Knowledge

Loharinag Pala Hydropower Project

Source đź“ť

688:
house and Penstock Package on 25-10-05 account, May 2006 account and Sept 2006, there was a schedule for 45 months. Bids were invited. For the electro-mechanical package April 2006 account, 09-06-06 and schedule Oct ’06, there was a schedule for 44 months. Bids were invited. For the hydro-mechanical package, Jan ’06, Account 31-05-06 Schedule Sep ’06, Schedule 40 months bids were invited. For construction of barrage and de-silting chamber 16-08-05, account 16-12-05. account June ’06 and anticipated 40 months, the evaluation was in progress.
77: 1469: 42: 1117: 1103: 631: 84: 738:
operating conditions. This table power supply is crucial for increased employment balanced growth in the area. The unit power cost from plants like the Loharinag–Pala HEP is less than the cost of private on site generation of electricity due to less-efficient technology and high fuel cost used of private off-grid generation.
721:, in the first week of March 2009 called off his second fast in a year against Himalayan dam projects, after the Indian government agreed to speed up its inquiry into how electricity could be generated without the flow of the Ganges being impeded. The free-running of the river is a crucial element of its sacred status. 687:
For construction of three units, there were audits of 18-01-05 account, 17-03-05 account and 29-07-05 account, 13 months were awarded. For the Head Race Tunnel Package, on 18-04-05 account, 15-09-05 account and June 2006 account, there were 38 months. Evaluation was in progress. For underground power
613:
was 19-01-2006, scheduled completion date was 18-09-2007. The formation required was 10 metres (33 ft). This road could not be completed due to geotechnical reason and alignment was require change but due to suspension of work forest land needed was not transferred. The formation width was 10 m.
612:
For construction of approach road to Helgu Adit (6,000 metres (20,000 ft) long) private, forest and Govt land was needed. The LOA No. LOA-53 was dated 07-04-05. Deposit Work, Agency was PWD, UA. The completion period was 20 months, date PWD awarded the work was 18-06-2005, date of start of work
616:
For construction of approach road to surge shaft, a 6,810 metres (22,340 ft) long Bhukki -Kujjan road was to be constructed. LOA No. was LOA-09 dated 29-03-2004. The Deposit Work Agency was BRO. Completion period was 24 Months, date of start of work was 01-07-2005 and scheduled completion date
579:
at Matli, private land needed was 11.383 hectares (28 acres) and government land needed was 1.835 ha. The revised proposal for Section IV was submitted in DM Office on 23-03-06. The Proposal was sent by DM, Uttarkashi to GoUA.now with discontinuation of the project by orders of India government the
604:
For construction of approach road to Dabrani Adit (750 metres (2,460 ft) long ) private, forest and government land was needed. The LOA No. was LOA-54 dated 07-04-05 and the Deposit Work Agency was PWD, UA. Completion period was 6 months. The Date PWD Awarded the Work was 18-06-2005, Date of
608:
For construction of approach road to Gunaga Adit (4,000 metres (13,000 ft) long )Private, Forest and Govt land was needed. The LOA No. was LOA-32 dated 20-12-04 and Deposit Work Agency was PWD, UA. The completion period was 10 months and date PWD awarded the work was 28-02-2005. The date of
737:
Addition of 2,353.37 GWh of electricity generation to the Northern region grid would be the main measurable benefit of the Project. The average unit cost of electricity generated by the plant would be about Rs2.00 (US$ 0.0455) per kWh. The project appears to be economically viable under normal
583:
For township land at Central Industrial Security Force (CISF) Colony at Kyark, private land needed was 9.979 hectares (25 acres) and government land needed was 1.436 hectares (4 acres). The proposal for Section IV was submitted in DM Office on 17-03-2006. The Proposal was sent to GoUA by DM,
767:
The loss of private agricultural and forest land has been or will be mitigated by the acquisition of private land at an above-market rate. The social impact of the projects will be mitigated by NTPC's resettlement and rehabilitation procedures, with fair compensation being paid by NTPC.
760:. Impacts on the rivers will be mitigated by the release of a 0.85–1.1 m3/s minimum environmentally acceptable dry season flow from the Loharinag–Pala dam, the release of monsoon season flushing flows, and yearly restocking of rivers above and below the barrage sites with 543:– 110003. The baseline methodology used for the project evaluation was ACM 0002: Consolidated methodology for grid-connected electricity generation from renewable sources – version 6; The latest version of the tool for demonstration and assessment of 571:
For Forest Clearance, The Certificate for "Non Availability of Non-Forest Land for afforestation" was obtained by UPCL from Chief Secretary (UA). Certificate was submitted to Nodal Officer on 01-05-2006. Proposal has been cleared by Nodal Officer.
538:
The Project Owner/Proponent was Mr. Piyush Pradhan, CDM Representative, Engineering Division, Project Engineering (Mech-CDM) (NTPC) Limited, NTPC Bhawan, Core-7; Scope Complex, 7-Institutional Area, Lodhi Road NTPC Bhawan, Scope Complex,
559:
state to issue award in line to land acquisition (LA) Act. The Village Development Advisory Committee (VDAC) meeting was held on 08-05-2006 at Uttarkashi. f Award by the Special Land Acquisition Officer (SLAO) had been declared.
595:
of 3,316 square kilometres (1,280 sq mi), of which 1,849 square kilometres (714 sq mi) (56%) is covered in snow or glacier. The source of the Bhagirathi is about 82 kilometres (51 mi) above the barrage.
771:
Also the owner of the project is not been fair on their contractual part as of not clearing the situation of uncertainty prevailing from so long duration to their contractors causing high stakes and risks at contractors end.
499:
project had been envisaged for installation of 4 generating Units of 150 MW utilizing a hydraulic head of 476.5 metres (1,563 ft) to have a maximum capacity of 600 MW. The facilities would include 4 vertical shaft
701:
Commissioning dates scheduled were: UNIT #1 February ’2011, UNIT #2 March ’2011, UNIT #3 April ’2011 and UNIT #4 - May ’2011. At present the schedule has slipped to end the project somewhere in second quarter of 2013
567:
Civil Soyam land (total 139.029 hectares (344 acres)), the draft CAT Plan was submitted by District Forest Officer, Uttarkashi on 20-02-2006. Approval of the Catchment Area Treatment (CAT) Plan by GoUA was done.
928: 1078:. India: NTPC Capacity Expansion Financing II (Tapovan–Vishnugad Hydroelectric Project and Loharinag–Pala Hydroelectric Project). Asian Development Bank. pp. 16–27. Archived from 1593: 1725: 591:
to 18 kilometres (11 mi) down stream at Thirang gad confluence with Bhagirathi river. The barrage site is next to NH 108 at Loharinag Temple. The Project has a mountainous
1862: 725:
Before his fast began in January, Agrawal said,: "The water ...(of the Ganges) is not ordinary water to a Hindu. It is a matter of the life and death of Hindu faith".
1867: 76: 1160: 955: 1776: 1311: 1887: 1806: 1720: 1586: 1029: 938: 1796: 1746: 1332: 132: 1882: 1831: 1816: 1756: 1423: 547:(the additionality tool). The expected date for commissioning of the project was in the year 2010. Duration of the project activity is 21 years. 1836: 1801: 1579: 1877: 1826: 1352: 1306: 1276: 1256: 1226: 1221: 1211: 1070: 718: 710:
Work on the Loharinag Pala Hydropower Project was stopped after one of India's eminent scientists came close to dying on the 38th day of his
378: 1821: 1786: 1781: 1413: 1408: 1271: 1231: 789: 487:. Together they are expected to provide 150,000 MW of electricity for areas in which power cuts are frequent and demand is growing fast. 453:
The main project construction contracts were awarded and construction started in 2006, however, work was stopped in 2009 after Professor
1377: 1357: 1296: 1286: 1216: 1771: 1766: 1699: 1669: 1505: 403: 306: 1811: 1791: 1316: 1251: 1241: 1236: 1153: 674: 473: 1761: 1751: 1246: 1201: 1196: 1337: 1694: 880: 742: 641: 995: 862: 1531: 1398: 1291: 1191: 1872: 1857: 1367: 1266: 1146: 431: 605:
Start of Work was 01-08-2005 and the scheduled completion date was 31-01-2006. The formation width required was 10 m .
1715: 1444: 1418: 1342: 1301: 1281: 850: 588: 963: 1393: 1372: 1347: 849:
Construction of the 600 MW Loharinag-Pala Hydropower Project on thel Bhagirathi River in Uttarakhand, India, 2008.
1069:(ADB) by NTPC Limited for the Asian Development Bank (August 2007). "III. LOHARINAG–PALA HYDROELECTRIC PROJECT". 556: 656: 555:
For 16.455 hectares (41 acres) of private land, The District Magistrate (DM), Uttarkashi was instructed by The
910: 881:"Himalayas hydroelectric dam project stopped after scientist on hunger strike against the project almost dies" 745:(EIS) prepared by the NTPC indicates the main adverse environmental impacts of the project will be changes in 1606: 1122: 652: 1454: 609:
start of Work was 16-07-2005, scheduled completion date was 16-05-2006, formation width Required was 10m.
501: 1629: 1003:. Government of India, Ministry of Statistics and Programme Implementation. p. 134. Archived from 505: 423: 337: 1730: 757: 617:
was 30-06-2007. Formation width was 10 m. Private land/forest land was acquired to start the work.
435: 103: 1571: 1079: 427: 17: 933: 815: 753: 476:
also played a pivotal role in stopping the project. The project was officially scrapped in 2010.
465: 349: 997:
PROJECT IMPLEMENTATION STATUS REPORT OF CENTRAL SECTOR PROJECTS Costing Rs.20 crore & above
799: 41: 1639: 1468: 1679: 1634: 1439: 761: 521: 496: 411: 399: 396: 216: 47: 714:
in protest of the harnessing of the river Bhagirathi, a source stream of the Ganges River.
587:
The project site starts from confluence of the Songad river on the Bhagirathi River in the
535:
equivalent is 5,268,027 t (Starting from 2010). Host Country Approval Status was Approved.
1644: 1261: 827: 1602: 592: 564: 529: 359: 321: 264: 584:
Uttarkashi but now not required as project has been discontinued by India government.
544: 1851: 1659: 1546: 1536: 525: 454: 331: 1684: 1624: 1500: 1495: 1169: 1108: 509: 419: 51: 888: 1664: 1610: 1556: 1116: 517: 513: 457:, one of India's eminent scientists, came close to dying on the 38th day of his 439: 107: 59: 1674: 1654: 1649: 1526: 1521: 1490: 1403: 1206: 1132: 1098: 415: 243: 116: 1004: 147: 134: 1689: 1551: 1102: 794: 749: 540: 484: 483:
planned or now being constructed by India, in the southern foothills of the
447: 512:
of 0.90, 3 phase, 250 rpm, and rated voltage of 11 to 18 kV. The generator
1541: 342: 55: 711: 458: 1138: 994:
Infrastructure and Project Monitoring Division (January–March 2008).
520:(OFAF) type with step-up voltage capacity of 400 kV. The estimate of 462: 659:. Statements consisting only of original research should be removed. 1449: 1362: 746: 504:. The generators would be of synchronous vertical shaft type. The 443: 111: 63: 1133:
Save the Ganga! (1/11)- Ganga Aahwaan Ganga Bachao Tripathagamini
729:
In August 2010, the Group of Ministers discontinued the project.
480: 407: 365: 206: 1575: 1142: 1072:
Summary Environmental Impact Assessment - Project Number: 41904
479:
The Loharinag-Pala project was one of several hundred dams and
624: 246:@ 13 m (43 ft) wide and 8.5 m (28 ft) high 201: 1030:"GoM decides to scrap NTPC hydel project on Bhagirathi river" 863:
Professor GD Agrawal's Fast unto death over Dam on Bhagirathi
446:. This is about 100 kilometres (62 mi) upstream of the 91:
Location of Loharinag Pala Hydropower Project in Uttarakhand
83: 410:(150 MW x 4 Units). The project is located on the river 648: 1726:
Indian states ranking by households having electricity
962:. Clean Development Mechanism Projects. Archived from 717:
Professor G. D. Agrawal (b. 1932), former dean of the
1739: 1708: 1617: 1514: 1483: 1476: 1432: 1386: 1325: 1184: 1177: 956:"Loharinag Pala Hydroelectric Project (4 x 150 MW)" 358: 348: 330: 320: 312: 302: 297: 289: 281: 273: 263: 255: 250: 238: 230: 222: 212: 200: 195: 187: 179: 171: 163: 126: 99: 34: 887:. Guardian News and Media Limited. Archived from 461:in protest of the blocking the headwaters of the 259:190,320 cubic metres (6,721,000 cu ft) 911:"NTPC suspends work at Loharinag-Pala project" 1587: 1154: 406:(NTPC) Ltd to have an output capacity of 600 8: 756:, loss of agricultural and forest land, and 379:III. LOHARINAG–PALA HYDROELECTRIC PROJECT 16 1863:Hydroelectric power stations in Uttarakhand 1721:States of India by installed power capacity 1594: 1580: 1572: 1480: 1181: 1161: 1147: 1139: 31: 1333:Indira Gandhi Super Thermal Power Project 675:Learn how and when to remove this message 790:"Work at Loharinag power project begins" 788:Staff Correspondent (20 February 2004). 874: 872: 870: 780: 386:Designer: Voith Hydro (E&M Package) 1868:Cancelled hydroelectric power stations 823: 813: 1353:Nabinagar Super Thermal Power Project 950: 948: 719:Indian Institute of Technology Kanpur 269:3,316 km (1,280 sq mi) 191:Rs 28,951 million (US$ 658 million). 7: 1032:. The Economic Times. 20 August 2010 929:"'Waterman' becomes Ganga's saviour" 580:land acquisition is not being done. 472:, headed by Magsaysay award-winner, 1378:Patratu Super Thermal Power Project 1358:Patratu Super Thermal Power Project 1888:2006 establishments in Uttarakhand 937:. 5 September 2010. Archived from 621:Construction of dam and powerhouse 404:National Thermal Power Corporation 402:generating project planned by the 307:National Thermal Power Corporation 25: 18:Loharinag Pala Hydro Power Project 508:would have capacity at a lagging 393:Loharinag Pala Hydropower Project 35:Loharinag Pala Hydropower Project 1467: 1115: 1101: 629: 120:18.7 km (11.6 mi) ExNE 82: 75: 50:river, the source stream of the 40: 1883:2010 disestablishments in India 1338:Nabinagar Thermal Power Project 885:reprint by International Rivers 326:475.67 metres (1,560.6 ft) 29:Dam in Uttarakhand state, India 752:, a decline in the quality of 743:Environmental impact statement 600:Construction of approach roads 426:, below the confluence of the 293:2,147.5 m (7,046 ft) 1: 282:Maximum water depth 1878:Dams on the Bhagirathi River 1368:Vallur Thermal Power Project 879:John Vidal (13 March 2009). 853:: Matu People's Organization 1716:Electricity sector in India 1343:Kanti Thermal Power Station 655:the claims made and adding 1904: 1373:Meja Thermal Power Station 234:115 m (377.3 ft) 1465: 557:Government of Uttarakhand 385: 372: 285:8.5 m (27.9 ft) 70: 39: 226:15 m (49.2 ft) 1123:Renewable energy portal 350:Installed capacity 277:3 ha (0.0 km) 172:Construction began 360:Annual generation 188:Construction cost 1700:Tapovan Vishnugad Dam 518:oil forced air forced 502:Pelton wheel turbines 290:Normal elevation 202:Type of dam 148:30.81833°N 78.61806°E 313:Commission date 1873:Uttarkashi district 1858:Dams in Uttarakhand 1731:Coalfields of India 1010:on 14 November 2009 917:. 21 February 2009. 436:Uttarkashi District 265:Catchment area 256:Total capacity 144: /  1670:Loharinag Pala Dam 960:CDM Projects India 934:The Times of India 826:has generic name ( 802:on 4 November 2004 754:aquatic ecosystems 640:possibly contains 470:Tarun Bharat Sangh 239:Spillway type 153:30.81833; 78.61806 1845: 1844: 1777:Jammu and Kashmir 1640:Dakpathar Barrage 1569: 1568: 1565: 1564: 1506:Tapovan Vishnugad 1463: 1462: 891:on 2 October 2011 685: 684: 677: 642:original research 390: 389: 316:October 2011 est. 274:Surface area 196:Dam and spillways 183:October 2011 est. 180:Opening date 121: 16:(Redirected from 1895: 1807:North-east India 1680:Pashulok Barrage 1635:Bhimgoda Barrage 1596: 1589: 1582: 1573: 1481: 1471: 1182: 1163: 1156: 1149: 1140: 1125: 1120: 1119: 1111: 1106: 1105: 1087: 1086: 1084: 1077: 1066: 1060: 1057: 1051: 1048: 1042: 1041: 1039: 1037: 1026: 1020: 1019: 1017: 1015: 1009: 1002: 991: 985: 982: 976: 975: 973: 971: 952: 943: 942: 925: 919: 918: 907: 901: 900: 898: 896: 876: 865: 860: 854: 847: 841: 838: 832: 831: 825: 821: 819: 811: 809: 807: 798:. Archived from 785: 762:common snowtrout 680: 673: 669: 666: 660: 657:inline citations 633: 632: 625: 589:Garhwal Himalaya 522:Greenhouse gases 497:Hydroelectricity 400:hydroelectricity 397:run-of-the-river 381: 217:Bhagirathi River 175:19 February 2004 159: 158: 156: 155: 154: 149: 145: 142: 141: 140: 137: 119: 86: 85: 79: 44: 32: 21: 1903: 1902: 1898: 1897: 1896: 1894: 1893: 1892: 1848: 1847: 1846: 1841: 1735: 1704: 1645:Dhauliganga Dam 1613: 1600: 1570: 1561: 1510: 1472: 1459: 1428: 1382: 1321: 1257:North Karanpura 1173: 1167: 1129: 1128: 1121: 1114: 1107: 1100: 1095: 1090: 1085:on 7 June 2011. 1082: 1075: 1068: 1067: 1063: 1058: 1054: 1049: 1045: 1035: 1033: 1028: 1027: 1023: 1013: 1011: 1007: 1000: 993: 992: 988: 983: 979: 969: 967: 966:on 13 July 2011 954: 953: 946: 941:on 1 July 2012. 927: 926: 922: 909: 908: 904: 894: 892: 878: 877: 868: 861: 857: 848: 844: 839: 835: 822: 812: 805: 803: 787: 786: 782: 778: 735: 708: 699: 694: 681: 670: 664: 661: 646: 634: 630: 623: 602: 553: 533: 516:would be 4 nos 493: 377: 376: 340: 338:Pelton Turbines 152: 150: 146: 143: 138: 135: 133: 131: 130: 114: 95: 94: 93: 92: 89: 88: 87: 66: 30: 23: 22: 15: 12: 11: 5: 1901: 1899: 1891: 1890: 1885: 1880: 1875: 1870: 1865: 1860: 1850: 1849: 1843: 1842: 1840: 1839: 1834: 1829: 1824: 1819: 1814: 1809: 1804: 1799: 1797:Madhya Pradesh 1794: 1789: 1784: 1779: 1774: 1769: 1764: 1759: 1754: 1749: 1747:Andhra Pradesh 1743: 1741: 1737: 1736: 1734: 1733: 1728: 1723: 1718: 1712: 1710: 1709:Related topics 1706: 1705: 1703: 1702: 1697: 1692: 1687: 1682: 1677: 1672: 1667: 1662: 1657: 1652: 1647: 1642: 1637: 1632: 1627: 1621: 1619: 1618:Power stations 1615: 1614: 1603:Power stations 1601: 1599: 1598: 1591: 1584: 1576: 1567: 1566: 1563: 1562: 1560: 1559: 1554: 1549: 1544: 1539: 1534: 1529: 1524: 1518: 1516: 1512: 1511: 1509: 1508: 1503: 1498: 1493: 1487: 1485: 1478: 1474: 1473: 1466: 1464: 1461: 1460: 1458: 1457: 1452: 1447: 1442: 1436: 1434: 1430: 1429: 1427: 1426: 1421: 1416: 1414:Jhanor-Gandhar 1411: 1406: 1401: 1396: 1390: 1388: 1384: 1383: 1381: 1380: 1375: 1370: 1365: 1360: 1355: 1350: 1345: 1340: 1335: 1329: 1327: 1323: 1322: 1320: 1319: 1314: 1309: 1304: 1299: 1297:Talcher Kaniha 1294: 1289: 1284: 1279: 1274: 1269: 1264: 1259: 1254: 1249: 1244: 1239: 1234: 1229: 1224: 1219: 1214: 1209: 1204: 1199: 1194: 1188: 1186: 1179: 1175: 1174: 1172:power stations 1168: 1166: 1165: 1158: 1151: 1143: 1137: 1136: 1127: 1126: 1112: 1097: 1096: 1094: 1093:External links 1091: 1089: 1088: 1061: 1052: 1043: 1021: 986: 977: 944: 920: 902: 866: 855: 842: 833: 779: 777: 774: 734: 731: 727: 726: 707: 704: 698: 695: 693: 690: 683: 682: 637: 635: 628: 622: 619: 601: 598: 593:catchment area 565:reserve forest 552: 549: 531: 492: 489: 474:Rajendra Singh 424:Loharinag Pala 388: 387: 383: 382: 370: 369: 366:Gigawatt hours 362: 356: 355: 352: 346: 345: 334: 328: 327: 324: 322:Hydraulic head 318: 317: 314: 310: 309: 304: 300: 299: 295: 294: 291: 287: 286: 283: 279: 278: 275: 271: 270: 267: 261: 260: 257: 253: 252: 248: 247: 240: 236: 235: 232: 228: 227: 224: 220: 219: 214: 210: 209: 204: 198: 197: 193: 192: 189: 185: 184: 181: 177: 176: 173: 169: 168: 165: 161: 160: 128: 124: 123: 101: 97: 96: 90: 81: 80: 74: 73: 72: 71: 68: 67: 45: 37: 36: 28: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1900: 1889: 1886: 1884: 1881: 1879: 1876: 1874: 1871: 1869: 1866: 1864: 1861: 1859: 1856: 1855: 1853: 1838: 1835: 1833: 1832:Uttar Pradesh 1830: 1828: 1825: 1823: 1820: 1818: 1815: 1813: 1810: 1808: 1805: 1803: 1800: 1798: 1795: 1793: 1790: 1788: 1785: 1783: 1780: 1778: 1775: 1773: 1770: 1768: 1765: 1763: 1760: 1758: 1755: 1753: 1750: 1748: 1745: 1744: 1742: 1738: 1732: 1729: 1727: 1724: 1722: 1719: 1717: 1714: 1713: 1711: 1707: 1701: 1698: 1696: 1693: 1691: 1688: 1686: 1683: 1681: 1678: 1676: 1673: 1671: 1668: 1666: 1663: 1661: 1660:Koteshwar Dam 1658: 1656: 1653: 1651: 1648: 1646: 1643: 1641: 1638: 1636: 1633: 1631: 1628: 1626: 1623: 1622: 1620: 1616: 1612: 1608: 1607:organisations 1604: 1597: 1592: 1590: 1585: 1583: 1578: 1577: 1574: 1558: 1555: 1553: 1550: 1548: 1545: 1543: 1540: 1538: 1535: 1533: 1530: 1528: 1525: 1523: 1520: 1519: 1517: 1513: 1507: 1504: 1502: 1499: 1497: 1494: 1492: 1489: 1488: 1486: 1482: 1479: 1475: 1470: 1456: 1453: 1451: 1448: 1446: 1443: 1441: 1438: 1437: 1435: 1431: 1425: 1422: 1420: 1417: 1415: 1412: 1410: 1407: 1405: 1402: 1400: 1397: 1395: 1392: 1391: 1389: 1385: 1379: 1376: 1374: 1371: 1369: 1366: 1364: 1361: 1359: 1356: 1354: 1351: 1349: 1346: 1344: 1341: 1339: 1336: 1334: 1331: 1330: 1328: 1324: 1318: 1315: 1313: 1310: 1308: 1305: 1303: 1300: 1298: 1295: 1293: 1290: 1288: 1285: 1283: 1280: 1278: 1275: 1273: 1270: 1268: 1265: 1263: 1260: 1258: 1255: 1253: 1250: 1248: 1245: 1243: 1240: 1238: 1235: 1233: 1230: 1228: 1225: 1223: 1220: 1218: 1215: 1213: 1210: 1208: 1205: 1203: 1200: 1198: 1195: 1193: 1190: 1189: 1187: 1183: 1180: 1176: 1171: 1164: 1159: 1157: 1152: 1150: 1145: 1144: 1141: 1134: 1131: 1130: 1124: 1118: 1113: 1110: 1104: 1099: 1092: 1081: 1074: 1073: 1065: 1062: 1056: 1053: 1047: 1044: 1031: 1025: 1022: 1006: 999: 998: 990: 987: 981: 978: 965: 961: 957: 951: 949: 945: 940: 936: 935: 930: 924: 921: 916: 915:Business Line 912: 906: 903: 890: 886: 882: 875: 873: 871: 867: 864: 859: 856: 852: 846: 843: 837: 834: 829: 817: 801: 797: 796: 791: 784: 781: 775: 773: 769: 765: 763: 759: 755: 751: 748: 744: 739: 732: 730: 724: 723: 722: 720: 715: 713: 705: 703: 696: 692:Commissioning 691: 689: 679: 676: 668: 658: 654: 650: 644: 643: 638:This section 636: 627: 626: 620: 618: 614: 610: 606: 599: 597: 594: 590: 585: 581: 578: 577:township Land 573: 569: 566: 561: 558: 550: 548: 546: 545:additionality 542: 536: 534: 527: 523: 519: 515: 511: 507: 503: 498: 490: 488: 486: 482: 477: 475: 471: 467: 464: 460: 456: 455:G. D. Agrawal 451: 449: 445: 441: 437: 433: 429: 425: 421: 417: 413: 409: 405: 401: 398: 394: 384: 380: 375: 371: 367: 363: 361: 357: 353: 351: 347: 344: 339: 335: 333: 329: 325: 323: 319: 315: 311: 308: 305: 301: 298:Power Station 296: 292: 288: 284: 280: 276: 272: 268: 266: 262: 258: 254: 249: 245: 241: 237: 233: 229: 225: 221: 218: 215: 211: 208: 205: 203: 199: 194: 190: 186: 182: 178: 174: 170: 166: 162: 157: 129: 125: 118: 113: 109: 105: 104:Uttarkashi Dt 102: 98: 78: 69: 65: 61: 57: 53: 49: 43: 38: 33: 27: 19: 1757:Chhattisgarh 1740:Other states 1695:Srinagar Dam 1685:Ramganga Dam 1625:Asan Barrage 1496:Lata Tapovan 1109:Water portal 1080:the original 1071: 1064: 1055: 1046: 1034:. Retrieved 1024: 1012:. Retrieved 1005:the original 996: 989: 980: 968:. Retrieved 964:the original 959: 939:the original 932: 923: 914: 905: 893:. Retrieved 889:the original 884: 858: 845: 836: 804:. Retrieved 800:the original 793: 783: 770: 766: 758:resettlement 740: 736: 728: 716: 709: 700: 697:Old schedule 686: 671: 662: 639: 615: 611: 607: 603: 586: 582: 576: 574: 570: 562: 554: 551:Project land 537: 510:power factor 494: 478: 469: 466:River Ganges 452: 428:Songad River 420:Ganges River 392: 391: 373: 167:Discontinued 52:Ganges River 26: 1837:West Bengal 1802:Maharashtra 1665:Lakhwar Dam 1611:Uttarakhand 1317:Vindhyachal 1059:(ADB) p. 28 1050:(ADB) p. 24 1036:23 November 984:(ADB) p. 17 840:(ADB) p. 16 824:|last= 665:August 2015 514:transformer 491:Description 440:Uttarakhand 303:Operator(s) 151: / 127:Coordinates 108:Uttarakhand 60:Uttarakhand 1852:Categories 1827:Tamil Nadu 1675:Maneri Dam 1655:Kishau Dam 1650:Ichari Dam 1424:Kayamkulam 1326:Coal (JVs) 1262:Ramagundam 1202:Bongaigaon 1185:Coal (own) 1135:Video 4:55 776:References 649:improve it 528:in tonnes 506:generators 430:, next to 416:headstream 412:Bhagirathi 117:Uttarkashi 48:Bhagirathi 1822:Rajasthan 1787:Karnataka 1782:Jharkhand 1690:Tehri Dam 1630:Bhali Dam 1547:Ranganadi 1537:Koteshwar 1433:Gas (JVs) 1409:Faridabad 1387:Gas (own) 1307:Telangana 1277:Singrauli 1227:Kahalgaon 1222:Gadarwara 1212:Darlipali 816:cite news 795:The Hindu 750:hydrology 653:verifying 541:New Delhi 526:abatement 485:Himalayas 448:Tehri Dam 364:2,353.37 251:Reservoir 139:78°37′5″E 136:30°49′6″N 1440:Agartala 1312:Unchahar 1272:Simhadri 1232:Khargone 481:barrages 368:per year 332:Turbines 213:Impounds 100:Location 56:Gangotri 1772:Haryana 1767:Gujarat 1557:Tuirial 1455:Tripura 1399:Auraiya 1292:Talcher 1287:Solapur 1217:Farakka 1192:Barauni 1178:Thermal 1014:5 March 970:1 March 895:1 March 806:6 March 647:Please 442:state, 418:of the 374:Website 110:state, 1817:Punjab 1812:Odisha 1792:Kerala 1532:Kopili 1527:Kameng 1522:Doyang 1501:Rammam 1491:Koldam 1267:Rihand 733:Impact 706:Update 524:(GHG) 463:sacred 414:, the 354:600 MW 341:@ 150 231:Length 223:Height 164:Status 115:(near 1762:Delhi 1752:Bihar 1552:Tehri 1477:Hydel 1450:RGPPL 1445:Assam 1419:Kawas 1404:Dadri 1363:NSPCL 1302:Tanda 1282:Sipat 1252:Mauda 1242:Kudgi 1237:Korba 1207:Dadri 1083:(PDF) 1076:(PDF) 1008:(PDF) 1001:(PDF) 851:Photo 747:river 444:India 432:NH 34 395:is a 336:four 244:gates 112:India 64:India 54:, in 1605:and 1542:Pare 1394:Anta 1348:Meja 1247:Lara 1197:Barh 1170:NTPC 1038:2011 1016:2010 972:2010 897:2010 828:help 808:2010 741:The 712:fast 575:For 563:For 495:The 459:fast 207:Weir 46:The 1609:in 1515:JVs 1484:Own 651:by 438:of 434:in 422:at 1854:: 958:. 947:^ 931:. 913:. 883:. 869:^ 820:: 818:}} 814:{{ 792:. 764:. 530:CO 468:. 450:. 408:MW 343:MW 242:4 106:, 62:, 58:, 1595:e 1588:t 1581:v 1162:e 1155:t 1148:v 1040:. 1018:. 974:. 899:. 830:) 810:. 678:) 672:( 667:) 663:( 645:. 532:2 122:) 20:)

Index

Loharinag Pala Hydro Power Project

Bhagirathi
Ganges River
Gangotri
Uttarakhand
India
Loharinag Pala Hydropower Project is located in Uttarakhand
Uttarkashi Dt
Uttarakhand
India
Uttarkashi
30°49′6″N 78°37′5″E / 30.81833°N 78.61806°E / 30.81833; 78.61806
Type of dam
Weir
Bhagirathi River
gates
Catchment area
National Thermal Power Corporation
Hydraulic head
Turbines
Pelton Turbines
MW
Installed capacity
Annual generation
Gigawatt hours
III. LOHARINAG–PALA HYDROELECTRIC PROJECT 16
run-of-the-river
hydroelectricity
National Thermal Power Corporation

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑