656:(equivalent to US$ 100 million) per year. Originally, the project was expected to be fully operational by the end of 2014. From the project perspective, the withdrawal of the World Bank could be seen in a positive light as it allowed LTWP to move forward to financial close. A source at power transmission firm Ketraco indicated that the agency was happy with the World Bank’s decision to quit. "We are happy that the World Bank has withdrawn. They were putting a lot of hurdles in our way but now we can go ahead." 2326: 925: 31: 723:, signed a contract with LTWP, to optimise power generation at the power station. The software company will analyse data from each of the 365 turbines at the power station. Fluctuations in wind speed at each turbine will be detected and mapped. Causes of underperformance at each turbine will be identified and solutions suggested. The overall objective is to improve the efficiency of the power plant and improve power output and grid stability. 897: 911: 712:
total installed capacity of 2300 MW, largely being generated by hydro (46.3%) and thermal (37.4%). The Government targets to increase generating capacity to 6762 MW in 2017. Kenya also plans to change the energy generation mix, with a view of reducing dependency on hydro and thermal. LTWP will play a key role in balancing the energy generation mix.
665:
Kenyan taxpayer KSh17 billion (US$ 150 million) annually. It is anticipated that the project will contribute KSh3 billion (US$ 35 million) annually in tax revenue and KSh58.6 billion (US$ 673 million) over a period 20 years. During construction, approximately 2,500 workers will be hired. Once commissioned, the power station will employ 200 full-time staff.
242:, Kenya's capital city. The wind farm covers 160 square kilometres (40,000 acres) and has a capacity of 310 MW, enough to supply one million homes. It comprises 365 wind turbines, each with a capacity of 850 kilowatts. The associated overhead electric grid distribution system and a high voltage substation that connect it to the national grid. 348:
completed in June 2017. In March 2016, the first shipment of 30 wind turbines arrived in the country, in anticipation of the first 50 MW coming online in September 2016. At 9 March 2017, Lake Turkana Wind Power Station was ready to produce 33% of the targeted of 310 MW. At that time, all 365 wind turbines had been erected.
848:
The transmission line was completed and connected to the national grid on 24 September 2018. The delays attracted total penalties of KSh14.5 billion (€127 million at that time). In a deal struck in 2017, Kenya committed to pay KSh5.7 billion (€46 million at the time) of the total penalty in lump sum,
839:
reported that the owners of this power station had, in January 2017, started to bill the Kenya Power Company a monthly "capacity charge" of KSh700 million (approx. US$ 7 million), for power produced by the power station that cannot be evacuated due to lack of a high voltage line to transmit it to the
682:
obliges the utility to buy all electricity produced by the wind farm, even if it is not needed, or if more economic electricity sources are available; "The power produced will be bought at a fixed price by Kenya Power (KPLC) over a 20-year period in accordance with the signed Power Purchase Agreement
803:
LTWP documents detail plans for the construction of a new "camp" for 2,500 construction site workers. LTWP states that these workers will be employed local workers, trained for the job. However, this part of Northern Kenya lacks enough people to provide the labour so LTWP will need to employ most of
739:
Local Turkana communities filed a lawsuit against LTWP in October 2014 at Meru High Court, Kenya to nullify the titles obtained by the company and return the land to its original status as community land. In November 2016 Justice Peter Njoroge of the Meru High Court rejected the application filed by
711:
connected to the grid, but this capacity is supplied across thousands of projects. While LTWP aims to provide 310 MW of reliable, low cost wind power to the Kenya national grid, equivalent to approximately 18% of Kenya’ current installed electricity generating capacity. As of 2018, Kenya had a
691:
has provided a 'partial risk guarantee' up to the value of €20 million. The Kenyan Government is also liable for losses incurred by delay due to political causes or project failure, as happened with the power line. These costs, as well as the expenses for the transmission line, are therefore likely
673:
The project is of significant strategic benefit to Kenya, and at KSh70 billion (€625 million) will be the largest single private investment in Kenya’s history. With a power tariff of 7.52 Euro cents per kWh (KSH11/kWh), LTWP is one of the lowest power tariffs in Kenya along with geothermal power at
884:
On 19 February 2024 Vestas Wind Systems announced it had completed the sale of its 12.5 percent share in Lake Turkana Wind Power Limited (LTWP). The shares have been acquired by the Climate Finance Partnership (CFP), which is managed by BlackRock, after CFP in March 2023 announced its intention to
826:
However, the project's positive social impacts have outweighed the negative ones and the project continues to share project benefits with the local communities through its Winds of Change Foundation. Some locals were informed about the project in 2007, while others expressed a lack of information.
664:
LTWP will be the largest single private investment in Kenya at the time it is made. LTWP claims the wind farm will reduce and possibly eliminate Kenya's dependency on diesel and heavy fuel power stations, however, this claim is unsubstantiated. Fuel imports to power thermal power stations cost the
347:
on 10 April 2008. Land permits IR Number 6395/1 (L.R. 28031) and IR Number 6396/1 (L.R. 28031/2) were signed with the Kenyan government in March 2009, which caused problems when local communities only came to know the plans in April 2014. Construction began in October 2014 and was expected to be
844:
agreed to pay the developers of Lake Turkana Wind Power station, a total of KSh5.7 billion (approx. US$ 55.83 million), in monthly installments, spread over a six-year period. The monthly payment will amount to KSh78,600,000 (approx. US$ 769,833). The monthly surcharge will be passed on to the
396:
to the project site, a distance of approximately 195 kilometres (121 mi), is slated to be upgraded. Construction began in 2015 and full operation is expected to commence in 2018. As of April 2015, construction had begun. The first 90 MW was expected online in October 2016 with full
655:
withdrew its support for the project. Bank officials were reported to have concerns that the electricity produced would outweigh demand. The World Bank Group’s country director in Kenya, Johannes Zutt, stated that Kenya could be left with excess power on the grid worth up to KSh8.5 billion
1133: 1621: 807:
According to the ESIA, there are a number of potential negative local impacts due to the arrival of the 2,500 workers and the construction work in general. These include: cultural contamination, increased risk of disease, community conflicts, challenges of labour force management,
285:, where the county headquarters are located. The geographical coordinates of the wind farm are: 02°30'44.0"N, 36°49'00.0"E (Latitude:2.512222; Longitude:36.816667). The wind is strongest in the morning and in October, and weakest in the afternoon and in February, contrasting with 383:
The power generated from the wind turbines will be transmitted via 33 kV overhead electric wires to a substation which will be located on the premises. From the substation, power will be transmitted via a 400 kV high voltage electric power lines to a substation in
743:
In 2015 the intertribal Sarima Indigenous Peoples’ Land Forum (SIPLF) was created as an attempt to bring indigenous communities together in order to stop the wind power project. The forum is named after the village of Sarima that was displaced by the project. In their
1644: 1188: 334:
energy, telecommunications, solid waste management, and road construction) and KP&P (a company that develops and operates wind energy projects). In 2005, discussions with the Kenyan government began regarding the development of a wind power project near to
779:
The SIPLF stated they were not against wind farm development, if they own and lead the business: "We are determined to make this happen on the basis of our communities' ownership and leadership. We won't allow the theft of our land under any circumstance".
301:
owned by local authorities, used by indigenous pastoralists. This means that all the land is held by the relevant local authority, ostensibly in trust for the local inhabitants. The tribes that communally use land in this area include
591:
In 2010, the Spanish government offered to finance the construction of a 427 km double circuit transmission line southwards from the site to Suswa, approximately 100 km west of Nairobi. The US$ 150 million offer comprises:
692:
to be passed on to Kenyan taxpayers and electricity consumers on top of the electricity produced. Before the power station opened, some feared that this could result in higher prices for electricity users than previous rates.
706:
It is generally accepted in wind technology research that intermittent resources can destabilise a small grid such as that in Kenya, especially if it is concentrated all in one location. Denmark has over 19% wind power
600:
of €55 million (US$ 74 million) at an interest of 0.10 percent, with a repayment period of 30 years, including a 14-year grace period. The loan will be supported by a 'Financial Co-operation Agreement' between Kenya’s
686:
Furthermore, the Kenyan Government has signed guarantees with LTWP to cover costs in case Kenya Power cannot afford to pay for excess electricity for the duration of the PPA. In order to mitigate this risk the
359:
that transmits the generated power for integration into the national grid. At that time, the power station was averaging generation of 199 megawatts (64 percent of its installed capacity of 310.25 megawatts).
1210: 459:
turbine supplier, which owns 12.5 percent of the holding company, said in Danish media that delays in completing the high voltage transmission line led to the cancellation of the transfer contract in 2019.
674:
KSh9. Other prices are KSh3 for hydro power and KSh18 for oil. It is estimated that Kenya will save up to US$ 120 million a year in fuel cost by reducing reliance on diesel power plants. LTWP’s contract
2103: 2297: 3151: 873:. At that time, other equity partners included (1) Vestas Wind Systems of Denmark (2) Anergi Turkana Investments of Turkey, which in 2021, acquired the shareholding previously owned by 639:(Ketraco), a Government-owned entity created in 2008, will also partly fund the transmission line and the substation by means of a tolling arrangement with Kenya Power. Spanish company 621: 776:, Northern Kenya, reject the illegal privatization of 610 square kilometres (150,000 acres) of our ancestral land by the European consortium 'Lake Turkana Wind Power Limited'". 1751: 1454: 1264: 849:
while the balance of KSh9.25 billion (€81 million under prevailing rates) was to be paid over a period of six years through a tariff increase to the electricity consumers.
994: 1512: 3505: 249:
70 billion wind farm is the single largest private investment in Kenya’s history and the biggest farm in Africa. The power produced is bought at a fixed price by
1396: 2486: 606: 2732: 827:
1180 people of the Sarima village were relocated and compensated with KSh13,000 (approximately €113), while Samburu people expressed appreciation of the project.
586: 3156: 388:, approximately 520 kilometres (320 mi), south of Loyangalani, where it will be integrated into the national power grid. The electricity will be bought by 81: 2038: 2620:
United Nations Framework Conventions on Climate Change (UNFCCC)- Clean Development Mechanism (CDM) Project 4513 : Lake Turkana 310 MW Wind Power Project
1894: 1832: 1038: 2515: 1780: 2570: 2244: 2095: 356: 1696: 1569: 2218: 3495: 878: 430: 1425: 196: 547: 514: 1480: 3073: 2654: 636: 257:
with the latter. The project was completed in January 2017, however the line evacuating the power generated was not completed until July 2019.
3381: 1290: 3500: 3171: 816:, increased demand for wood resources in an area with an already "acute shortage", sanitation and waste disposal problems, and a decreased 2457: 2271: 3136: 800:(ESIA) which would have serious implications for the social, cultural, economic and political well-being of the communities affected. 2544: 2962: 2067: 1014: 703:
The LTWP project is of such a large scale that it will provide up to 20% of the Kenyan power grid’s capacity to absorb wind energy.
2006: 3490: 3321: 3116: 2203: 964: 679: 389: 344: 250: 3296: 3216: 979: 954: 793: 3306: 286: 3407: 2717: 2118: 1952: 3454: 3450: 563: 534: 524: 494: 2737: 1544: 3485: 3361: 3336: 3186: 3161: 3126: 3111: 3211: 1325:"Lake Turkana Wind Power Project, Kenya: Environmental and Social Impact Assessment Study Report, 2009 Updated in 2011" 3446: 3346: 3311: 3286: 3266: 3231: 3176: 3121: 3096: 2752: 944: 720: 602: 340: 3326: 3146: 2877: 1725: 3386: 3271: 3256: 3241: 3196: 3131: 2196: 736:
LTWP commenced its community engagement activities in 2005, nine years before construction started in October 2014.
339:
and as a result, extensive wind assessments were conducted. Later in 2007 environmental fieldwork was undertaken. A
3356: 3351: 3291: 3261: 3246: 3206: 3101: 3082: 3066: 2647: 529: 3181: 2988: 3437: 3433: 3424: 3415: 3316: 3301: 3281: 3276: 3236: 3226: 3221: 3201: 3191: 3166: 2614: 2427: 3035: 3031: 1975: 3480: 3411: 3331: 3251: 3106: 2435: 2248: 1868: 789: 688: 675: 509: 489: 469: 368:
The wind farm site, covers approximately 160 square kilometres (40,000 acres). The farm has 365 turbines (type
278: 3341: 3141: 2404: 455:
In February 2020, it became public that Google Inc. would not become an investor in the project. Vestas, the
3027: 2792: 2011: 1067: 902: 450:; which is to pay US$ 40 million for a 12.5 percent shareholding in the power project, once up and running). 2907: 2727: 1238: 2902: 2892: 2777: 2697: 1090: 2842: 2145: 3059: 2797: 2762: 2640: 2520: 2491: 2043: 1756: 1401: 989: 949: 769: 708: 392:
at a fixed price for 20 years from the time of commissioning. As part of the development, the road from
121: 3018: 3005: 2996: 1594: 2992: 2967: 2887: 2852: 2837: 2822: 2712: 2331: 2922: 2604: 2598: 2168: 1923: 1009: 924: 841: 813: 809: 573: 372:
V52), each with capacity of 850 kW. The V52 had gone out of production, but was updated with
270: 2942: 2917: 2767: 2742: 2707: 2692: 1674: 984: 162: 845:
consumers, beginning in May 2018, when the high-voltage power line is expected to be completed.
30: 1670: 3014: 2927: 2897: 2882: 2867: 2857: 2847: 2812: 2807: 2757: 2702: 2677: 2619: 1802: 1106: 969: 862: 2937: 2932: 2872: 2827: 2787: 2682: 2663: 1430: 640: 2912: 2862: 2817: 2802: 2782: 2772: 2747: 2687: 2431: 1928: 1899: 1837: 1814: 1785: 1701: 1517: 1324: 1118: 1043: 959: 773: 753: 373: 355:, the president of Kenya, officially commissioned the 438 kilometres (272 mi), 400kV 307: 274: 246: 235: 65: 2624: 1622:"Distance between Lake Turkana Wind Farm, C77, Kenya and Ketraco Suswa Substation, Kenya" 1134:"Distance between Nairobi Central, Nairobi, Kenya and Lake Turkana Wind Farm, C77, Kenya" 1239:"Basic Principles of Least-Cost Planning & Regional Interconnection in EA Countries" 265:
The wind farm is located approximately 50 kilometres (31 mi), north of the town of
2832: 2722: 1979: 930: 761: 757: 749: 569: 352: 318:
and other indigenous and pastoralist communities in the South-East of Marsabit County.
315: 311: 303: 3474: 2222: 1872: 939: 473: 1165: 2462: 2302: 2173: 2072: 1485: 974: 916: 836: 539: 481: 336: 330:(a company involved in project development and management in the areas of tourism, 231: 281:. This location lies approximately 194 kilometres (121 mi), by road, west of 1864: 695:
For the fiscal year of 2019, Kenya Power paid KSh11 billion to LTWP for 1.1 TWh.
468:
The lead arranger for the US$ 853.12 million syndicated financing package is the
2122: 1215: 896: 765: 61: 2119:"Lake Turkana Wind Power Project Profile: Cached File Originally by Ltwp.co.ke" 1004: 892: 652: 298: 266: 3051: 2327:"Sh75 billion Lake Turkana Wind Power project case adjourned to January 2015" 96: 83: 1455:"Kenya's Lake Turkana wind power scheme readying for production by end June" 817: 223: 1865:"AfDB Convenes Lenders to Secure Kenya's Largest Private Sector Investment" 2245:"Lake Turkana Wind Power Project nominated Power Deal of the Year in 2014" 409:. The consortium which owns LTWP Limited includes the following entities: 205: 2272:"Kenya: Clir Renewables to optimise production at Lake Turkana wind farm" 1645:"Distance between Laisamis, Kenya and Lake Turkana Wind Farm, C77, Kenya" 1291:"Kenya: Minorities, Indigenous Peoples and Ethnic Diversity (April 2005)" 1189:"Distance between Marsabit, Kenya and Lake Turkana Wind Farm, C77, Kenya" 740:
Marsabit residents, requesting the court to stop the Wind Power project.
519: 393: 282: 2516:"Sh1.16bn payment to Turkana Wind Power averts sovereign default crisis" 2615:
Overseas Private Investment Corporation (OPIC): Lake Turkana Wind Power
1729: 1458: 874: 820: 504: 499: 484:
as co-arrangers. The following have provided financing to the project.
477: 456: 425: 377: 239: 2545:"Kenya: Finnfund sells its stake in the 310 MW Lake Turkana wind farm" 1781:"Google drops plan to buy stake in Kenya's Lake Turkana power project" 1373: 2381: 999: 447: 443: 376:
towers for transport on the 1,200 kilometres (746 mi) road from
369: 331: 2358: 1671:"Will Africa's Biggest Wind Power Project Transform Kenya's Growth?" 1513:"Danish Firm Says 365 Turkana Turbines Order Largest In Its History" 840:
substation at Suswa. Following negotiations, in September 2017, the
2632: 861:
reported that the shareholding in the project, previously owned by
617: 1350: 385: 380:
port, of which 200 kilometres (124 mi) are new gravel roads.
227: 69: 48: 405:
The company that owns and is developing the wind farm is called
3055: 2636: 2298:"Court declines to stop Sh75bn Lake Turkana wind power project" 559:
The following entities made outright donations to the project:
2571:"Vestas divests its shares in Lake Turkana Wind Power Limited" 2219:"Kenya Postpones Renewable Energy Drive to Reduce Power Costs" 1426:"Sh70 billion Lake Turkana wind power project almost complete" 238:, approximately 545 kilometres (339 mi) by road north of 1924:"Spain gives giant Turkana Wind Power Project $ 150m funding" 397:
commissioning of the full 300 MW planned for July 2017.
2039:"Kenya Power's deal that forced World Bank out of wind farm" 1265:"Kenya: Minorities, Indigenous Peoples and Ethnic Diversity" 2609: 2007:"Lake Turkana Wind Farm Project in Kenya Battles Headwinds" 1752:"Google eyes Sh4 Billion stake in Turkana wind power plant" 2169:"Taxpayer billions to bail out Spanish power line builder" 2096:"Kenya Power on the spot for ignoring cheaper electricity" 1953:"Isolux to build 400 Kilo-Volt Transmission Line in Kenya" 1039:"Lake Turkana Wind Power $ 52.5m fine pushed to consumers" 2357:
Sarima Indigenous Peoples’ Land Forum (7 February 2015).
1833:"$ 858 Million Gets Lake Turkana Wind Power Plant Moving" 1397:"Lake Turkana Wind Power receives first turbine shipment" 1481:"President Kenyatta set to open Lake Turkana Wind Power" 885:
acquire the shares held by Vestas Eastern Africa Ltd.
877:(3) Danish Climate Investment Fund (KIF), through the 643:
won a US$ 208.1 million tender for this construction.
2487:"Consumers to pay Sh5.7bn for wind power line delays" 2068:"Kenya to host sub-Saharan Africa's largest windfarm" 181: 2428:"The forgotten struggle of Kenyan indigenous people" 2380:
Lake Turkana Wind Power Station (27 February 2018).
2359:"Sarima Indigenous Peoples' Land Forum: Declaration" 253:(KPLC) over a 20-year period in accordance with the 3395: 3370: 3089: 2976: 2951: 2670: 1351:"Sarima Indigenous Peoples' Land Forum: Background" 192: 176: 171: 161: 140: 130: 120: 112: 75: 57: 41: 23: 2144:Project Finance International (31 December 2015). 1726:"Norfund: Investments - Lake Turkana Wind Project" 1166:"Lake Turkana Wind Power Station: Project Profile" 995:UN Declaration on the Rights of Indigenous Peoples 326:LTWP was created in 2006 out of the partnering of 796:impacts have also been highlighted in LTWP’s own 2037:Zeddy Sambu, and Muna Wahome (21 October 2012). 1976:"To Be Dropped, Knya: Lake Turkana Wind Project" 2117:Lake Turkana Wind Power Project (August 2014). 1545:"Lake Turkana Wind Power Project, Loyangalani" 1349:Sarima Indigenous Peoples’ Land Forum (2014). 1289:Minority Rights Organization (13 April 2005). 3067: 2648: 2352: 2350: 1211:"Location of Lake Turkana Wind Power Station" 8: 1895:"$ 250m for Lake Turkana Wind Power Project" 1374:"Major Milestones | Lake Turkana Wind Power" 1089:Nairobi Business Monthly (7 November 2018). 2382:"Winds of Change | Lake Turkana Wind Power" 2197:"Audited Accounts for Year Ended 30.6.2019" 804:these workers from outside the local area. 446:) - turbine supplier (to be transferred to 3074: 3060: 3052: 2655: 2641: 2633: 1858: 1856: 1779:Business Daily Africa (11 February 2020). 1506: 1504: 798:Environmental and Social Impact Assessment 357:Loiyangalani-Suswa High Voltage Power Line 20: 1697:"Works On 300 MW Turkana Wind Farm Start" 1263:Maurice Odhiambo Makoloo, and Yash Ghai. 1159: 1157: 1155: 1153: 1151: 651:LTWP suffered a setback in 2012 when the 587:Loyangalani–Suswa High Voltage Power Line 2610:Ministry of Energy and Petroleum (Kenya) 2291: 2289: 2217:David Malingha Doya (27 November 2013). 1664: 1662: 879:Investment Fund for Developing Countries 431:Investment Fund for Developing Countries 3506:Energy infrastructure completed in 2018 2458:"Kenya Power billed for idle wind farm" 2296:Manyara, Darlington (9 November 2016). 2270:Jean Marie Takouleu (22 January 2021). 1318: 1316: 1314: 1312: 1310: 1308: 1026: 863:Finnish Fund for Industrial Cooperation 719:, a Canadian software company based in 618:Spanish Export Credit Insurance Company 607:Ministry of Industry, Tourism and Trade 548:Overseas Private Investment Corporation 515:Netherlands Development Finance Company 197:Related media on Commons 2032: 2030: 2000: 1998: 1996: 1810: 1800: 1564: 1562: 1538: 1536: 1114: 1104: 1032: 1030: 637:Kenya Electricity Transmission Company 2543:Jean Marie Takouleu (20 March 2023). 2106:from the original on 1 November 2020. 1826: 1824: 1575:. IDA Global Development. 2 June 2016 1037:Muchira, Njiraini (27 October 2018). 669:Impacts on Kenyan State and consumers 7: 2485:Otuki, Neville (24 September 2017). 2066:Clar Ni Chonghaile (28 March 2012). 1453:Obulutsa, George (18 January 2017). 1066:Richard, Craig (26 September 2018). 2206:. 4 September 2020. pp. 52–54. 1831:Akumu, Washington (29 March 2014). 1091:"Can you really get cheaper power?" 570:EU Africa Infrastructure Trust Fund 1643:Globefeed.com (27 February 2018). 1620:Globefeed.com (27 February 2018). 1511:Gachiri, John (17 December 2014). 1187:Globefeed.com (27 February 2018). 1132:Globefeed.com (27 February 2018). 343:(MOU) was signed between LTWP and 14: 2456:Otuki, Neville (29 August 2017). 2167:Herbling, David (25 March 2017). 1893:Senelwa, Kennedy (14 June 2014). 1750:Okuttah, Mark (20 October 2015). 1479:Kennedy Kimanthi (19 July 2019). 1015:Savannah Tarka Wind Power Station 273:, in the extreme western part of 3382:Sahrawi Arab Democratic Republic 3152:Democratic Republic of the Congo 2963:Sahrawi Arab Democratic Republic 2733:Democratic Republic of the Congo 2599:Oh no! Not the World Bank again! 2426:Tarazona, David (13 June 2017). 2204:Kenya Power and Lighting Company 1955:. Nairobi: Constructionkenya.com 1570:"Lake Turkana Wind Power (LTWP)" 1424:Kanyi, Wambugu (23 March 2017). 1168:. Lake Turkana Wind Power (LTWP) 1005:Variability issues in wind power 965:Free, prior and informed consent 923: 909: 895: 784:Social and Environmental Impacts 746:Declaration of 7th February 2015 581:Transmission line and substation 167:310.25 MW (416,050 hp) 29: 3496:Energy infrastructure in Africa 2514:Constant Munda (24 June 2019). 2274:. Paris, France: Afrik21.Africa 2146:"Lake Turkana gets up to speed" 1922:Kisero, Jaindi (1 March 2010). 1724:Press Release (24 March 2014). 1669:Court, Alex (29 January 2015). 1395:Otuki, Neville (2 March 2016). 980:List of power stations in Kenya 955:Constitutional Reforms in Kenya 647:World Bank pulls out of project 407:Lake Turkana Wind Power Limited 216:Lake Turkana Wind Power Project 135:Lake Turkana Wind Power Limited 24:Lake Turkana Wind Power Project 2325:Abdi, Ali (25 November 2014). 2148:. Pfie.com (PFI Yearbook 2015) 1974:Karan Capoor (14 March 2012). 1863:Sponsor Wire (24 March 2014). 1695:Mbogo, Steve (18 April 2015). 1237:Hindpal S. Jabbal (May 2015). 287:Ngong Hills Wind Power Station 255:Power Purchase Agreement (PPA) 1: 2005:Stevis, Matina (6 May 2015). 1951:Mwende, Judy (13 June 2011). 1595:"The Windiest Place on Earth" 1068:"First power at Lake Turkana" 564:Government of the Netherlands 535:German Investment Corporation 525:East African Development Bank 495:Standard Bank of South Africa 422:Aldwych International Limited 3501:2018 establishments in Kenya 2405:"Indigenous Peoples or not?" 1244:. ESI-Africa. pp. 13–14 865:(Finnfund) had been sold to 3083:Renewable energy in Africa 945:Clean Development Mechanism 867:Climate Finance Partnership 721:Vancouver, British Columbia 341:Memorandum of Understanding 3522: 1093:. Nairobi Business Monthly 869:(CFP), that is managed by 709:(wind capacity of 4,885MW) 676:(Power Purchase Agreement) 584: 530:Trade and Development Bank 2403:DanWatch Denmark (2016). 2243:AfD) (19 December 2014). 1372:LTWPL (25 October 2014). 1323:EIB.org (November 2011). 881:(IFU) and (4) Sandpiper. 764:and other indigenous and 631:by the Kenyan Government. 202: 149: 145: 37: 28: 3137:Central African Republic 2718:Central African Republic 2249:African Development Bank 1869:African Development Bank 732:Indigenous rights issues 689:African Development Fund 510:European Investment Bank 490:African Development Bank 470:African Development Bank 3491:Power stations in Kenya 2625:Current wind conditions 2605:Lake Turkana Wind Power 2012:The Wall Street Journal 1599:Copenhagen Film Company 1164:LTWP (31 August 2014). 903:Renewable energy portal 271:Loyiangalani sub-county 163:Nameplate capacity 2601:As of 21 October 2012. 2575:News Powered by Cision 871:BlackRock Alternatives 748:the SIPLF stated the " 678:with government-owned 616:with support from the 401:Developers and funding 154:Units operational 3297:SĂŁo TomĂ© and PrĂ­ncipe 3157:Republic of the Congo 2878:SĂŁo TomĂ© and PrĂ­ncipe 2738:Republic of the Congo 2521:Business Daily Africa 2492:Business Daily Africa 2332:East African Standard 2044:Business Daily Africa 1757:Business Daily Africa 1547:. Powertechnology.com 1402:Business Daily Africa 990:Ngong Hills Wind Farm 950:Constitution of Kenya 770:Laisamis Constituency 439:Other Equity Partners 141:Power generation 1376:. Ltwp.co.ke (LTWPL) 1293:. Minorityrights.org 1270:. Minorityrights.org 1070:. Wind Power Monthly 835:In August 2017, the 810:occupational hazards 772:and Karare Ward, in 635:This means that the 629:sovereign guarantee' 328:Anset Africa Limited 122:Commission date 97:2.51222°N 36.81667°E 3486:Wind farms in Kenya 3372:States with limited 2953:States with limited 2102:. 21 October 2020. 1010:Wind power in Kenya 842:government of Kenya 814:antisocial behavior 603:Ministry of Finance 574:European Commission 230:. It is located in 172:External links 93: /  2577:. 19 February 2024 2125:on 31 October 2014 1978:. Washington, DC: 1813:has generic name ( 1675:Cable News Network 1543:Power Technology. 1117:has generic name ( 985:Kinangop Wind Park 614:commercial credit' 598:concessional loan' 464:Financial partners 419:KP&P BV Africa 297:The project is on 16:Wind farm in Kenya 3468: 3467: 3399:other territories 3172:Equatorial Guinea 3049: 3048: 2980:other territories 2753:Equatorial Guinea 2664:Energy in Africa 970:Indigenous rights 442:Wind Power A.S. ( 351:On 19 July 2019, 213: 212: 102:2.51222; 36.81667 3513: 3460: 3459:(United Kingdom) 3455:Tristan da Cunha 3451:Ascension Island 3443: 3430: 3421: 3397:Dependencies and 3090:Sovereign states 3076: 3069: 3062: 3053: 3041: 3040:(United Kingdom) 3036:Tristan da Cunha 3032:Ascension Island 3024: 3011: 3002: 2978:Dependencies and 2671:Sovereign states 2657: 2650: 2643: 2634: 2587: 2586: 2584: 2582: 2567: 2561: 2560: 2558: 2556: 2540: 2534: 2533: 2531: 2529: 2511: 2505: 2504: 2502: 2500: 2482: 2476: 2475: 2473: 2471: 2453: 2447: 2446: 2444: 2442: 2423: 2417: 2416: 2414: 2412: 2400: 2394: 2393: 2391: 2389: 2377: 2371: 2370: 2368: 2366: 2354: 2345: 2344: 2342: 2340: 2322: 2316: 2315: 2313: 2311: 2293: 2284: 2283: 2281: 2279: 2267: 2261: 2260: 2258: 2256: 2240: 2234: 2233: 2231: 2229: 2214: 2208: 2207: 2201: 2193: 2187: 2186: 2184: 2182: 2164: 2158: 2157: 2155: 2153: 2141: 2135: 2134: 2132: 2130: 2121:. Archived from 2114: 2108: 2107: 2092: 2086: 2085: 2083: 2081: 2063: 2057: 2056: 2054: 2052: 2034: 2025: 2024: 2022: 2020: 2002: 1991: 1990: 1988: 1986: 1971: 1965: 1964: 1962: 1960: 1948: 1942: 1941: 1939: 1937: 1919: 1913: 1912: 1910: 1908: 1890: 1884: 1883: 1881: 1879: 1860: 1851: 1850: 1848: 1846: 1828: 1819: 1818: 1812: 1808: 1806: 1798: 1796: 1794: 1776: 1770: 1769: 1767: 1765: 1747: 1741: 1740: 1738: 1736: 1721: 1715: 1714: 1712: 1710: 1692: 1686: 1685: 1683: 1681: 1666: 1657: 1656: 1654: 1652: 1640: 1634: 1633: 1631: 1629: 1617: 1611: 1610: 1608: 1606: 1591: 1585: 1584: 1582: 1580: 1574: 1566: 1557: 1556: 1554: 1552: 1540: 1531: 1530: 1528: 1526: 1508: 1499: 1498: 1496: 1494: 1476: 1470: 1469: 1467: 1465: 1450: 1444: 1443: 1441: 1439: 1431:The Star (Kenya) 1421: 1415: 1414: 1412: 1410: 1392: 1386: 1385: 1383: 1381: 1369: 1363: 1362: 1360: 1358: 1346: 1340: 1339: 1337: 1335: 1329: 1320: 1303: 1302: 1300: 1298: 1286: 1280: 1279: 1277: 1275: 1269: 1260: 1254: 1253: 1251: 1249: 1243: 1234: 1228: 1227: 1225: 1223: 1207: 1201: 1200: 1198: 1196: 1184: 1178: 1177: 1175: 1173: 1161: 1146: 1145: 1143: 1141: 1129: 1123: 1122: 1116: 1112: 1110: 1102: 1100: 1098: 1086: 1080: 1079: 1077: 1075: 1063: 1057: 1056: 1054: 1052: 1034: 933: 928: 927: 919: 914: 913: 912: 905: 900: 899: 715:In January 2021 660:Economic impacts 612:€55 million in ' 433:(IFU) of Denmark 279:Eastern Province 277:, in the former 206:edit on Wikidata 188: 185: 183: 108: 107: 105: 104: 103: 98: 94: 91: 90: 89: 86: 33: 21: 3521: 3520: 3516: 3515: 3514: 3512: 3511: 3510: 3481:Marsabit County 3471: 3470: 3469: 3464: 3463: 3458: 3441: 3428: 3419: 3400: 3398: 3391: 3375: 3373: 3366: 3085: 3080: 3050: 3045: 3044: 3039: 3022: 3009: 3000: 2981: 2979: 2972: 2956: 2954: 2947: 2666: 2661: 2630: 2595: 2590: 2580: 2578: 2569: 2568: 2564: 2554: 2552: 2551:. Paris, France 2542: 2541: 2537: 2527: 2525: 2513: 2512: 2508: 2498: 2496: 2484: 2483: 2479: 2469: 2467: 2455: 2454: 2450: 2440: 2438: 2425: 2424: 2420: 2410: 2408: 2402: 2401: 2397: 2387: 2385: 2379: 2378: 2374: 2364: 2362: 2356: 2355: 2348: 2338: 2336: 2324: 2323: 2319: 2309: 2307: 2295: 2294: 2287: 2277: 2275: 2269: 2268: 2264: 2254: 2252: 2242: 2241: 2237: 2227: 2225: 2216: 2215: 2211: 2199: 2195: 2194: 2190: 2180: 2178: 2166: 2165: 2161: 2151: 2149: 2143: 2142: 2138: 2128: 2126: 2116: 2115: 2111: 2094: 2093: 2089: 2079: 2077: 2065: 2064: 2060: 2050: 2048: 2036: 2035: 2028: 2018: 2016: 2015:. New York City 2004: 2003: 1994: 1984: 1982: 1973: 1972: 1968: 1958: 1956: 1950: 1949: 1945: 1935: 1933: 1929:The EastAfrican 1921: 1920: 1916: 1906: 1904: 1900:The EastAfrican 1892: 1891: 1887: 1877: 1875: 1862: 1861: 1854: 1844: 1842: 1838:The EastAfrican 1830: 1829: 1822: 1809: 1799: 1792: 1790: 1786:The EastAfrican 1778: 1777: 1773: 1763: 1761: 1749: 1748: 1744: 1734: 1732: 1723: 1722: 1718: 1708: 1706: 1702:The EastAfrican 1694: 1693: 1689: 1679: 1677: 1668: 1667: 1660: 1650: 1648: 1647:. Globefeed.com 1642: 1641: 1637: 1627: 1625: 1624:. Globefeed.com 1619: 1618: 1614: 1604: 1602: 1601:. 23 March 2017 1593: 1592: 1588: 1578: 1576: 1572: 1568: 1567: 1560: 1550: 1548: 1542: 1541: 1534: 1524: 1522: 1518:The EastAfrican 1510: 1509: 1502: 1492: 1490: 1478: 1477: 1473: 1463: 1461: 1452: 1451: 1447: 1437: 1435: 1423: 1422: 1418: 1408: 1406: 1394: 1393: 1389: 1379: 1377: 1371: 1370: 1366: 1356: 1354: 1348: 1347: 1343: 1333: 1331: 1327: 1322: 1321: 1306: 1296: 1294: 1288: 1287: 1283: 1273: 1271: 1267: 1262: 1261: 1257: 1247: 1245: 1241: 1236: 1235: 1231: 1221: 1219: 1209: 1208: 1204: 1194: 1192: 1191:. Globefeed.com 1186: 1185: 1181: 1171: 1169: 1163: 1162: 1149: 1139: 1137: 1136:. Globefeed.com 1131: 1130: 1126: 1113: 1103: 1096: 1094: 1088: 1087: 1083: 1073: 1071: 1065: 1064: 1060: 1050: 1048: 1044:The EastAfrican 1036: 1035: 1028: 1024: 1019: 960:Energy in Kenya 929: 922: 915: 910: 908: 901: 894: 891: 857:In March 2023, 855: 833: 831:Capacity charge 786: 774:Marsabit County 768:communities of 734: 729: 717:Clir Renewables 701: 671: 662: 649: 589: 583: 576:) – €25 million 552: 500:Nedbank Capital 478:Nedbank Capital 453: 413:Equity partners 403: 366: 324: 295: 275:Marsabit County 263: 236:Marsabit County 209: 180: 101: 99: 95: 92: 87: 84: 82: 80: 79: 66:Marsabit County 53: 17: 12: 11: 5: 3519: 3517: 3509: 3508: 3503: 3498: 3493: 3488: 3483: 3473: 3472: 3466: 3465: 3462: 3461: 3444: 3431: 3422: 3408:Canary Islands 3404: 3403: 3401: 3396: 3393: 3392: 3390: 3389: 3384: 3378: 3376: 3371: 3368: 3367: 3365: 3364: 3359: 3354: 3349: 3344: 3339: 3334: 3329: 3324: 3319: 3314: 3309: 3304: 3299: 3294: 3289: 3284: 3279: 3274: 3269: 3264: 3259: 3254: 3249: 3244: 3239: 3234: 3229: 3224: 3219: 3214: 3209: 3204: 3199: 3194: 3189: 3184: 3179: 3174: 3169: 3164: 3159: 3154: 3149: 3144: 3139: 3134: 3129: 3124: 3119: 3114: 3109: 3104: 3099: 3093: 3091: 3087: 3086: 3081: 3079: 3078: 3071: 3064: 3056: 3047: 3046: 3043: 3042: 3025: 3012: 3003: 2989:Canary Islands 2985: 2984: 2982: 2977: 2974: 2973: 2971: 2970: 2965: 2959: 2957: 2952: 2949: 2948: 2946: 2945: 2940: 2935: 2930: 2925: 2920: 2915: 2910: 2905: 2900: 2895: 2890: 2885: 2880: 2875: 2870: 2865: 2860: 2855: 2850: 2845: 2840: 2835: 2830: 2825: 2820: 2815: 2810: 2805: 2800: 2795: 2790: 2785: 2780: 2775: 2770: 2765: 2760: 2755: 2750: 2745: 2740: 2735: 2730: 2725: 2720: 2715: 2710: 2705: 2700: 2695: 2690: 2685: 2680: 2674: 2672: 2668: 2667: 2662: 2660: 2659: 2652: 2645: 2637: 2628: 2627: 2622: 2617: 2612: 2607: 2602: 2594: 2593:External links 2591: 2589: 2588: 2562: 2549:Afrik21.africa 2535: 2506: 2477: 2448: 2436:EIBinAfrica.eu 2418: 2395: 2372: 2346: 2317: 2285: 2262: 2235: 2223:Bloomberg News 2209: 2188: 2159: 2136: 2109: 2100:Business Daily 2087: 2058: 2026: 1992: 1980:The World Bank 1966: 1943: 1914: 1885: 1852: 1820: 1771: 1742: 1716: 1687: 1658: 1635: 1612: 1586: 1558: 1532: 1500: 1471: 1445: 1416: 1387: 1364: 1341: 1304: 1281: 1255: 1229: 1202: 1179: 1147: 1124: 1081: 1058: 1025: 1023: 1020: 1018: 1017: 1012: 1007: 1002: 997: 992: 987: 982: 977: 972: 967: 962: 957: 952: 947: 942: 936: 935: 934: 931:Weather portal 920: 906: 890: 887: 854: 851: 832: 829: 812:, increase in 785: 782: 733: 730: 728: 725: 700: 699:Grid stability 697: 670: 667: 661: 658: 648: 645: 633: 632: 625: 610: 585:Main article: 582: 579: 578: 577: 567: 557: 556: 551: 550: 545: 542: 537: 532: 527: 522: 517: 512: 507: 502: 497: 492: 486: 466: 465: 452: 451: 440: 437: 434: 428: 423: 420: 416: 415: 414: 402: 399: 365: 362: 353:Uhuru Kenyatta 323: 320: 294: 291: 262: 259: 211: 210: 203: 200: 199: 194: 190: 189: 178: 174: 173: 169: 168: 165: 159: 158: 155: 151: 150: 147: 146: 143: 142: 138: 137: 132: 128: 127: 124: 118: 117: 114: 110: 109: 77: 73: 72: 59: 55: 54: 52: 51: 45: 43: 39: 38: 35: 34: 26: 25: 15: 13: 10: 9: 6: 4: 3: 2: 3518: 3507: 3504: 3502: 3499: 3497: 3494: 3492: 3489: 3487: 3484: 3482: 3479: 3478: 3476: 3456: 3452: 3448: 3445: 3439: 3435: 3432: 3426: 3423: 3417: 3413: 3409: 3406: 3405: 3402: 3394: 3388: 3385: 3383: 3380: 3379: 3377: 3369: 3363: 3360: 3358: 3355: 3353: 3350: 3348: 3345: 3343: 3340: 3338: 3335: 3333: 3330: 3328: 3325: 3323: 3320: 3318: 3315: 3313: 3310: 3308: 3305: 3303: 3300: 3298: 3295: 3293: 3290: 3288: 3285: 3283: 3280: 3278: 3275: 3273: 3270: 3268: 3265: 3263: 3260: 3258: 3255: 3253: 3250: 3248: 3245: 3243: 3240: 3238: 3235: 3233: 3230: 3228: 3225: 3223: 3220: 3218: 3215: 3213: 3212:Guinea-Bissau 3210: 3208: 3205: 3203: 3200: 3198: 3195: 3193: 3190: 3188: 3185: 3183: 3180: 3178: 3175: 3173: 3170: 3168: 3165: 3163: 3160: 3158: 3155: 3153: 3150: 3148: 3145: 3143: 3140: 3138: 3135: 3133: 3130: 3128: 3125: 3123: 3120: 3118: 3115: 3113: 3110: 3108: 3105: 3103: 3100: 3098: 3095: 3094: 3092: 3088: 3084: 3077: 3072: 3070: 3065: 3063: 3058: 3057: 3054: 3037: 3033: 3029: 3026: 3020: 3016: 3013: 3007: 3004: 2998: 2994: 2990: 2987: 2986: 2983: 2975: 2969: 2966: 2964: 2961: 2960: 2958: 2950: 2944: 2941: 2939: 2936: 2934: 2931: 2929: 2926: 2924: 2921: 2919: 2916: 2914: 2911: 2909: 2906: 2904: 2901: 2899: 2896: 2894: 2891: 2889: 2886: 2884: 2881: 2879: 2876: 2874: 2871: 2869: 2866: 2864: 2861: 2859: 2856: 2854: 2851: 2849: 2846: 2844: 2841: 2839: 2836: 2834: 2831: 2829: 2826: 2824: 2821: 2819: 2816: 2814: 2811: 2809: 2806: 2804: 2801: 2799: 2796: 2794: 2793:Guinea-Bissau 2791: 2789: 2786: 2784: 2781: 2779: 2776: 2774: 2771: 2769: 2766: 2764: 2761: 2759: 2756: 2754: 2751: 2749: 2746: 2744: 2741: 2739: 2736: 2734: 2731: 2729: 2726: 2724: 2721: 2719: 2716: 2714: 2711: 2709: 2706: 2704: 2701: 2699: 2696: 2694: 2691: 2689: 2686: 2684: 2681: 2679: 2676: 2675: 2673: 2669: 2665: 2658: 2653: 2651: 2646: 2644: 2639: 2638: 2635: 2631: 2626: 2623: 2621: 2618: 2616: 2613: 2611: 2608: 2606: 2603: 2600: 2597: 2596: 2592: 2576: 2572: 2566: 2563: 2550: 2546: 2539: 2536: 2523: 2522: 2517: 2510: 2507: 2494: 2493: 2488: 2481: 2478: 2465: 2464: 2459: 2452: 2449: 2437: 2433: 2429: 2422: 2419: 2407:. Danwatch.dk 2406: 2399: 2396: 2383: 2376: 2373: 2360: 2353: 2351: 2347: 2334: 2333: 2328: 2321: 2318: 2305: 2304: 2299: 2292: 2290: 2286: 2273: 2266: 2263: 2250: 2246: 2239: 2236: 2224: 2220: 2213: 2210: 2205: 2198: 2192: 2189: 2176: 2175: 2170: 2163: 2160: 2147: 2140: 2137: 2124: 2120: 2113: 2110: 2105: 2101: 2097: 2091: 2088: 2075: 2074: 2069: 2062: 2059: 2046: 2045: 2040: 2033: 2031: 2027: 2014: 2013: 2008: 2001: 1999: 1997: 1993: 1981: 1977: 1970: 1967: 1954: 1947: 1944: 1931: 1930: 1925: 1918: 1915: 1902: 1901: 1896: 1889: 1886: 1874: 1873:AllAfrica.com 1870: 1866: 1859: 1857: 1853: 1840: 1839: 1834: 1827: 1825: 1821: 1816: 1811:|author= 1804: 1788: 1787: 1782: 1775: 1772: 1759: 1758: 1753: 1746: 1743: 1731: 1727: 1720: 1717: 1704: 1703: 1698: 1691: 1688: 1676: 1672: 1665: 1663: 1659: 1646: 1639: 1636: 1623: 1616: 1613: 1600: 1596: 1590: 1587: 1571: 1565: 1563: 1559: 1546: 1539: 1537: 1533: 1520: 1519: 1514: 1507: 1505: 1501: 1488: 1487: 1482: 1475: 1472: 1460: 1456: 1449: 1446: 1433: 1432: 1427: 1420: 1417: 1404: 1403: 1398: 1391: 1388: 1375: 1368: 1365: 1352: 1345: 1342: 1326: 1319: 1317: 1315: 1313: 1311: 1309: 1305: 1292: 1285: 1282: 1266: 1259: 1256: 1240: 1233: 1230: 1218: 1217: 1212: 1206: 1203: 1190: 1183: 1180: 1167: 1160: 1158: 1156: 1154: 1152: 1148: 1135: 1128: 1125: 1120: 1115:|author= 1108: 1092: 1085: 1082: 1069: 1062: 1059: 1046: 1045: 1040: 1033: 1031: 1027: 1021: 1016: 1013: 1011: 1008: 1006: 1003: 1001: 998: 996: 993: 991: 988: 986: 983: 981: 978: 976: 973: 971: 968: 966: 963: 961: 958: 956: 953: 951: 948: 946: 943: 941: 940:Additionality 938: 937: 932: 926: 921: 918: 907: 904: 898: 893: 888: 886: 882: 880: 876: 872: 868: 864: 860: 859:Afrk21.africa 852: 850: 846: 843: 838: 830: 828: 824: 822: 819: 815: 811: 805: 801: 799: 795: 794:environmental 791: 783: 781: 777: 775: 771: 767: 763: 759: 755: 751: 747: 741: 737: 731: 727:Controversies 726: 724: 722: 718: 713: 710: 704: 698: 696: 693: 690: 684: 681: 677: 668: 666: 659: 657: 654: 646: 644: 642: 641:Isolux Corsán 638: 630: 626: 623: 619: 615: 611: 608: 604: 599: 595: 594: 593: 588: 580: 575: 572:(part of the 571: 568: 566:– €10 million 565: 562: 561: 560: 554: 553: 549: 546: 543: 541: 538: 536: 533: 531: 528: 526: 523: 521: 518: 516: 513: 511: 508: 506: 503: 501: 498: 496: 493: 491: 488: 487: 485: 483: 479: 475: 474:Standard Bank 471: 463: 462: 461: 458: 449: 445: 441: 438: 435: 432: 429: 427: 424: 421: 418: 417: 412: 411: 410: 408: 400: 398: 395: 391: 387: 381: 379: 375: 371: 364:Specification 363: 361: 358: 354: 349: 346: 342: 338: 333: 329: 321: 319: 317: 313: 309: 305: 300: 292: 290: 288: 284: 280: 276: 272: 268: 260: 258: 256: 252: 248: 243: 241: 237: 234:District, in 233: 229: 225: 221: 217: 207: 201: 198: 195: 191: 187: 179: 175: 170: 166: 164: 160: 156: 153: 152: 148: 144: 139: 136: 133: 129: 125: 123: 119: 115: 111: 106: 78: 74: 71: 67: 63: 60: 56: 50: 47: 46: 44: 40: 36: 32: 27: 22: 19: 3447:Saint Helena 3418:   3322:South Africa 3312:Sierra Leone 3117:Burkina Faso 3028:Saint Helena 2999:   2903:South Africa 2893:Sierra Leone 2698:Burkina Faso 2629: 2579:. Retrieved 2574: 2565: 2553:. Retrieved 2548: 2538: 2526:. Retrieved 2519: 2509: 2499:25 September 2497:. Retrieved 2490: 2480: 2468:. Retrieved 2463:Daily Nation 2461: 2451: 2439:. Retrieved 2421: 2409:. Retrieved 2398: 2386:. Retrieved 2384:. Ltwp.co.ke 2375: 2363:. Retrieved 2337:. Retrieved 2330: 2320: 2308:. Retrieved 2303:Daily Nation 2301: 2276:. Retrieved 2265: 2253:. Retrieved 2238: 2226:. Retrieved 2212: 2191: 2179:. Retrieved 2174:Daily Nation 2172: 2162: 2150:. Retrieved 2139: 2127:. Retrieved 2123:the original 2112: 2099: 2090: 2078:. Retrieved 2073:The Guardian 2071: 2061: 2049:. Retrieved 2042: 2017:. Retrieved 2010: 1983:. Retrieved 1969: 1957:. Retrieved 1946: 1934:. Retrieved 1927: 1917: 1905:. Retrieved 1898: 1888: 1876:. Retrieved 1843:. Retrieved 1836: 1791:. Retrieved 1784: 1774: 1762:. Retrieved 1755: 1745: 1733:. Retrieved 1719: 1707:. Retrieved 1700: 1690: 1678:. Retrieved 1649:. Retrieved 1638: 1626:. Retrieved 1615: 1603:. Retrieved 1598: 1589: 1577:. Retrieved 1549:. Retrieved 1523:. Retrieved 1516: 1491:. Retrieved 1486:Daily Nation 1484: 1474: 1462:. Retrieved 1448: 1436:. Retrieved 1429: 1419: 1407:. Retrieved 1400: 1390: 1378:. Retrieved 1367: 1355:. Retrieved 1344: 1332:. Retrieved 1295:. Retrieved 1284: 1272:. Retrieved 1258: 1246:. Retrieved 1232: 1220:. Retrieved 1214: 1205: 1193:. Retrieved 1182: 1170:. Retrieved 1138:. Retrieved 1127: 1095:. Retrieved 1084: 1072:. Retrieved 1061: 1049:. Retrieved 1042: 975:Lake Turkana 917:Kenya portal 883: 870: 866: 858: 856: 853:Developments 847: 837:Daily Nation 834: 825: 806: 802: 797: 787: 778: 745: 742: 738: 735: 716: 714: 705: 702: 694: 685: 672: 663: 650: 634: 628: 613: 605:and Spain’s 597: 590: 558: 540:Triodos Bank 482:South Africa 467: 454: 406: 404: 382: 367: 350: 337:Lake Turkana 327: 325: 296: 264: 254: 244: 232:Loiyangalani 219: 215: 214: 134: 126:October 2018 18: 3374:recognition 3327:South Sudan 3217:Ivory Coast 2955:recognition 2908:South Sudan 2798:Ivory Coast 2581:19 February 2441:27 February 2411:27 February 2388:27 February 2365:27 February 2361:. Siplf.org 2339:27 February 2310:27 February 2255:27 February 2247:. Abidjan: 2228:27 February 2181:27 February 2152:27 February 2129:27 February 2080:27 February 2051:27 February 2019:27 February 1985:27 February 1959:27 February 1936:27 February 1907:18 February 1878:18 February 1845:18 February 1793:16 February 1735:18 February 1680:18 February 1651:27 February 1628:27 February 1605:18 December 1579:27 February 1551:27 February 1525:18 February 1464:27 February 1438:27 February 1380:27 February 1357:27 February 1353:. Siplf.org 1334:27 February 1297:27 February 1274:27 February 1248:27 February 1222:27 February 1216:Google Maps 1195:27 February 1172:18 February 1140:27 February 1097:12 February 1074:12 February 766:pastoralist 680:Kenya Power 390:Kenya Power 345:Kenya Power 293:Land rights 251:Kenya Power 116:Operational 100: / 76:Coordinates 62:Loyangalani 3475:Categories 3429:(Portugal) 3387:Somaliland 3307:Seychelles 3272:Mozambique 3257:Mauritania 3242:Madagascar 3197:The Gambia 3132:Cape Verde 3010:(Portugal) 2968:Somaliland 2888:Seychelles 2853:Mozambique 2838:Mauritania 2823:Madagascar 2778:The Gambia 2713:Cape Verde 2432:Luxembourg 2278:23 January 1764:20 October 1051:28 October 1022:References 653:World Bank 299:trust land 267:South Horr 88:36°49′00″E 85:02°30′44″N 3262:Mauritius 2843:Mauritius 2524:. Nairobi 2495:. Nairobi 2470:30 August 2466:. Nairobi 2335:. Nairobi 2306:. Nairobi 2177:. Nairobi 2047:. Nairobi 1932:. Nairobi 1903:. Nairobi 1841:. Nairobi 1789:. Nairobi 1760:. Nairobi 1705:. Nairobi 1521:. Nairobi 1489:. Nairobi 1434:. Nairobi 1405:. Nairobi 1330:. EIB.org 1047:. Nairobi 818:livestock 788:Negative 224:wind farm 3453: / 3449: / 3442:(France) 3436: / 3414: / 3410: / 3362:Zimbabwe 3337:Tanzania 3187:Ethiopia 3182:Eswatini 3162:Djibouti 3127:Cameroon 3112:Botswana 3034: / 3030: / 3023:(France) 3017: / 2995: / 2991: / 2943:Zimbabwe 2918:Tanzania 2768:Ethiopia 2763:Eswatini 2743:Djibouti 2708:Cameroon 2693:Botswana 2555:21 March 2104:Archived 2076:. London 1803:cite web 1709:25 April 1107:cite web 889:See also 754:Rendille 683:(PPA)." 544:EKF Bank 520:PROPARCO 436:FinnFund 394:Laisamis 308:Rendille 283:Marsabit 261:Location 131:Owner(s) 58:Location 3438:RĂ©union 3434:Mayotte 3425:Madeira 3420:(Spain) 3416:Melilla 3347:Tunisia 3317:Somalia 3302:Senegal 3287:Nigeria 3277:Namibia 3267:Morocco 3232:Liberia 3227:Lesotho 3177:Eritrea 3147:Comoros 3122:Burundi 3097:Algeria 3019:RĂ©union 3015:Mayotte 3006:Madeira 3001:(Spain) 2997:Melilla 2928:Tunisia 2898:Somalia 2883:Senegal 2868:Nigeria 2858:Namibia 2848:Morocco 2813:Liberia 2808:Lesotho 2758:Eritrea 2728:Comoros 2703:Burundi 2678:Algeria 2528:24 June 1730:Norfund 1493:19 July 1459:Reuters 1409:2 March 1213:(Map). 875:Norfund 821:grazing 762:Turkana 758:Samburu 750:El Molo 505:Norfund 472:, with 426:Norfund 378:Mombasa 322:History 316:Turkana 312:Samburu 304:El Molo 240:Nairobi 222:) is a 193:Commons 177:Website 42:Country 3457:  3440:  3427:  3357:Zambia 3352:Uganda 3292:Rwanda 3247:Malawi 3207:Guinea 3102:Angola 3038:  3021:  3008:  2938:Zambia 2933:Uganda 2873:Rwanda 2828:Malawi 2788:Guinea 2683:Angola 2251:(AfDB) 1000:UNFCCC 823:area. 790:social 624:terms; 555:Donors 457:Danish 448:Google 444:Vestas 374:nested 370:Vestas 332:biogas 113:Status 3412:Ceuta 3332:Sudan 3282:Niger 3237:Libya 3222:Kenya 3202:Ghana 3192:Gabon 3167:Egypt 3107:Benin 2993:Ceuta 2913:Sudan 2863:Niger 2818:Libya 2803:Kenya 2783:Ghana 2773:Gabon 2748:Egypt 2688:Benin 2200:(PDF) 1573:(PDF) 1328:(PDF) 1268:(PDF) 1242:(PDF) 386:Suswa 269:, in 228:Kenya 204:[ 70:Kenya 49:Kenya 3342:Togo 3252:Mali 3142:Chad 2923:Togo 2833:Mali 2723:Chad 2583:2024 2557:2023 2530:2019 2501:2017 2472:2017 2443:2018 2413:2018 2390:2018 2367:2018 2341:2018 2312:2018 2280:2021 2257:2018 2230:2018 2183:2018 2154:2018 2131:2018 2082:2018 2053:2018 2021:2018 1987:2018 1961:2018 1938:2018 1909:2015 1880:2015 1871:via 1847:2015 1815:help 1795:2020 1766:2015 1737:2015 1711:2015 1682:2015 1653:2018 1630:2018 1607:2017 1581:2018 1553:2018 1527:2015 1495:2019 1466:2018 1440:2018 1411:2016 1382:2018 1359:2018 1336:2018 1299:2018 1276:2018 1250:2018 1224:2018 1197:2018 1174:2015 1142:2018 1119:help 1099:2019 1076:2019 1053:2018 792:and 622:OECD 476:and 245:The 220:LTWP 182:ltwp 627:A ' 620:on 596:A ' 480:of 247:KSh 226:in 186:.ke 184:.co 157:365 3477:: 2573:. 2547:. 2518:. 2489:. 2460:. 2434:: 2430:. 2349:^ 2329:. 2300:. 2288:^ 2221:. 2202:. 2171:. 2098:. 2070:. 2041:. 2029:^ 2009:. 1995:^ 1926:. 1897:. 1867:. 1855:^ 1835:. 1823:^ 1807:: 1805:}} 1801:{{ 1783:. 1754:. 1728:. 1699:. 1673:. 1661:^ 1597:. 1561:^ 1535:^ 1515:. 1503:^ 1483:. 1457:. 1428:. 1399:. 1307:^ 1150:^ 1111:: 1109:}} 1105:{{ 1041:. 1029:^ 760:, 756:, 752:, 314:, 310:, 306:, 289:. 68:, 64:, 3075:e 3068:t 3061:v 2656:e 2649:t 2642:v 2585:. 2559:. 2532:. 2503:. 2474:. 2445:. 2415:. 2392:. 2369:. 2343:. 2314:. 2282:. 2259:. 2232:. 2185:. 2156:. 2133:. 2084:. 2055:. 2023:. 1989:. 1963:. 1940:. 1911:. 1882:. 1849:. 1817:) 1797:. 1768:. 1739:. 1713:. 1684:. 1655:. 1632:. 1609:. 1583:. 1555:. 1529:. 1497:. 1468:. 1442:. 1413:. 1384:. 1361:. 1338:. 1301:. 1278:. 1252:. 1226:. 1199:. 1176:. 1144:. 1121:) 1101:. 1078:. 1055:. 609:; 218:( 208:]

Index


Kenya
Loyangalani
Marsabit County
Kenya
02°30′44″N 36°49′00″E / 2.51222°N 36.81667°E / 2.51222; 36.81667
Commission date
Nameplate capacity
ltwp.co.ke
Related media on Commons
edit on Wikidata
wind farm
Kenya
Loiyangalani
Marsabit County
Nairobi
KSh
Kenya Power
South Horr
Loyiangalani sub-county
Marsabit County
Eastern Province
Marsabit
Ngong Hills Wind Power Station
trust land
El Molo
Rendille
Samburu
Turkana
biogas

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑