Knowledge (XXG)

Pfungstadt Railway

Source đź“ť

467: 475: 406: 528:, which begins in Darmstadt. Every second train of the Odenwald Railway that arrives at Darmstadt Hauptbahhnof, continues to Pfungstadt. However, these have to stay in Darmstadt for about 20 minutes before continuing. There are intermediate services that only shuttle between Darmstadt and Pfungstadt. The two lines are shown separately in the timetable: while the Odenwald Railway service is operated as 562: 398: 313: 261: 29: 288: 236: 212: 457:
abandoned passenger services on 30 April 1955, but freight traffic (mainly wood and sugar beet) continued to 31 May 1997. At the end of the decline of the sugar beet traffic in the early 1990s, this was little traffic. The last timetable number for the passenger service before traffic ended was 315d.
503:
and difficulties with a level crossing in Pfungstadt. The same level crossing, which is located just before the end of the line, was restored and not—as appeared likely in the meantime—replaced by an underpass or made unnecessary by shortening the line. The costs for reactivating the line were borne
584:. The original station building has been demolished. A new, simply-equipped station with a 140-metre-long platform was built on the foundations of the historic station for the reactivation. Access for local traffic is provided by a terminal loop and a 417:
fabric) and Justus Hildebrand (who owned the Pfungstadt brewery) had advocated for the construction of the line since the mid-19th century. Various alternative routes were considered, as well as a possible extension on a curve to
447:(secondary railway) on 20 December 1886 and Pfungstadt was incorporated as a municipality at the same time. The line proved to be an economic success for both the railway company and the industrial area. It was 765: 504:
by the Federal Government and the state of Hesse. The total cost was valued at €7 million, of which €4.2 million was spent on the laying out of the 1.8 km-long track, which was organised by
668: 529: 466: 856: 799:
Liebig, Valentin (1985). "Die Nebenbahn vom Viadukt Eberstadt nach Pfungstadt" [The branch line from Eberstadt viaduct to Pfungstadt]. In Georg Wittenberger (ed.).
474: 724: 649: 538:
An order for four more diesel multiple units for the Odenwald Railway, placed by the Rhein-Main-Verkehrsverbund in November 2007, provided an additional
409:
The former siding to the brewery in 2011 from about the same camera location as in 1914. The track had been removed on the right-hand side of the road.
588:
parking area. Of the total costs of €2.8 million, the state of Hesse assumed €170,000 and the rest was shared by the town and the federal government.
451:'s shortest timetable route. The siding to the site of the ultramarine fabric factory, which was built with the railway, was dismantled in the 1930s. 773: 846: 676: 532:
line 65 (RB 65), the Pfungstadt Railway service has been given the number 66. The line is listed as route 650.1 in the Deutsche Bahn timetable.
851: 547:
The Pro Bahn association criticised the thin service on the weekend and the early last service in the evening as being a "half-hearted offer".
841: 618: 423: 512:(Rhine-Main transport association, RMV) and Dadina. The line was commissioned at the 2011/2012 timetable change on 11 December 2011. 836: 823:(Die Geschichte des Bahnhofs Pfungstadt von der Planung über die Eröffnung 1886 bis zur Wiederinbetriebnahme 2011 , 264 pages) 499:. Initially scheduled for competition in December 2007, the reactivation was delayed due to necessary signalling changes at 422:, which was rejected for cost reasons. The project was discussed for 22 years from 1864. The line was finally built by the 573: 419: 193: 146: 378: 247: 509: 525: 496: 500: 478:
The track of the Pfungstadt Railway, which branches off from Darmstadt-Eberstadt station to Pfungstadt
807:] (in German). Darmstadt: Förderkreis Museen und Denkmalpflege Darmstadt-Dieburg. pp. 36–39. 698: 577: 427: 454: 448: 374: 273: 221: 495:
for short) decided that it would put the disused line back into service and integrate it into the
643: 569: 556: 324: 725:"Deutsche Bahn timetable: 650.1 Darmstadt Hbf - Darmstadt-Eberstadt - Pfungstadt Pfungstadtbahn" 535:
The journey to Pfungstadt takes 12 minutes with stops in Darmstadt SĂĽd and Darmstadt-Eberstadt.
405: 614: 540: 33: 581: 821:] (in German). Pfungstadt: self-published in cooperation with Stadtarchiv Pfungstadt. 401:
Exit of a T3 locomotive from the grounds of the brewery. Taken by Ernst BĂĽchner, ca. 1914
508:. The annual operating cost, which is estimated to amount to €900,000, is shared by the 438:(condominium railway) that was owned by several states and had its own administration. 138: 830: 585: 164: 561: 434:). The Main-Neckar Railway was not chosen to build it because it was then still a 414: 397: 110: 382: 443: 28: 809:(part 2 of a series of publications of the district of Darmstadt-Dieburg) 572:
was opened at the same time as the railway. This was taken by Grand Duke
505: 188: 560: 473: 465: 404: 396: 386: 68: 521: 381:
and runs to a station on the eastern edge of the inner town of
413:
The Pfungstadt industrialists Wilhelm BĂĽchner (who made
636:
Abschied von der Schiene - GĂĽterstrecken 1980 bis 1993
373:) is a single-track branch line that branches off the 613:(10 ed.). Schweers + Wall. 2017. p. 154. 163: 155: 145: 109: 101: 93: 88: 80: 75: 64: 56: 46: 41: 21: 819:125 years of the Eberstadt-Pfungstadt branch line 611:Eisenbahnatlas Deutschland (German railway atlas) 491:(Darmstadt-Dieburg local transport organisation, 36:set of VIAS near the exit from Pfungstadt station 857:Buildings and structures in Darmstadt-Dieburg 675:(in German). 29 November 2011. Archived from 520:The route is operated by the railway company 8: 489:Darmstadt-Dieburger Nahverkehrsorganisation 432:GroĂźherzoglich Hessischen Staatseisenbahnen 663: 661: 659: 648:: CS1 maint: location missing publisher ( 201: 174: 815:125 Jahre Nebenbahn Eberstadt-Pfungstadt 602: 176: 641: 18: 699:"Pfungstadt hat wieder Bahnanschluss" 580:as an opportunity to give Pfungstadt 544:set for the extension to Pfungstadt. 7: 766:"In zwölf Minuten zum Hauptbahnhof" 638:(in German). Stuttgart. p. 83. 565:Pfungstadt station in December 2011 764:Bach, Thomas (16 September 2011). 222:Main-Neckar Railway from Darmstadt 14: 669:"Endspurt fĂĽr die Pfungstadtbahn" 634:Kramer, U.; Brodkorb, M. (2008). 311: 286: 259: 234: 210: 27: 274:Main-Neckar Railway to Bensheim 847:1886 establishments in Germany 1: 852:Railway stations in Darmstadt 751:Eisenbahn-Revue International 705:(in German). 12 December 2011 351:Source: German railway atlas 312: 260: 842:Railway lines opened in 1886 801:Die Bahn und ihre Geschichte 151:>190 m (620 ft) 805:The railway and its history 772:(in German). Archived from 753:(in German) (5): 212. 2010. 703:Eisenbahnjournal Zughalt.de 470:Darmstadt-Eberstadt station 287: 235: 211: 159:100 km/h (62 mph) 873: 730:(in German). Deutsche Bahn 554: 510:Rhein-Main-Verkehrsverbund 813:Kohlmann, Werner (2011). 441:The line was opened as a 323: 305: 298: 280: 271: 253: 246: 228: 219: 204: 173: 97:1.7 km (1.1 mi) 50: 26: 16:Railway line in Germany 837:Railway lines in Hesse 566: 524:, the operator of the 501:Darmstadt Hauptbahnhof 479: 471: 410: 402: 564: 477: 469: 408: 400: 749:"Vier neue Itinos". 428:Grand Duchy of Hesse 455:Deutsche Bundesbahn 449:Deutsche Reichsbahn 379:Darmstadt-Eberstadt 375:Main-Neckar Railway 248:Darmstadt-Eberstadt 679:on 1 December 2011 570:Pfungstadt station 567: 557:Pfungstadt station 551:Pfungstadt station 480: 472: 411: 403: 367:Pfungstadt Railway 300:Eberstädter StraĂźe 22:Pfungstadt Railway 620:978-3-89494-146-8 516:Operating program 363: 362: 359: 358: 355: 354: 346: 345: 864: 822: 808: 786: 785: 783: 781: 776:on 14 April 2015 761: 755: 754: 746: 740: 739: 737: 735: 729: 721: 715: 714: 712: 710: 695: 689: 688: 686: 684: 673:Darmstädter Echo 665: 654: 653: 647: 639: 631: 625: 624: 607: 526:Odenwald Railway 497:Odenwald Railway 315: 314: 290: 289: 263: 262: 238: 237: 214: 213: 202: 189: 175: 141: 135: 133: 132: 128: 125: 117: 102:Number of tracks 52: 34:Bombardier Itino 31: 19: 872: 871: 867: 866: 865: 863: 862: 861: 827: 826: 812: 798: 795: 790: 789: 779: 777: 763: 762: 758: 748: 747: 743: 733: 731: 727: 723: 722: 718: 708: 706: 697: 696: 692: 682: 680: 667: 666: 657: 640: 633: 632: 628: 621: 609: 608: 604: 599: 594: 582:town privileges 578:Hesse-Darmstadt 559: 553: 518: 485: 464: 462:Recommissioning 395: 321: 316: 301: 296: 291: 276: 269: 264: 244: 239: 224: 215: 196: 180: 165:Maximum incline 156:Operating speed 137: 130: 126: 123: 121: 120:4 ft  119: 115: 37: 17: 12: 11: 5: 870: 868: 860: 859: 854: 849: 844: 839: 829: 828: 825: 824: 810: 794: 791: 788: 787: 756: 741: 716: 690: 655: 626: 619: 601: 600: 598: 595: 593: 590: 555:Main article: 552: 549: 517: 514: 484: 481: 463: 460: 436:Kondominalbahn 424:State Railways 394: 391: 371:Pfungstadtbahn 361: 360: 357: 356: 353: 352: 348: 347: 344: 343: 341: 339: 337: 335: 333: 331: 328: 327: 322: 319: 317: 310: 308: 306: 303: 302: 299: 297: 294: 292: 285: 283: 281: 278: 277: 272: 270: 267: 265: 258: 256: 254: 251: 250: 245: 242: 240: 233: 231: 229: 226: 225: 220: 218: 216: 209: 207: 205: 198: 197: 192: 182: 181: 178: 171: 170: 167: 161: 160: 157: 153: 152: 149: 147:Minimum radius 143: 142: 139:standard gauge 113: 107: 106: 103: 99: 98: 95: 91: 90: 86: 85: 82: 78: 77: 73: 72: 66: 62: 61: 58: 54: 53: 51:Pfungstadtbahn 48: 44: 43: 39: 38: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 869: 858: 855: 853: 850: 848: 845: 843: 840: 838: 835: 834: 832: 820: 816: 811: 806: 802: 797: 796: 792: 775: 771: 767: 760: 757: 752: 745: 742: 726: 720: 717: 704: 700: 694: 691: 678: 674: 670: 664: 662: 660: 656: 651: 645: 637: 630: 627: 622: 616: 612: 606: 603: 596: 591: 589: 587: 586:park and ride 583: 579: 575: 571: 563: 558: 550: 548: 545: 543: 542: 536: 533: 531: 527: 523: 515: 513: 511: 507: 502: 498: 494: 490: 482: 476: 468: 461: 459: 456: 452: 450: 446: 445: 439: 437: 433: 429: 425: 421: 416: 407: 399: 392: 390: 388: 384: 380: 376: 372: 368: 350: 349: 342: 340: 338: 336: 334: 332: 330: 329: 326: 318: 309: 307: 304: 293: 284: 282: 279: 275: 266: 257: 255: 252: 249: 241: 232: 230: 227: 223: 217: 208: 206: 203: 200: 199: 195: 191: 190: 187: 184: 183: 177: 172: 168: 166: 162: 158: 154: 150: 148: 144: 140: 116:1,435 mm 114: 112: 108: 104: 100: 96: 92: 87: 83: 79: 74: 70: 67: 63: 59: 55: 49: 45: 40: 35: 30: 25: 20: 818: 814: 804: 800: 778:. Retrieved 774:the original 769: 759: 750: 744: 732:. Retrieved 719: 707:. Retrieved 702: 693: 681:. Retrieved 677:the original 672: 635: 629: 610: 605: 568: 546: 539: 537: 534: 519: 492: 488: 486: 483:Construction 453: 444:Secundärbahn 442: 440: 435: 431: 412: 370: 366: 364: 185: 81:Route number 415:ultramarine 389:, Germany. 111:Track gauge 94:Line length 57:Line number 47:Native name 831:Categories 592:References 420:Bickenbach 383:Pfungstadt 325:Pfungstadt 644:cite book 597:Footnotes 179:Route map 89:Technical 71:, Germany 780:14 April 734:14 April 709:14 April 683:14 April 574:Louis IV 134: in 42:Overview 793:Sources 506:DB Netz 426:of the 393:History 129:⁄ 76:Service 617:  493:Dadina 194:Legend 186: 65:Locale 817:[ 803:[ 728:(PDF) 541:Itino 387:Hesse 385:, in 69:Hesse 60:650.1 782:2018 770:Echo 736:2018 711:2018 685:2018 650:link 615:ISBN 522:VIAS 487:The 365:The 169:1.5% 84:3543 576:of 530:RMV 377:in 320:1.8 295:1.6 268:0.1 243:0.0 833:: 768:. 701:. 671:. 658:^ 646:}} 642:{{ 136:) 784:. 738:. 713:. 687:. 652:) 623:. 430:( 369:( 131:2 127:1 124:+ 122:8 118:( 105:1

Index


Bombardier Itino
Hesse
Track gauge
standard gauge
Minimum radius
Maximum incline
Legend
Main-Neckar Railway from Darmstadt
Darmstadt-Eberstadt
Main-Neckar Railway to Bensheim
Pfungstadt
Main-Neckar Railway
Darmstadt-Eberstadt
Pfungstadt
Hesse


ultramarine
Bickenbach
State Railways
Grand Duchy of Hesse
Secundärbahn
Deutsche Reichsbahn
Deutsche Bundesbahn


Odenwald Railway
Darmstadt Hauptbahnhof
DB Netz

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑