49:
102:
The bridge had a central span (46.80 meter long) with external platforms and an upper parabolic chord supported by tubular cells, and eight additional spans of 11.25 m each supported on metallic girders. These height access spans were demolished with the channelling of the river in the 60s, remaining
111:
In March 2001, the bridge was closed to traffic for structural reasons. Murcia City
Council decided its restoration trying to preserve as much as possible the original structure. This led to its transformation into a pedestrian-only bridge because the original bridge was not designed for the traffic
123:. After a series of preliminary studies which confirmed the validity of the proposed restoration, works began on 26 July 2002. The bridge reopened to the public on 13 May 2003.
91:
It was designed in 1894 by the civil engineer José María Ortiz and was built by the company
Materiales para Ferrocarriles y Construcciones of
179:
216:
197:, Murcia: Consejería de Educación y Cultura. Dirección General de Cultura. Servicio de Patrimonio Histórico, D.L.: MU-1.732-2004
18:
211:
191:
Memorias de patrimonio 1998–2002. Intervenciones en el patrimonio histórico de la Región De Murcia. Inmuebles. Nº 6
169:
80:
52:
The New Bridge over the River Segura seen from downstream. In the background the tower of the
Cathedral.
189:
175:
113:
188:
Manterola Armisén, Javier; Fernández
Revenga, Javier; Muñoz-Rojas Fernández, Javier (2004),
120:
72:
96:
205:
174:, Murcia: Colegio de Ingenieros de Caminos, Canales y Puentes. Demarcación Murcia,
64:
48:
75:, Spain). As the second bridge built in the city across the river, was called
33:
20:
92:
63:(Spanish for Iron Bridge) is a parabolic metallic bridge spanning the
68:
47:
168:
Gimeno Díaz de Atauri, Jorge; Gutiérrez Andrés, Juan (2001),
83:), even though today it is the second oldest of the city.
112:
loads required by the current
Spanish bridge standards
119:
The restoration project was conducted in June 2001 by
79:
to distinguish it from the old bridge (Puente Viejo o
67:, completed in 1903 and located in the city of
8:
103:in place only the central parabolic span.
171:El Puente de la Pólvora y otros puentes
132:
138:
136:
7:
150:
148:
99:finishing work on 21 February 1903.
14:
107:Traffic closure and restoration
1:
142:Gimeno and Gutierrez. pag.122
95:with a budget of 592,982.95
59:(Spanish for New Bridge) or
217:Pedestrian bridges in Spain
233:
154:Manterola et al. p.256
81:Puente de los Peligros
53:
51:
34:37.9813°N 1.12682°W
30: /
54:
212:Bridges in Murcia
181:978-84-607-3209-9
39:37.9813; -1.12682
224:
198:
196:
184:
155:
152:
143:
140:
121:Javier Manterola
73:Region of Murcia
61:Puente de Hierro
45:
44:
42:
41:
40:
35:
31:
28:
27:
26:
23:
232:
231:
227:
226:
225:
223:
222:
221:
202:
201:
194:
187:
182:
167:
164:
159:
158:
153:
146:
141:
134:
129:
109:
89:
57:El Puento Nuevo
38:
36:
32:
29:
24:
21:
19:
17:
16:
12:
11:
5:
230:
228:
220:
219:
214:
204:
203:
200:
199:
185:
180:
163:
160:
157:
156:
144:
131:
130:
128:
125:
108:
105:
88:
85:
13:
10:
9:
6:
4:
3:
2:
229:
218:
215:
213:
210:
209:
207:
193:
192:
186:
183:
177:
173:
172:
166:
165:
161:
151:
149:
145:
139:
137:
133:
126:
124:
122:
117:
115:
106:
104:
100:
98:
94:
86:
84:
82:
78:
74:
70:
66:
62:
58:
50:
46:
43:
190:
170:
162:Bibliography
118:
110:
101:
90:
87:Construction
76:
65:Segura River
60:
56:
55:
15:
37: /
206:Categories
127:References
77:New Bridge
22:37°58′53″N
93:Barcelona
25:1°07′37″W
114:(IAP-98)
97:pesetas
178:
69:Murcia
195:(PDF)
176:ISBN
208::
147:^
135:^
116:.
71:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.