Kikagati Hydroelectric Power Station

Source đź“ť

33: 1084: 458: 430: 1027: 444: 40: 322:, was issued the construction license for the project in 2008. At that time, construction costs were estimated at US$ 25 million. The 33kV transmission line that connects the power from the station to the Uganda national electricity grid was constructed and completed ahead of station commissioning. Some of the power is sold to 369:(ERA), in October 2014. SBI International AG was awarded the construction contract. The construction cost was reported at US$ 50 million, in 2018. Construction started in February 2018, with commissioning planned for the first half of 2021. In March 2019, the project received a total of US$ 27 million in funding from the 596: 623: 290:
Kikagati Power Station is a mini-hydropower plant, with initial planned capacity installation of 10 MW (13,000 hp). The project involved the construction of a dam, creating a 4,000 square metres (0.99 acres) reservoir lake. The new reservoir lies partly within
416:(FMO) (b) Africa Renewable Energy Fund (c) Emerging Africa Infrastructure Fund (EAIF) and (d) Private Infrastructure Development Group (PIDG). All loans are to be repaid within 16 years, from date of commercial commissioning. 650: 988: 404:). The total construction cost was reported as US$ 87 million. A 33kV medium voltage evacuation line transmits the generated energy to a point where it enters the Ugandan electricity grid. 1124: 282:, the capital of Uganda and the largest city in that country. The geographical coordinates of the power station are 01°03'27.0"S, 30°39'33.0"E (Latitude:-1.057500; Longitude:30.659167). 357:, a proposed 39 MW (52,000 hp) minihydroplant, approximately 13 kilometres (8.1 mi), downstream of Kikagati, on which TronderEnergi has development rights as well. 392:
In January 2022, Voith Hydro completed the installation of three turbines, each rated at 5.19 MW, for total generation capacity of 15.57 MW, to be sold directly to the
1240: 1215: 393: 85: 1230: 1015: 306:
In September 2011, the planned capacity installation was increased to 16.5 MW. This power project received partial funding from the Uganda GetFit Program.
353:. In July 2013, TronderEnergi advertised for suitable firms to bid on the construction of Kikagati Power Station. Bids were also sought on the nearby 32: 1145: 1235: 1245: 1119: 834: 907: 960: 880: 295:. The new power station was built at the location of another smaller power station that was destroyed in 1979 during the war that removed 784: 930: 478: 366: 1225: 1008: 993: 354: 315: 753: 678: 263: 1220: 1001: 505: 811: 463: 788: 473: 350: 327: 1140: 550: 396:(UETCL), via a 33kV evacuation line. UETCL, in turn, sells half of the power station's energy to 218: 1083: 1031: 413: 378: 275: 73: 1189: 1184: 338: 120: 707: 730: 574: 385:-funded GET-FiT program. In August 2019, Afrik21 reported that the project had reached 334: 228: 1209: 1179: 543: 435: 205: 1194: 1163: 449: 259: 177: 538: 278:. Kikagati lies approximately 331 kilometres (206 mi), by road, southwest of 655: 628: 601: 457: 539:"Tanzania: Year Ender. 2023 - Milestone in Tanzania-Uganda Joint Power Project" 757: 683: 513: 425: 412:
Kikagati HPP received funding from a number of funding sources including: (a)
961:"Uganda: EAIF and PIDG invest $ 27 million in Kikagati hydroelectric project" 881:"Uganda: EAIF and PIDG invest $ 27 million in Kikagati hydroelectric project" 100: 87: 1098: 908:"Tanzania/Uganda: KPCL completes project financing for Kikagati Dam Project" 761: 443: 857: 1062: 1057: 1041: 323: 296: 292: 267: 69: 835:"Kikagati Hydropower Project In Uganda Receives US $ 27 Million Funding" 1073: 401: 279: 271: 246:, is a 15.57 MW (20,880 hp) hydroelectric power station, in 346: 342: 300: 247: 59: 931:"Uganda/Tanzania: Voith Hydro Commissions Kikagati Hydropower Plant" 812:"Contractors To Develop The Kikagati Hydro Power Project In Uganda" 210: 377:(PIDG). An equal amount of funding (50 percent) was provided by 997: 365:
Kikagati Power Station was awarded a production license by the
382: 270:, approximately 75 kilometres (47 mi), by road, south of 858:"About Kikagati Hydroelectric Power Station: Project Details" 624:"Road Distance Between Kampala, Uganda And Kikagati, Uganda" 597:"Road Distance Between Mbarara, Uganda And Kikagati, Uganda" 337:
pulled out of the deal. Development rights were taken up by
47:
Map of Uganda showing the location of Kikagati Power Station
39: 575:"GetFit Uganda: 2017 Annual Report, Kikagati Power Station" 506:"Government Calls for Timely Completion of Kikagati Dam" 1172: 1154: 1133: 1107: 1091: 1048: 227: 217: 204: 196: 188: 183: 173: 168: 158: 150: 142: 134: 126: 116: 79: 65: 55: 21: 708:"Tanzania And Uganda To Build Dam On Kagera River" 651:"Location of Kikagati Hydroelectric Power Station" 1125:Mirama–Kikagati–Nsongezi High Voltage Power Line 394:Uganda Electricity Transmission Company Limited 262:, along Uganda's International border with the 1009: 8: 731:"Uganda GET Fit Program: 2017 Annual Report" 414:Netherlands Development Finance Corporation 1016: 1002: 994: 18: 954: 952: 785:"Cross-Border Electrification Programme" 398:Tanzania Electric Supply Company Limited 375:Private Infrastructure Development Group 258:The power station is located across the 1241:Energy infrastructure completed in 2022 989:Museveni Commissions Kabalega Power Dam 929:Jean Marie Takouleu (18 January 2022). 516:Quoted by SBI International Holdings AG 489: 381:. The project also benefitted from the 1216:Hydroelectric power stations in Uganda 1120:Nshungyezi Hydroelectric Power Station 906:Jean Marie Takouleu (14 August 2019). 326:, under arrangements made through the 266:. This location lies near the town of 837:. Nairobi: Construction Review Online 679:"Tanzania, Uganda To Build Power Dam" 7: 1115:Kikagati Hydroelectric Power Station 959:Jean Marie Takouleu (7 March 2019). 879:Jean Marie Takouleu (7 March 2019). 856:FMO Netherlands (14 February 2018). 706:Infrastructure (21 September 2011). 499: 497: 495: 493: 240:Kikagati Hydroelectric Power Station 729:Uganda GET Fit (31 December 2017). 677:Fred Turyakira (3 September 2008). 371:Emerging Africa Infrastructure Fund 1231:Buildings and structures in Uganda 833:Patrick Mulyungi (20 March 2019). 573:GetFit Uganda (31 December 2017). 16:Dam in Kikagati, Isingiro District 14: 733:. Kampala: Uganda GET Fit Program 537:Meddy Mulisa (29 December 2023). 1082: 1025: 504:Odyek, John (19 February 2018). 456: 442: 428: 367:Electricity Regulatory Authority 38: 31: 754:"More Power Licenses Given Out" 752:Kasita, Ibrahim (15 May 2008). 1146:Isingiro–Ntantamuki–Rakai Road 223:15.57 MW (20,880 hp) 163:Kikagati Power Company Limited 1: 1246:2022 establishments in Uganda 355:Nshungyezi Hydropower Station 192:1,300 m (4,300 ft) 710:. Arusha.WantedInAfrica.com 333:Between 2008 and 2013, the 264:United Republic of Tanzania 1262: 814:. DevBusiness.com (DevBus) 274:, the largest city in the 1236:Tanzania–Uganda relations 1080: 1038: 554:. Dar es Salaam, Tanzania 26: 860:. The Hague, Netherlands 464:Renewable energy portal 219:Installed capacity 135:Construction began 1226:Western Region, Uganda 810:DevBus (4 July 2013). 789:East African Community 361:Construction timetable 351:Tronder Energy Limited 345:power company, with a 328:East African Community 244:Kikagati Power Station 242:, also referred to as 229:Annual generation 151:Construction cost 22:Kikagati Power Station 1141:Mbarara-Kikagati Road 551:Daily News (Tanzania) 479:Uganda Power Stations 189:Normal elevation 197:Commission date 101:1.05750°S 30.65917°E 97: /  310:Development rights 106:-1.05750; 30.65917 1221:Isingiro District 1203: 1202: 1032:Isingiro District 379:FMO (Netherlands) 237: 236: 169:Dam and spillways 143:Opening date 74:Isingiro District 1253: 1190:Gordon Wavamunno 1185:Bright Rwamirama 1086: 1030: 1029: 1028: 1018: 1011: 1004: 995: 977: 976: 974: 972: 956: 947: 946: 944: 942: 926: 920: 919: 917: 915: 903: 897: 896: 894: 892: 876: 870: 869: 867: 865: 853: 847: 846: 844: 842: 830: 824: 823: 821: 819: 807: 801: 800: 798: 796: 780: 774: 773: 771: 769: 760:. Archived from 749: 743: 742: 740: 738: 726: 720: 719: 717: 715: 703: 697: 696: 694: 692: 674: 668: 667: 665: 663: 647: 641: 640: 638: 636: 620: 614: 613: 611: 609: 593: 587: 586: 584: 582: 570: 564: 563: 561: 559: 547: 534: 528: 527: 525: 523: 510: 501: 466: 461: 460: 452: 447: 446: 438: 433: 432: 431: 320:China Shan Sheng 112: 111: 109: 108: 107: 102: 98: 95: 94: 93: 90: 42: 41: 35: 19: 1261: 1260: 1256: 1255: 1254: 1252: 1251: 1250: 1206: 1205: 1204: 1199: 1168: 1156: 1150: 1129: 1103: 1087: 1078: 1050: 1044: 1034: 1026: 1024: 1022: 985: 980: 970: 968: 967:. Paris, France 958: 957: 950: 940: 938: 937:. Paris, France 928: 927: 923: 913: 911: 910:. Paris, France 905: 904: 900: 890: 888: 887:. Paris, France 878: 877: 873: 863: 861: 855: 854: 850: 840: 838: 832: 831: 827: 817: 815: 809: 808: 804: 794: 792: 782: 781: 777: 767: 765: 764:on 14 July 2014 751: 750: 746: 736: 734: 728: 727: 723: 713: 711: 705: 704: 700: 690: 688: 676: 675: 671: 661: 659: 649: 648: 644: 634: 632: 622: 621: 617: 607: 605: 595: 594: 590: 580: 578: 577:. GetFit Uganda 572: 571: 567: 557: 555: 541: 536: 535: 531: 521: 519: 508: 503: 502: 491: 487: 470: 469: 462: 455: 448: 441: 434: 429: 427: 422: 410: 387:financial close 373:(EAIF) and the 363: 314:Initially, the 312: 288: 256: 105: 103: 99: 96: 91: 88: 86: 84: 83: 51: 50: 49: 48: 45: 44: 43: 17: 12: 11: 5: 1259: 1257: 1249: 1248: 1243: 1238: 1233: 1228: 1223: 1218: 1208: 1207: 1201: 1200: 1198: 1197: 1192: 1187: 1182: 1176: 1174: 1173:Notable people 1170: 1169: 1167: 1166: 1160: 1158: 1152: 1151: 1149: 1148: 1143: 1137: 1135: 1131: 1130: 1128: 1127: 1122: 1117: 1111: 1109: 1105: 1104: 1102: 1101: 1095: 1093: 1089: 1088: 1081: 1079: 1077: 1076: 1071: 1068: 1065: 1060: 1054: 1052: 1046: 1045: 1039: 1036: 1035: 1023: 1021: 1020: 1013: 1006: 998: 992: 991: 984: 983:External links 981: 979: 978: 965:Afrik21.africa 948: 935:Afrik21.africa 921: 898: 885:Afrik21.africa 871: 848: 825: 802: 775: 744: 721: 698: 669: 642: 615: 588: 565: 529: 488: 486: 483: 482: 481: 476: 474:Western Uganda 468: 467: 453: 439: 424: 423: 421: 418: 409: 406: 389:at that time. 362: 359: 311: 308: 299:from power in 287: 284: 255: 252: 235: 234: 231: 225: 224: 221: 215: 214: 208: 202: 201: 198: 194: 193: 190: 186: 185: 181: 180: 175: 171: 170: 166: 165: 160: 156: 155: 154:US$ 87 million 152: 148: 147: 144: 140: 139: 136: 132: 131: 128: 124: 123: 118: 114: 113: 81: 77: 76: 67: 63: 62: 57: 53: 52: 46: 37: 36: 30: 29: 28: 27: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 1258: 1247: 1244: 1242: 1239: 1237: 1234: 1232: 1229: 1227: 1224: 1222: 1219: 1217: 1214: 1213: 1211: 1196: 1193: 1191: 1188: 1186: 1183: 1181: 1180:Benon Biraaro 1178: 1177: 1175: 1171: 1165: 1162: 1161: 1159: 1153: 1147: 1144: 1142: 1139: 1138: 1136: 1132: 1126: 1123: 1121: 1118: 1116: 1113: 1112: 1110: 1106: 1100: 1097: 1096: 1094: 1090: 1085: 1075: 1072: 1069: 1066: 1064: 1061: 1059: 1056: 1055: 1053: 1047: 1043: 1037: 1033: 1019: 1014: 1012: 1007: 1005: 1000: 999: 996: 990: 987: 986: 982: 966: 962: 955: 953: 949: 936: 932: 925: 922: 909: 902: 899: 886: 882: 875: 872: 859: 852: 849: 836: 829: 826: 813: 806: 803: 790: 786: 779: 776: 763: 759: 755: 748: 745: 732: 725: 722: 709: 702: 699: 686: 685: 680: 673: 670: 658: 657: 652: 646: 643: 631: 630: 625: 619: 616: 604: 603: 598: 592: 589: 576: 569: 566: 553: 552: 545: 544:AllAfrica.com 540: 533: 530: 517: 515: 507: 500: 498: 496: 494: 490: 484: 480: 477: 475: 472: 471: 465: 459: 454: 451: 445: 440: 437: 436:Uganda portal 426: 419: 417: 415: 407: 405: 403: 399: 395: 390: 388: 384: 380: 376: 372: 368: 360: 358: 356: 352: 348: 344: 340: 339:TrønderEnergi 336: 331: 329: 325: 321: 317: 309: 307: 304: 302: 298: 294: 285: 283: 281: 277: 273: 269: 265: 261: 253: 251: 249: 245: 241: 232: 230: 226: 222: 220: 216: 212: 209: 207: 203: 199: 195: 191: 187: 182: 179: 176: 172: 167: 164: 161: 157: 153: 149: 145: 141: 137: 133: 129: 125: 122: 119: 115: 110: 82: 78: 75: 71: 68: 64: 61: 58: 54: 34: 25: 20: 1195:Mull Katende 1164:Kagera River 1114: 969:. Retrieved 964: 939:. Retrieved 934: 924: 912:. Retrieved 901: 889:. Retrieved 884: 874: 862:. Retrieved 851: 839:. Retrieved 828: 816:. Retrieved 805: 793:. Retrieved 778: 766:. Retrieved 762:the original 747: 735:. Retrieved 724: 712:. Retrieved 701: 689:. Retrieved 682: 672: 660:. Retrieved 654: 645: 633:. Retrieved 627: 618: 606:. Retrieved 600: 591: 579:. Retrieved 568: 556:. Retrieved 549: 532: 520:. Retrieved 512: 450:Water portal 411: 397: 391: 386: 374: 370: 364: 332: 319: 313: 305: 289: 260:Kagera River 257: 243: 239: 238: 213:: 3 x 5.19MW 200:January 2022 178:Kagera River 162: 146:January 2022 656:Google Maps 629:Google Maps 602:Google Maps 558:31 December 349:subsidiary 130:Operational 104: / 80:Coordinates 1210:Categories 1070:Ntantamuki 941:18 January 758:New Vision 684:New Vision 514:New Vision 485:References 276:sub-region 92:30°39′33″E 89:01°03′27″S 1157:landmarks 1134:Transport 1099:DFCU Bank 1067:Nsungyezi 1049:Towns and 1040:Capital: 914:28 August 891:24 August 737:10 August 691:10 August 687:. Kampala 518:. Kampala 343:Norwegian 184:Reservoir 1063:Kikagati 1058:Isingiro 1051:villages 1042:Isingiro 420:See also 324:Tanzania 318:company 297:Idi Amin 293:Tanzania 286:Overview 268:Kikagati 254:Location 206:Turbines 174:Impounds 159:Owner(s) 70:Kikagati 66:Location 1155:Notable 1092:Economy 1074:Rugaaga 864:13 June 841:16 July 818:11 July 795:11 July 768:11 July 714:11 July 662:13 June 653:(Map). 635:13 June 626:(Map). 608:13 June 599:(Map). 581:8 March 408:Funding 402:TANESCO 347:Ugandan 335:Chinese 316:Chinese 280:Kampala 272:Mbarara 233:115 GWh 117:Purpose 56:Country 1108:Energy 971:14 May 522:24 May 301:Uganda 248:Uganda 127:Status 60:Uganda 791:(EAC) 783:EAC. 542:(via 509:(PDF) 211:Voith 121:Power 973:2022 943:2022 916:2021 893:2021 866:2021 843:2019 820:2014 797:2014 770:2014 739:2018 716:2014 693:2018 664:2021 637:2021 610:2021 583:2018 560:2023 524:2018 341:, a 138:2018 383:KfW 1212:: 963:. 951:^ 933:. 883:. 787:. 756:. 681:. 548:. 511:. 492:^ 330:. 303:. 250:. 72:, 1017:e 1010:t 1003:v 975:. 945:. 918:. 895:. 868:. 845:. 822:. 799:. 772:. 741:. 718:. 695:. 666:. 639:. 612:. 585:. 562:. 546:) 526:. 400:(

Index

Kikagati Hydroelectric Power Station is located in Uganda
Uganda
Kikagati
Isingiro District
01°03′27″S 30°39′33″E / 1.05750°S 30.65917°E / -1.05750; 30.65917
Power
Kagera River
Turbines
Voith
Installed capacity
Annual generation
Uganda
Kagera River
United Republic of Tanzania
Kikagati
Mbarara
sub-region
Kampala
Tanzania
Idi Amin
Uganda
Chinese
Tanzania
East African Community
Chinese
TrønderEnergi
Norwegian
Ugandan
Tronder Energy Limited
Nshungyezi Hydropower Station

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑