Knowledge (XXG)

Lanjigarh–Junagarh section

Source 📝

28: 519: 453: 616: 582: 539: 494: 433: 413: 328: 296: 641: 303: 244: 609: 602: 559: 487: 480: 463: 390: 371: 348: 269: 724:
A new line survey for the easy connection of Titlagarh and Junagarh has been made by bypassing Lanjigarh Road. This is an extension of a C-shape curve from G. Ramchandrapur to Norla bypassing Lanjigarh. This will reduce the journey by 30 minutes, otherwise wasted due to the need to rotate the Engine
715:
on 11 August 2012. On the same day, the first train on this line Bhawanipatna–Bhubaneswar Link Express flagged off by Lok Sabha member and former railway minister Bhakta Charan Das. Bhawanipatna–Junagarh section completion became late due to the non-acquisition of 2.5 km forest land.
710:
The Lanjigarh–Junagarh line was completed in two sections. One up to Bhawanipatna which was completed in 2011. Another one from Bhawanipatna to Junagarh. An engine trial run was done on 5 June 2011 from Lanjigarh to Bhawanipatna. After a year of completion, the rail line opened up to
812: 281: 745: 807: 802: 313: 254: 674: 774: 712: 505: 466: 210: 95: 27: 627: 82: 699: 173: 156: 110: 728:
A new line survey for Bhawanipatna-Nabarangpur–Jeypore–Malkangiri–Bhadrachalam has been conducted.
749: 54: 796: 32:
A passenger train enters Bhawani Patna railway station on Lanjigarh–Junagarh section
166: 151: 775:"Er. Sumit Rout shared some information related to railway lines in Kalahandi" 695: 77: 205: 64: 725:
from front to back and back to front at Lanjigarh Road.
746:"Lanjigarh–Junagarh rail line opened upto Bhawanipatna" 716:
Bhawanipatna–Junagarh section opened on March 2, 2014.
182: 172: 150: 142: 134: 129: 121: 116: 106: 101: 91: 70: 60: 50: 42: 37: 20: 8: 769: 767: 218: 191: 737: 193: 17: 7: 462: 675:Bhubaneshwar-Junagarh link express 14: 813:5 ft 6 in gauge railways in India 777:. Kalahandia blog. 19 March 2013 639: 614: 607: 600: 580: 557: 537: 518: 517: 492: 485: 478: 461: 452: 451: 431: 411: 388: 369: 346: 326: 301: 294: 267: 242: 26: 615: 581: 538: 493: 432: 412: 327: 295: 1: 640: 302: 243: 608: 601: 558: 486: 479: 389: 370: 347: 268: 829: 808:Sambalpur railway division 692:Lanjigarh–Junagarh section 21:Lanjigarh–Junagarh section 648: 633: 626: 594: 589: 574: 569: 551: 546: 531: 526: 511: 504: 472: 460: 445: 440: 425: 420: 405: 400: 382: 378: 363: 358: 340: 335: 320: 310: 288: 279: 261: 251: 236: 232: 221: 190: 25: 803:Rail transport in Odisha 158:5 ft 6 in 700:East Coast Railway Zone 138:56 km (35 mi) 673:Source:Google Maps, 111:East Coast Railway 752:on 15 August 2012 688: 687: 684: 683: 680: 679: 668: 667: 820: 787: 786: 784: 782: 771: 762: 761: 759: 757: 748:. Archived from 742: 643: 642: 618: 617: 611: 610: 604: 603: 584: 583: 561: 560: 541: 540: 521: 520: 496: 495: 489: 488: 482: 481: 465: 464: 455: 454: 435: 434: 415: 414: 392: 391: 373: 372: 350: 349: 330: 329: 305: 304: 298: 297: 271: 270: 246: 245: 219: 206: 192: 164: 159: 143:Number of tracks 30: 18: 828: 827: 823: 822: 821: 819: 818: 817: 793: 792: 791: 790: 780: 778: 773: 772: 765: 755: 753: 744: 743: 739: 734: 722: 720:New line survey 708: 694:belongs to the 644: 624: 619: 612: 605: 590:Makarsola road 585: 567: 562: 542: 522: 502: 497: 490: 483: 456: 436: 416: 398: 393: 374: 359:Ramachandrapur 356: 351: 331: 306: 299: 277: 272: 247: 230: 213: 197: 183:Operating speed 174:Electrification 162: 157: 87: 55:Indian Railways 33: 12: 11: 5: 826: 824: 816: 815: 810: 805: 795: 794: 789: 788: 763: 736: 735: 733: 730: 721: 718: 707: 704: 686: 685: 682: 681: 678: 677: 670: 669: 666: 665: 663: 661: 659: 657: 655: 653: 650: 649: 647: 645: 638: 636: 634: 631: 630: 625: 622: 620: 613: 606: 599: 597: 595: 592: 591: 588: 586: 579: 577: 575: 572: 571: 568: 565: 563: 556: 554: 552: 549: 548: 545: 543: 536: 534: 532: 529: 528: 525: 523: 516: 514: 512: 509: 508: 503: 500: 498: 491: 484: 477: 475: 473: 470: 469: 459: 457: 450: 448: 446: 443: 442: 439: 437: 430: 428: 426: 423: 422: 419: 417: 410: 408: 406: 403: 402: 399: 396: 394: 387: 385: 383: 380: 379: 377: 375: 368: 366: 364: 361: 360: 357: 354: 352: 345: 343: 341: 338: 337: 334: 332: 325: 323: 321: 318: 317: 309: 307: 300: 293: 291: 289: 286: 285: 282:Lanjigarh Road 278: 275: 273: 266: 264: 262: 259: 258: 250: 248: 241: 239: 237: 234: 233: 231: 228: 226: 224: 222: 215: 214: 209: 199: 198: 195: 188: 187: 184: 180: 179: 176: 170: 169: 154: 148: 147: 144: 140: 139: 136: 132: 131: 127: 126: 123: 119: 118: 114: 113: 108: 104: 103: 99: 98: 93: 89: 88: 86: 85: 80: 74: 72: 68: 67: 62: 58: 57: 52: 48: 47: 44: 40: 39: 35: 34: 31: 23: 22: 13: 10: 9: 6: 4: 3: 2: 825: 814: 811: 809: 806: 804: 801: 800: 798: 776: 770: 768: 764: 751: 747: 741: 738: 731: 729: 726: 719: 717: 714: 705: 703: 701: 697: 693: 676: 672: 671: 664: 662: 660: 658: 656: 654: 652: 651: 646: 637: 635: 632: 629: 621: 598: 596: 593: 587: 578: 576: 573: 564: 555: 553: 550: 544: 535: 533: 530: 524: 515: 513: 510: 507: 499: 476: 474: 471: 468: 458: 449: 447: 444: 441:Ulikupa road 438: 429: 427: 424: 418: 409: 407: 404: 395: 386: 384: 381: 376: 367: 365: 362: 353: 344: 342: 339: 333: 324: 322: 319: 316: 315: 308: 292: 290: 287: 284: 283: 274: 265: 263: 260: 257: 256: 249: 240: 238: 235: 227: 225: 223: 220: 217: 216: 212: 208: 207: 204: 201: 200: 194: 189: 185: 181: 177: 175: 171: 168: 163:1,676 mm 160: 155: 153: 149: 145: 141: 137: 133: 128: 124: 120: 115: 112: 109: 105: 100: 97: 94: 90: 84: 81: 79: 76: 75: 73: 69: 66: 63: 59: 56: 53: 49: 45: 41: 36: 29: 24: 19: 16: 779:. Retrieved 754:. Retrieved 750:the original 740: 727: 723: 713:Bhawanipatna 709: 698:division of 691: 689: 547:Sagda river 506:Bhawanipatna 311: 280: 252: 202: 135:Track length 125:2 March 2014 96:Bhawanipatna 15: 570:Kurtukamar 167:broad gauge 152:Track gauge 107:Operator(s) 46:Operational 797:Categories 756:7 December 732:References 702:in India. 696:Sambalpur 314:Titlagarh 196:Route map 130:Technical 78:Lanjigarh 781:16 April 628:Junagarh 421:to SH-6 255:Rayagada 186:100 km/h 92:Stations 83:Junagarh 38:Overview 117:History 102:Service 71:Termini 706:Opened 527:SH-16 467:NH 201 401:Depur 336:SH-6A 211:Legend 203: 122:Opened 65:Odisha 61:Locale 43:Status 51:Owner 783:2017 758:2013 690:The 312:to 253:to 178:Yes 799:: 766:^ 623:54 566:41 501:30 397:17 355:15 229:km 165:) 785:. 760:. 276:0 161:( 146:1

Index


Indian Railways
Odisha
Lanjigarh
Junagarh
Bhawanipatna
East Coast Railway
Track gauge
5 ft 6 in
broad gauge
Electrification
Legend
Rayagada
Lanjigarh Road
Titlagarh
NH 201
Bhawanipatna
Junagarh
Bhubaneshwar-Junagarh link express
Sambalpur
East Coast Railway Zone
Bhawanipatna
"Lanjigarh–Junagarh rail line opened upto Bhawanipatna"
the original


"Er. Sumit Rout shared some information related to railway lines in Kalahandi"
Categories
Rail transport in Odisha
Sambalpur railway division

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.