of 459.5 million euros. In
February 2022, CIPESS financed the project for 370 million, of which 333 for the section between Di Vittorio and Carlo III and 37 for the purchase of 7 automatically guided trains. The following month, the financing of another 2 lots was added (Di Vittorio-Casoria Afragola and Casoria Afragola-Afragola Centro), bringing the total investments to 795 million.
248:
The new project is spread over 13 kilometers with 13 stations: Cavour, Foria, Carlo III, Ottocalli, Leonardo
Bianchi, Di Vittorio (falling within the municipality of Naples), Casavatore San Pietro, Casoria Casavatore, Casoria Centro, Casoria Afragola, Afragola Garibaldi, Afragola Centro and Afragola
256:
The investment is quantified at approximately 1.6 billion euros. Added to this is the project for a link road towards Arzano, approximately 3.15 km long, which departs from the route from the Di
Vittorio station with two further stations (Casavatore Arzano and Arzano Centro), with an estimated cost
222:
The first feasibility study, in 1991, envisaged a route in 12 stations: Piscinola-Secondigliano, Parco del Sole, Monte Rosa, Arzano, Casavatore, Principe di Napoli (Casoria), Vittorio
Emanuele, Casoria railway station, S. Antonio (Afragola), Afragola Town Hall, Afragola Salicelle, Porta Station.
265:
as the implementing body. In March 2023, in an interview, the municipal transport councilor of Naples, Edoardo
Cosenza, anticipated the decision to modify the route of the Cavour-Carlo III lot, eliminating the Cavour and Foria stations and providing the terminus in Piazza Principe Umberto, with
435:
537:
260:
In
December 2022, the memorandum of understanding was signed between the Municipality of Naples, the Campania Region and the Metropolitan City which gave the green light to the construction of the line, identifying the
215:
In 1985 the municipality of
Casoria stipulated an agreement with the Naples Metro spa for the design of a metropolitan line capable of reaching Naples through the interchange with the planned
636:
226:
Following the start of work for the Naples
Afragola station on the high-speed line, the project was completely revised to locate the terminus in the station under construction.
383:
241:
relaunched the project financing the creation of a new feasibility study through ACAMIR (Agenzia
Campana MobilitĂ , Infrastrutture e Reti), presented and adopted by the
512:
485:
629:
237:
to the blocking of a good part of the infrastructure works in progress and planned - put the project in quiescence until 2016, when the regional council of
917:
941:
622:
384:"IL PROGETTO / Linea 10 della metropolitana di Napoli: "Nuovo collegamento tra la stazione AV di Afragola e la rete metropolitana di Napoli""
229:
The
Municipality of Naples redesigned the route by inserting it into the "100 Stations Plan" adopted by the Municipality of Naples under the
460:
946:
565:
233:
council in 2003, with the name "Line 10". However, the consequences of the economic recession - which led during the regional council of
706:
910:
340:
250:
160:
164:
646:
701:
436:"Approvato lo studio di fattibilitĂ della Linea 10 della metropolitana che collegherĂ Napoli alla stazione AV di Afragola"
362:
357:
614:
601:
936:
903:
267:
848:
168:
542:
187:
railway. The line itself is designed to be automatically guided (driverless) and connect the municipalities of
409:
606:
538:"Linea 10 della metropolitana, intesa su primo bando dei lavori. De Luca: Napoli-Afragola, bruciamo le tappe"
829:
760:
696:
315:
262:
835:
798:
686:
681:
676:
311:
286:
282:
216:
176:
172:
513:"Metro senza conducente da Napoli ad Afragola: per la Linea 10 dal Governo Draghi 1,2 miliardi di euro"
792:
486:"La metro a piazza Carlo III e Posillipo, Tangenziale a Bagnoli: a Napoli nuovi lavori da 400 milioni"
788:
739:
724:
593:
230:
306:
824:
734:
887:
729:
238:
180:
875:
854:
784:
780:
755:
290:
234:
184:
803:
144:
17:
930:
74:
461:"Linea 10 metropolitana di Napoli, firmato l'accordo: «Treni tra Napoli e Afragola»"
883:
819:
668:
659:
352:
156:
96:
84:
842:
116:
490:
203:, as well as a branch called "Baffo di Arzano" to connect the municipality of
192:
270:. The preparatory works (geological investigations) began in March 2023.
242:
188:
47:
196:
651:
204:
200:
43:
51:
618:
891:
812:
773:
748:
717:
667:
658:
115:
107:
102:
92:
80:
70:
65:
57:
39:
34:
29:
566:"Trasporto pubblico a Napoli: ancora un'utopia"
911:
630:
8:
594:Official site of the Metropolitana di Naples
918:
904:
664:
637:
623:
615:
249:AV metro which will connect Naples to the
159:line being built designed to connect the
374:
266:interchange with Line 1 and Line 2 in
26:
7:
872:
870:
607:Railways and metro station of Naples
564:Iacovo, Rosario Dello (2023-03-14).
890:. You can help Knowledge (XXG) by
25:
602:Urbanrail.net Naples rail website
382:Corradini, Antonio (2019-06-14).
874:
645:
942:Proposed railway lines in Italy
155:is the name of the underground
165:Rome-Naples high-speed railway
1:
363:List of rapid transit systems
358:List of Naples metro stations
111:12.35 km (7.67 mi)
947:Italian rapid transit stubs
963:
869:
650:Urban public transport in
410:"Piano delle 100 stazioni"
849:Rete Ferroviaria Italiana
440:www.comune.afragola.na.it
434:Web, Staff (2020-07-21).
171:, with interchanges with
169:historic Centre of Naples
546:(in Italian). 2022-01-12
543:Corriere del Mezzogiorno
519:(in Italian). 2022-03-31
494:(in Italian). 2022-02-15
467:(in Italian). 2022-12-02
161:Naples Afragola station
86:Metropolitana di Napoli
799:Circumflegrea (Line 5)
341:Afragola Alta VelocitĂ
18:Line 10 (Naples metro)
836:MetroCampania NordEst
322:Casavatore-San Pietro
245:region in July 2020.
217:Secondigliano station
740:Montesanto Funicular
725:Mergellina Funicular
414:www.comune.napoli.it
408:Napoli, Comune di.
251:Afragola AV station
207:with two stations.
937:Naples Metro lines
334:Afragola Garibaldi
325:Casoria-Casavatore
310:(Interchange with
281:(Interchange with
899:
898:
864:
863:
774:Commuter railways
769:
768:
735:Central Funicular
319:
294:
279:Principe Umberto
150:
149:
16:(Redirected from
954:
920:
913:
906:
878:
871:
749:On-street routes
730:Chiaia Funicular
702:List of stations
665:
649:
639:
632:
625:
616:
611:
598:
581:
580:
578:
577:
561:
555:
554:
552:
551:
534:
528:
527:
525:
524:
509:
503:
502:
500:
499:
482:
476:
475:
473:
472:
465:www.ilmattino.it
457:
451:
450:
448:
447:
431:
425:
424:
422:
421:
405:
399:
398:
396:
395:
379:
331:Casoria-Afragola
309:
303:Leonardo Bianchi
280:
239:Vincenzo De Luca
141:
139:
138:
134:
131:
123:
27:
21:
962:
961:
957:
956:
955:
953:
952:
951:
927:
926:
925:
924:
867:
865:
860:
808:
804:Cumana (Line 4)
781:Circumvesuviana
765:
744:
713:
654:
643:
609:
596:
590:
585:
584:
575:
573:
563:
562:
558:
549:
547:
536:
535:
531:
522:
520:
511:
510:
506:
497:
495:
484:
483:
479:
470:
468:
459:
458:
454:
445:
443:
433:
432:
428:
419:
417:
407:
406:
402:
393:
391:
381:
380:
376:
371:
349:
337:Afragola Centro
291:Circumvesuviana
276:
235:Stefano Caldoro
213:
185:Circumvesuviana
143:
136:
132:
129:
127:
126:4 ft
125:
121:
23:
22:
15:
12:
11:
5:
960:
958:
950:
949:
944:
939:
929:
928:
923:
922:
915:
908:
900:
897:
896:
879:
862:
861:
859:
858:
851:
846:
839:
832:
827:
822:
816:
814:
810:
809:
807:
806:
801:
796:
777:
775:
771:
770:
767:
766:
764:
763:
758:
752:
750:
746:
745:
743:
742:
737:
732:
727:
721:
719:
715:
714:
712:
711:
710:
709:
699:
694:
689:
684:
679:
673:
671:
662:
656:
655:
644:
642:
641:
634:
627:
619:
613:
612:
604:
599:
589:
588:External links
586:
583:
582:
556:
529:
517:Napoli Fanpage
504:
477:
452:
426:
400:
373:
372:
370:
367:
366:
365:
360:
355:
348:
345:
344:
343:
338:
335:
332:
329:
328:Casoria Centro
326:
323:
320:
304:
301:
298:
295:
275:
272:
212:
209:
148:
147:
145:standard gauge
119:
113:
112:
109:
105:
104:
100:
99:
94:
90:
89:
82:
78:
77:
72:
68:
67:
63:
62:
59:
55:
54:
41:
37:
36:
32:
31:
24:
14:
13:
10:
9:
6:
4:
3:
2:
959:
948:
945:
943:
940:
938:
935:
934:
932:
921:
916:
914:
909:
907:
902:
901:
895:
893:
889:
886:article is a
885:
880:
877:
873:
868:
857:
856:
852:
850:
847:
845:
844:
840:
838:
837:
833:
831:
828:
826:
823:
821:
818:
817:
815:
811:
805:
802:
800:
797:
794:
790:
786:
782:
779:
778:
776:
772:
762:
759:
757:
754:
753:
751:
747:
741:
738:
736:
733:
731:
728:
726:
723:
722:
720:
716:
708:
705:
704:
703:
700:
698:
695:
693:
690:
688:
685:
683:
680:
678:
675:
674:
672:
670:
666:
663:
661:
657:
653:
648:
640:
635:
633:
628:
626:
621:
620:
617:
608:
605:
603:
600:
595:
592:
591:
587:
571:
567:
560:
557:
545:
544:
539:
533:
530:
518:
514:
508:
505:
493:
492:
487:
481:
478:
466:
462:
456:
453:
441:
437:
430:
427:
415:
411:
404:
401:
389:
385:
378:
375:
368:
364:
361:
359:
356:
354:
351:
350:
346:
342:
339:
336:
333:
330:
327:
324:
321:
317:
313:
308:
305:
302:
299:
296:
292:
288:
284:
278:
277:
273:
271:
269:
264:
258:
254:
252:
246:
244:
240:
236:
232:
227:
224:
220:
218:
210:
208:
206:
202:
198:
194:
190:
186:
182:
178:
174:
170:
166:
162:
158:
154:
146:
122:1,435 mm
120:
118:
114:
110:
106:
101:
98:
95:
91:
88:
87:
83:
79:
76:
75:Rapid transit
73:
69:
64:
60:
56:
53:
49:
45:
42:
38:
33:
28:
19:
892:expanding it
884:Naples Metro
881:
866:
853:
841:
834:
761:Trolleybuses
691:
669:Naples Metro
610:(in Italian)
597:(in Italian)
574:. Retrieved
572:(in Italian)
569:
559:
548:. Retrieved
541:
532:
521:. Retrieved
516:
507:
496:. Retrieved
489:
480:
469:. Retrieved
464:
455:
444:. Retrieved
442:(in Italian)
439:
429:
418:. Retrieved
416:(in Italian)
413:
403:
392:. Retrieved
390:(in Italian)
387:
377:
353:Naples Metro
259:
255:
247:
228:
225:
221:
214:
157:Naples Metro
152:
151:
85:
843:Metronapoli
570:Napoliclick
307:Di Vittorio
219:of Line 1.
117:Track gauge
108:Line length
93:Operator(s)
931:Categories
718:Funiculars
576:2023-11-26
550:2023-11-26
523:2023-11-26
498:2023-11-26
491:Fanpage.it
471:2023-11-26
446:2023-11-26
420:2023-11-26
394:2023-11-26
369:References
193:Casavatore
813:Companies
300:Ottocalli
297:Carlo III
268:Garibaldi
231:Jervolino
167:with the
103:Technical
347:See also
274:Stations
243:Campania
189:Afragola
183:and the
140: in
58:Stations
48:Campania
35:Overview
793:Line 12
697:Line 11
692:Line 10
316:Line 11
211:History
197:Casoria
181:Line 11
163:of the
153:Line 10
135:⁄
66:Service
30:Line 10
789:Line 9
785:Line 7
687:Line 6
682:Line 2
677:Line 1
652:Naples
388:SulSud
312:Line 1
287:Line 2
283:Line 1
205:Arzano
201:Naples
177:Line 2
173:Line 1
81:System
44:Naples
40:Locale
882:This
855:SEPSA
756:Trams
52:Italy
888:stub
314:and
289:and
199:and
71:Type
830:EAV
825:CTP
820:ANM
707:Art
660:ANM
263:EAV
97:ANM
933::
791:,
787:,
568:.
540:.
515:.
488:.
463:.
438:.
412:.
386:.
285:,
253:.
195:,
191:,
179:,
175:,
61:13
50:,
46:,
919:e
912:t
905:v
894:.
795:)
783:(
638:e
631:t
624:v
579:.
553:.
526:.
501:.
474:.
449:.
423:.
397:.
318:)
293:)
142:)
137:2
133:1
130:+
128:8
124:(
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.