Shan Sheng
112:
111:
109:
108:
107:
102:
98:
95:
94:
93:
90:
42:
41:
35:
19:
1261:
1260:
1256:
1255:
1254:
1252:
1251:
1250:
1206:
1205:
1204:
1199:
1168:
1156:
1150:
1129:
1103:
1087:
1078:
1050:
1044:
1034:
1026:
1024:
1022:
985:
980:
970:
968:
967:. Paris, France
958:
957:
950:
940:
938:
937:. Paris, France
928:
927:
923:
913:
911:
910:. Paris, France
905:
904:
900:
890:
888:
887:. Paris, France
878:
877:
873:
863:
861:
855:
854:
850:
840:
838:
832:
831:
827:
817:
815:
809:
808:
804:
794:
792:
782:
781:
777:
767:
765:
764:on 14 July 2014
751:
750:
746:
736:
734:
728:
727:
723:
713:
711:
705:
704:
700:
690:
688:
676:
675:
671:
661:
659:
649:
648:
644:
634:
632:
622:
621:
617:
607:
605:
595:
594:
590:
580:
578:
577:. GetFit Uganda
572:
571:
567:
557:
555:
541:
536:
535:
531:
521:
519:
508:
503:
502:
491:
487:
470:
469:
462:
455:
448:
441:
434:
429:
427:
422:
410:
387:financial close
373:(EAIF) and the
363:
314:Initially, the
312:
288:
256:
105:
103:
99:
96:
91:
88:
86:
84:
83:
51:
50:
49:
48:
45:
44:
43:
17:
12:
11:
5:
1259:
1257:
1249:
1248:
1243:
1238:
1233:
1228:
1223:
1218:
1208:
1207:
1201:
1200:
1198:
1197:
1192:
1187:
1182:
1176:
1174:
1173:Notable people
1170:
1169:
1167:
1166:
1160:
1158:
1152:
1151:
1149:
1148:
1143:
1137:
1135:
1131:
1130:
1128:
1127:
1122:
1117:
1111:
1109:
1105:
1104:
1102:
1101:
1095:
1093:
1089:
1088:
1081:
1079:
1077:
1076:
1071:
1068:
1065:
1060:
1054:
1052:
1046:
1045:
1039:
1036:
1035:
1023:
1021:
1020:
1013:
1006:
998:
992:
991:
984:
983:External links
981:
979:
978:
965:Afrik21.africa
948:
935:Afrik21.africa
921:
898:
885:Afrik21.africa
871:
848:
825:
802:
775:
744:
721:
698:
669:
642:
615:
588:
565:
529:
488:
486:
483:
482:
481:
476:
474:Western Uganda
468:
467:
453:
439:
424:
423:
421:
418:
409:
406:
389:at that time.
362:
359:
311:
308:
299:from power in
287:
284:
255:
252:
235:
234:
231:
225:
224:
221:
215:
214:
208:
202:
201:
198:
194:
193:
190:
186:
185:
181:
180:
175:
171:
170:
166:
165:
160:
156:
155:
154:US$ 87 million
152:
148:
147:
144:
140:
139:
136:
132:
131:
128:
124:
123:
118:
114:
113:
81:
77:
76:
67:
63:
62:
57:
53:
52:
46:
37:
36:
30:
29:
28:
27:
24:
23:
15:
13:
10:
9:
6:
4:
3:
2:
1258:
1247:
1244:
1242:
1239:
1237:
1234:
1232:
1229:
1227:
1224:
1222:
1219:
1217:
1214:
1213:
1211:
1196:
1193:
1191:
1188:
1186:
1183:
1181:
1180:Benon Biraaro
1178:
1177:
1175:
1171:
1165:
1162:
1161:
1159:
1153:
1147:
1144:
1142:
1139:
1138:
1136:
1132:
1126:
1123:
1121:
1118:
1116:
1113:
1112:
1110:
1106:
1100:
1097:
1096:
1094:
1090:
1085:
1075:
1072:
1069:
1066:
1064:
1061:
1059:
1056:
1055:
1053:
1047:
1043:
1037:
1033:
1019:
1014:
1012:
1007:
1005:
1000:
999:
996:
990:
987:
986:
982:
966:
962:
955:
953:
949:
936:
932:
925:
922:
909:
902:
899:
886:
882:
875:
872:
859:
852:
849:
836:
829:
826:
813:
806:
803:
790:
786:
779:
776:
763:
759:
755:
748:
745:
732:
725:
722:
709:
702:
699:
686:
685:
680:
673:
670:
658:
657:
652:
646:
643:
631:
630:
625:
619:
616:
604:
603:
598:
592:
589:
576:
569:
566:
553:
552:
545:
544:AllAfrica.com
540:
533:
530:
517:
515:
507:
500:
498:
496:
494:
490:
484:
480:
477:
475:
472:
471:
465:
459:
454:
451:
445:
440:
437:
436:Uganda portal
426:
419:
417:
415:
407:
405:
403:
399:
395:
390:
388:
384:
380:
376:
372:
368:
360:
358:
356:
352:
348:
344:
340:
339:TrønderEnergi
336:
331:
329:
325:
321:
317:
309:
307:
304:
302:
298:
294:
285:
283:
281:
277:
273:
269:
265:
261:
253:
251:
249:
245:
241:
232:
230:
226:
222:
220:
216:
212:
209:
207:
203:
199:
195:
191:
187:
182:
179:
176:
172:
167:
164:
161:
157:
153:
149:
145:
141:
137:
133:
129:
125:
122:
119:
115:
110:
82:
78:
75:
71:
68:
64:
61:
58:
54:
34:
25:
20:
1195:Mull Katende
1164:Kagera River
1114:
969:. Retrieved
964:
939:. Retrieved
934:
924:
912:. Retrieved
901:
889:. Retrieved
884:
874:
862:. Retrieved
851:
839:. Retrieved
828:
816:. Retrieved
805:
793:. Retrieved
778:
766:. Retrieved
762:the original
747:
735:. Retrieved
724:
712:. Retrieved
701:
689:. Retrieved
682:
672:
660:. Retrieved
654:
645:
633:. Retrieved
627:
618:
606:. Retrieved
600:
591:
579:. Retrieved
568:
556:. Retrieved
549:
532:
520:. Retrieved
512:
450:Water portal
411:
397:
391:
386:
374:
370:
364:
332:
319:
313:
305:
289:
260:Kagera River
257:
243:
239:
238:
213:: 3 x 5.19MW
200:January 2022
178:Kagera River
162:
146:January 2022
656:Google Maps
629:Google Maps
602:Google Maps
558:31 December
349:subsidiary
130:Operational
104: /
80:Coordinates
1210:Categories
1070:Ntantamuki
941:18 January
758:New Vision
684:New Vision
514:New Vision
485:References
276:sub-region
92:30°39′33″E
89:01°03′27″S
1157:landmarks
1134:Transport
1099:DFCU Bank
1067:Nsungyezi
1049:Towns and
1040:Capital:
914:28 August
891:24 August
737:10 August
691:10 August
687:. Kampala
518:. Kampala
343:Norwegian
184:Reservoir
1063:Kikagati
1058:Isingiro
1051:villages
1042:Isingiro
420:See also
324:Tanzania
318:company
297:Idi Amin
293:Tanzania
286:Overview
268:Kikagati
254:Location
206:Turbines
174:Impounds
159:Owner(s)
70:Kikagati
66:Location
1155:Notable
1092:Economy
1074:Rugaaga
864:13 June
841:16 July
818:11 July
795:11 July
768:11 July
714:11 July
662:13 June
653:(Map).
635:13 June
626:(Map).
608:13 June
599:(Map).
581:8 March
408:Funding
402:TANESCO
347:Ugandan
335:Chinese
316:Chinese
280:Kampala
272:Mbarara
233:115 GWh
117:Purpose
56:Country
1108:Energy
971:14 May
522:24 May
301:Uganda
248:Uganda
127:Status
60:Uganda
791:(EAC)
783:EAC.
542:(via
509:(PDF)
211:Voith
121:Power
973:2022
943:2022
916:2021
893:2021
866:2021
843:2019
820:2014
797:2014
770:2014
739:2018
716:2014
693:2018
664:2021
637:2021
610:2021
583:2018
560:2023
524:2018
341:, a
138:2018
383:KfW
1212::
963:.
951:^
933:.
883:.
787:.
756:.
681:.
548:.
511:.
492:^
330:.
303:.
250:.
72:,
1017:e
1010:t
1003:v
975:.
945:.
918:.
895:.
868:.
845:.
822:.
799:.
772:.
741:.
718:.
695:.
666:.
639:.
612:.
585:.
562:.
546:)
526:.
400:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.