New England Wind

Source 📝

199:
Avangrid has divided the project into two sections for bidding in the joint Connecticut–Rhode Island–Massachusetts offshore wind procurement, one with 791 MW (formerly Park City Wind) and one with 1,080 MW (formerly Commonwealth Wind). The project was awarded a contract with Massachsetts for 791 MW
423: 503: 593: 588: 330: 64: 521: 259: 406: 193:
In October 2023, Avangrid canceled its contract with Connecticut due to higher development costs. It intends to rebid the project for a higher price.
369: 436: 583: 536: 578: 304: 455: 479: 210: 388: 149: 183: 350: 504:"Avangrid Submits Multiple Proposals for Transformative New England Wind Projects to Regional Offshore Wind Solicitation" 172: 325: 562: 320: 176: 200:
in September 2024. This section is expected to begin construction in 2025 with commercial operation by 2030.
160: 141: 47: 351:"Park City Wind Offshore Wind Farm - Consent Application Submitted - United States | 4C Offshore" 251: 137: 219: 164: 145: 133: 522:"Massachusetts and Rhode Island Announce Largest Offshore Wind Selection in New England History" 168: 171:. Electric transmission cables from the project would make an underground landfall at 572: 196:
BOEM issued approval of the project's construction and operations plan in July 2024.
52: 480:"BOEM issues key approvals for New Jersey, Massachusetts offshore wind projects" 370:"Bridgeport Property To Serve As Staging Ground For Wind Turbine Construction" 17: 274: 261: 79: 66: 111: 186:(DEIS) and a construction and operations plan (COP) had been submitted to 300: 224: 153: 27:
Proposed offshore wind farm off the coast of Massachusetts, United States
437:"Avangrid delays commissioning of Park City, Commonwealth wind projects" 456:"Avangrid Cancels Park City Wind Contract, Pays State $ 16m Penalty" 407:"Park City Wind Will Transform Bridgeport into Offshore Wind Hub" 557: 187: 537:"New England Wind Offshore Wind Project Reaches New Milestone" 389:"Millions in federal aid to boost offshore wind in Bridgeport" 136:
to be located about 23 miles (37 km) off the coast of
159:
The project takes its original name from the nickname of
100: 95: 58: 41: 32: 331:List of offshore wind farms in the United States 190:. It was projected to be commissioned in 2027. 167:is being developed to support the project at 8: 202: 29: 594:Offshore wind farms in the United States 589:Proposed wind farms in the United States 342: 435:Petrova, Veselina (October 28, 2022). 7: 387:Lockhart, Brian (November 6, 2022). 535:Memija, Adnan (December 20, 2022). 305:Copenhagen Infrastructure Partners 247:Offshore Massachusetts OCS-A 0501 25: 454:Crowley, Brendan (2023-10-03). 368:Dunavin, Davis (May 19, 2021). 150:East Coast of the United States 184:environmental impact statement 1: 101:Distance from shore 584:Wind power in Massachusetts 326:Wind power in Massachusetts 610: 250:23 miles off the coast of 579:Wind power in Connecticut 321:Wind power in Connecticut 208: 177:Barnstable, Massachusetts 108: 37: 563:New England Wind 1 and 2 213:wind energy lease area 161:Bridgeport, Connecticut 142:Outer Continental Shelf 48:Outer Continental Shelf 275:40.86111°N 70.71111°W 230:Projected completion 104:23 miles (37 km) 80:40.86111°N 70.71111°W 45:OCS-A 0501 Lease Area 524:. September 6, 2024. 280:40.86111; -70.71111 271: /  182:As of 2022 a draft 85:40.86111; -70.71111 76: /  355:www.4coffshore.com 239:Regulatory agency 236:Developer/Utility 165:offshore wind port 156:is the developer. 146:territorial waters 134:offshore wind farm 124:, formerly called 510:. March 27, 2024. 312: 311: 252:Martha's Vineyard 244:New England Wind 169:Bridgeport Harbor 138:Martha's Vineyard 130:Commonwealth Wind 119: 118: 16:(Redirected from 601: 545: 544: 541:OffshoreWIND.biz 532: 526: 525: 518: 512: 511: 500: 494: 493: 491: 490: 476: 470: 469: 467: 466: 451: 445: 444: 432: 426: 424:Federal Register 421: 415: 414: 403: 397: 396: 393:Connecticut Post 384: 378: 377: 365: 359: 358: 347: 286: 285: 283: 282: 281: 276: 272: 269: 268: 267: 264: 216:Receiving state 203: 173:Craigville Beach 132:, is a proposed 122:New England Wind 112:edit on Wikidata 91: 90: 88: 87: 86: 81: 77: 74: 73: 72: 69: 33:New England Wind 30: 21: 609: 608: 604: 603: 602: 600: 599: 598: 569: 568: 554: 549: 548: 534: 533: 529: 520: 519: 515: 502: 501: 497: 488: 486: 478: 477: 473: 464: 462: 453: 452: 448: 434: 433: 429: 422: 418: 405: 404: 400: 386: 385: 381: 367: 366: 362: 349: 348: 344: 339: 317: 303: 279: 277: 273: 270: 265: 262: 260: 258: 257: 222: 115: 96:Wind farm 84: 82: 78: 75: 70: 67: 65: 63: 62: 50: 46: 28: 23: 22: 15: 12: 11: 5: 607: 605: 597: 596: 591: 586: 581: 571: 570: 567: 566: 560: 558:Park City Wind 553: 552:External links 550: 547: 546: 527: 513: 495: 471: 446: 441:Renewables Now 427: 416: 398: 379: 360: 341: 340: 338: 335: 334: 333: 328: 323: 316: 313: 310: 309: 307: 298: 295: 292: 289: 287: 255: 248: 245: 241: 240: 237: 234: 231: 228: 217: 214: 207: 126:Park City Wind 117: 116: 109: 106: 105: 102: 98: 97: 93: 92: 60: 56: 55: 43: 39: 38: 35: 34: 26: 24: 18:Park City Wind 14: 13: 10: 9: 6: 4: 3: 2: 606: 595: 592: 590: 587: 585: 582: 580: 577: 576: 574: 564: 561: 559: 556: 555: 551: 542: 538: 531: 528: 523: 517: 514: 509: 505: 499: 496: 485: 481: 475: 472: 461: 457: 450: 447: 442: 438: 431: 428: 425: 420: 417: 412: 411:Vineyard Wind 408: 402: 399: 394: 390: 383: 380: 375: 371: 364: 361: 356: 352: 346: 343: 336: 332: 329: 327: 324: 322: 319: 318: 314: 308: 306: 302: 299: 296: 293: 290: 288: 284: 256: 253: 249: 246: 243: 242: 238: 235: 232: 229: 226: 221: 218: 215: 212: 205: 204: 201: 197: 194: 191: 189: 185: 180: 178: 174: 170: 166: 162: 157: 155: 151: 147: 143: 139: 135: 131: 127: 123: 113: 107: 103: 99: 94: 89: 61: 57: 54: 53:Massachusetts 49: 44: 40: 36: 31: 19: 540: 530: 516: 507: 498: 487:. Retrieved 484:Utility Dive 483: 474: 463:. Retrieved 459: 449: 440: 430: 419: 410: 401: 392: 382: 373: 363: 354: 345: 198: 195: 192: 181: 158: 129: 125: 121: 120: 460:CT Examiner 278: / 83: / 59:Coordinates 573:Categories 489:2024-07-03 465:2024-01-23 337:References 297:Up to 129 266:70°42′40″W 263:40°51′40″N 206:Wind farm 163:, where a 71:70°42′40″W 68:40°51′40″N 233:Turbines 209:Offshore 51:Offshore 508:Avangrid 315:See also 301:Avangrid 220:Capacity 154:Avangrid 144:in U.S. 140:(MA) on 42:Location 148:of the 565:– BOEM 291:1,871 294:2030 254:(MA) 110:[ 374:WSHU 211:BOEM 188:BOEM 128:and 179:. 175:in 575:: 539:. 506:. 482:. 458:. 439:. 409:. 391:. 372:. 353:. 227:) 225:MW 152:. 543:. 492:. 468:. 443:. 413:. 395:. 376:. 357:. 223:( 114:] 20:)

Index

Park City Wind
Outer Continental Shelf
Massachusetts
40°51′40″N 70°42′40″W / 40.86111°N 70.71111°W / 40.86111; -70.71111
edit on Wikidata
offshore wind farm
Martha's Vineyard
Outer Continental Shelf
territorial waters
East Coast of the United States
Avangrid
Bridgeport, Connecticut
offshore wind port
Bridgeport Harbor
Craigville Beach
Barnstable, Massachusetts
environmental impact statement
BOEM
BOEM
Capacity
MW
Martha's Vineyard
40°51′40″N 70°42′40″W / 40.86111°N 70.71111°W / 40.86111; -70.71111
Avangrid
Copenhagen Infrastructure Partners
Wind power in Connecticut
Wind power in Massachusetts
List of offshore wind farms in the United States
"Park City Wind Offshore Wind Farm - Consent Application Submitted - United States | 4C Offshore"
"Bridgeport Property To Serve As Staging Ground For Wind Turbine Construction"